PART 50—DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
Part Index
General Provisions
Sec.
50.1 Basis, purpose, and procedures applicable.
50.2 Definitions.
50.3 Interpretations.
50.4 Written communications.
50.5 Deliberate misconduct.
50.7 Employee protection.
50.8 Information collection requirements: OMB approval.
50.9 Completeness and accuracy of information.
Requirement of License, Exceptions
50.10 License required; limited work
authorization.
50.11 Exceptions and exemptions from licensing requirements.
50.12 Specific exemptions.
50.13 Attacks and destructive acts by enemies of the United States; and defense activities.
Classification and Description of Licenses
50.20 Two classes of licenses.
50.21 Class 104 licenses; for medical therapy and research and development facilities.
50.22 Class 103 licenses; for commercial and industrial facilities.
50.23 Construction permits.
Applications for Licenses, Certifications, and Regulatory Approvals; Form; Contents; Ineligibility
of Certain Applicants
50.30 Filing of applications for licenses; oath or affirmation.
50.31 Combining applications.
50.32 Elimination of repetition.
50.33 Contents of applications; general information.
50.34 Contents of applications; technical information.
50.34a Design objectives for equipment to control releases of radioactive material in effluents—
nuclear power reactors.
50.35 Issuance of construction permits.
50.36 Technical specifications.
50.36a Technical specifications on effluents from nuclear power reactors.
50.36b Environmental conditions.
50.37 Agreement limiting access to Classified Information.
50.38 Ineligibility of certain applicants.
50.39 Public inspection of applications.
Standards for Licenses, Certifications,and Regulatory Approvals
50.40 Common standards.
50.41 Additional standards for class 104 licenses.
50.42 Additional standard for class 103 licenses.
50.43 Additional standards and provisions affecting class 103 licenses and certifications for commercial
power.
50.44 Combustible gas control for nuclear power reactors.
50.45 Standards for construction permits, operating licenses, and combined licenses.
50.46 Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
50.46a Acceptance criteria for reactor coolant system venting systems.
50.47 Emergency plans.
50.48 Fire protection.
50.49 Environmental qualification of electric equipment important to safety for nuclear power plants.
Issuance, Limitations, and Conditions of Licenses and Construction Permits
50.50 Issuance of licenses and construction permits.
50.51 Continuation of license.
50.52 Combining licenses.
50.53 Jurisdictional limitations.
50.54 Conditions of licenses.
50.55 Conditions of construction permits, early site permits, combined licenses, and manufacturing
licenses.
50.55a Codes and standards.
50.56 Conversion of construction permit to license; or amendment of license.
50.57 Issuance of operating license.
50.58 Hearings and report of the Advisory Committee on Reactor Safeguards.
50.59 Changes, tests and experiments.
50.60 Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal
operation.
50.61 Fracture toughness requirements for protection against pressurized thermal shock events.
50.61a Alternate fracture toughness requirements for protection against pressurized thermal shock events.
50.62 Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-
water-cooled nuclear power plants.
50.63 Loss of all alternating current power.
50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
50.65 Requirements for monitoring the effectiveness of maintenance at nuclear power plants.
50.66 Requirements for thermal annealing of the reactor pressure vessel.
50.67 Accident source term.
50.68 Criticality accident requirements.
Inspections, Records, Reports, Notifications
50.69 Risk-informed categorization and treatment of structures, systems and components for nuclear power
reactors.
50.70 Inspections.
50.71 Maintenance of records, making of reports.
50.72 Immediate notification requirements for operating nuclear power reactors.
50.73 License event report system.
50.74 Notification of change in operator or senior operator status.
50.75 Reporting and recordkeeping for decommissioning planning.
50.76. Licensee's change of status; financial qualifications.
US/IAEA Safeguards Agreement
50.78 Facility information and verification.
Transfers of Licenses—Creditors' Rights—Surrender of Licenses
50.80 Transfer of licenses.
50.81 Creditor regulations.
50.82 Termination of license.
50.83 Release of part of a power reactor facility or site for unrestricted use.
Amendment of License or Construction Permit at Request of Holder
50.90 Application for amendment of license, construction permit, or early site permit.
50.91 Notice for public comment; State consultation.
50.92 Issuance of amendment.
Revocation, Suspension, Modification, Amendment of Licenses and Construction Permits, Emergency Operations by the Commission
50.100 Revocation, suspension, modification of licenses, permits, and approvals for cause.
50.101 Retaking possession of special nuclear material.
50.102 Commission order for operation after revocation.
50.103 Suspension and operation in war or national emergency.
Backfitting
50.109 Backfitting.
Enforcement
50.110 Violations.
50.111 Criminal penalties.
Additional Standards for Licenses, Certifications, and Regulatory Approvals
50.120 Training and qualification of nuclear power plant personnel.
50.150 Aircraft impact assessment.
50.155 Mitigation of beyond-design-basis events.
Small Modular Reactors, Non-Light-
Water Reactors, and Non-Power
Production or Utilization Facilities
50.160 Emergency preparedness for
small modular reactors, non-light-water
reactors, and non-power production or
utilization facilities.
Appendix A to Part 50—General Design Criteria for Nuclear Power Plants
Appendix B to Part 50—Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing
Plants
Appendix C to Part 50—A Guide for the Financial Data and Related Information Required To Establish
Financial Qualifications for Construction Permits and Combined Licenses
Appendix D to Part 50 [Reserved]
Appendix E to Part 50—Emergency Planning and Preparedness for Production and Utilization Facilities
Appendix F to Part 50—Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste
Management Facilities
Appendix G to Part 50—Fracture Toughness Requirements
Appendix H to Part 50—Reactor Vessel Material Surveillance Program Requirements
Appendix I to Part 50—Numerical Guides for Design Objectives and Limiting Conditions for Operation to
Meet the Criterion "As Low as is Reasonably Achievable" for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
Appendix J to Part 50—Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Appendix K to Part 50—ECCS Evaluation Models
Appendix L to Part 50 [Reserved]
Appendix M to Part 50 [Reserved]
Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To Construct and
Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites
Appendix O to Part 50 [Reserved]
Appendix P to Part 50 [Reserved]
Appendix Q to Part 50—Pre-application Early Review of Site Suitability Issues
Appendix R to Part 50—Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979
Appendix S to Part 50—Earthquake Engineering Criteria for Nuclear Power Plants
Authority: Atomic Energy Act of 1954, secs. 11, 101, 102, 103, 104, 105, 108, 122, 147, 149, 161, 181, 182, 183, 184, 185, 186, 187, 189, 223, 234 (42 U.S.C. 2014, 2131,
2132, 2133, 2134, 2135, 2138, 2152, 2167, 2169, 2201, 2231, 2232, 2233, 2234, 2235, 2236, 2237, 2239, 2273, 2282); Energy Reorganization Act of 1974, secs. 201, 202, 206, 211 (42 U.S.C. 5841, 5842, 5846, 5851); Nuclear Waste Policy Act of 1982, sec. 306 (42 U.S.C. 10226); National Environmental Policy Act of 1969 (42 U.S.C. 4332); 44 U.S.C. 3504 note; Sec. 109, Pub. L. 96–295, 94 Stat. 783.
