The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 22, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100

Beaver Valley 2 100
Calvert Cliffs 1 100
*
Calvert Cliffs 2 100
*
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 0 4/8/2022 Refueling Outage
Nine Mile Point 1 100
Nine Mile Point 2 100

Peach Bottom 2 100 *
Peach Bottom 3 100
Salem 1 98

Increasing Power
*
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
*
Susquehanna 2 100
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

*
Browns Ferry 2 100 *
Browns Ferry 3 100 *
Brunswick 1 100
Brunswick 2 97
Increasing Power after Rod Sequence Exchange
*
Catawba 1 100 Yellow Grid Condition *
Catawba 2 100 Yellow Grid Condition *
Farley 1 100
Farley 2 100


Harris 1 100
Hatch 1 97 Reduced power due to possible SRV leakage
Hatch 2 100
McGuire 1 100 Yellow Grid Condition
McGuire 2 100 Yellow Grid Condition
North Anna 1 97
Decreased power for plant computer replacement
*
North Anna 2 100 *
Oconee 1 100 Yellow Grid Condition.
Oconee 2 100 Yellow Grid Condition.
Oconee 3 0 5/6/2022 Refueling Outage; Yellow Grid Condition.
*
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100

Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
*
Surry 2 100

*
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100 *
Watts Bar 2 0 3/2/2022 Refueling Outage
*

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 85 Maintenance *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 75 Maintenance *
D.C. Cook 1 0 4/2/2022 Refueling Outage

D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 98 Power is Limited by Core Flow
LaSalle 1 100
LaSalle 2 100
Monticello 100
*
Palisades 0 5/20/2022 Permanent Shutdown *
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 4/4/2022 Refueling Outage
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
*
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 99 Power is Limited by Core Flow

Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 0 4/2/2022 Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.