The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Report - 2000-230

SIEMENS

October 19, 2000

NRC:00:046

Document Control Desk
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555-0001

Evaluation of a Deviation in Pump Seizure Methodology

On October 6, 2000 a deviation was determined to exist in the pump model of the COTRANSA2 computer code. The deviation was discovered during the code verification and validation (V&V) activity that has been ongoing since the Nuclear Regulatory Commission's Core Performance Inspection (Inspection Report 99900061/97-01) of Siemens Power Corporation in 1997. The deviation was determined to have been introduced about 20 years ago in the COTRANSA code, the predecessor to the COTRANSA2 code. The pump model was found to improperly calculate the pump flow resistance during a pump seizure event.

A Part 21 evaluation of the deviation was completed for the plants affected - Dresden Units 2 and 3 and Susquehanna Units 1 and 2. The deviation was determined not to be reportable under 10 CFR 21.21(c) for Dresden Units 2 and 3 and for events initiated during two-loop operation of Susquehanna Units 1 and 2. However, SPC does not have the capability to determine whether the deviation is reportable for events initiated during single-loop operation (SLO) of Susquehanna Units 1 and 2, because the licensee independently establishes higher MCPR operating limits for SLO based on MCPR values provided by SPC. The SLO MCPR limits calculated by SPC with the pump error corrected did not exceed the SLO MCPR COLR limits in effect at the time of discovery.

The affected licensees have been informed of the error and SPC's Part 21 evaluation results.

Very truly yours,

James F. Mallay, Director
Regulatory Affairs

cc. R. Caruso
N. Kalyanam
J. S. Wermiel

Project No.702

Siemens Power Corporation