Power Reactor Status Report for November 18, 2020
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
86 |
|
Recovering from issues with non 1E electrical bus. Increasing Power |
* |
|
Indian Point 2 |
0 |
4/30/2020 |
Reactor defueled for permanent shutdown |
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
58 |
|
Increasing Power |
* |
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Peach Bottom 2 |
99 |
|
Increasing Power |
* |
|
Peach Bottom 3 |
100 |
|
|
|
|
Salem 1 |
0 |
10/2/2020 |
Refueling Outage |
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
100 |
|
|
|
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
99 |
|
Rod Pattern adjustment |
* |
|
Three Mile Island 1 |
0 |
9/20/2019 |
Reactor defueled for permanent shutdown |
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
85 |
|
Holding Power |
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
81 |
|
Increasing Power per Power Ascension Plan |
* |
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
25 |
|
Raising power |
* |
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
0 |
|
Refueling Outage |
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
92 |
|
Heater drain pump issue |
* |
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
84 |
|
Secondary Control Valve Maintenance |
|
|
Turkey Point 4 |
30 |
|
Starting up |
* |
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
15 |
|
Starting Up |
* |
|
Watts Bar 1 |
100 |
|
|
|
|
Watts Bar 2 |
0 |
10/23/2020 |
Refueling Outage |
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
98 |
|
100% Electrical Capability |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
100 |
|
|
|
|
Dresden 3 |
100 |
|
|
|
|
Duane Arnold |
0 |
8/10/2020 |
Reactor defueled for permanent shutdown |
|
|
Fermi 2 |
100 |
|
|
|
|
LaSalle 1 |
100 |
|
|
|
|
LaSalle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
0 |
10/5/2020 |
Refueling Outage |
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
0 |
10/15/2020 |
Forced outage due to generator issue |
|
|
Grand Gulf 1 |
0 |
11/5/2020 |
EN #54986
|
* |
|
Palo Verde 1 |
0 |
10/10/2020 |
Refueling Outage |
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend Station 1 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
70 |
|
Load following |
* |
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
- Additional plant status information is made available on the web page after 28 days.