The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Morning Report for April 8, 2004

Headquarters Daily Report

To top of page

REGION III

Davis-Besse Synchronized to Grid

Licensee/Facility:

FIRSTENERGY NUCLEAR OPERATING CO.
Davis-Besse
OAK HARBOR, Ohio
Dockets: 05000346
[1] B&W-L-LP
License No:
Notification:

MR Number: 3-2004-0028
Date: 04/08/2004

RIII- Via Teleconf. with Site

Discussion:

This information is current as of 10:00 a.m. (EDT) on April 8, 2004. The plant is currently in Mode 1 at 100 percent power. At approximately 3:06 p.m. April 7, the plant experienced a loss of two non-essential 480V busses (E4 & E6) coincident with a loss of #1circulating water pump, due to the 13.8 kV feeder breakers to these loads tripping on instantaneous overcurrent. The operators performed the abnormal procedures for loss of condenser vacuum, loss of circulating water pump, rapid plant shutdown, and loss of AC power. The plant was stabilized with reactor power at 97 percent and electrical output reduced by about 30 MW. Per procedures, the circulating water system was aligned to operate using three of the four circulating water pumps, and the plant was returned to 100 percent power. The two 480V busses were verified to be fault free, and were re-energized from an alternate power source.

Resident inspector observations from the control room concluded that the operators' responses to expeditiously stabilize the plant in a safe condition were appropriate. The licensee established a problem-solving decision-making team to investigate the cause for the breakers tripping.

The Davis-Besse Oversight Panel will continue to monitor plant activities utilizing enhanced inspection oversight coverage. For non-routine evolutions occurring after normal working hours, enhanced inspection oversight coverage will continue to be expanded to monitor these activities.

Regional Action: For Information Only

Accession Numbers:

Accession No Accession Date
ML040990306 04/08/2004

Contacts:

Name Office Abbrev Phone No E-Mail
THOMAS, C S R3 (419) 244-4494 CST1@nrc.gov

Page Last Reviewed/Updated Thursday, March 25, 2021