The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 29, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 Coastdown To Refueling Outage
*
Beaver Valley 2 100
Calvert Cliffs 1 100
*
Calvert Cliffs 2 100
FitzPatrick 0 9/26/2022 Refueling Outage
Ginna 100
Hope Creek 1 0 9/28/2022 Refueling Outage
*
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100

Nine Mile Point 2 100
Peach Bottom 2 91 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 9/29/2022
Maintenance Outage to address Elevated Drywell Leakage
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 38 Recirc Pump 1B malfunctioning
*
Browns Ferry 2 100
Browns Ferry 3 100


Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 9/14/2022 Refueling Outage;

Farley 1 0 9/18/2022 Refueling Outage

*
Farley 2 100
*
Harris 1 94


Coastdown To Refueling Outage
Hatch 1 100 Conservative Ops Due to Hurricane IAN
*
Hatch 2 100 Conservative Ops Due to Hurricane IAN *
McGuire 1 100
McGuire 2 100
North Anna 1 0 9/21/2022 Refueling Outage

*
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 9/25/2022 Maintenance Outage
Saint Lucie 1 0 9/3/2022
Refueling Outage
*
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100

Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian
Vogtle 2 100 Conservative Operations Order beginning 9/30/22 at 0100 due to Hurricane Ian
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 82 Coastdown To Refueling Outage
*
Braidwood 2 100
Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 60
Coastdown To Refueling Outage
*
Davis-Besse 100
Dresden 2 100

Dresden 3 96
Coastdown To Refueling Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 0 9/26/2022 Manual Trip See EN#56120


*
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 93 Coastdown To Refueling Outage
*
Prairie Island 2 100

Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 75 Coastdown To Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 71 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100


River Bend Station 1 100
South Texas 1 100
South Texas 2 95 Coastdown To Refueling Outage
*
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Thursday, October 27, 2022