Power Reactor Status Report for October 21, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 10/9/2022 Refueling Outage
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 95 Increasing power following rod pattern adjustment
*
Ginna 100
Hope Creek 1 0 9/28/2022 Refueling Outage
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 0 10/17/2022 Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 One down power contingency due to ISO New England work
Susquehanna 1 70 Decreasing power for sequence exchange
*
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 10/1/2022 Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100


Brunswick 1 100
Brunswick 2 100

Catawba 1 100
Catawba 2 0 9/14/2022 Refueling Outage

*
Farley 1 0 9/18/2022 Refueling Outage

Farley 2 100
Harris 1 0 10/8/2022 Refueling Outage
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 99 C Heater Drain Tank Pump trip
*
North Anna 1 0 9/21/2022 Refueling Outage

North Anna 2 100
Oconee 1 100
Coastdown To Refueling Outage
*
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 84
Coastdown To Refueling Outage
Sequoyah 2 100
Summer 100
Surry 1 88 Coastdown To Refueling Outage
*
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 0
Watts Bar 1 92 Reduced Power For Maintenance
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 10
Increasing Power
*
Braidwood 2 100
Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 0 10/1/2022 Refueling Outage
Davis-Besse 100
Dresden 2 100

Dresden 3 87
Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 10/15/2022 Refueling Outage
Prairie Island 2 100

Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/8/2022 Refueling Outage
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 91 Condenser waterbox isolated to repair tube leaks
Cooper 0 10/1/2022 Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 0 10/15/2022 Refueling Outage
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 0 10/8/2022 Refueling Outage
River Bend Station 1 99 Reduced Power For Rod Pattern Adjustment
*
South Texas 1 100
South Texas 2 0 10/8/2022 Refueling Outage
Waterford 3 100
Wolf Creek 1 0 10/6/2022 Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Friday, November 18, 2022