Source: 21 FR 355, Jan. 19, 1956, unless otherwise noted.
[72 FR 55932 Oct. 1, 2007; 72 FR 57441, Oct. 9, 2007; 72 FR 63973, Nov. 14, 2007; 73 FR 42674, Jul. 23, 2008; 73 FR 78605, Dec. 23, 2008; 73 FR 63571, Oct. 24, 2008; 74 FR 28146, Jun. 12, 2009; 75 FR 23, Jan. 4, 2010; 75 FR 61335, Oct. 5, 2010; 76 FR 35570, Jun. 17, 2011; 77 FR 39906, Jul. 6, 2012; 79 FR 65798, Nov. 5, 2014; 79 FR 62334, Oct. 17, 2014; 80 FR 54234, Sep. 9, 2015; 84 FR 39718, Aug. 9, 2019]
General Provisions
§ 50.1 Basis, purpose, and procedures applicable.
The regulations in this part are promulgated by the Nuclear Regulatory Commission pursuant to the Atomic Energy Act of
1954, as amended (68 Stat. 919), and Title II of the Energy Reorganization Act of 1974 (88 Stat. 1242), to provide for the
licensing of production and utilization facilities. This part also gives notice to all persons who knowingly provide to any
licensee, applicant, contractor, or subcontractor, components, equipment, materials, or other goods or services, that relate to
a licensee's or applicant's activities subject to this part, that they may be individually subject to NRC enforcement action for
violation of § 50.5.
[63 FR 1897, Jan 13, 1998]
§ 50.2 Definitions.
As used in this part,
Act means the Atomic Energy Act of 1954 (68 Stat. 919) including any amendments thereto.
Alternate ac source means an alternating current (ac) power source that is available to and located at or nearby a nuclear power plant and meets the following requirements:
(1) Is connectable to but not normally connected to the offsite or onsite emergency ac power systems;
(2) Has minimum potential for common mode failure with offsite power or the onsite emergency ac power sources;
(3) Is available in a timely manner after the onset of station blackout; and
(4) Has sufficient capacity and reliability for operation of all systems required for coping with station blackout and for the time required to bring and maintain the plant in safe shutdown (non-design basis accident).
Applicant means a person or an entity applying for a license, permit, or other form of Commission permission or approval under this part or part 52 of this chapter.
Atomic energy means all forms of energy released in the course of nuclear fission or nuclear transformation.
Atomic weapon means any device utilizing atomic energy, exclusive of the means for transporting or propelling the device (where such means is a separable and divisible part of the device), the prinicipal purpose of which is for use as, or for development of, a weapon, a weapon prototype, or a weapon test device.
Basic component means, for the purposes of § 50.55(e) of this chapter:
(1) When applied to nuclear power reactors, any plant structure, system, component, or part thereof necessary to assure
(i) The integrity of the reactor coolant pressure boundary,
(ii) The capability to shut down the reactor and maintain it in a safe shutdown condition, or
(iii) The capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to those referred to in § 50.34(a)(1), § 50.67(b)(2), or § 100.11 of this chapter, as applicable.
(2) When applied to other types of facilities or portions of such facilities for which construction permits are issued under § 50.23, a component, structure, system or part thereof that is directly procured by the construction permit holder for the facility subject to the regulations of this part and in which a defect or failure to comply with any applicable regulation in this chapter, order, or license issued by the Commission could create a substantial safety hazard.
(3) In all cases, basic component includes safety related design, analysis, inspection, testing, fabrication, replacement parts, or consulting services that are associated with the component hardware, whether these services are performed by the component supplier or other supplier.
Byproduct material means—
(1) Any radioactive material (except special nuclear material) yielded in, or made radioactive by, exposure to the radiation incident to the process of producing or using special nuclear material;
(2)(i) Any discrete source of radium-226 that is produced, extracted, or converted after extraction, before, on, or after August 8, 2005, for use for a commercial, medical, or research activity; or
(ii) Any material that—
(A) Has been made radioactive by use of a particle accelerator; and
(B) Is produced, extracted, or converted after extraction, before, on, or after August 8, 2005, for use for a commercial, medical, or research activity; and
(3) Any discrete source of naturally occurring radioactive material, other than source material, that—
(i) The Commission, in consultation with the Administrator of the Environmental Protection Agency, the
Secretary of Energy, the Secretary of Homeland Security, and the head of any other appropriate Federal agency, determines would pose a threat similar to the threat posed by a discrete source of radium-226 to the public health and safety or the common defense and security; and
(ii) Before, on, or after August 8, 2005, is extracted or converted after extraction for use in a commercial, medical, or research activity.
Certified fuel handler means, for a nuclear power reactor facility, a non-licensed operator who has qualified in accordance with a fuel handler training program approved by the Commission.
Commission means the Nuclear Regulatory Commission or its duly authorized representatives.
Committed dose equivalent means the dose equivalent to organs or tissues of reference that will be received from an intake of radioactive material by an individual during the 50-year period following the intake.
Committed effective dose equivalent is the sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues.
Common defense and security means the common defense and security of the United States.
Construction or constructing means, for the purposes of § 50.55(e), the analysis, design, manufacture, fabrication, quality assurance, placement, erection, installation, modification, inspection, or testing of a facility or activity which is subject to the regulations in this part and consulting services related to the facility or activity that are safety related.
Controls when used with respect to nuclear reactors means apparatus and mechanisms, the manipulation of which directly affects the reactivity or power level of the reactor.
Controls when used with respect to any other facility means apparatus and mechanisms, the manipulation of which could affect the chemical, physical, metallurgical, or nuclear process of the facility in such a manner as to affect the protection of health and safety against radiation.
Cost of service regulation means the traditional system of rate regulation, or similar regulation, including "price cap" or "incentive" regulation, in which a rate regulatory authority generally allows an electric utility to charge its customers the reasonable and prudent costs of providing electricity services, including capital, operations, maintenance, fuel, decommissioning, and other costs required to provide such services.
Decommission means to remove a facility or site safely from service and reduce residual radioactivity to a level that permits—
(1) Release of the property for unrestricted use and termination of the license; or
(2) Release of the property under restricted conditions and termination of the license.
