The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 31, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 97 Coastdown To Refueling Outage

Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100

FitzPatrick 100

Ginna 100
Hope Creek 1 81 Coastdown To Refueling Outage *
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 92 Coastdown To Refueling Outage
One offsite feeder OOS and two are restricted
Limerick 1 100
Limerick 2 84 Coastdown To Refueling Outage
*
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 0 3/22/2021 Refueling Outage
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 3/22/2021 Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2/26/2021 Refueling Outage
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 0 3/6/2021 Refueling Outage
Catawba 1 100
Catawba 2 0 3/28/2021 Refueling Outage
Farley 1 0 3/22/2021 Refueling Outage
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 3/14/2021 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 97 Reduced Power For Unplanned Maintenance Until Outage
*
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Holding Power

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 88 Coastdown To Refueling Outage
*
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 98 Full Electrical Output
*
D.C. Cook 1 100

D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 86 Reduced Power For Planned Maintenance
*
LaSalle 2 0 2/22/2021 Refueling Outage
Monticello 85 Coastdown To Refueling Outage
Palisades 100
Perry 1 0 3/7/2021 Refueling Outage
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100 *
Quad Cities 1 0 3/15/2021 Raising Pressure *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 91 Coastdown To Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 0 12/25/2020 See EN# 55049
Columbia Generating Station 97 Coastdown To Refueling Outage
Comanche Peak 1 57 Downpower due to feedwater pump outage *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2/4/2021 Forced Outage and Refueling Outage
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100

*
South Texas 1 100
South Texas 2 0 3/20/2021 Refueling Outage
Waterford 3 88 Reduced Power For Planned Maintenance
*
Wolf Creek 1 0 3/25/2021
Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.