The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 05, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action
Beaver Valley 2 100
High System Voltage Action
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 0 5/1/2021 Reactor defueled for permanent shutdown
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 97 Coastdown To Refueling Outage
*
Salem 1 100
Salem 2 99

Coastdown To Refueling Outage
Seabrook 1 100
Susquehanna 1 100 *
Susquehanna 2 100
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 99 Coastdown To Refueling Outage
*
North Anna 1 100
North Anna 2 100

Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 8/28/2021 Refueling Outage
Sequoyah 1 100
Sequoyah 2 95 Coastdown to Refueling Outage
Summer 100
Surry 1 100

Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Limited to 90% power until Steam Generator is replaced

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
High System Voltage Action
Braidwood 2 100
High System Voltage Action
Byron 1 83 Coastdown To Refueling Outage

*
Byron 2 100
*
Clinton 95
Coastdown To Refueling Outage
D.C. Cook 1 100 High System Voltage Action
D.C. Cook 2 100
High System Voltage Action
Davis-Besse 100

High System Voltage Action
Dresden 2 100 High System Voltage Action
Dresden 3 100 High System Voltage Action
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 91 Coastdown To Refueling Outage
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
*
Arkansas Nuclear 2 85 Coastdown To Refueling Outage.

Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100 Conservative Operations
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 87 Reduced Power For Rod Pattern Adjustment
*
South Texas 1 100
South Texas 2 100
Waterford 3 0 8/30/2021 Loss of Off-Site Power; See EN#55345
Conservative operations on grid
*
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, October 4, 2021