Deep-dose equivalent, which applies to external whole-body exposure, is the dose equivalent at a tissue depth of 1 cm (1000mg/cm2).
Defect means, for the purposes of § 50.55(e) of this chapter:
(1) A deviation in a basic component delivered to a purchaser for use in a facility or activity subject to a construction permit under this part, if on the basis of an evaluation, the deviation could create a substantial safety hazard; or
(2) The installation, use, or operation of a basic component containing, a defect as defined in paragraph (1) of this definition; or
(3) A deviation in a portion of a facility subject to the construction permit of this part provided the deviation could, on the basis of an evaluation, create a substantial safety hazard.
Department and Department of Energy means the Department of Energy established by the Department of Energy Organization Act (Pub. L. 95-91, 91 Stat. 565, 42 U.S.C. 7101 et seq.), to the extent that the department, or its duly authorized representatives, exercises functions formerly vested in the Atomic Energy Commission, its Chairman, members, officers and components and transferred to the U.S. Energy Research and Development Administration and to the Administrator thereof pursuant to sections 104 (b), (c) and (d) of the Energy Reorganization Act of 1974 (Pub. L. 93-438, 88 Stat. 1233 at 1237, 42 U.S.C. 5814) and retransferred to the Secretary of Energy pursuant to section 301(a) of the Department of Energy Organization Act (Pub. L. 95-91, 91 Stat. 565 at 577-578, 42 U.S.C. 7151).
Design bases means that information which identifies the specific functions to be performed by a structure, system, or component of a facility, and the specific values or ranges of values chosen for controlling parameters as reference bounds for design. These values may be (1) restraints derived from generally accepted "state of the art" practices for achieving functional goals, or (2) requirements derived from analysis (based on calculation and/or experiments) of the effects of a postulated accident for which a structure, system, or component must meet its functional goals.
Deviation means, for the purposes of § 50.55(e) of this chapter, a departure from the technical or quality assurance requirements defined in procurement documents, safety analysis report, construction permit, or other documents provided for basic components installed in a facility subject to the regulations of this part.
Director means, for the purposes of § 50.55(e) of this chapter, an individual, appointed or elected according to law, who is authorized to manage and direct the affairs of a corporation, partnership or other entity.
Discovery means, for the purposes of § 50.55(e) of this chapter, the completion of the documentation first identifying the existence of a deviation or failure to comply potentially associated with a substantial safety hazard within the evaluation procedures discussed in § 50.55(e)(1).
Electric utility means any entity that generates or distributes electricity and which recovers the cost of this electricity, either directly or indirectly, through rates established by the entity itself or by a separate regulatory authority. Investor-owned utilities, including generation or distribution subsidiaries, public utility districts, municipalities, rural electric cooperatives, and State and Federal agencies, including associations of any of the foregoing, are included within the meaning of "electric utility."
Evaluation means, for the purposes of § 50.55(e) of this chapter, the process of determining whether a particular deviation could create a substantial safety hazard or determining whether a failure to comply is associated with a substantial safety hazard.
Exclusion area means that area surrounding the reactor, in which the reactor licensee has the authority to determine all activities including exclusion or removal of personnel and property from the area. This area may be traversed by a highway, railroad, or waterway, provided these are not so close to the facility as to interfere with normal operations of the facility and provided appropriate and effective arrangements are made to control traffic on the highway, railroad, or waterway, in case of emergency, to protect the public health and safety. Residence within the exclusion area shall normally be prohibited. In any event, residents shall be subject to ready removal in case of necessity. Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate limitations, provided that no significant hazards to the public health and safety will result.
Federal Government funding for conversion means funds appropriated to the Department of Energy or to any other Federal Agency to pay directly to or to reimburse non-power reactor licensees for costs attendant to conversion.
Federal licensee means any NRC licensee, the obligations of which are guaranteed by and supported by the full faith and credit of the United States Government.
Fuel acceptable to the Commission means that the fuel replacing the existing HEU fuel in a specific non-power reactor (1) meets the operating requirements of the existing license or, through appropriate NRC safety review and approval, can be used in a manner which protects public health and safety and promotes the common defense and security; and (2) meets the Commission's policy of limiting, to the maximum extent possible, the use of HEU fuel in that reactor.
Government agency means any executive department, commission, independent establishment, corporation, wholly or partly owned by the United States of America which is an instrumentality of the United States, or any board, bureau, division, service, office, officer, authority, administration, or other establishment in the executive branch of the Government.
Highly enriched uranium (HEU) fuel means fuel in which the weight percent of U-235 in the uranium is 20% or greater. Target material, special instrumentation, or experimental devices using HEU are not included.
Historical site assessment means the identification of potential, likely, or known sources of radioactive material and radioactive contamination based on existing or derived information for the purpose of classifying a facility or site, or parts thereof, as impacted or non-impacted.
Impacted areas mean the areas with some reasonable potential for residual radioactivity in excess of natural background or fallout levels.
Incentive regulation means the system of rate regulation in which a rate regulatory authority establishes rates that an electric generator may charge its customers that are based on specified performance factors, in addition to cost-of-service factors.
License means a license, including a construction permit or operating license under this part, an early site permit, combined license or manufacturing license under part 52 of this chapter, or a renewed license issued by the Commission under this part, part 52, or part 54 of this chapter.
Licensee means a person who is authorized to conduct activities under a license issued by the Commission.
Low enriched uranium (LEU) fuel means fuel in which the weight percent of U-235 in the uranium is less than 20%.
Low population zone means the area immediately surrounding the exclusion area which contains residents, the total number and density of which are such that there is a reasonable probability that appropriate protective measures could be taken in their behalf in the event of a serious accident. These guides do not specify a permissible population density or total population within this zone because the situation may vary from case to case. Whether a specific number of people can, for example, be evacuated from a specific area, or instructed to take shelter, on a timely basis will depend on many factors such as location, number and size of highways, scope and extent of advance planning, and actual distribution of residents within the area.
Major decommissioning activity means, for a nuclear power reactor facility, any activity that results in permanent removal of major radioactive components, permanently modifies the structure of the containment, or results in dismantling components for shipment containing greater than class C waste in accordance with § 61.55 of this chapter.
Major radioactive components means, for a nuclear power reactor facility, the reactor vessel and internals, steam generators, pressurizers, large bore reactor coolant system piping, and other large components that are radioactive to a comparable degree.
Non-bypassable charges mean those charges imposed over an established time period by a Government authority that affected persons or entities are required to pay to cover costs associated with the decommissioning of a nuclear power plant. Such charges include, but are not limited to, wire charges, stranded cost charges, transition charges, exit fees, other similar charges, or the securitized proceeds of a revenue stream.
