U.S. Nuclear Regulatory Commission Operations Center Event Reports For 05/13/2004 - 05/14/2004 ** EVENT NUMBERS ** | Power Reactor | Event Number: 40720 | Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] GE-6 NRC Notified By: RON FRANTZ HQ OPS Officer: JEFF ROTTON | Notification Date: 05/03/2004 Notification Time: 09:42 [ET] Event Date: 05/03/2004 Event Time: 01:25 [CDT] Last Update Date: 05/13/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: 26.73 - FITNESS FOR DUTY | Person (Organization): BRUCE BURGESS (R3) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 1 | N | Y | 100 | Power Operation | 100 | Power Operation | Event Text NON-LICENSED EMPLOYEE TESTED POSITIVE FOR ALCOHOL A non-licensed employee was identified as under the influence during for cause testing. The employee's access to the plant has been placed on hold. Contact the Headquarters Operations Officer for additional details. The licensee notified the NRC Resident Inspector. * * * * UPDATE FROM RON FRANTZ TO MIKE RIPLEY 5/13/04 AT 1132 EDT * * * Followup testing at the hospital confirmed the previous positive test results. The employee's plant access remains suspended. The employee has been referred to the Employee Assistance Program. Contact the Headquarters Operations Officer for additional details. The licensee notified the NRC Resident Inspector. Notified R3RDO (Stone) | General Information or Other | Event Number: 40740 | Rep Org: MARYLAND DEPT OF THE ENVIRONMENT Licensee: CTI CONSULTANTS INC Region: 1 City: State: MD County: MONTGOMERY License #: MD-31-241-01 Agreement: Y Docket: NRC Notified By: BOB NELSON HQ OPS Officer: CHAUNCEY GOULD | Notification Date: 05/10/2004 Notification Time: 11:10 [ET] Event Date: 05/07/2004 Event Time: 13:30 [EDT] Last Update Date: 05/10/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: AGREEMENT STATE | Person (Organization): JOHN ROGGE (R1) TOM ESSIG (NMSS) | Event Text TROXLER GAUGE RUN OVER BY BULLDOZER AT CONSTRUCTION SITE A Troxler gauge model 3430 containing 10 millicuries Cs-137 and 40 millicuries AmBe-241 was run over by a bulldozer at a construction site in Montgomery County, MD. The device was completely destroyed, but the sources were not broken or leaking. The device was shipped to NE Technical Service in Westminster, MD and will be disposed of at a nuclear waste site in California.. | Power Reactor | Event Number: 40743 | Facility: POINT BEACH Region: 3 State: WI Unit: [1] [2] [ ] RX Type: [1] W-2-LP,[2] W-2-LP NRC Notified By: JIM WILSON HQ OPS Officer: JEFF ROTTON | Notification Date: 05/13/2004 Notification Time: 16:47 [ET] Event Date: 05/13/2004 Event Time: 10:29 [CDT] Last Update Date: 05/13/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: 26.73 - FITNESS FOR DUTY | Person (Organization): ANNE MARIE STONE (R3) CHRISTOPHER GRIMES (NRR) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 1 | N | N | 0 | Refueling | 0 | Refueling | 2 | N | Y | 100 | Power Operation | 100 | Power Operation | Event Text NON-ACTIVE LICENSED OPERATOR TESTED POSITIVE FOR ALCOHOL A non-active licensed employee was determined to be under the influence of alcohol during for cause testing. The employee's access has been suspended to the Point Beach Nuclear Plant and all other Nuclear Management Company, LLC (NMC) sites. Contact the Headquarters Operations Officer for additional details. The licensee notified the NRC Resident Inspector. | Other Nuclear Material | Event Number: 40744 | Rep Org: APPLIED TESTING INC Licensee: APPLIED TESTING INC Region: 1 City: NORRISTOWN State: PA County: License #: 37-30701-01 Agreement: N Docket: NRC Notified By: MELISSA HEELY HQ OPS Officer: BILL GOTT | Notification Date: 05/13/2004 Notification Time: 16:00 [ET] Event Date: 05/13/2004 Event Time: 09:40 [EDT] Last Update Date: 05/13/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: INFORMATION ONLY | Person (Organization): JOHN