The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 19, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action *
Beaver Valley 2 100 High System Voltage Action *
Calvert Cliffs 1 100 High System Voltage Action *
Calvert Cliffs 2 100 High System Voltage Action *
FitzPatrick 0 9/13/2020 Refueling Outage - Fuel Movement in Progress
Ginna 100
Hope Creek 1 100
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100 *
Nine Mile Point 2 100
Peach Bottom 2 87 Coastdown To Refueling Outage *
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 Contingency down power to 800 MWE due to switchyard work
Susquehanna 1 100 High System Voltage Action *
Susquehanna 2 100 High System Voltage Action *
Three Mile Island 1 0 9/20/2019 Reactor defueled for permanent shutdown

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 90 Coastdown To Refueling Outage
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 9/18/2020 Refueling Outage *
McGuire 2 100
North Anna 1 100
North Anna 2 0 9/12/2020 Refueling Outage
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 50 Hydraulic Leak *
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 96 Reduced power due to equipment malfunction *
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100 TS LCO to repair lines for Offsite Power
Watts Bar 2 100 TS LCO to repair lines for Offsite Power

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 88 Load Dispatch *
Braidwood 2 100
Byron 1 100
Byron 2 90 Coastdown To Refueling Outage *
Clinton 99 100% Electrical Capability
D.C. Cook 1 0 9/19/2020 Refueling Outage *
D.C. Cook 2 100
Davis-Besse 100 High System Voltage *
Dresden 2 100
Dresden 3 94 Coastdown To Refueling Outage
Duane Arnold 0 8/10/2020 See EN 54826
Fermi 2 100
LaSalle 1 93 Load Following *
LaSalle 2 100
Monticello 100
Palisades 0 8/30/2020 Refueling Outage
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 9/18/2020 Refueling Outage *
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100 Coastdown To Refueling Outage
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 86 Coastdown To Refueling Outage *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 83 EHC Fluid Leak
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 85 Coastdown To Refueling Outage *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.