Power Reactor Status Report for November 12, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100

Millstone 3 0 10/20/2023
Refueling Outage
Nine Mile Point 1 100

Nine Mile Point 2 98
Reduced Power For Moisture Separator Reheater Efficiency
Peach Bottom 2 100 *
Peach Bottom 3 100
Salem 1 17 *
Salem 2 100
Seabrook 1 100
Susquehanna 1 0 11/10/2023 EN 56846 *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100 *
Brunswick 1 89 Increasing Power
*
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 10/9/2023
Refueling Outage
Harris 1 100
Hatch 1 99 Core flow limited
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 0 10/28/2023
Refueling Outage
Oconee 3 100
Robinson 2 100

Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 2 Increasing Power
*
Vogtle 1 100
Vogtle 2 95 Heater Drain Pump Trip
Vogtle 3 100
Vogtle 4 0
Prestartup testing on hold for RCP replacement
Watts Bar 1 100
Watts Bar 2 0 11/4/2023 Refueling Outage
*

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100

Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 0 10/14/2023 Refueling Outage
*
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 10/30/2023
Refueling Outage
*
Dresden 3 100
Fermi 2 100 .
*
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100

Prairie Island 1 0 10/20/2023
EN 56803
Prairie Island 2 0 10/7/2023
Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 .
Columbia Generating Station 100
Comanche Peak 1 0 10/16/2023
Refueling Outage
Comanche Peak 2 100
Cooper 100 .
Diablo Canyon 1 0 10/1/2023
Refueling Outage
*
Diablo Canyon 2 46 Holding power for tunnel cleaning


*
Grand Gulf 1 100
Palo Verde 1 13 Increasing Power
*
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 0 10/29/2023
Planned Outage
South Texas 1 100
South Texas 2 100
Waterford 3 0 10/14/2023
Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, December 11, 2023