Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 95   INCREASING POWER *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 91   HIGH CONDENSER DISCHARGE TEMPERATURE *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 99   XENON BUILDING IN *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100   0900 ENTERING GRID CONTINGENCY ALERT *  
Brunswick 2 100   0900 ENTERING GRID CONTINGENCY ALERT *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100   0700-2200 GRID CONTINGENCY ALERT *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100   GRID YELLOW *  
Oconee 2 100   GRID YELLOW *  
Oconee 3 100   GRID YELLOW *  
Robinson 2 100   0700 ENTERING GRID CONTINGENCY ALERT *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100     *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 100        
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 98   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 98   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100   HIGH FLOW OF POWER SOUTH OUT OF COOPER SUBSTATION DUE TO DEMAND *  
Diablo Canyon 1 100   AT 0600 PDT 500KV BUS #2 WILL BE OOS FOR MAINTENANCE FOR APPROXIMATELY 12 HOURS. *  
Diablo Canyon 2 100   AT 0600 PDT 500KV BUS #2 WILL BE OOS FOR MAINTENANCE FOR APPROXIMATELY 12 HOURS. *  
Fort Calhoun 100   345KV RAUN LINE LOST FROM FT. CALHOUN TO SIOUX CITY, IA DUE TO FAILURE OF TOWER KNEE BRACE WHICH BROKE DOWN THE ALPHA PHASE - ANTICIPATE RESTORATION SHORTY *  
Grand Gulf 1 100        
Palo Verde 1 80   REDUCED POWER DUE TO PARTIAL LENGTH CONTROL ROD SLIPPING APPROXIMATELY 6" INTO CORE - TROUBLESHOOTING IN PROGRESS *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours