Part 21 Report - 1996-236
ACCESSION #: 9606040240
Information & Support Services
P.O. Box 3707
Seattle, WA 98124-2207
May 30, 1996
G-1151-SJA-96-302
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D. C. 20555
BOEING
Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992;
R. S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.
J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Tenera Engineering Services
Gibbs & Hill, Inc.
Error notices have been sent to our other former customers.
Very truly yours,
Sandra J. Andrews
Nuclear Administrator
G-1151 M/S 7A-33
(206) 865-6248
Attachment(s): GTSTRUDL Program Report Form No. 96.16
Georgia Tech Computer Aided Structural Engineering Center
Georgia Institute of Technology
School of Civil & Environmental Engineering
Atlanta, Georgia 30332-0355
USA
404-894-2260
404 894 8014 FAX
May 24, 1996
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O. Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM No. 96.16 and
a VENDOR ACKNOWLEDGEMENT FORM. Please sign and return the VENDOR
ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program
Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
Catherine Lee
Configuration Control Manager
CL/jhb
Enclosures
An Equal Education and Employment A Unit of the University System
Opportunity Institution of Georgia
GTSTRUDL Program Report Form
GPRF No.: 96.16
DATE: May 23, 1996
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
X URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within the
session or job.
_ SERIOUS Problem results in incorrect answers which are obvious or
problem prevents completion of a particular user's task.
_ MINOR Problem can be worked around or problem poses high
frustration factor.
_ INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed May 23, 1996
Date Notification Sent May 24, 1996
Computers All
Operating System All
Version 94.01 and later
Target Release for Correction 96.02
Mgr. ASD
Signature Title
R & D Division
Michael H. Swanger
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.: 96.16
DATE: May 23 1996
DESCRIPTION:
The LIST DYNAMIC PARTICIPATION FACTORS command produces incorrect results
for the case when rotated released support conditions are present in a
consistent mass model. A consistent mass model will be computed if the
INERTIA OF JOINTS CONSISTENT command is given or if rigid body elements
are used in the model. The only possible work around at this time is to
avoid one or more of these conditions.
Other dynamic analysis computations or results are not adversely affected
by these conditions.
Applicable sections of the User's Manual
Inertia specification Command Section 2.4.3.1, Vol. 3
The JOINT RELEASES Command Section 2.1.7.2, Vol. 1
Joint Constraints Section 5.9, GTSTRUDL Release
Guide Version 9401
RS, 9401VAX, 9401
Solaris
Section 6.9, GTSTRUDL Release Guide
Version 9401 PC, 9601 PC
Rev. 2.2
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021