Power Reactor Status Report for July 20, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Beaver Valley 1 93 Hotwell temperature limits; Hot Weather Alert
*
Beaver Valley 2 100
Hot Weather Alert
*
Calvert Cliffs 1 100

Hot Weather Alert
Calvert Cliffs 2 100
Hot Weather Alert
FitzPatrick 98 Coastdown To Refueling Outage
Ginna 100
Hope Creek 1 100

Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100
Sequoyah 1 100 Conservative Operations Alert
*
Sequoyah 2 100 Conservative Operations Alert
*
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100
Browns Ferry 1 100 Conservative Operations Alert *
Browns Ferry 2 100 Conservative Operations Alert

*
Browns Ferry 3 100 Conservative Operations Alert
*
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
Hot Weather Alert
*
North Anna 2 100
Hot Weather Alert
*
Oconee 1 100
Oconee 2 100
Oconee 3 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Perry 1 93 Limited by ambient conditions *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100
Braidwood 1 100
Braidwood 2 100
Byron 1 100 Hot Weather Alert
*
Byron 2 100 Hot Weather Alert
*
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100 Hot Weather Alert
*
Dresden 3 100 Hot Weather Alert
*
Fermi 2 100
LaSalle 1 98 ISO Phase experiencing 'Hot Spots'
*
LaSalle 2 100
Monticello 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Palo Verde 2 100

*
Palo Verde 3 100

*
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 7/19/2022 See Event #56005 1
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 94 Coastdown To Refueling Outage
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 7/13/2022 Outage due to maintenance on Turbine Control Valve
Palo Verde 1 100 *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Wednesday, August 17, 2022