Non-impacted areas mean the areas with no reasonable potential for residual radioactivity in excess of natural background or fallout levels.
Non-light-water reactor means a
nuclear power reactor using a coolant
other than light water.
Non-power production or utilization
facility means a production or
utilization facility, licensed under
§ 50.21(a) or (c), or § 50.22, as
applicable, that is not a nuclear power
reactor or a production facility as
defined under paragraphs (1) and (2) of
the definition of Production facility in
this section.
Non-power reactor means a research or test reactor licensed under §§ 50.21(c) or 50.22 of this part for research and development.
Notification means the telephonic communication to the NRC Operations Center or written transmittal of information to the NRC Document Control Desk.
Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to sustain nuclear fission in a self-supporting chain reaction.
Permanent cessation of operation(s) means, for a nuclear power reactor facility, a certification by a licensee to the NRC that it has permanently ceased or will permanently cease reactor operation(s), or a final legally effective order to permanently cease operation(s) has come into effect.
Permanent fuel removal means, for a nuclear power reactor facility, a certification by the licensee to the NRC that it has permanently removed all fuel assemblies from the reactor vessel.
Person means (1) any individual, corporation, partnership, firm, association, trust, estate, public or private institution, group, government agency other than the Commission or the Department, except that the Department shall be considered a person to the extent that its facilities are subject to the licensing and related regulatory authority of the Commission pursuant to section 202 of the Energy Reorganization Act of 1974, any State or any political subdivision of, or any political entity within a State, any foreign government or nation or any political subdivision of any such government or nation, or other entity; and (2) any legal successor, representative, agent, or agency of the foregoing.
Price-cap regulation means the system of rate regulation in which a rate regulatory authority establishes rates that an electric generator may charge its customers that are based on a specified maximum price of electricity.
Procurement document means, for the purposes of § 50.55(e) of this chapter, a contract that defines the requirements which facilities or basic components must meet in order to be considered acceptable by the purchaser.
Produce, when used in relation to special nuclear material, means (1) to manufacture, make, produce, or refine special nuclear material; (2) to separate special nuclear material from other substances in which such material may be contained; or (3) to make or to produce new special nuclear material.
Production facility means:
(1) Any nuclear reactor designed or used primarily for the formation of plutonium or uranium-233; or
(2) Any facility designed or used for the separation of the isotopes of plutonium, except laboratory scale facilities designed or used for experimental or analytical purposes only; or
(3) Any facility designed or used for the processing of irradiated materials containing special nuclear material, except (i) laboratory scale facilities designed or used for experimental or analytical purposes, (ii) facilities in which the only special nuclear materials contained in the irradiated material to be processed are uranium enriched in the isotope U-235 and plutonium produced by the irradiation, if the material processed contains not more than 10–6 grams of plutonium per gram of U-235 and has fission product activity not in excess of 0.25 millicuries of fission products per gram of U-235, and (iii) facilities in which processing is conducted pursuant to a license issued under parts 30 and 70 of this chapter, or equivalent regulations of an Agreement State, for the receipt, possession, use, and transfer of irradiated special nuclear material, which authorizes the processing of the irradiated material on a batch basis for the separation of selected fission products and limits the process batch to not more than 100 grams of uranium enriched in the isotope 235 and not more than 15 grams of any other special nuclear material.
Prototype plant means a nuclear reactor that is used to test design features, such as the testing required under § 50.43(e). The prototype plant is similar to a first-of-a-kind or standard plant design in all features and size, but may include additional safety features to protect the public and the plant staff from the possible consequences of accidents during the testing period.
Reactor coolant pressure boundary means all those pressure-containing components of boiling and pressurized water-cooled nuclear power reactors, such as pressure vessels, piping, pumps, and valves, which are:
(1) Part of the reactor coolant system, or
(2) Connected to the reactor coolant system, up to and including any and all of the following:
(i) The outermost containment isolation valve in system piping which penetrates primary reactor containment,
(ii) The second of two valves normally closed during normal reactor operation in system piping which does not penetrate primary reactor containment,
(iii) The reactor coolant system safety and relief valves.
For nuclear power reactors of the direct cycle boiling water type, the reactor coolant system extends to and includes the outermost containment isolation valve in the main steam and feedwater piping.
Research and development means (1) theoretical analysis, exploration, or experimentation; or (2) the extension of investigative findings and theories of a scientific or technical nature into practical application for experimental and demonstration purposes, including the experimental production and testing of models, devices, equipment, materials, and processes.
Responsible officer means, for the purposes of § 50.55(e) of this chapter, the president, vice-president, or other individual in the organization of a corporation, partnership, or other entity who is vested with executive authority over activities subject to this part.
Restricted Data means all data concerning (1) design, manufacture, or utilization of atomic weapons; (2) the production of special nuclear material; or (3) the use of special nuclear material in the production of energy, but shall not include data declassified or removed from the Restricted Data category pursuant to section 142 of the Act.
Safe shutdown (non-design basis accident (non-DBA)) for station blackout means bringing the plant to those shutdown conditions specified in plant technical specifications as Hot Standby or Hot Shutdown, as appropriate (plants have the option of maintaining the RCS at normal operating temperatures or at reduced temperatures).
Safety-related structures, systems and components means those structures, systems and components that are relied upon to remain functional during and following design basis events to assure:
(1) The integrity of the reactor coolant pressure boundary
(2) The capability to shut down the reactor and maintain it in a safe shutdown condition; or
(3) The capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to the applicable guideline exposures set forth in § 50.34(a)(1) or § 100.11 of this chapter, as applicable.
Small modular reactor means a power
reactor, which may be of modular
design as defined in § 52.1 of this
chapter, licensed under § 50.21 or
§ 50.22 to produce heat energy up to
1,000 megawatts thermal per module.
Source material means source material as defined in subsection 11z. of the Act and in the regulations contained in part 40 of this chapter.
Source term refers to the magnitude and mix of the radionuclides released from the fuel, expressed as fractions of the fission product inventory in the fuel, as well as their physical and chemical form, and the timing of their release.
Special nuclear material means (1) plutonium, uranium-233, uranium enriched in the isotope-233 or in the isotope-235, and any other material which the Commission, pursuant to the provisions of section 51 of the act, determines to be special nuclear material, but does not include source material; or (2) any material artificially enriched by any of the foregoing, but does not include source material.
