NOEDs Issued to Power Reactor Licensees
On this page:
| | 2026 | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | |
| | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | |
| | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 | |
2026
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 06/24/2026 | EAF-RIV-2026-0060 | NOTICE OF ENFORCEMENT DISCRETION FOR WATERFORD STEAM ELECTRIC STATION (EPID L-2026-LLD-0004) |
| 02/05/2026 | EAF-RIV-2026-0013 | NOTICE OF ENFORCEMENT DISCRETION FOR COOPER NUCLEAR STATION (EPID L-2026-LLD-0001) |
2025
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 11/19/2025 | EAF-RII-2025-0197 | NOTICE OF ENFORCEMENT DISCRETION (NOED) FOR VIRGIL C. SUMMER NUCLEAR PLANT, UNIT 1 (EPID: L-2025-LLD-0007) |
| 02/05/2025 | EAF-RI-2025-0048 | NOTICE OF ENFORCEMENT DISCRETION FOR HOPE CREEK GENERATING STATION (EPID: L-2025-LLD-0002) |
2024
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 09/26/2024 | EA-24-113 | Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant (EPID: L-2024-lLD-0005) |
| 08/29/2024 | EA-24-091 | Notice Of Enforcement Discretion For Wolf Creek Generating Station |
| 04/02/2024 | EA-24-036 | Cooper Nuclear Station (EPID L-2024-LLD-0003) |
| 03/25/2024 | EA-24-033 | Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) |
| 03/05/2024 | EA-24-027 | Seabrook Station, Unit 1 (EPID L-2024-033) |
2023
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 07/26/2023 | EA-23-091 | Fermi Power Plant, Unit 2 (EPID L-2023-LLD-0002) |
| 06/08/2023 | EA-23-067 | Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) |
2022
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/30/2022 | EA-22-137 | Davis-Besse Nuclear Power Station, Unit 1 (EPID L-2022-LLD-0008) |
| 07/27/2022 | EA-22-073 | Surry Power Station, Units 1 and 2 (EPID I 2022 003 0023 AND EPID L 2022 LLD 0006) |
| 07/26/2022 | EA-22-072 | Sequoyah Nuclear Plant, Unit 1 (EPID I-2022-003-0027 and EPID L-2022-LLD-0005) |
| 01/31/2022 | EA-22-008 | Millstone Power Station, Unit 3 (EPID: L-2022-LLD-0000) |
2021
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 09/28/2021 | EA-21-138 Enclosure | Seabrook Station, UNIT NO. 1: Notice Of Enforcement Discretion (NOED) (EPID: L-2021-LLA-0168) |
| 03/04/2021 | EA-21-024 | Donald C. Cook Nuclear Plant, Units 1 and 2 (EPID: L-2021-LLD-0000) |
2020
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 07/01/2020 | EA-20-089 | Wolf Creek Generating Station (Wolf Creek Nuclear Operating Corporation) |
2018
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 06/18/2018 | 18-2-001 | Catawba Nuclear Station, Unit 2 (Duke Energy Corporation) |
| 08/15/2018 | 18-1-01 | Beaver Valley Power Station, Unit No. 2 (FirstEnergy Nuclear Operating Company) |
2017
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 09/10/2017 | 17-2-01 | Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Tennessee Valley Authority) |
| 09/12/2017 | 17-3-001 | Dresden Nuclear Power Station, Unit 3 (Exelon Generation Company) |
2016
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 03/09/2016 | 16-2-001 | Brunswick Steam Electric Plant, Unit 2 (Duke Energy Progress, Inc.) |
