Power Reactor Status Report for September 27, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 99 Reduced Power for Economic Dispatch
*
Calvert Cliffs 2 100
FitzPatrick 0 9/26/2022 Refueling Outage
*
Ginna 100
Hope Creek 1 84 Coastdown To Refueling Outage
Limerick 1 100 Geo-Magnetic warning
*
Limerick 2 100 Geo-Magnetic warning
*
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100

Nine Mile Point 2 100
Peach Bottom 2 92 Coastdown To Refueling Outage
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 Geo-Magnetic warning
*
Susquehanna 2 100 Geo-Magnetic warning
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 84 Coastdown To Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100


Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 9/14/2022 Refueling Outage;

Farley 1 0 9/18/2022 Refueling Outage;
Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian
*
Farley 2 100 Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian
*
Harris 1 100


Coastdown To Refueling Outage
*
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 9/21/2022 Refueling Outage
Geo-Magnetic warning
*
North Anna 2 100 Geo-Magnetic warning *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 9/25/2022 Maintenance Outage
Saint Lucie 1 0 9/3/2022
Refueling Outage
*
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 93 Feedwater booster pump trip *
Surry 1 100

Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian
*
Vogtle 2 100 Conservative Operations Order beginning 9/29/22 at 0000 due to Hurricane Ian *
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 84 Coastdown To Refueling Outage
Geo-Magnetic Warning
*
Braidwood 2 100 Geo-Magnetic Warning
*
Byron 1 100 Geo-Magnetic Warning

*
Byron 2 100 Geo-Magnetic warning
*
Clinton 100 Geo-Magnetic warning
*
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100 Geo-Magnetic warning
*
Dresden 2 100

Dresden 3 97
Coastdown To Refueling Outage
Fermi 2 100 Geo-Magnetic warning *
LaSalle 1 100 Geo-Magnetic warning *
LaSalle 2 0 9/26/2022 Manual Trip See EN#56120
Geo-Magnetic warning

*
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 95 Coastdown To Refueling Outage
Geo-Magnetic warning
*
Prairie Island 2 100 Geo-Magnetic warning

*
Quad Cities 1 100 Geo-Magnetic warning
*
Quad Cities 2 100 Geo-Magnetic warning *

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 76 Coastdown To Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 70 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100


River Bend Station 1 100
South Texas 1 100
South Texas 2 96 Coastdown To Refueling Outage
*
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, October 25, 2022