The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 25, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 6/24/2022 Reduced power for main turbine issue

Beaver Valley 2 100

Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100

Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 65 Power Supply Alert;
Reduced Power For Rod Pattern Adjustment
*
Browns Ferry 2 100 Power Supply Alert
Browns Ferry 3 100 Power Supply Alert
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100 *
Farley 2 100
*
Harris 1 100
Hatch 1 100 *
Hatch 2 100 *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100
Sequoyah 1 100 Power Supply Alert
Sequoyah 2 100 Power Supply Alert
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 *
Vogtle 2 100 *
Watts Bar 1 100 Power Supply Alert; Conservative Operations Alert
Watts Bar 2 0 3/2/2022 Refueling Outage;
Power Supply Alert; Conservative Operations Alert

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 0 6/24/2022 Capacity Advisory; See EN #55964 * 1
LaSalle 1 100
LaSalle 2 100
Monticello 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100 Conservative Operations Order
Arkansas Nuclear 2 77 Increasing power following loss of MFP; Conservative Operations Order
*
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 85 Rod Pattern Adjustment; Increasing power *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100 Conservative Operations Order; Maximum Capacity Alert; Hot Weather Alert *
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100

River Bend Station 1 100 Conservative Operations Order
South Texas 1 100
South Texas 2 100
Waterford 3 0 6/24/2022 Conservative Operations Order; See EN #55963
* 1
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, July 25, 2022