The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 4, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/16/2001 REFUELING OUTAGE - FUEL SHUFFLE COMPLETE - CONTROL ELEMENT ASSEMBLY SWAPS IN PROGRESS *  
FITZPATRICK 1 95   HOLDING POWER AT THIS LEVEL TO PERFORM MAINTENANCE    
GINNA 1 100        
HOPE CREEK 1 100     *  
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 82   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 100        
MILLSTONE 3 100     *  
NINE MILE POINT 1 0 03/18/2001 REFUELING OUTAGE    
NINE MILE POINT 2 100        
OYSTER CREEK 1 99   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 46   HOLDING POWER AT THIS LEVEL DUE TO A FEEDWATER PUMP TRIP *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/09/2001 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 0 03/18/2001 REFUELING OUTAGE - CORE VERIFICATION IN PROGRESS AFTER PERFORMANCE OF A FUEL SHUFFLE *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 0 02/24/2001 REFUELING OUTAGE - DEFUELED    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 0 03/09/2001 REFUELING OUTAGE - DEFUELED    
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 0 03/10/2001 REFUELING OUTAGE - REFUELED - HEAD TENSIONING IN PROGRESS *  
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 02/16/2001 MAINTENANCE OUTAGE    
ROBINSON 2 72   COASTDOWN TO REFUELING OUTAGE    
SAINT LUCIE 1 0 04/02/2001 REFUELING OUTAGE *  
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 94   COASTDOWN TO REFUELING OUTAGE    
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 92   HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL SYSTEM FAILURE *  
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 90   COASTDOWN TO REFUELING OUTAGE *  
CLINTON 1 100        
COOK 1 100        
COOK 2 99   INCREASING POWER AFTER REDUCING POWER TO PERFORM WATERBOX CLEANING AND FEEDWATER PUMP MAINTENANCE *  
DAVIS BESSE 1 100        
DRESDEN 2 0 04/03/2001 POWER REDUCTION DUE TO A RECIRCULATION PUMP TRIP FOR UNKNOWN REASONS FOLLOWED BY A MANUAL REACTOR SCRAM FROM 27% POWER DUE TO ANOTHER RECIRCULATION PUMP TRIP FOR UNKNOWN REASONS (Refer to event #37887) * 1
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 6   MAINTENANCE OUTAGE - STARTUP IN PROGRESS *  
PALISADES 1 0 03/30/2001 REFUELING OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 0 03/16/2001 REFUELING OUTAGE    
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 80   COASTDOWN TO REFUELING OUTAGE    
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 0 03/24/2001 REFUELING OUTAGE - DEFUELED *  
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 0 03/15/2001 REFUELING OUTAGE - DEFUELED *  
GRAND GULF 1 100        
PALO VERDE 1 0 03/31/2001 REFUELING OUTAGE *  
PALO VERDE 2 99        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 02/03/2001 MAINTENANCE OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 35   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021