Power Reactor Status Report for May 24, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 55   HOLDING POWER FOR FEEDWATER PUMP MAINTENANCE *  
Ginna 100        
Hope Creek 1 100   SWITCHYARD WORK    
Indian Point 2 100   MAINTENANCE ON FEEDER 95331 *  
Indian Point 3 100   MAINTENANCE ON FEEDER 95331 *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 99   CIRCULATING WATER PUMP OOS    
Millstone 3 100        
Nine Mile Point 1 100   FINAL ROD PATTERN ADJUSTMENT 05/25 *  
Nine Mile Point 2 100        
Oyster Creek 100   34.5 KV OFFSITE LINE Z52 OOS *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 05/23/2007 AUTOMATIC REACTOR TRIP DUE LOWERING SGWL AS A RESULT OF A CONDENSATE LEAK AT THE CONDENSATE POLISHER - SEE EN # 43382 * 1
Seabrook 1 100   SWITCHYARD BREAKER 169 OOS UNTIL 25MAY07    
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100   230 KV LINE 1051 OOS FOR MAINTENANCE    
Vermont Yankee 0 05/13/2007 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 05/23/2007 MANUAL REACTOR SCRAM DUE TO EHC LEAK - SEE EN # 43381 - TRINTY-1 500 KV LINE OOS * 1
Browns Ferry 2 100   TRINTY-1 500 KV LINE OOS *  
Browns Ferry 3 100   TRINTY-1 500 KV LINE OOS *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 54   INCREASING POWER *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE.    
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/27/2007 REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 99   REDUCED POWER FOR TESTING - 115 KV SWITCHYARD MAINTENANCE - NO OFFSITE POWER IMPACT *  
Saint Lucie 1 0 04/01/2007 REFUELING OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 99   100% ELECTRICAL CAPABILITY.    
Vogtle 2 99   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 97   INCREASING POWER FOLLOWING PLANNED MAINTENANCE *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 100        
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   PM TO BE COMPLETED ON 5/24 FOR OFFSITE POWER SUPPLY BREAKER #152-402 TO SAFEGUARDS BUS *  
Perry 1 92   HOLDING POWER FOR RECIRC FLOW CONTROL VALVE ISSUE *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 20   HOLDING FOR TURBINE TESTING *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/12/2007 REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 85   INCREASING POWER *  
Diablo Canyon 1 0 04/30/2007 REFUELING OUTAGE - WILL HAVE 230 KV MORRO BAY - MESA LINE OOS THURSDAY 5/24 *  
Diablo Canyon 2 100   WILL HAVE 230 KV MORRO BAY - MESA LINE OOS THURSDAY 5/24    
Fort Calhoun 100        
Grand Gulf 1 0 05/19/2007 SCRAM DUE TO LOSS OF CONDENSER VACUUM SEE EN #43376    
Palo Verde 1 0 05/18/2007 REFUELING OUTAGE    
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 0 05/22/2007 FORCED OUTAGE - RCS COOLDOWN IN PROGRESS - SHUTDOWN TO INVESTIGATE AND REPAIR 'A' RECIRC PUMP MALFUNCTION *  
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021