Power Reactor Status Report for December 22, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100

Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 90 Reduced Power For Troubleshooting
Limerick 1 100
Limerick 2 100
Millstone 2 100

Millstone 3 100
*
Nine Mile Point 1 100

Nine Mile Point 2 98 Moisture Separator Reheater Issue
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100

Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 95
Coastdown To Refueling Outage

*
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 0 12/19/2023
Reactor Coolant Pump Seal Return Line Replacement
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 70 Reduced Power due to Condenser Tube Leak
Vogtle 3 100
Vogtle 4 0 Heating up with RCPs
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100

Byron 1 100

Byron 2 100
Clinton 99 100% Electrical Capability
*
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100

Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100

Monticello 100 *
Perry 1 100
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 0 10/20/2023
See EN 56803
Prairie Island 2 0 10/7/2023
Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100

Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100

Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100

Diablo Canyon 2 100
Grand Gulf 1 0 12/16/2023 See EN 56894
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 0 10/14/2023
Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Friday, January 19, 2024