The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 08, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action
Beaver Valley 2 100 High System Voltage Action
*
Calvert Cliffs 1 100
High System Voltage Action
Calvert Cliffs 2 100 High System Voltage Action
FitzPatrick 100
*
Ginna 100
Hope Creek 1 100
Limerick 1 100
High System Voltage Action
Limerick 2 80 High System Voltage Action; Reduced Power for Turbine Valve Testing
*
Millstone 2 100

Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 97
Reduced Power For Maintenance
Peach Bottom 2 100
Peach Bottom 3 78 Coastdown To Refueling Outage
*
Salem 1 0 10/8/2023 High System Voltage Action; Refueling Outage
*
Salem 2 100 High System Voltage Action
Seabrook 1 100 900 MW Down Power Contingency
Susquehanna 1 100 High System Voltage Action
Susquehanna 2 100 High System Voltage Action

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 67 Coastdown To Refueling Outage
*
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 9/16/2023 Refueling Outage
McGuire 2 100
North Anna 1 100
North Anna 2 0 9/10/2023 Refueling Outage
*
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100

Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 0 9/30/2023 Refueling Outage
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 0 Prestartup testing on hold due to RCP trip
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
High System Voltage Action
Braidwood 2 100
High System Voltage Action
Byron 1 100

Byron 2 85 Coastdown To Refueling Outage
*
Clinton 0 9/11/2023 Refueling Outage
D.C. Cook 1 100 High System Voltage Action
D.C. Cook 2 100 High System Voltage Action
Davis-Besse 100 High System Voltage Action
Dresden 2 88 Coastdown To Refueling Outage
Dresden 3 100
Fermi 2 100
LaSalle 1 100
High System Voltage Action
LaSalle 2 100
High System Voltage Action
Monticello 88 Increasing Power
*
Perry 1 100
Point Beach 1 0 10/7/2023
Refueling Outage
*
Point Beach 2 100

Prairie Island 1 100

Prairie Island 2 0 10/7/2023 Refueling Outage
*
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 9/30/2023 Refueling Outage
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100

Diablo Canyon 1 0 10/1/2023 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 0 10/7/2023 Refueling Outage
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, November 6, 2023