The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 02, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 9/30/2024 Refueling Outage
Hope Creek 1 100

Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 89 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 94 Coastdown To Refueling Outage
*
Seabrook 1 99 Coastdown To Refueling Outage; Contingency downpower to 1000 MW
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 85 Holding Power
*
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 10/1/2024 Refueling Outage
*
Catawba 2 34 Reduced Power For Maintenance
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 9/27/2024 Forced Outage, EN57343
*
Hatch 2 100
McGuire 1 100 Conservative Operations *
McGuire 2 100 Conservative Operations *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 8/31/2024 Refueling Outage
Sequoyah 1 0 9/30/2024 Forced Outage, EN57351
Sequoyah 2 0 7/31/2024 Refueling Outage
Summer 0 9/21/2024 Refueling Outage
*
Surry 1 100
Surry 2 100
Turkey Point 3 100

Turkey Point 4 100
Vogtle 1 0 9/8/2024 Refueling Outage
Vogtle 2 100
Vogtle 3 91 Increasing Power
*
Vogtle 4 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 95 Coastdown To Refueling Outage
*
Byron 1 41 Holding Power for Chemistry
*
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 28 Coastdown To Refueling Outage,
Reduced Power For Maintenance
*
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 88 Coastdown To Refueling Outage
*
Prairie Island 1 0 9/21/2024 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/28/2024 Refueling Outage
*
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100


Comanche Peak 2 100
Cooper 0 9/29/2024 Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.