Power Reactor Status Report for April 25, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 4/11/2020 REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 4/5/2020 REFUELING OUTAGE
Hope Creek 1 100
Indian Point 2 72 COASTDOWN TO DEFUELING *
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 0 4/23/2020 REFUELING OUTAGE *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 4/10/2020 REFUELING OUTAGE
Seabrook 1 0 4/1/2020 REFUELING OUTAGE *
Susquehanna 1 17 PLANT STARTUP IN PROGRESS
INCREASING POWER PER POWER ASCENSION PLAN
*
Susquehanna 2 99 MAINTAIN 100 MVAR DUE TO GRID INSTABILITIES
100% ELECTRICAL CAPABILITY
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 71 ROD SEQUENCE EXCHANGE *
Browns Ferry 2 100
Browns Ferry 3 77 MELLA PLUS TESTING *
Brunswick 1 100
Brunswick 2 100
Catawba 1 94 COASTDOWN TO REFUELING OUTAGE *
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 60 INCREASING POWER *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 0 4/10/2020 REFUELING OUTAGE *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 4/10/2020 REFUELING OUTAGE
Summer 0 4/10/2020 REFUELING OUTAGE
Surry 1 100
Surry 2 86 COASTDOWN TO REFUELING OUTAGE *
Turkey Point 3 5 PLANT STARTUP IN PROGRESS
TURBINE TESTING IN PROGRESS
*
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 0 4/19/2020 REFUELING OUTAGE *
Byron 1 100
Byron 2 90 INCREASING POWER *
Clinton 98 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 HIGH SYSTEM VOLTAGE *
D.C. Cook 2 100 HIGH SYSTEM VOLTAGE *
Davis-Besse 100 HIGH SYSTEM VOLTAGE *
Dresden 2 100
Dresden 3 100
Duane Arnold 98 HOLDING POWER *
Fermi 2 0 3/21/2020 REFUELING OUTAGE
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100 *

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 95 HOLDING POWER *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 4/19/2020 REFUELING OUTAGE
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 2/22/2020 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 0 4/3/2020 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, June 30, 2020