Power Reactor Status Report for November 30, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100     *  
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 11/28/2008 AUTOMATIC REACTOR SCRAM DUE TO MAIN TRANSFORMER FAULT - SEE EN# 44688 *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 10/25/2008 #1 COOLING TOWER TRANSFORMER OOS - ANTICIPATE ENTERING MODE 2 WITHIN THE NEXT 8 HRS *  
Browns Ferry 2 100   #1 COOLING TOWER TRANSFORMER OOS    
Browns Ferry 3 100   #1 COOLING TOWER TRANSFORMER OOS    
Brunswick 1 64   INCREASING POWER *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 91   INCREASING POWER *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 10/24/2008 CORE LOADED EXPECT TO BE IN MODE 5 BY NOON *  
Oconee 3 100        
Robinson 2 0 11/18/2008 NOT & NOP *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 0 09/20/2008 SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100   MINIMUM GENERATION ALERT UNTIL 0700    
Kewaunee 100        
La Salle 1 100        
La Salle 2 90   REDUCED POWER FOR SCHEDULED LOAD DROP *  
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 99   REDUCED POWER FOR ONGOING PLANT MOD *  
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/26/2008 DEFUELED    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 98   REDUCING POWER TO 90% DUE TO TRIP OF MAIN TRANSFORMER PHASE A GROUP 2 OIL PUMP *  
Palo Verde 1 100        
Palo Verde 2 0 11/21/2008 REPAIRS FOR HYDROGEN LEAK IN MAIN GENERATOR ONGOING *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 96   STEAM GENERATOR LIMITATIONS TURBINE VALVE TESTING    
San Onofre 3 0 10/12/2008 EXITING REFUELING OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021