Power Reactor Status Report for April 18, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 HIGH SYSTEM VOLTAGE ACTION *
Beaver Valley 2 0 4/11/2020 HIGH SYSTEM VOLTAGE ACTION
REFUELING OUTAGE
*
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 0 4/5/2020 REFUELING OUTAGE
Hope Creek 1 100
Indian Point 2 77 COASTDOWN TO DEFUELING
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 0 4/10/2020 REFUELING OUTAGE *
Seabrook 1 0 4/1/2020 REFUELING OUTAGE
Susquehanna 1 0 3/27/2020 REFUELING OUTAGE
Susquehanna 2 99 MAINTAIN 100 MVAR DUE TO GRID INSTABILITIES
100% ELECTRICAL CAPABILITY
*
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 99 LIMITED BY CORE FLOW
Brunswick 1 96 LIMITED BY CORE FLOW *
Brunswick 2 100
Catawba 1 97 COASTDOWN TO REFUELING OUTAGE *
Catawba 2 100
Farley 1 100
Farley 2 100 *
Harris 1 100
Hatch 1 91 REDUCED POWER FOR ROD PATTERN ADJUSTMENT *
Hatch 2 0 4/14/2020 PLANNED MAINTENANCE OUTAGE
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 80 INCREASING POWER *
Oconee 1 100
Oconee 2 100
Oconee 3 0 4/10/2020 REFUELING OUTAGE *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 4/10/2020 REFUELING OUTAGE *
Summer 0 4/10/2020 REFUELING OUTAGE
Surry 1 100
Surry 2 91 COASTDOWN TO REFUELING OUTAGE *
Turkey Point 3 0 3/29/2020 REFUELING OUTAGE
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 83 COASTDOWN TO REFUELING OUTAGE
Byron 1 100
Byron 2 100
Clinton 99 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 HIGH SYSTEM VOLTAGE ACTION *
D.C. Cook 2 100 HIGH SYSTEM VOLTAGE ACTION *
Davis-Besse 100 HIGH SYSTEM VOLTAGE ACTION *
Dresden 2 100
Dresden 3 100
Duane Arnold 99 LIMITED BY CORE FLOW *
Fermi 2 0 3/21/2020 REFUELING OUTAGE
LaSalle 1 100
LaSalle 2 100
Monticello 80 REDUCED POWER PER DISPATCH REQUEST *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 80 REDUCED POWER PER DISPATCH REQUEST *
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100 *

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 3/13/2020 REFUELING OUTAGE
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 2/22/2020 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 0 4/3/2020 REFUELING OUTAGE
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 22 REDUCING POWER FOR UNPLANNED MAINTENANCE *
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, June 30, 2020