| 10/20/2016 | 16-2-01 | Watts Bar Nuclear Plant, Units 1 and 2 (Tennessee Valley Authority) |
2015
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 07/17/2015 | 15-4-02 | Comanche Peak Nuclear Power Plant (Luminant Generation Company) |
| 06/04/2015 | 15-4-01 | Palo Verde Nuclear Generating Station, Unit 3 (Arizona Public Service Company) |
2014
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 10/16/2014 | 14-4-002 | Wolf Creek Generating Station (Wolf Creek Nuclear Operating Corporation) |
| 08/28/2014 | 14-1-04 | Peach Bottom Atomic Power Station Units 2 and 3 (Exelon) |
| 08/27/2014 | 14-2-03 | Vogtle Electric Generating Plant Unit 2 (Southern Nuclear Operating Company, Inc.) |
| 08/27/2014 | 14-2-002 | McGuire Nuclear Station Unit 1 (Duke Energy Carolinas, LLC) |
| 08/21/2014 | 14-4-001 | Diablo Canyon Power Plant Unit 2 (Pacific Gas and Electric Company) |
| 07/31/2014 | 14-2-001 (Extension) | Turkey Point Nuclear Generating Station Units 3 and 4 (Florida Power and Light Company) |
| 07/23/2014 | 14-2-001 | Turkey Point Nuclear Generating Station Units 3 and 4 (Florida Power and Light Company) |
| 07/17/2014 | 14-1-03 | Three Mile Island Unit 1 (Exelon Generation Company LLC.) |
| 03/12/2014 | 14-2-001 | Catawba Nuclear Station Unit 1 (Duke Energy Corporation) |
| 02/19/2014 | 14-1-02 | Salem Unit 2 (PSEG Nuclear) |
| 01/30/2014 | 14-1-01 | Millstone Power Station Unit 3 (Dominion Resources) |
2013
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/11/2013 | 13-4-004 | Comanche Peak Nuclear Power Plant (Luminant Generation Company LLC) |
| 10/24/2013 | 13-4-003 | NOED DENIED – Wolf Creek (Wolf Creek Nuclear Operating Corporation) |
| 06/21/2013 | 13-4-002 | Wolf Creek (Wolf Creek Nuclear Operating Corporation) |
| 04/17/2013 | 13-2-001 | Brunswick 1 (Carolina Power and Light Company) |
| 01/15/2013 | 13-4-001 | Wolf Creek (Wolf Creek Nuclear Operating Corporation) |
2012
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 07/12/2012 | 12-3-001 | Braidwood (Exelon) |
| 07/31/2012 | 12-2-002 | NOED DENIED – Joseph M. Farley Nuclear Plant Unit 1 (Southern Nuclear Company) |
| 07/26/2012 | 12-2-001 | Shearon Harris Nuclear Power Plant Unit 1 (Carolina Power and Light Company) |
| 07/25/2012 | 12-3-002 | Donald C Cook 1 (Indiana Michigan Power) |
| 08/23/2012 | 12-4-002 | Callaway Plant Unit 1 (Union Electric Company) |
| 08/15/2012 | 12-2-003 | Surry Power Station Units 1 and 2 (Virginia Electric and Power Company) |
2011
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/22/2011 | 11-2-004 | Catawba Nuclear Station Unit 1 and 2 (Duke Energy Corporation) |
| 10/12/2011 | 11-1-001 | Calvert Cliffs (Constellation Energy Nuclear Group, LLC) |
| 10/05/2011 | 11-3-001 | Monticello Nuclear Generating Plant (Northern States Power Company) |
| 08/18/2011 | 11-4-001 | Wolf Creek Generating Station (Wolf Creek Nuclear Operating Corporation) |
| 06/06/2011 | 11-2-003 | Oconee Nuclear Station (Duke Energy Carolinas, LLC) |
