Power Reactor Status Report for March 15, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100

FitzPatrick 100
Ginna 100
Hope Creek 1 90 Coastdown To Refueling Outage
*
Limerick 1 94 Coastdown To Refueling Outage
*
Limerick 2 100
Millstone 2 100
Millstone 3 100

Nine Mile Point 1 100

Nine Mile Point 2 0 3/3/2024 Refueling Outage
Peach Bottom 2 100
Peach Bottom 3 100

Salem 1 100
Salem 2 100
Seabrook 1 100 One Down Power Contingency to 1100 Mwe
Susquehanna 1 92 Coastdown To Refueling Outage
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2/17/2024 Refueling Outage
Brunswick 1 65 Holding Power
*
Brunswick 2 100
Catawba 1 100
Catawba 2 95 Coastdown To Refueling Outage
Farley 1 100
Farley 2 100
Harris 1 98 Coastdown To Refueling Outage
*
Hatch 1 0 3/11/2024 Forced Outage, See EN57021
Hatch 2 100

McGuire 1 100
McGuire 2 100
North Anna 1 0 3/3/2024 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 3/9/2024
Refueling Outage
Saint Lucie 2 100
Sequoyah 1 90 Coastdown To Refueling Outage
*
Sequoyah 2 100
Summer 100

Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100

Vogtle 3 100
Vogtle 4 35 Holding power for testing
*
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 98 Coastdown To Refueling Outage
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 100% Electrical Capability
*
D.C. Cook 1 100

D.C. Cook 2 100

Davis-Besse 0 3/3/2024 Refueling Outage
*
Dresden 2 100
Dresden 3 36 Reduced Power For Drywell Entry
*
Fermi 2 100

LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100

Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100

Prairie Island 2 48 Holding power for chemistry
*
Quad Cities 1 100
Quad Cities 2 90 Coastdown To Refueling Outage

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100

Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 2 Reactor Plant Startup
*
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 3/2/2024 Refueling Outage
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.