The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 18, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 98

Coastdown To Refueling Outage
Calvert Cliffs 1 100
Calvert Cliffs 2 100

FitzPatrick 100
Ginna 100
Hope Creek 1 83 Reduced Power For Rod Pattern Adjustment
*
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 0 5/1/2021 Reactor defueled for permanent shutdown
Limerick 1 90 Reduced Power For Turbine Valve Testing
*
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 77 Reduced Power For Planned Load Drop
*
Peach Bottom 3 92 Coastdown To Refueling Outage
*
Salem 1 100
Salem 2 92

Coastdown To Refueling Outage
*
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

Browns Ferry 2 60
Reduced Power For Rod Pattern Adjustment & Testing
*
Browns Ferry 3 100

Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 94 Reduced Power For Bypass Valve Testing
*
Hatch 2 100
McGuire 1 100
McGuire 2 0 9/11/2021 Refueling Outage
North Anna 1 0 9/11/2021
Reduced Power For Planned Maintenance
North Anna 2 100


Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 8/28/2021 Refueling Outage
*
Sequoyah 1 100
Sequoyah 2 85 Coastdown to Refueling Outage
Summer 100
Surry 1 100


Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 0 9/12/2021 Refueling Outage
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 0 9/11/2021 Planned Maintenance Outage

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 0 9/13/2021 Refueling Outage
Byron 2 100
Clinton 94
Coastdown To Refueling Outage
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
*
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 93 Coastdown to Refueling Outage *
Prairie Island 1 100
Prairie Island 2 83 Coastdown To Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 75 Coastdown To Refueling Outage

*
Callaway 100
Columbia Generating Station 84 Reduced Power For Rod Pattern Adjustment
*
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100


Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.