Power Reactor Status Report for May 17, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 *
Beaver Valley 2 100 *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100

Ginna 100
Hope Creek 1 93 Increasing Power
*
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 0 5/1/2021 Permanently Defueled
Limerick 1 100
Limerick 2 60 Increasing Power *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 91 Reduced Power For Planned Maintenance
*
Peach Bottom 3 100
Salem 1 100
Salem 2 100 *
Seabrook 1 100 One contingency downpower to 1100 MWe.
Susquehanna 1 100 *
Susquehanna 2 98 Increasing Power following Rod Pattern Adjustment
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 98 Increasing Power following Rod Pattern Adjustment
*
Brunswick 2 100
Catawba 1 100
Catawba 2 99 Limit on Control Valve Opening
Farley 1 100
Farley 2 100
Harris 1 93 Increasing Power; 95 percent power limit due to electric plant lineup
*
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 5/7/2021 See EN# 55239
*
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 4/10/2021 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100 *
Surry 1 0 4/25/2021 Refueling Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Max Power until Steam Generator Replacement.

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100 *
Clinton 99 Full Electrical Output
D.C. Cook 1 100 *
D.C. Cook 2 0 4/17/2021 Refueling Outage *
Davis-Besse 100 *
Dresden 2 17 Increasing Power;
Synced to the grid
*
Dresden 3 100
Fermi 2 0 5/17/2021 Forced Outage *
LaSalle 1 100
LaSalle 2 100
Monticello 0 4/18/2021 Refueling Outage
Palisades 100
Perry 1 100

Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 12/25/2020 See EN# 55049
Columbia Generating Station 0 5/9/2021 Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 4/10/2021 Refueling Outage;
Startup testing
*
River Bend Station 1 100 *
South Texas 1 100
South Texas 2 100
Waterford 3 100

Wolf Creek 1 70 Holding *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, June 14, 2021