The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 17, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 2
*
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100

Millstone 3 0 10/20/2023
Refueling Outage
Nine Mile Point 1 100

Nine Mile Point 2 98
Reduced Power For Moisture Separator Reheater Efficiency
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
*
Salem 2 100
Seabrook 1 100
Susquehanna 1 4 Holding power
Continued Investigation into Condenser Vacuum Leak
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 48 Increasing Power
*
Harris 1 100
Hatch 1 99 Core flow limited
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 10/28/2023
Refueling Outage
Oconee 3 100
Robinson 2 100

Saint Lucie 1 100
*
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 95 Heater Drain Pump Trip
Vogtle 3 100
Vogtle 4 0
Prestartup testing on hold for RCP replacement
Watts Bar 1 100
Watts Bar 2 0 11/4/2023
Refueling Outage

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100

Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 65 Increasing Power
*
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 40 Increasing Power
*
Dresden 3 100
Fermi 2 100 .
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 0 10/20/2023
EN 56803
Prairie Island 2 0 10/7/2023
Refueling Outage
Quad Cities 1 100
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 .
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100 .
Diablo Canyon 1 70 Increasing Power
*
Diablo Canyon 2 48 Reduced Power For Maintenance
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 21 Holding power
Recirculation pump trip

South Texas 1 100
South Texas 2 100
Waterford 3 0 10/14/2023
Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.