Station blackout means the complete loss of alternating current (ac) electric power to the essential and nonessential switchgear buses in a nuclear power plant (i.e., loss of offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency ac power system). Station blackout does not include the loss of available ac power to buses fed by station batteries through inverters or by alternate ac sources as defined in this section, nor does it assume a concurrent single failure or design basis accident. At single unit sites, any emergency ac power source(s) in excess of the number required to meet minimum redundancy requirements (i.e., single failure) for safe shutdown (non-DBA) is assumed to be available and may be designated as an alternate power source(s) provided the applicable requirements are met. At multi-unit sites, where the combination of emergency ac power sources exceeds the minimum redundancy requirements for safe shutdown (non-DBA) of all units, the remaining emergency ac power sources may be used as alternate ac power sources provided they meet the applicable requirements. If these criteria are not met, station blackout must be assumed on all the units.
Substantial safety hazard means, for the purposes of § 50.55(e) of this chapter, a loss of safety function to the extent that there is a major reduction in the degree of protection provided to public health and safety for any facility or activity authorized by the construction permit issued under this part.
Testing facility means a nuclear reactor which is of a type described in § 50.21(c) of this part and for which an application has been filed for a license authorizing operation at:
(1) A thermal power level in excess of 10 megawatts; or
(2) A thermal power level in excess of 1 megawatt, if the reactor is to contain:
(i) A circulating loop through the core in which the applicant proposes to conduct fuel experiments; or
(ii) A liquid fuel loading; or
(iii) An experimental facility in the core in excess of 16 square inches in cross-section.
Total effective dose equivalent (TEDE) means the sum of the effective dose equivalent (for external exposures) and the committed effective dose equivalent (for internal exposures).
Unique purpose means a project, program, or commercial activity which cannot reasonably be accomplished without the use of HEU fuel, and may include: (1) A specific experiment, program, or commercial activity (typically long-term) that significantly serves the U.S. national interest and cannot be accomplished without the use of HEU fuel; (2) Reactor physics or reactor development based explicitly on the use of HEU fuel; (3) Research projects based on neutron flux levels or spectra attainable only with HEU fuel; or (4) A reactor core of special design that could not perform its intended function without using HEU fuel.
United States, when used in a geographical sense, includes Puerto Rico and all territories and possessions of the United States.
Utilization facility means:
(1) Any nuclear reactor other than one designed or used primarily for the formation of plutonium or U–233; or
(2) An accelerator-driven subcritical operating assembly used for the irradiation of materials containing special nuclear material and described in the application assigned docket
number 50–608.
[21 FR 355, Jan. 19, 1956; 72 FR 49489, Aug. 28, 2007; 72 FR 55932 Oct. 1, 2007; 72 FR 68059, Dec. 4, 2007; 79 FR 62335, Oct. 17, 2014; 88 FR 80074, Nov. 16, 2023]
Editorial Note: For Federal Register citations affecting § 50.2, see the list of CFR Sections Affected.
§ 50.3 Interpretations.
Except as specifically authorized by the Commission in writing, no interpretation of the meaning of the regulations in this
part by any officer or employee of the Commission other than a written interpretation by the General Counsel will be
recognized to be binding upon the Commission.
§ 50.4 Written communications.
(a) General requirements. All correspondence, reports, applications, and other written communications from the applicant or licensee to the Nuclear Regulatory Commission concerning the regulations in this part or individual license conditions must be sent either by mail addressed: ATTN: Document Control Desk, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; by hand delivery to the NRC's offices at 11555 Rockville Pike, Rockville, Maryland 20852–2738, between the hours of 8:15 a.m. and 4 p.m. eastern time; or, where practicable, by electronic submission, for example, via Electronic Information Exchange, e-mail, or CD-ROM. Electronic submissions must be made in a manner that enables the NRC to receive, read, authenticate, distribute, and archive the submission, and process and retrieve it a single page at a time. Detailed guidance on making electronic submissions can be obtained by visiting the NRC’s Web site at http://www.nrc.gov/site-help/e-submittals.html; by e-mail to MSHD.Resource@nrc.gov; or by writing the Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. The guidance discusses, among other topics, the formats the NRC can accept, the use of electronic signatures, and the treatment of nonpublic information. If the communication is on paper, the signed original must be sent. If a submission due date falls on a Saturday, Sunday, or Federal holiday, the next Federal working day becomes the official due date.
(b) Distribution requirements. Copies of all correspondence, reports, and other written communications concerning the regulations in this part or individual license conditions must be submitted to the persons listed below (addresses for the NRC Regional Offices are listed in appendix D to part 20 of this chapter).
(1) Applications for amendment of permits and licenses; reports; and other communications. All written communications (including responses to: generic letters, bulletins, information notices, regulatory information summaries, inspection reports, and miscellaneous requests for additional information) that are required of holders of operating licenses or construction permits issued pursuant to this part, must be submitted as follows, except as otherwise specified in paragraphs (b)(2) through (b)(7) of this section: to the NRC's Document
Control Desk (if on paper, the signed original), with a copy to the appropriate Regional Office, and a copy to the appropriate NRC Resident Inspector, if one has been assigned to the site of the facility.
(2) Applications for permits and licenses, and amendments to applications. Applications for construction permits, applications for operating licenses and amendments to either type of application must be submitted as follows, except as otherwise specified in paragraphs (b)(3) through (b)(7) in this section.
(i) Applications for licenses for facilities described in § 50.21 (a) and (c) and amendments to these applications must be sent to the NRC's Document Control Desk, with a copy to the appropriate Regional Office. If the application or amendment is on paper, the submission to the Document Control Desk must be the signed original.
(ii) Applications for permits and licenses for facilities described in § 50.21(b) or § 50.22, and amendments to these applications must be sent to the NRC's Document Control Desk, with a copy to the appropriate Regional Office, and a copy to the appropriate NRC Resident Inspector, if one has been assigned to the site of the facility. If the application
or amendment is on paper, the submission to the Document Control Desk must be the signed original.
(3) Acceptance review application. Written communications required for an application for determination of suitability for docketing under § 50.30(a)(6) must be submitted to the NRC's Document Control Desk, with a copy to the appropriate Regional Office. If the communication is on paper, the submission to the Document Control Desk must be the signed original.
(4) Security plan and related submissions. Written communications, as defined in paragraphs (b)(4)(i) through (iv) of this section, must be submitted to the NRC's Document Control Desk, with a copy to the appropriate Regional Office. If the communication is on paper, the submission to the Document Control Desk must be the signed original.
(i) Physical security plan under § 50.34;
(ii) Safeguards contingency plan under § 50.34;
(iii) Change to security plan, guard training and qualification plan, or safeguards contingency plan made without prior Commission approval under § 50.54(p);
(iv) Application for amendment of physical security plan, guard training and qualification plan, or safeguards contingency plan under § 50.90.
