The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 14, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
*
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100

Millstone 3 0 10/20/2023
Refueling Outage
*
Nine Mile Point 1 100

Nine Mile Point 2 98
Reduced Power For Moisture Separator Reheater Efficiency
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 72 Increasing Power per Power Ascension Plan;
Hold Point for Testing
*
Salem 2 100
Seabrook 1 100
Susquehanna 1 0
Continued Investigation into Condenser Vacuum Leak
*
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
*
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 1
Increasing Power per Power Ascension Plan
*
Harris 1 100
Hatch 1 99 Core flow limited
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 10/28/2023
Refueling Outage
Oconee 3 100
Robinson 2 100

Saint Lucie 1 92 Reduced Power For Maintenance
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 57
Increasing Power per Power Ascension Plan
*
Vogtle 1 100
Vogtle 2 95 Heater Drain Pump Trip
Vogtle 3 100
Vogtle 4 0
Prestartup testing on hold for RCP replacement
Watts Bar 1 100
Watts Bar 2 0 11/4/2023
Refueling Outage

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100

Byron 1 100

Byron 2 100
Clinton 99 100% Electrical Capability
*
D.C. Cook 1 2 Plant startup in progress
*
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 10/30/2023
Refueling Outage
Dresden 3 100
Fermi 2 100 .
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 0 10/20/2023
EN 56803
Prairie Island 2 0 10/7/2023
Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 .
Columbia Generating Station 100
Comanche Peak 1 46
Holding power for flux mapping
*
Comanche Peak 2 100
Cooper 100 .
Diablo Canyon 1 14
Preparing to synch to grid
*
Diablo Canyon 2 46 Holding power for tunnel cleaning


*
Grand Gulf 1 100
Palo Verde 1 61
Increasing Power
*
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 14 Preparing to synch to grid
*
South Texas 1 100
South Texas 2 100
Waterford 3 0 10/14/2023
Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, December 12, 2023