Power Reactor Status Report for September 18, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Hot Weather Alert
*
Calvert Cliffs 2 0 9/14/2022
Maintenance Outage;
Hot Weather Alert
*
FitzPatrick 79 Coastdown To Refueling Outage
*
Ginna 100
Hope Creek 1 87 Coastdown To Refueling Outage
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100

Nine Mile Point 2 63 Holding Power for Feedwater Issues
*
Peach Bottom 2 95 Coastdown To Refueling Outage
*
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 One Contingency From Down Power Due To One Line OOS
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 87 Coastdown To Refueling Outage
*
Browns Ferry 2 100
Browns Ferry 3 100

Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0 9/14/2022 Refueling Outage
Farley 1 61 Coastdown To Refueling Outage
*
Farley 2 100
Harris 1 100

Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100

North Anna 2 7
See EN #56073
*
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 9/3/2022 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 92 Coastdown To Refueling Outage
*
Braidwood 2 100
Byron 1 100

Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 80
Reduced Power For Rod Pattern Adjustment
*
LaSalle 2 100


Monticello 100
Perry 1 70 Reduced Power For Rod Pattern Adjustment
*
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 90 Reduced Power For Rod Pattern Adjustment;
Increasing Power
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 81 Coastdown To Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 74 Coastdown To Refueling Outage
*
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 95
Reduced Power For Rod Pattern Adjustment
*
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100


River Bend Station 1 100
*
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, October 17, 2022