(5) Emergency plan and related submissions. Written communications as defined in paragraphs (b)(5)(i) through (iii) of this section must be submitted to the NRC's Document Control Desk, with a copy to the appropriate Regional Office, and a copy to the appropriate NRC Resident Inspector if one has been assigned to the site of the facility. If the communication is on paper, the submission to the Document Control Desk must be the signed original.
(i) Emergency plan under § 50.34;
(ii) Change to an emergency plan under § 50.54(q);
(iii) Emergency implementing procedures under appendix E.V of this part.
(6) Updated FSAR. An updated Final Safety Analysis Report (FSAR) or replacement pages, under § 50.71(e) must be submitted to the NRC's Document Control Desk, with a copy to the appropriate Regional Office, and a copy to the appropriate NRC Resident Inspector if one has been assigned to the site of the facility. Paper copy submissions may be made using
replacement pages; however, if a licensee chooses to use electronic submission, all subsequent updates or submissions must be performed electronically on a total replacement basis. If the communication is on paper, the submission to the Document Control Desk must be the signed original. If the communications are submitted electronically, see Guidance for Electronic Submissions to the Commission.
(7) Quality assurance related submissions. (i) A change to the Safety Analysis Report quality assurance program description under § 50.54(a)(3) or § 50.55(f)(3), or a change to a licensee's NRC-accepted quality assurance topical report under § 50.54(a)(3) or § 50.55(f)(3), must be submitted to the NRC's Document Control Desk, with a copy to the appropriate Regional Office, and a copy to the appropriate NRC Resident Inspector if one has been assigned to the site of the facility. If the communication is on paper, the submission to the Document Control Desk must be the signed original.
(ii) A change to an NRC-accepted quality assurance topical report from nonlicensees (i.e., architect/engineers, NSSS suppliers, fuel suppliers, constructors, etc.) must be submitted to the NRC's Document Control Desk. If the communication is on paper, the signed original must be sent.
(8) Certification of permanent cessation of operations. The licensee's certification of permanent cessation of operations, under § 50.82(a)(1), must state the date on which operations have ceased or will cease, and must be submitted to the NRC's Document Control Desk. This submission must be under oath or affirmation.
(9) Certification of permanent fuel removal. The licensee's certification of permanent fuel removal, under § 50.82(a)(1), must state the date on which the fuel was removed from the reactor vessel and the disposition of the fuel, and must be submitted to the NRC's Document Control Desk. This submission must be under oath or affirmation.
(c) Form of communications. All paper copies submitted to meet the requirements set forth in paragraph (b) of this section must be typewritten, printed or otherwise reproduced in permanent form on unglazed paper. Exceptions to these requirements imposed on paper submissions may be granted for the submission of micrographic, photographic, or similar forms.
(d) Regulation governing submission. Licensees and applicants submitting correspondence, reports, and other written communications under the regulations of this part are requested but not required to cite whenever practical, in the upper right corner of the first page of the submission, the specific regulation or other basis requiring submission.
(e) Conflicting requirements. The communications requirements contained in this section and §§ 50.12, 50.30, 50.36, 50.36a. 50.44, 50.49, 50.54, 50.55, 50.55a, 50.59, 50.62, 50.71, 50.73, 50.82, 50.90, and 50.91 supersede and replace all existing requirements in any license conditions or technical specifications in effect on January 5, 1987. Exceptions to these requirements must be approved by the Office of the Chief Information Officer, Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone (301) 415-7233, e-mail INFOCOLLECTS@nrc.gov.
[51 FR 40306, Nov. 6, 1986, as amended at 52 FR 31611, Aug. 21, 1987; 53 FR 6139, Mar. 1, 1988; 60 FR 24551, May 9, 1995; 61 FR 39298, July 29, 1996; 68 FR 58808, Oct. 10, 2003; 70 FR 69421, Nov. 16, 2005; 72 FR 33386, Jun. 18, 2007; 74 FR 62682, Dec. 1, 2009; 80 FR 74979, Dec. 1, 2015; 88 FR 57873, Aug. 24, 2023]
§ 50.5 Deliberate misconduct.
(a) Any licensee, applicant for a license, employee of a licensee or applicant; or any contractor (including a supplier or
consultant), subcontractor, employee of a contractor or subcontractor of any licensee or applicant for a license, who
knowingly provides to any licensee, applicant, contractor, or subcontractor, any components, equipment, materials, or other
goods or services that relate to a licensee's or applicant's activities in this part, may not:
(1) Engage in deliberate misconduct that causes or would have caused, if not detected, a licensee or applicant to be in
violation of any rule, regulation, or order; or any term, condition, or limitation of any license issued by the Commission; or
(2) Deliberately submit to the NRC, a licensee, an applicant, or a licensee's or applicant's contractor or subcontractor,
information that the person submitting the information knows to be incomplete or inaccurate in some respect material to the
NRC.
(b) A person who violates paragraph (a)(1) or (a)(2) of this section may be subject to enforcement action in accordance
with the procedures in 10 CFR part 2, subpart B.
(c) For the purposes of paragraph (a)(1) of this section, deliberate misconduct by a person means an intentional act or
omission that the person knows:
(1) Would cause a licensee or applicant to be in violation of any rule, regulation, or order; or any term, condition, or
limitation, of any license issued by the Commission; or
(2) Constitutes a violation of a requirement, procedure, instruction, contract, purchase order, or policy of a licensee,
applicant, contractor, or subcontractor.
[63 FR 1897, Jan 13, 1998]
§ 50.7 Employee protection.
(a) Discrimination by a Commission licensee, an applicant for a Commission license, or a contractor or subcontractor of a Commission licensee or applicant against an employee for engaging in certain protected activities is prohibited. Discrimination includes discharge and other actions that relate to compensation, terms, conditions, or privileges of employment. The protected activities are established in section 211 of the Energy Reorganization Act of 1974, as amended, and in general are related to the administration or enforcement of a requirement imposed under the Atomic Energy Act or the Energy Reorganization Act.
(1) The protected activities include but are not limited to:
(i) Providing the Commission or his or her employer information about alleged violations of either of the statutes named in paragraph (a) introductory text of this section or possible violations of requirements imposed under either of those statutes;
(ii) Refusing to engage in any practice made unlawful under either of the statutes named in paragraph (a) introductory text or under these requirements if the employee has identified the alleged illegality to the employer;
(iii) Requesting the Commission to institute action against his or her employer for the administration or enforcement of these requirements;
(iv) Testifying in any Commission proceeding, or before Congress, or at any Federal or State proceeding regarding any provision (or proposed provision) of either of the statutes named in paragraph (a) introductory text.
