The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 06, 2020

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 99 COASTDOWN TO REFUELING OUTAGE
Calvert Cliffs 1 0 2/16/2020 REFUELING OUTAGE
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 83 COASTDOWN TO REFUELING OUTAGE
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 0 3/4/2020 MANUAL REACTOR TRIP - SEE EN# 54562 *
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 0 2/25/2020 FORCED OUTAGE - STEAM GENERATOR TUBE LEAK
Salem 2 100
Seabrook 1 100
Susquehanna 1 79 MAINTAIN 100 MVAR DUE TO GRID INSTABILITIES
COASTDOWN TO REFUELING OUTAGE
Susquehanna 2 98 MAINTAIN 100 MVAR DUE TO GRID INSTABILITIES
100% ELECTRICAL CAPABILITY
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2/21/2020 REFUELING OUTAGE
Brunswick 1 0 2/28/2020 REFUELING OUTAGE
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 1/31/2020 REFUELING OUTAGE
Hatch 2 100
McGuire 1 100
McGuire 2 95 COASTDOWN TO REFUELING OUTAGE *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2/16/2020 REFUELING OUTAGE *
Sequoyah 1 100 CONSERVATIVE OPERATIONS DUE TO SEVERE WEATHER
Sequoyah 2 100 CONSERVATIVE OPERATIONS DUE TO SEVERE WEATHER
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 90 COASTDOWN TO REFUELING OUTAGE *
Vogtle 2 100
Watts Bar 1 100 CONSERVATIVE OPERATIONS DUE TO SEVERE WEATHER
Watts Bar 2 100 CONSERVATIVE OPERATIONS DUE TO SEVERE WEATHER

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 82 COASTDOWN TO REFUELING OUTAGE *
Byron 2 100
Clinton 90 REDUCED POWER FOR ADVANCED NUCLEAR DISPATCH *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 0 2/28/2020 REFUELING OUTAGE
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100 *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 95 COASTDOWN TO REFUELING OUTAGE *
Prairie Island 1 100 REDUCING POWER TO FIX LEADING EDGE FLOW METER *
Prairie Island 2 100
Quad Cities 1 100 *
Quad Cities 2 98 COASTDOWN TO REFUELING OUTAGE

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 0 2/22/2020 REFUELING OUTAGE
Palo Verde 1 100
Palo Verde 2 0 3/3/2020 AUTOMATIC REACTOR TRIP. SEE EN# 54560
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, June 30, 2020