The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 19, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
*
Beaver Valley 2 0 10/10/2021 Refueling Outage
*
Calvert Cliffs 1 100
Calvert Cliffs 2 100

FitzPatrick 100
Ginna 0 10/4/2021 Refueling Outage
Hope Creek 1 100

Limerick 1 100
Limerick 2 100
Millstone 2 0 10/8/2021 Refueling Outage
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 80 Coastdown To Refueling Outage
Salem 1 100
Salem 2 0 10/2/2021 Refueling Outage
Seabrook 1 0 10/2/2021 Refueling Outage
Susquehanna 1 100
Susquehanna 2 80
Increasing power
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

Browns Ferry 2 100

Browns Ferry 3 100

Brunswick 1 100
Brunswick 2 100
Catawba 1 0 10/17/2021 Refueling Outage
*
Catawba 2 100
Farley 1 100
Farley 2 98 Reduced Power due to potential inaccuracies in flow measurement systems
Harris 1 100
Hatch 1 100

Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100

North Anna 2 97 Plant Computer Maintenance


Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 10/19/2021 Outage to replace RCP Seal *
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 10/2/2021 Refueling Outage - Fuel movement in progress
*
Summer 0 10/9/2021 Refueling Outage - Defueled
*
Surry 1 100


Surry 2 78
Coastdown to Refueling Outage
*
Turkey Point 3 0 10/9/2021 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 97 Coastdown To Refueling Outage
*
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 0 10/18/2021 Refueling Outage
*
Byron 1 100
Byron 2 100
Clinton 0 9/27/2021 Refueling Outage
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100

Dresden 2 86 Coastdown to Refueling Outage
*
Dresden 3 0 10/17/2021
Forced Outage
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 0 10/9/2021 Refueling Outage
*
Prairie Island 1 100
*
Prairie Island 2 0 10/2/2021 Refueling Outage
Quad Cities 1 100

Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/25/2021 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 10/3/2021 Refueling Outage
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 10/15/2021 See EN #55526
Grand Gulf 1 82
Reduced Power For Rod Pattern Adjustment
*
Palo Verde 1 100
Palo Verde 2 0 10/9/2021 Defueled; Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 0 10/9/2021 Refueling Outage
South Texas 2 100
Waterford 3 100


Wolf Creek 1 70 Load Following

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, November 16, 2021