Power Reactor Status Report for April 03, 2021
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
95 |
|
Coastdown To Refueling Outage
|
* |
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
80 |
|
Coastdown To Refueling Outage |
|
|
Indian Point 2 |
0 |
4/30/2020 |
Reactor defueled for permanent shutdown |
|
|
Indian Point 3 |
90 |
|
Coastdown To Refueling Outage One offsite feeder OOS and two are restricted |
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
84 |
|
Coastdown To Refueling Outage
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
0 |
3/22/2021 |
Refueling Outage
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
|
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
0 |
3/22/2021 |
Refueling Outage
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
* |
|
Browns Ferry 2 |
0 |
2/26/2021 |
Refueling Outage |
|
|
Browns Ferry 3 |
73 |
|
Rod Sequence Exchange |
* |
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
0 |
3/6/2021 |
Refueling Outage
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
0 |
3/28/2021 |
Refueling Outage
|
* |
|
Farley 1 |
0 |
3/22/2021 |
Refueling Outage |
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
0 |
3/14/2021 |
Refueling Outage
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
47 |
|
Reduced power to secure Condensate Pump.
|
* |
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
97 |
|
Reduced Power For Unplanned Maintenance Until Outage
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Watts Bar 2 |
90 |
|
Max Power until Steam Generator Replacement. |
* |
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
86 |
|
Coastdown To Refueling Outage
|
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
* |
|
Byron 2 |
100 |
|
|
|
|
Clinton |
98 |
|
Full Electrical Output
|
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
100 |
|
|
|
|
Dresden 3 |
100 |
|
|
|
|
Fermi 2 |
100 |
|
|
|
|
LaSalle 1 |
100 |
|
|
|
|
LaSalle 2 |
0 |
2/22/2021 |
Refueling Outage
|
|
|
Monticello |
84 |
|
Coastdown To Refueling Outage |
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
0 |
3/7/2021 |
Refueling Outage |
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
94 |
|
Increasing Power Following Rod Pattern Adjustment
|
* |
|
Quad Cities 2 |
100 |
|
|
* |
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
88 |
|
Coastdown To Refueling Outage
|
* |
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
0 |
12/25/2020 |
See EN# 55049 |
|
|
Columbia Generating Station |
96 |
|
Coastdown To Refueling Outage
|
|
|
Comanche Peak 1 |
100 |
|
|
* |
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
0 |
2/4/2021 |
Forced Outage and Refueling Outage
|
* |
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend Station 1 |
0 |
|
See EN# 55169
|
* |
1 |
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
0 |
3/20/2021 |
Refueling Outage |
|
|
Waterford 3 |
0 |
4/1/2021 |
Planned Maintenance Outage
|
|
|
Wolf Creek 1 |
0 |
3/25/2021 |
Refueling Outage
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
- Additional plant status information is made available on the web page after 28 days.