United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > NRC Library > Document Collections > Reports Associated with Events > Power Reactor Status Reports > 2020 > September 20

Power Reactor Status Report for September 20, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   High System Voltage Action    
Beaver Valley 2 100   High System Voltage Action    
Calvert Cliffs 1 100   High System Voltage Action    
Calvert Cliffs 2 100   High System Voltage Action    
FitzPatrick 0 09/13/2020 Refueling Outage *  
Ginna 100      
Hope Creek 1 100   High System Voltage Action *  
Indian Point 2 0 04/30/2020 Reactor defueled for permanent shutdown    
Indian Point 3 100      
Limerick 1 100      
Limerick 2 100      
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Peach Bottom 2 87   Coastdown To Refueling Outage    
Peach Bottom 3 100      
Salem 1 100      
Salem 2 100      
Seabrook 1 100   Contingency down power to 800 MWE due to switchyard work    
Susquehanna 1 100   High System Voltage Action    
Susquehanna 2 100   High System Voltage Action    
Three Mile Island 1 0 09/20/2019 Reactor defueled for permanent shutdown    

Region 2

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 89   Coastdown To Refueling Outage *  
Browns Ferry 2 100      
Browns Ferry 3 100      
Brunswick 1 100      
Brunswick 2 22   Downpower Due To Maintenance on Generator Component Not Synced To Grid *  
Catawba 1 100      
Catawba 2 100      
Farley 1 100      
Farley 2 100      
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 0 09/18/2020 Refueling Outage *  
McGuire 2 100      
North Anna 1 100      
North Anna 2 0 09/12/2020 Refueling Outage    
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 99   Increasing Power *  
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 100      
Summer 95   Reduced power due to equipment malfunction *  
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100   *  
Watts Bar 2 100   *  

Region 3

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100   *  
Braidwood 2 100      
Byron 1 100      
Byron 2 91   Coastdown To Refueling Outage *  
Clinton 98   100% Electrical Capability *  
D.C. Cook 1 0 09/19/2020 Refueling Outage *  
D.C. Cook 2 100      
Davis-Besse 100   High System Voltage    
Dresden 2 100      
Dresden 3 94   Coastdown To Refueling Outage    
Duane Arnold 0 08/10/2020 See EN 54826    
Fermi 2 100      
LaSalle 1 83   Reduced Power For Rod Pattern Adjustment *  
LaSalle 2 100      
Monticello 100      
Palisades 0 08/30/2020 Refueling Outage    
Perry 1 100      
Point Beach 1 100      
Point Beach 2 100      
Prairie Island 1 0 09/18/2020 Refueling Outage *  
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

To top of page
Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 100      
Callaway 100   Coastdown To Refueling Outage    
Columbia Generating Station 100      
Comanche Peak 1 100      
Comanche Peak 2 100      
Cooper 85   Coastdown To Refueling Outage *  
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 83   EHC Fluid Leak    
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 100      
River Bend Station 1 100      
South Texas 1 100      
South Texas 2 100      
Waterford 3 84   Coastdown To Refueling Outage *  
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
Page Last Reviewed/Updated Monday, October 19, 2020
Monday, October 19, 2020