(v) Assisting or participating in, or is about to assist or participate in, these activities.
(2) These activities are protected even if no formal proceeding is actually initiated as a result of the employee assistance or participation.
(3) This section has no application to any employee alleging discrimination prohibited by this section who, acting without direction from his or her employer (or the employer's agent), deliberately causes a violation of any requirement of the Energy Reorganization Act of 1974, as amended, or the Atomic Energy Act of 1954, as amended.
(b) Any employee who believes that he or she has been discharged or otherwise discriminated against by any person for engaging in protected activities specified in paragraph (a)(1) of this section may seek a remedy for the discharge or discrimination through an administrative proceeding in the Department of Labor. The administrative proceeding must be initiated within 180 days after an alleged violation occurs. The employee may do this by filing a complaint alleging the violation with the Department of Labor, Employment Standards Administration, Wage and Hour Division. The Department of Labor may order reinstatement, back pay, and compensatory damages.
(c) A violation of paragraph (a), (e), or (f) of this section by a Commission licensee, an applicant for a Commission license, or a contractor or subcontractor of a Commission licensee or applicant may be grounds for—
(1) Denial, revocation, or suspension of the license.
(2) Imposition of a civil penalty on the licensee, applicant, or a contractor or subcontractor of the licensee or applicant.
(3) Other enforcement action.
(d) Actions taken by an employer, or others, which adversely affect an employee may be predicated upon nondiscriminatory grounds. The prohibition applies when the adverse action occurs because the employee has engaged in protected activities. An employee's engagement in protected activities does not automatically render him or her immune from discharge or discipline for legitimate reasons or from adverse action dictated by nonprohibited considerations.
(e)(1) Each licensee and each applicant for a license shall prominently post the revision of NRC Form 3, "Notice to Employees," referenced in 10 CFR 19.11(e)(1). This form must be posted at locations sufficient to permit employees protected by this section to observe a copy on the way to or from their place of work. Premises must be posted not later than 30 days after an application is docketed and remain posted while the application is pending before the Commission, during the term of the license, and for 30 days following license termination.
(2) Copies of NRC Form 3 may be obtained by writing to the Regional Administrator of the appropriate U.S. Nuclear Regulatory Commission Regional Office listed in appendix D to part 20 of this chapter, via email to Forms.Resource@nrc.gov, or by visiting the NRC's online library at http://www.nrc.gov/reading-rm/doc-collections/forms/.
(f) No agreement affecting the compensation, terms, conditions, or privileges of employment, including an agreement to settle a complaint filed by an employee with the Department of Labor pursuant to section 211 of the Energy Reorganization Act of 1974, as amended, may contain any provision which would prohibit, restrict, or otherwise discourage an employee from participating in protected activity as defined in paragraph (a)(1) of this section including, but not limited to, providing information to the NRC or to his or her employer on potential violations or other matters within NRC's regulatory responsibilities.
[58 FR 52410, Oct. 8, 1993, as amended at 60 FR 24551, May 9, 1995; 61 FR 6765, Feb. 22, 1996; 68 FR 58809, Oct. 10, 2003; 72 FR 63974, Nov. 14, 2007; 79 FR 66603, Nov. 10, 2014; 83 FR 58465, Dec. 12, 2018]
§ 50.8 Information collection requirements: OMB approval.
(a) The Nuclear Regulatory Commission has submitted the information collection requirements contained in this part to the Office of Management and Budget (OMB) for approval as required by the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. OMB has approved the information collection requirements contained in this part under control number 3150–0011.
(b) The approved information collection requirements contained in this part appear in §§ 50.12, 50.30, 50.33, 50.34, 50.34a, 50.35, 50.36, 50.36a, 50.36b, 50.44, 50.46, 50.47, 50.48, 50.49, 50.54, 50.55, 50.55a, 50.59, 50.60, 50.61, 50.61a, 50.62, 50.63, 50.64, 50.65, 50.66, 50.68, 50.69, 50.70, 50.71, 50.72, 50.74, 50.75, 50.80, 50.82, 50.90, 50.91, 50.120, 50.150, 50.155, 50.160, and appendices A, B, E, G, H, I, J, K, M, N, O, Q, R, and S to this part.
(c) This part contains information collection requirements in addition to those approved under the control number specified in paragraph (a) of this section. These information collection requirement and the control numbers under which they are approved are as follows:
(1) In § 50.73, NRC Form 366 is approved under control number 3150–0104.
(2) In § 50.78, IAEA Design Information Questionnaire forms are approved under control number 3150–0056.
(3) In § 50.78, DOC/NRC Forms AP–1, AP–A, and associated forms are approved under control numbers 0694–0135.
[49 FR 19627, May 9, 1984, as amended at 58 FR 68731, Dec. 29, 1993; 60 FR 65468, Dec. 19, 1995; 61 FR 65172, Dec. 11, 1996; 62 FR 52187, Oct. 6, 1997; 67 FR 67099, Nov. 4, 2002; 68 FR 19727, Apr. 22, 2003; 69 FR 68046, Nov. 22, 2004; 70 FR 81887, Oct. 17, 2005; 73 FR 78605, Dec. 23, 2008; 74 FR 28145, Jun. 12, 2009; 75 FR 23, Jan. 4, 2010; 77 FR 39907, Jul. 6, 2012; 83 FR 58465, Dec. 12, 2018; 84 FR 39718, Aug. 9, 2019; 85 FR 65662, Oct. 16, 2020; 88 FR 80074, Nov. 16, 2023]
§ 50.9 Completeness and accuracy of information.
(a) Information provided to the Commission by an applicant for a license or by a licensee or information required by statute
or by the Commission's regulations, orders, or license conditions to be maintained by the applicant or the licensee shall be
complete and accurate in all material respects.
(b) Each applicant or licensee shall notify the Commission of information identified by the applicant or licensee as having
for the regulated activity a significant implication for public health and safety or common defense and security. An
applicant or licensee violates this paragraph only if the applicant or licensee fails to notify the Commission of information
that the applicant or licensee has identified as having a significant implication for public health and safety or common
defense and security. Notification shall be provided to the Administrator of the appropriate Regional Office within two
working days of identifying the information. This requirement is not applicable to information which is already required to
be provided to the Commission by other reporting or updating requirements.
[52 FR 49372, Dec. 31, 1987]
Requirement of License, Exceptions
§ 50.10 License required; limited work authorization.
(a) Definitions. As used in this section, construction means the activities in paragraph (a)(1) of this section, and does not mean the activities in paragraph (a)(2) of this section.
