Power Reactor Status Report for May 16, 2021
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
High System Voltage Action
|
|
|
Beaver Valley 2 |
100 |
|
High System Voltage Action
|
|
|
Calvert Cliffs 1 |
100 |
|
High System Voltage Action
|
* |
|
Calvert Cliffs 2 |
100 |
|
High System Voltage Action
|
* |
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
64 |
|
Increasing Power
|
* |
|
Indian Point 2 |
0 |
4/30/2020 |
Reactor defueled for permanent shutdown |
|
|
Indian Point 3 |
0 |
5/1/2021 |
Permanently Defueled |
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
21 |
|
Holding power |
* |
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Peach Bottom 2 |
91 |
|
Increasing power following turbine valve testing and sequence exchange
|
* |
|
Peach Bottom 3 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
82 |
|
|
|
|
Seabrook 1 |
100 |
|
One contingency downpower to 1100 MWe. |
|
|
Susquehanna 1 |
100 |
|
High System Voltage Action
|
* |
|
Susquehanna 2 |
82 |
|
Increasing Power following Rod Pattern Adjustment High System Voltage Action |
* |
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
80 |
|
Increasing Power following Rod Pattern Adjustment
|
* |
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
99 |
|
Limit on Control Valve Opening |
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
60 |
|
Increasing Power
|
* |
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
0 |
5/7/2021 |
See EN# 55239
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
0 |
4/10/2021 |
Refueling Outage
|
* |
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
93 |
|
Increasing Power |
* |
|
Surry 1 |
0 |
4/25/2021 |
Refueling Outage
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Watts Bar 2 |
90 |
|
Max Power until Steam Generator Replacement. |
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
92 |
|
Increasing power post planned maintenance
|
* |
|
Clinton |
99 |
|
Full Electrical Output
|
|
|
D.C. Cook 1 |
100 |
|
High System Voltage Action |
|
|
D.C. Cook 2 |
0 |
4/17/2021 |
Refueling Outage; High System Voltage Action |
|
|
Davis-Besse |
100 |
|
High System Voltage Action |
|
|
Dresden 2 |
0 |
5/12/2021 |
Forced Outage
|
|
|
Dresden 3 |
100 |
|
|
|
|
Fermi 2 |
17 |
|
Down powering for forced outage
|
* |
|
LaSalle 1 |
100 |
|
|
|
|
LaSalle 2 |
100 |
|
|
|
|
Monticello |
0 |
4/18/2021 |
Refueling Outage
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
0 |
12/25/2020 |
See EN# 55049 |
|
|
Columbia Generating Station |
0 |
5/9/2021 |
Refueling Outage
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
0 |
4/10/2021 |
Refueling Outage
|
* |
|
River Bend Station 1 |
74 |
|
Reduced Power For Condensate Pump A Repair
|
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
30 |
|
Increasing power post maintenance
|
* |
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
- Additional plant status information is made available on the web page after 28 days.