The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 28, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
*
Calvert Cliffs 2 0 2/21/2023 Refueling Outage *
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100 *
Limerick 2 96 Coastdown To Refueling Outage

*
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 82 Coastdown To Refueling Outage *
Nine Mile Point 2 100
Peach Bottom 2 100 *
Peach Bottom 3 100 *
Salem 1 100
Salem 2 100
Seabrook 1 100 Down power contingency
Susquehanna 1 100
Susquehanna 2 90 Coastdown To Refueling Outage
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2/19/2023 Refueling Outage
Browns Ferry 3 100

Brunswick 1 100
Brunswick 2 0 2/7/2023 Refueling Outage
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 18 Not paralleled due to turbine issue
*
McGuire 1 100
McGuire 2 0 2/19/2023 Refueling Outage
North Anna 1 100 *
North Anna 2 100 *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100


Saint Lucie 1 100
Saint Lucie 2 0 2/18/2023 Refueling Outage
Sequoyah 1 100
Sequoyah 2 98
Coastdown To Refueling Outage
*
Summer 100
Surry 1 100 *
Surry 2 100
*
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 95 Coastdown To Refueling Outage
*
Vogtle 2 100
Vogtle 3 0
Watts Bar 1 99 Issue with pump on secondary side *
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 95 Coastdown To Refueling Outage *
Byron 2 100 *
Clinton 100 *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
*
Dresden 3 97
Reduced Power For Maintenance
*
Fermi 2 100 *
LaSalle 1 100 *
LaSalle 2 0 2/13/2023 Refueling Outage *
Monticello 100
Perry 1 0 2/26/2023 Refueling Outage
Point Beach 1 100 *
Point Beach 2 92 Coastdown To Refueling Outage *
Prairie Island 1 100
*
Prairie Island 2 100 *
Quad Cities 1 85 Coastdown To Refueling Outage
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 94
Reduced Power For Maintenance
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100
River Bend Station 1 0 2/11/2023
Refueling Outage
South Texas 1 100
South Texas 2 100
Waterford 3 100

Wolf Creek 1 70 Reduced Power for Economic Dispatch

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, March 28, 2023