Power Reactor Status Report for November 10, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 10/13/2024 Refueling Outage
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 82
Reduced Power for Maintenance
*
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 90 Reduced Power Limit due to Fuel Defect
*
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 10/6/2024 Refueling Outage
Seabrook 1 11 Holding Power for EHC Repairs; Contingency down power 1175 MW net
*
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100

North Anna 2 100
Oconee 1 0 10/22/2024 Refueling Outage
*
Oconee 2 100
Oconee 3 100
Robinson 2 0 11/5/2024
Refueling Outage
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 7/31/2024 Refueling Outage
Summer 100
Surry 1 100
Surry 2 0 10/27/2024 Refueling Outage.
Turkey Point 3 0 10/13/2024 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0 10/13/2024 Refueling Outage
*
Vogtle 4 100
Watts Bar 1 0 11/2/2024 Refueling Outage
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 0 10/28/2024 Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 9/21/2024 Refueling Outage
Prairie Island 2 1 Starting up *
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100


Comanche Peak 2 0 10/21/2024 Refueling Outage
Cooper 68
Reduced Power for Rod Pattern Adjustment
Diablo Canyon 1 100

Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 10/5/2024 Maintenance Outage
*
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 15 Holding Power for Warming Turbine
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, December 9, 2024