Power Reactor Status Report for May 12, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 40 Increasing Power per Power Ascension Plan.
*
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100

Ginna 100
Hope Creek 1 0 4/22/2021 Refueling Outage
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 0 5/1/2021 Permanently Defueled; one 345kV feeder out of service *
Limerick 1 100
Limerick 2 0 4/26/2021

Refueling Outage
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 One contingency downpower to 1100 MWe.
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 0 5/2/2021 Startup in progress
*
Brunswick 2 100
Catawba 1 100
Catawba 2 98 Limit on Control Valve Opening.
Farley 1 100
Farley 2 100
Harris 1 0 4/24/2021 Refueling Outage
*
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 5/7/2021 See EN# 55239
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 4/10/2021 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 50 Increasing Power
*
Sequoyah 2 100
Summer 100
Surry 1 0 4/25/2021 Refueling Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Max Power until Steam Generator Replacement.

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 Full Electrical Output
*
D.C. Cook 1 100

D.C. Cook 2 0 4/17/2021
Refueling Outage
*
Davis-Besse 100
Dresden 2 0 5/12/2021 Forced Outage
*
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 0 4/18/2021 Refueling Outage
*
Palisades 99 Reduced Power For Planned Maintenance
Perry 1 100

Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 95 Increasing Power per Power Ascension Plan. *
Arkansas Nuclear 2 100
Callaway 0 12/25/2020 See EN# 55049
Columbia Generating Station 0 5/9/2021 Refueling Outage
*
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 4/10/2021 Refueling Outage
*
River Bend Station 1 89
Reduced Power For Condensate Pump A Repair
*
South Texas 1 100
South Texas 2 100
Waterford 3 100

Wolf Creek 1 0 3/25/2021 Refueling Outage
Holding for Criticality Testing
*

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Wednesday, June 9, 2021