| 01/26/2011 | 11-2-001 | McGuire Nuclear Station Unit 1 (Duke Energy Carolinas, LLC) |
2010
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 04/08/2010 | 10-4-001 | Callaway, Unit 1 (Union Electric Company) |
2009
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 10/07/2009 | 09-3-002 | Palisades (Entergy Nuclear Operations, Inc.) |
| 01/29/2009 | 09-3-01 | Kewaunee (Dominion Energy Kewaunee, Inc.) |
2008
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 10/02/2008 | 08-2-001 | Sequoyah 1 and 2 (Tennessee Valley Authority) |
| 08/21/2008 | 08-3-002 | Dresden 3 (Exelon Generation Company, LLC) |
| 04/10/2008 | 08-3-01 | Palisades (Energy Nuclear Operations, Inc.) |
| 02/20/2008 | 08-4-01 | Wolf Creek (Wolf Creek Nuclear Operating Corporation) |
2007
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 07/12/2007 | 07-4-01 | Wolf Creek (Wolf Creek Nuclear Operating Corporation) |
| 01/24/2007 | 07-3-01 | Dresden (Exelon Generation Company, LLC) |
2006
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/20/2006 | 06-4-02 | South Texas Unit 1 (STP Nuclear) |
| 12/06/2006 | 06-4-01 | South Texas Unit 2 (STP Nuclear) |
| 10/18/2006 | 06-3-01 | Quad Cities (Exelon Generation Company) |
| 04/20/2006 | 06-1-01 | Beaver Valley 2 (FirstEnergy Nuclear Operating Company) |
| 02/22/2006 | 06-2-01 | St. Lucie 2 (Florida Power and Light Company) |
2005
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/05/2005 | 05-01-01 | Seabrook (FPL Energy Seabrook, LLC) |
| 10/14/2005 | 05-2-002 | McGuire 1 (Duke Power Company) |
| 05/17/2005 | 05-2-001 | Brunswick (Carolina Power and Light Company) |
2004
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 05/26/2004 | 03-4-002 | Callaway (Union Electric Company) |
| 03/23/2004 | 04-6-001 | South Texas Project 1 and 2 (STP Nuclear Operating Company) |
2003
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 11/25/2003 | 03-2-007 | St. Lucie 2 (Florida Power and Light Company) |
| 11/07/2003 | 03-6-004 | Vogtle 2 (Southern Nuclear Operating Company) |
| 10/16/2003 | 03-1-003 | Calvert Cliffs 2 (Constellation Generation Group, LLC) |
| 10/14/2003 | 03-6-003 | Catawba 1 (Duke Energe Corporation) |
| 09/10/2003 | 03-3-006 | Perry (FirstEnergy Nuclear Operating Co.) |
| 08/20/2003 | 03-2-006 | Catawba 2 (Duke Energy Corporation) |
| 08/20/2003 | 03-6-002 | Ginna (Rochester Gas and Electric Corporation) |
| 08/18/2003 | 03-1-002 | Nine Point 2 (Nine Mile Point Nuclear Station, LLC) |
| 07/10/2003 | 03-3-005 | Palisades (Nuclear Management Co., LLC) |
| 05/13/2003 | 03-2-005 | Catawba 1 (Duke Energy Corporation) |
| 04/14/2003 | 03-3-004 | LaSalle 1 (Exelon Generation Company) |
| 03/13/2003 | 03-3-003 | D.C. Cook 2 (Indiana Michigan Power Company) |
| 03/06/2003 | 03-2-004 | Sequoyah 2 (Tennessee Valley Authority) |
| 02/26/2003 | 03-1-001 | Pilgrim 1 (Entergy Nuclear Operations, Inc.) |
| 02/21/2003 | 03-4-001 | Columbia Generating Station (Energy Northwest) |
| 02/11/2003 | 03-2-003 | McGuire 1 (Duke Energy Corporation) |
| 02/11/2003 | 03-2-002 | Summer 1 (South Carolina Electric & Gas Company) |
