Power Reactor Status Report for October 29, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100

Beaver Valley 2 0 10/10/2021 Refueling Outage

Calvert Cliffs 1 100
Calvert Cliffs 2 100

FitzPatrick 100
Ginna 47 Holding power for equipment repair.
Hope Creek 1 100

Limerick 1 100
Limerick 2 100
Millstone 2 0 10/8/2021 Refueling Outage
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 0 10/25/2021 Refueling Outage
Salem 1 100
Salem 2 0 10/2/2021 Refueling Outage
Seabrook 1 0 10/2/2021 Preparing for Startup
*
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

Browns Ferry 2 100

Browns Ferry 3 100

Brunswick 1 100
Brunswick 2 100
Catawba 1 0 10/17/2021 Refueling Outage
Catawba 2 100
Farley 1 100
Farley 2 98 Reduced Power due to potential inaccuracies in flow measurement systems
Harris 1 100
Hatch 1 100

Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100

North Anna 2 97 Plant Computer Maintenance


Oconee 1 100
Oconee 2 98 Coastdown To Refueling Outage
Oconee 3 100
Robinson 2 0 10/19/2021 Outage to replace RCP Seal
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 10/2/2021 Refueling Outage
Summer 0 10/9/2021 Refueling Outage
Surry 1 100


Surry 2 0 10/24/2021
Refueling Outage
Turkey Point 3 0 10/9/2021 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 92 Coastdown To Refueling Outage
*
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100

Braidwood 2 0 10/18/2021 Refueling Outage

Byron 1 100

Byron 2 100
Clinton 0 10/29/2021 Preparing for Startup
*
D.C. Cook 1 100
D.C. Cook 2 100

Davis-Besse 100
Dresden 2 83 Coastdown to Refueling Outage

*
Dresden 3 0 10/17/2021 Forced Outage

Fermi 2 88
Reduced Power For Planned Maintenance
*
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 0 10/9/2021 Refueling Outage
Prairie Island 1 100
Prairie Island 2 2 Startup. Increasing Power.
*
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/25/2021 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 10/3/2021 Refueling Outage
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 10/26/2021 Feedwater heater tube leakage. Condenser fowling.
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 10/9/2021 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 10/9/2021 Refueling Outage
*
South Texas 2 100
Waterford 3 100

Wolf Creek 1 70 Decreased power due to flexible power operations.

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Friday, November 26, 2021