The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Morning Report for April 20, 2004

Headquarters Daily Report

To top of page

REGION I

Oyster Creek Spent Fuel Transfer

Licensee/Facility:

AMERGEN ENERGY CO., LLC
Oyster Creek
FORKED RIVER, New Jersey
Dockets: 05000219
[1] GE-2
License No:
Notification:

MR Number: 1-2004-0001
Date: 04/16/2004

Call / Fax from SRI

Discussion:

On Friday, April 16, 2004, the first independent spent fuel storage installation (ISFSI) transfer of the current campaign was stopped during final fit-up of the Trans Nuclear shipping transfer cask to the Horizontal Storage Module (HSM) due to a fluid leak and loss of pressure in the hydraulic positioning system.

The transport vehicle was left in place on the ISFSI pad and appropriate security was maintained for the vehicle until repairs were made on Saturday, April 17, 2004. The licensee verified that the license and tech specs for the ISFSI were met throughout the transfer including the extended period with the HSM opened for receipt of fuel and with transfer cask loaded.

The licensee found that a hydraulic fitting associated with the transfer ram came into contact with a deck plate on the vehicle during fit-up, bending the fitting and causing a loss of hydraulic fluid. It appears that the length of the fitting was too long causing the impact with the deck plate. The last use of this vehicle was at Duane Arnold. The licensee's current assessment is that the fitting was replaced after the Duane Arnold use, prior to transfer to Oyster Creek.

After replacement of the broken parts on Saturday, April 17, 2004, the spent fuel was successfully placed in the HSM by 4:45 p.m.

Contacts:

Name Office Abbrev Phone No E-Mail
SUMMERS, R J R1 (609) 693-0702 RJS@nrc.gov
WRAY, J R R1 (610) 337-5268 JRW3@nrc.gov

Page Last Reviewed/Updated Thursday, March 25, 2021