The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 08, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action, Geomagnetic Disturbance Alert
*
Beaver Valley 2 100 High System Voltage Action, Geomagnetic Disturbance Alert
*
Calvert Cliffs 1 100 Geomagnetic Disturbance Alert *
Calvert Cliffs 2 100 Geomagnetic Disturbance Alert *
FitzPatrick 100
Ginna 0 9/30/2024 Refueling Outage
Hope Creek 1 100
Limerick 1 100 High System Voltage Action
*
Limerick 2 100 High System Voltage Action
*
Millstone 2 0 10/4/2024 Refueling Outage
*
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 87 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
*
Salem 2 0 10/6/2024 Refueling Outage
Seabrook 1 0 10/5/2024 Refueling Outage
Susquehanna 1 100 High System Voltage Action
*
Susquehanna 2 100 High System Voltage Action
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 10/5/2024
Maintenance Outage
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 10/1/2024 Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 8/31/2024 Refueling Outage
Sequoyah 1 0 9/30/2024 Forced Outage, EN57351
Sequoyah 2 0 7/31/2024 Refueling Outage
Summer 0 9/21/2024 Refueling Outage
Surry 1 100
Surry 2 100
Turkey Point 3 100

Turkey Point 4 100
Vogtle 1 100
*
Vogtle 2 100
Vogtle 3 100
Vogtle 4 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100 Geomagnetic Disturbance Alert
*
Braidwood 2 0 10/7/2024 Refueling Outage; Geomagnetic Disturbance Alert
*
Byron 1 95 Holding Power for Fuel Conditioning
*
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 High System Voltage Action, Geomagnetic Disturbance Alert *
Dresden 2 100 Geomagnetic Disturbance Alert *
Dresden 3 100 Geomagnetic Disturbance Alert
*
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100 Geomagnetic Disturbance Alert
*
Perry 1 100
Point Beach 1 100
Point Beach 2 86 Coastdown To Refueling Outage
Prairie Island 1 0 9/21/2024 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/28/2024 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100


Comanche Peak 2 100
Cooper 0 9/29/2024 Refueling Outage
Diablo Canyon 1 100

*
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 10/5/2024

Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 10/5/2024
Refueling Outage
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.