The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 08, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 HIGH SYSTEM VOLTAGE ACTION
Beaver Valley 2 67 INCREASING POWER
HIGH SYSTEM VOLTAGE ACTION
*
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 4/5/2020 REFUELING OUTAGE
Hope Creek 1 100
Indian Point 2 0 4/30/2020 SHUTDOWN FOR PERMANENT DEFUELING
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 4/23/2020 REFUELING OUTAGE
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 4/10/2020 REFUELING OUTAGE *
Seabrook 1 100 CONTINGENCY TO DOWNPOWER IF AUTO VOLTAGE REGULATOR IS LOST
Susquehanna 1 9 SEE EN# 54691 *
Susquehanna 2 99 MAINTAIN 100 MVAR DUE TO GRID INSTABILITIES
100% ELECTRICAL CAPABILITY
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 0 5/1/2020 REFUELING OUTAGE
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 99 HOLDING FOR MAINTENANCE ISSUE *
Oconee 1 100
Oconee 2 100
Oconee 3 0 4/10/2020 REFUELING OUTAGE *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 98 INCREASING POWER *
Summer 0 4/10/2020 REFUELING OUTAGE
Surry 1 100
Surry 2 0 5/2/2020 REFUELING OUTAGE
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 95 COASTDOWN TO REFUELING OUTAGE *
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100 *
Braidwood 2 88 INCREASING POWER *
Byron 1 100
Byron 2 100
Clinton 99 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 HIGH SYSTEM VOLTAGE ACTION *
D.C. Cook 2 0 4/30/2020 SEE EN#54687
HIGH SYSTEM VOLTAGE ACTION
*
Davis-Besse 100 HIGH SYSTEM VOLTAGE ACTION *
Dresden 2 100 *
Dresden 3 100
Duane Arnold 97 FUEL LEAKER, TWO CONTROL RODS INSERTED AND RECIRC SPEED LIMITED
Fermi 2 0 3/21/2020 REFUELING OUTAGE
LaSalle 1 100
LaSalle 2 100
Monticello 80 REDUCED POWER FOR ECONOMIC DISPATCH *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 79 REDUCED POWER FOR ECONOMIC DISPATCH *
Quad Cities 1 87 ADVANCED NUCLEAR DISPATCHING
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 4/19/2020 REFUELING OUTAGE
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 2/22/2020 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 100 *
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.