ROGGE (R1) ROBERT PIERSON (NMSS) | Event Text DAMAGED TROXLER GAUGE At approximately 0940 EDT on 05/13/04, an employee set a Troxler Moisture Density Gauge (Model: 3411B, S/N: 9031, containing an 8 milliCurie Cs-137 (S/N: 750-3440) and a 40 milliCurie Am-241:Be (S/N: 47-5500) source) down to prepare for testing. Another contractor in a pick-up truck drove through and knocked over the gauge. The source was in the locked position when the gauge was knocked over. The employee cordoned off the area and checked the gauge for damage. The gauge had little damage but the source appears to be bent in the stowed position. The gauge will be sent to NorthEast Technical Services for repair or decommissioning. | Other Nuclear Material | Event Number: 40745 | Rep Org: ENGINEERING CONSULTING SERVICES LTD Licensee: ENGINEERING CONSULTING SERVIES LTD Region: 1 City: CULPEPPER State: VA County: License #: 45-25583-01 Agreement: N Docket: NRC Notified By: OMER BUZYOZ HQ OPS Officer: BILL GOTT | Notification Date: 05/13/2004 Notification Time: 18:26 [ET] Event Date: 05/13/2004 Event Time: 14:30 [EDT] Last Update Date: 05/13/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: INFORMATION ONLY | Person (Organization): JOHN ROGGE (R1) ROBERT PIERSON (NMSS) | Event Text DAMAGED CPN MOISTURE DENSITY GAUGE At approximately 1430 EDT on 05/13/04, an equipment operator backed a truck over a CPN moisture density gauge model MC1DRP, Serial No. MD30506972, containing an 10 milliCurie Cs-137 and a 50 milliCurie Am-241:Be source. The exterior cover of the gauge was damaged, the source rod was stuck in the shielded position at the time the incident occurred. The top shield was broken off. The technician removed personnel from the area and contacted the company headquarters who contacted the manufacturer. The technician placed the gauge in a five gallon bucket filled with gravel. The bucket and gauge are locked in a truck for transportation to the home office in Fredericksburg, VA. Radiation measurement before the gauge was placed in the bucket was 2 millirem per hour at five feet. Radiation measurement after the gauge was placed in the bucket was 0.6 millirem per hour at one meter. The ground where the accident occurred was also surveyed at a slow pace at a distance of 1 inch, and no reading was recorded other than background radiation. The licensee will conduct a leak test of the gauge when the gauge reaches Fredericksburg, VA. They plan to ship the gauge to the manufacturer. | Power Reactor | Event Number: 40746 | Facility: DRESDEN Region: 3 State: IL Unit: [ ] [2] [3] RX Type: [1] GE-1,[2] GE-3,[3] GE-3 NRC Notified By: WARREN DEAGLE HQ OPS Officer: JEFF ROTTON | Notification Date: 05/13/2004 Notification Time: 22:12 [ET] Event Date: 05/13/2004 Event Time: 19:15 [CDT] Last Update Date: 05/13/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: 50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE | Person (Organization): ANNE MARIE STONE (R3) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 2 | N | Y | 98 | Power Operation | 98 | Power Operation | 3 | N | Y | 99 | Power Operation | 99 | Power Operation | Event Text LOSS OF ENS AND COMMERCIAL PHONE LINES TO CONTROL ROOMS "At 1915 CST, Dresden personnel identified that the ENS phone was not operational, either with outgoing or incoming calls. The NRC Ops Center was contacted via the normal commercial phone system and informed of the situation. Call back from the NRC via the commercial phone line failed as Dresden is currently not receiving outside phone calls due to the failure. A call back method through BPO [Bulk Power Operations] has been established. The phone problem appears to be not at the Dresden Site, SBC [local phone provider] is initiating repairs. Current off-site communications are being augmented via personal cellular telephones." The licensee notified the NRC Resident Inspector. | |