The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for March 21, 2003








                    U.S. Nuclear Regulatory Commission

                              Operations Center



                              Event Reports For

                           03/20/2003 - 03/21/2003



                              ** EVENT NUMBERS **



39681  39682  39683  



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39681       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: BRUNSWICK                REGION:  2  |NOTIFICATION DATE: 03/19/2003|

|    UNIT:  [1] [] []                 STATE:  NC |NOTIFICATION TIME: 23:15[EST]|

|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        03/19/2003|

+------------------------------------------------+EVENT TIME:        21:30[EST]|

| NRC NOTIFIED BY:  David Jester                 |LAST UPDATE DATE:  03/20/2003|

|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |CAUDLE JULIAN        R2      |

|10 CFR SECTION:                                 |                             |

|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       94       Power Operation  |94       Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| SINK HOLE IN SITE STABILIZATION POND                                         |

|                                                                              |

| "The site stabilization pond has developed a sink hole which has created a   |

| partial bypass of the normal treatment system from an unauthorized release   |

| point. The stabilization pond receives water pumped from a Storm Drain Basin |

| which collects storm drainage from various areas around the site. This       |

| release from an unauthorized discharge point requires notification to the    |

| State of North Carolina in accordance with our NPDES permit. This report     |

| initiated per [50.72(b)(2)(xi)] due to State of North Carolina               |

| notification."                                                               |

|                                                                              |

| The licensee has notified the NRC Resident Inspector.                        |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39682       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 03/20/2003|

|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 04:39[EST]|

|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        03/20/2003|

+------------------------------------------------+EVENT TIME:        00:15[EST]|

| NRC NOTIFIED BY:  Robert Boesch                |LAST UPDATE DATE:  03/20/2003|

|  HQ OPS OFFICER:  ERIC THOMAS                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |PETE ESELGROTH       R1      |

|10 CFR SECTION:                                 |                             |

|AINC 50.72(b)(3)(v)(C)   POT UNCNTRL RAD REL    |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|2     N          N       0        Refueling        |0        Refueling        |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| INOPERABLE SECONDARY CONTAINMENT                                             |

|                                                                              |

| "On 3/20/03 at 0015 hours during performance of Secondary Containment        |

| drawdown testing, it was determined that the Technical Specification maximum |

| allowed combined flowrate of 2885 SCFM for Zone 1 and Zone 3 was exceeded.   |

| The average flow for the two zones was approximately 3000 SCFM. The          |

| condition required the Station to declare both zones inoperable, and placed  |

| Unit 1 in a 4 hour LCO to restore Secondary Containment. Unit 2 is already   |

| in Mode 5, however the condition would have prevented all additional fuel    |

| moves. The Standby Gas Treatment System was capable of maintaining the DP    |

| requirement of 0.25 " vac. water gauge during the test. By 0330              |

| investigation had reduced flow from the two zones to approximately 2600      |

| SCFM, and the LCO was exited. The inoperability of Secondary Containment is  |

| a loss of an entire Safety Function that is needed to control the release of |

| radioactive material, and is reportable under 10CFR50.72(b)(3)(v)(c)."       |

|                                                                              |

| The licensee notified the NRC Resident Inspector.                            |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   39683       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: PALO VERDE               REGION:  4  |NOTIFICATION DATE: 03/20/2003|

|    UNIT:  [1] [2] [3]               STATE:  AZ |NOTIFICATION TIME: 13:13[EST]|

|   RXTYPE: [1] CE,[2] CE,[3] CE                 |EVENT DATE:        03/20/2003|

+------------------------------------------------+EVENT TIME:        08:30[MST]|

| NRC NOTIFIED BY:  DAN MARKS                    |LAST UPDATE DATE:  03/20/2003|

|  HQ OPS OFFICER:  ARLON COSTA                  +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |CLAUDE JOHNSON       R4      |

|10 CFR SECTION:                                 |                             |

|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       97       Power Operation  |97       Power Operation  |

|2     N          Y       98       Power Operation  |98       Power Operation  |

|3     N          Y       99       Power Operation  |99       Power Operation  |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| MEDIA COVERAGE OF TERRORIST TARGET                                           |

|                                                                              |

| "The following event description is based on information currently           |

| available.  If through subsequent reviews of this event, additional          |

| information is identified that is pertinent to this event or alters the      |

| information being provided at this time, a follow-up notification will be    |

| made via the ENS or under the reporting requirements of 10CFR50.73.          |

|                                                                              |

| "This ENS notification is to inform the agency of an issue within the NRC's  |

| purview that may affect or raise a concern about the public health and       |

| safety.                                                                      |

|                                                                              |

| "It has been reported in two news articles that the Palo Verde Nuclear       |

| Generating Station has been identified as a terrorist target.  These two     |

| articles have been copied from the internet                                  |

| [ww.cnn.com/2003/US/Southwest/03/20/nuclear.plant.threat/index.html and      |

| www.washtimes.com/national/20030320-43174000.htm] and attached to this       |

| notification. We have also been informed of television coverage on the same  |

| subject on CNN and local networks.                                           |

|                                                                              |

| "The Palo Verde Nuclear Generating Station is prepared to respond to media   |

| questions, but has no plans to issue a press release.                        |

|                                                                              |

| "The NRC Resident Inspector has been notified of this ENS call."             |

+------------------------------------------------------------------------------+



                    