| 02/06/2003 | 03-3-002 | Braidwood (Exelon Generation Company, LLC) |
| 01/30/2003 | 03-6-001 | Sequoyah 2 (Tennessee Valley Authority) |
| 01/22/2003 | 03-3-001 | Palisades (Nuclear Management Company, LLC) |
2002
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 12/20/2002 | 02-6-002 | Hope Creek (PSEG Nuclear, LLC) |
| 12/23/2002 | 02-4-004 | Callaway (Union Electric Company) |
| 11/15/2002 | 02-3-059 | Palisades (Nuclear Management Company, LLC) |
| 11/08/2002 | 02-3-058 | D.C. Cook 2 (Indiana Michigan Power Company) |
| 10/08/2002 | 02-1-003 | Susquehanna 1 (PP&L, Inc.) |
| 08/23/2002 | 02-4-003 | Diablo Canyon 2 (Pacific Gas and Electric Company) |
| 07/17/2002 | 02-3-009 | Dresden (Thomas S. Cisco) |
| 07/17/2002 | 02-3-012 | Dresden (Daniel G. Daly) |
| 07/17/2002 | 02-3-018 | Dresden (Gerard A. Gates) |
| 07/17/2002 | 02-3-029 | Dresden (Christopher A. Keebaugh) |
| 07/17/2002 | 02-3-033 | Dresden (Raymond D. Laboda) |
| 07/17/2002 | 02-3-035 | Dresden (Steven E. Mattson) |
| 07/17/2002 | 02-3-040 | Dresden (Daniel M. Potochnic) |
| 07/10/2002 | 02-3-003 | Dresden (Michael B. Alfred) |
| 07/10/2002 | 02-3-004 | Dresden (Leigh D. Anderson) |
| 07/10/2002 | 02-3-005 | Dresden (Carol Y. Barajas) |
| 07/10/2002 | 02-3-006 | Dresden (Gary D. Bierwirth) |
| 07/10/2002 | 02-3-007 | Dresden (Scott J. Briley) |
| 07/10/2002 | 02-3-008 | Dresden (David J. Carlson) |
| 07/10/2002 | 02-3-010 | Dresden (Louis A. Ciuffini) |
| 07/10/2002 | 02-3-011 | Dresden (Larry E. Cruse) |
| 07/10/2002 | 02-3-013 | Dresden (Hal G. Dodd) |
| 07/10/2002 | 02-3-014 | Dresden (John C. Doyle) |
| 07/10/2002 | 02-3-015 | Dresden (Ronald B. Eltrevoog) |
| 07/10/2002 | 02-3-016 | Dresden (Andrew R. Failor) |
| 07/10/2002 | 02-3-017 | Dresden (Richard E. Gadbois) |
| 07/10/2002 | 02-3-019 | Dresden (Robert A. Gato) |
| 07/10/2002 | 02-3-020 | Dresden (Joseph T. Glanek) |
| 07/10/2002 | 02-3-021 | Dresden (Brian E. Grant) |
| 07/10/2002 | 02-3-022 | Dresden (David H. Gronek) |
| 07/10/2002 | 02-3-023 | Dresden (James J. Gulas) |
| 07/10/2002 | 02-3-024 | Dresden (David I. Hamilton) |
| 07/10/2002 | 02-3-025 | Dresden (Gerald T. Hartman) |
| 07/10/2002 | 02-3-026 | Dresden (Richard L. Hocraffer) |
| 07/10/2002 | 02-3-027 | Dresden (Martin T. Kapchinske) |
| 07/10/2002 | 02-3-028 | Dresden (Peter J. Karaba) |
| 07/10/2002 | 02-3-030 | Dresden (Christopher P. Kent) |
| 07/10/2002 | 02-3-031 | Dresden (David M. Klimek) |
| 07/10/2002 | 02-3-032 | Dresden (Thomas D. Koppen) |
| 07/10/2002 | 02-3-034 | Dresden (Gregory N. Leonatti) |
| 07/10/2002 | 02-3-036 | Dresden (Michael J. McDonald) |
| 07/10/2002 | 02-3-037 | Dresden (Glen K. Morrow) |
| 07/10/2002 | 02-3-038 | Dresden (Thomas A. Mosey) |
| 07/10/2002 | 02-3-039 | Dresden (Terence S. Palanyk) |
| 07/10/2002 | 02-3-041 | Dresden (Thomas L. Pouk) |
| 07/10/2002 | 02-3-042 | Dresden (Randy F. Pritzl) |
| 07/10/2002 | 02-3-043 | Dresden (Donald F. Ragan) |
| 07/10/2002 | 02-3-044 | Dresden (Mitchell D. Roether) |
| 07/10/2002 | 02-3-045 | Dresden (William M. Runion) |
| 07/10/2002 | 02-3-046 | Dresden (Paul A. Salgado) |
