Power Reactor Status Report for November 21, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 48 Holding for maintenance *
Beaver Valley 2 100
Calvert Cliffs 1 99 Per dispatcher request
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
*
Salem 1 100
Salem 2 100
Seabrook 1 100 One down power contingency from ISO
*
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 95 Reduced Power For Maintenance *
Brunswick 1 100
Brunswick 2 98 Flow limited
Catawba 1 100
Catawba 2 100
Farley 1 0 9/18/2022 Refueling Outage

Farley 2 100
Harris 1 100
Hatch 1 100 *
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 99
North Anna 2 100
Oconee 1 0 10/29/2022 Refueling Outage
Oconee 2 100
Oconee 3 100
Robinson 2 0 11/19/2022 Refueling Outage
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 0 10/22/2022 Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 0 10/30/2022 Refueling Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100

Davis-Besse 100
Dresden 2 100

Dresden 3 100 *
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100

Quad Cities 1 100
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/8/2022 Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100

Comanche Peak 2 100

Cooper 78 Increasing power following control rod shuffle
*
Diablo Canyon 1 100
Diablo Canyon 2 0 10/15/2022 Refueling Outage
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100
River Bend Station 1 93 Coastdown To Refueling Outage
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 28 Startup in progress. Chemistry hold per power ascension plan.
*

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, December 19, 2022