The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 25, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 4/13/2024 Refueling Outage
*
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0 4/4/2024 Refueling Outage
Limerick 1 0 4/8/2024 Refueling Outage
Limerick 2 100
Millstone 2 100
Millstone 3 100

Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 Limited to Less Than 1100MW
Susquehanna 1 16 Startup in progress *
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 4/24/2024 See EN 57090

* 1
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100

Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 0 4/8/2024 Refueling Outage
Farley 2 100
Harris 1 0 4/10/2024 Refueling Outage
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 98 Coastdown To Refueling Outage
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 0 3/23/2024 Refueling Outage
Sequoyah 2 100
Summer 100

Surry 1 0 4/7/2024 Refueling Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 90

Increasing Power
*
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 4/15/2024 Refueling Outage
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 0 3/22/2024 Refueling Outage
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 0 3/23/2024 Refueling Outage
LaSalle 1 100
LaSalle 2 100
Monticello 80 Reduced Power for Economic Dispatch
*
Perry 1 100
Point Beach 1 98 Reduced Power For Maintenance
*
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 79 Reduced Power for Economic Dispatch
*
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 98 Coastdown To Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 4/7/2024
Refueling Outage
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 0 4/6/2024 Refueling Outage
*
River Bend Station 1 100

South Texas 1 100
South Texas 2 0 3/23/2024 Refueling Outage
Waterford 3 0 3/21/2024 EN 57042
Forced Outage
Wolf Creek 1 0 3/28/2024 Refueling Outage.

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.