| 07/10/2002 | 02-3-047 | Dresden (Brian W. Sampson) |
| 07/10/2002 | 02-3-048 | Dresden (David P. Schupp) |
| 07/10/2002 | 02-3-049 | Dresden (Robert P. Scott) |
| 07/10/2002 | 02-3-050 | Dresden (David A. Slager) |
| 07/10/2002 | 02-3-051 | Dresden (Roger W. Stobert) |
| 07/10/2002 | 02-3-052 | Dresden (David B. Throne) |
| 07/10/2002 | 02-3-053 | Dresden (Steven P. Vercelli) |
| 07/10/2002 | 02-3-054 | Dresden (Joseph M. Welch) |
| 07/10/2002 | 02-3-055 | Dresden (Kim R. Wynn) |
| 07/10/2002 | 02-3-056 | Dresden (Alan H. Zlomie) |
| 06/18/2002 | 02-3-002 | D.C. Cook 1 and 2 (Indiana Michigan Power Company) |
| 06/13/2002 | 02-1-002 | Indian Point 3 (Entergy Nuclear) |
| 04/10/2002 | 02-3-001 | D.C. Cook 2 (Indiana Michigan Power Company) |
| 04/02/2002 | 02-4-001 | Grand Gulf 1 (Energy Operations, Inc.) |
| 03/26/2002 | 02-6-001 | Columbia Generating Station (Energy Northwest) |
| 01/31/2002 | 02-1-001 | Calvert Cliffs (Constellation Nuclear) |
2001
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 10/03/2001 | 01-6-003 | Byron 1 (Exelon Generation Company, LLC) |
| 01-6-004 | Byron 2 (Exelon Generation Company, LLC) | |
| 01-6-005 | Braidwood 2 (Exelon Generation Company, LLC) | |
| 09/25/2001 | 01-4-002 | South Texas Project 1 (STP Nuclear Operating Company) |
| 04/24/2001 | 01-2-001 | McGuire 1 (Duke Energy Corporation) |
| 04/18/2001 | 01-3-002 | Prairie Island (Nuclear Management Company, LLC) |
| 03/29/2001 | 01-3-001 | Fermi 2 (Detroit Edison Company) |
| 03/08/2001 | 01-2-001 | Watts Bar 1 (Tennessee Valley Authority) |
| 02/23/2001 | 01-4-001 | Grand Gulf (Entergy Operations, Inc.) |
| 02/05/2001 | 01-6-002 | Monticello (Nuclear Management Company, LLC) |
| 01/19/2001 | 01-1-001 | Hope Creek (PSEG Nuclear, LLC) |
| 01/18/2001 | 01-6-001 | Clinton (AmerGen Energy Company, LLC) |
2000
| Confirmation Date | NOED Number | Facility (Licensee) |
|---|---|---|
| 11/28/2000 | 00-4-002 | Fort Calhoun (Omaha Public Power District) |
| 11/03/2000 | 00-3-001 | Prairie Island (Nuclear Management Company, LLC) |
| 10/12/2000 | 00-2-001 | Surry 1 (Virginia Electric and Power Company) |
| 09/20/2000 | 00-6-011 | Clinton (AmerGen Energy Company) |
| 09/11/2000 | 00-6-010 | Callaway (Union Electric Company) |
| 09/08/2000 | 00-6-009 | Oconee 1, 2, and 3 (Duke Energy Corporation) |
| 07/21/2000 | 00-6-007 | Oyster Creek (GPU Nuclear, Inc.) |
| 09/05/2000 | 00-6-008 | FitzPatrick (Power Authority of the State of New York) |
| 05/01/2000 | 00-6-006 | Waterford 3 (Entergy Operations, Inc.) |
| 04/11/2000 | 00-6-005 | Susquehanna 2 (PP&L, Inc.) |
| 02/25/2000 | 00-6-004 | Watts Bar 1 (Tennessee Valley Authority) |
| 02/23/2000 | 00-6-003 | LaSalle (Commonwealth Edison Company) |
| 02/18/2000 | 00-6-002 | Palisades (Consumer Power) |
| 02/14/2000 | 00-6-001 | Vermont Yankee (Vermont Yankee Nuclear Power Corporation) |
| 01/24/2000 | 00-4-001 | Comanche Peak 1 (TXU Electric) |
| 01/08/2000 | 99-3-001 | Point Beach 1 (Wisconsin Electric) |
| 01/04/2000 | 99-6-010 | Cooper (Nebraska Public Power District) |