Power Reactor Status Report for September 28, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 93 Coastdown To Refueling Outage
Hope Creek 1 100

Limerick 1 83 Reduced Power For Rod Pattern Adjustment
*
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 25 Increasing Power
*
Peach Bottom 2 91 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 96
Coastdown To Refueling Outage
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 32 Increasing Power
*
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 33 Coastdown To Refueling Outage, EN57344
*
Catawba 2 0 9/28/2024 EN57344
* 1
Farley 1 100 Conservative ops for weather
Farley 2 100 Conservative ops for weather
Harris 1 100
Hatch 1 0 9/27/2024 EN 57343 *
Hatch 2 42 Increasing Power
*
McGuire 1 100 Conservative ops for weather *
McGuire 2 100 Conservative ops for weather *
North Anna 1 100
North Anna 2 100
Oconee 1 100 Conservative ops for weather
*
Oconee 2 100 Conservative ops for weather *
Oconee 3 100 Conservative ops for weather *
Robinson 2 100 Conservative ops for weather *
Saint Lucie 1 100
Saint Lucie 2 0 8/31/2024 Refueling Outage
Sequoyah 1 100
Sequoyah 2 0 7/31/2024 Refueling Outage
Summer 0 9/21/2024 Refueling Outage
Surry 1 100
Surry 2 100
Turkey Point 3 100

Turkey Point 4 100
Vogtle 1 0 9/8/2024 Refueling Outage
Vogtle 2 100 Conservative ops for weather
Vogtle 3 25 Holding Power for Grid Operations
*
Vogtle 4 83 Reduced Power for Grid Operations
*
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 98 Coastdown To Refueling Outage
*
Byron 1 0 9/9/2024 Refueling Outage
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 99 Reduced Power For Maintenance
*
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 85 Reduced Power For Rod Pattern Adjustment
*
Point Beach 1 100
Point Beach 2 91 Coastdown To Refueling Outage
*
Prairie Island 1 0 9/21/2024 Refueling Outage
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 32 Reduced Power For Maintenance
*

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/28/2024
*
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100


Comanche Peak 2 100
Cooper 87 Coastdown To Refueling Outage
Diablo Canyon 1 49
Reduced Power For Maintenance
*
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 93 Transformer Limitation.
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, October 28, 2024