The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 19, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 4/9/2023 Refueling Outage
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 4/10/2023 Refueling Outage
Hope Creek 1 100
Limerick 1 100
Limerick 2 82 Coastdown To Refueling Outage
*
Millstone 2 0 4/7/2023 Refueling Outage
Millstone 3 100
Nine Mile Point 1 0 Startup in Progress
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 4/1/2023 Refueling Outage
Seabrook 1 0 4/1/2023 Refueling Outage
Susquehanna 1 100
Susquehanna 2 0 3/20/2023 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100

Browns Ferry 3 88 Reduced Power For Condenser Vacuum
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 4/19/2023 Refueling Outage
*
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100


Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
*
Summer 0 4/6/2023 Refueling Outage
Surry 1 100
Surry 2 84 Coastdown To Refueling Outage
Turkey Point 3 0 4/8/2023 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 48 Holding Power for Testing *
Watts Bar 1 0 4/15/2023
Refueling Outage
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 78 Coastdown To Refueling Outage
*
Byron 1 100
Byron 2 70 Reduced Power for Economic Dispatch
*
Clinton 100
D.C. Cook 1 50 Reduced Power For Maintenance
*
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 95
Reduced Power for Economic Dispatch
*
Monticello 0 4/14/2023
Refueling Outage

Perry 1 12 Not Sync. to Grid
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 80 Reduced Power for Economic Dispatch
*
Prairie Island 2 100
Quad Cities 1 100
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 4/14/2023
Refueling Outage
Callaway 100
Columbia Generating Station 47 Coastdown To Refueling Outage
Single loop operation
*
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 81 Increasing Power
*
Palo Verde 2 0 4/8/2023 Refueling Outage
Palo Verde 3 100
River Bend Station 1 0 2/11/2023 Refueling Outage
South Texas 1 0 3/18/2023 Refueling Outage *
South Texas 2 100
Waterford 3 100
Wolf Creek 1 70 Reduced Power for Economic Dispatch (Flexible Power Operations)

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Wednesday, May 17, 2023