(1) Activities constituting construction are the driving of piles, subsurface preparation, placement of
backfill, concrete, or permanent retaining walls within an excavation, installation of foundations, or in-place assembly, erection, fabrication, or testing, which are for:
(i) Safety-related structures, systems, or components (SSCs) of a facility, as defined in 10 CFR 50.2;
(ii) SSCs relied upon to mitigate accidents or transients or used in plant emergency operating procedures;
(iii) SSCs whose failure could prevent safety-related SSCs from fulfilling their safety-related function;
(iv) SSCs whose failure could cause a reactor scram or actuation of a safety-related system;
(v) SSCs necessary to comply with 10 CFR part 73;
(vi) SSCs necessary to comply with 10 CFR 50.48 and criterion 3 of 10 CFR part 50, appendix A; and
(vii) Onsite emergency facilities
necessary to comply with either
§ 50.160 or § 50.47 and appendix E to
this part, as applicable.
(2) Construction does not include:
(i) Changes for temporary use of the land for public recreational purposes;
(ii) Site exploration, including necessary borings to determine foundation conditions or other
preconstruction monitoring to establish background information related to the suitability of the site, the environmental impacts of construction or operation, or the protection of environmental values;
(iii) Preparation of a site for construction of a facility, including clearing of the site, grading, installation of drainage, erosion and other environmental mitigation measures, and construction of temporary roads and borrow areas;
(iv) Erection of fences and other access control measures;
(v) Excavation;
(vi) Erection of support buildings (such as, construction equipment storage sheds, warehouse and shop
facilities, utilities, concrete mixing plants, docking and unloading facilities, and office buildings) for use in connection with the construction of the facility;
(vii) Building of service facilities, such as paved roads, parking lots, railroad spurs, exterior utility and
lighting systems, potable water systems, sanitary sewerage treatment facilities, and transmission lines;
(viii) Procurement or fabrication of components or portions of the proposed facility occurring at other than the final, in-place location at the facility;
(ix) Manufacture of a nuclear power reactor under a manufacturing license under subpart F of part 52 of this
chapter to be installed at the proposed site and to be part of the proposed facility; or
(x) With respect to production or utilization facilities, other than testing facilities and nuclear power plants, required to be licensed under Section 104.a or Section 104.c of the Act, the erection of buildings which will be used for activities other than operation of a facility and which may also be used to house a facility (e.g., the construction of a college laboratory building with space for installation of a training reactor).
(b) Requirement for license. Except as provided in § 50.11 of this chapter, no person within the United States shall transfer or receive in interstate commerce, manufacture, produce, transfer, acquire, possess, or use any production or utilization facility except as authorized by a license issued by the
Commission.
(c) Requirement for construction permit, early site permit authorizing limited work authorization activities, combined license, or limited work authorization. No person may begin the construction of a production or utilization facility on a site on which the facility is to be operated until that person has been issued either a construction permit under this part, a combined license under part 52 of this chapter, an early site permit authorizing the activities under paragraph (d) of this section, or a limited work authorization under paragraph (d) of this section.
(d) Request for limited work authorization. (1) Any person to whom the Commission may otherwise issue either a license or permit under Sections 103, 104.b, or 185 of the Act for a facility of the type specified in §§ 50.21(b)(2), (b)(3), or 50.22 of this chapter, or a testing facility, may request a limited work authorization allowing that person to perform the driving of piles, subsurface preparation, placement of backfill, concrete, or permanent retaining walls within an excavation, installation of the foundation, including placement of concrete, any of which are for an SSC of the facility for which either a construction permit or combined license is otherwise required under paragraph (c) of this section.
(2) An application for a limited work authorization may be submitted as part of a complete application for a construction permit or combined license in accordance with 10 CFR 2.101(a)(1) through (a)(5), or as a partial application in accordance with 10 CFR 2.101(a)(9). An application for a limited work authorization must be submitted by an applicant for or holder of an early site permit as a complete application in accordance with 10 CFR 2.101(a)(1) through (a)(4).
(3) The application must include:
(i) A safety analysis report required by 10 CFR 50.34, 10 CFR 52.17 or 10 CFR 52.79 of this chapter, as applicable, a description of the activities requested to be performed, and the design and construction information otherwise required by the Commission's rules and regulations to be submitted for a construction permit or combined license, but limited to those portions of the facility that are within the scope of
the limited work authorization. The safety analysis report must demonstrate that activities conducted under the limited work authorization will be conducted in compliance with the technically-relevant Commission requirements in 10 CFR Chapter I applicable to the design of those portions of the facility within the scope of the limited work authorization;
(ii) An environmental report in accordance with § 51.49 of this chapter; and
(iii) A plan for redress of activities performed under the limited work authorization, should limited work activities be terminated by the holder or the limited work authorization be revoked by the NRC, or upon effectiveness of the Commission's final decision denying the associated construction permit or combined license application, as applicable.
(e) Issuance of limited work authorization. (1) The Director of the Office of Nuclear Reactor Regulation may issue a limited work authorization only after:
(i) The NRC staff issues the final environmental impact statement for the limited work authorization in accordance with subpart A of part 51 of this chapter;
(ii) The presiding officer makes the finding in § 51.105(c) or § 51.107(d) of this chapter, as applicable;
(iii) The Director determines that the applicable standards and requirements of the Act, and the Commission’s regulations applicable to the activities to be conducted under the limited work authorization, have been met; the applicant is technically qualified to engage in the activities authorized; and issuance of the limited work authorization will provide reasonable assurance of adequate protection to public health and safety and will not be inimical to the common defense and security; and
(iv) The presiding officer finds that there are no unresolved safety issues relating to the activities to be conducted under the limited work authorization that would constitute good cause for withholding the authorization.
(2) Each limited work authorization will specify the activities that the holder is authorized to perform.
(f) Effect of limited work authorization. Any activities undertaken under a limited work
authorization are entirely at the risk of the applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of the limited work authorization has no bearing on the issuance of a construction permit or combined license with respect to the requirements of the Act, and rules, regulations, or orders issued under the Act. The environmental impact statement for a construction permit or combined license application for which a limited work authorization was previously issued will not address, and the presiding officer will not consider, the sunk costs of the holder of limited work authorization in determining the proposed action (i.e., issuance of the construction permit or combined license).
(g) Implementation of redress plan. If construction is terminated by the holder, the underlying application is withdrawn by the applicant or denied by the NRC, or the limited work authorization is revoked by the NRC, then the holder must begin implementation of the redress plan in a reasonable time. The holder must also complete the redress of the site no later than 18 months after termination of construction, revocation of the limited work authorization, or upon effectiveness of the Commission's final decision denying the associated construction permit application or the underlying combined license application, as applicable.
[21 FR 355, Jan. 19, 1956, as amended at 25 FR 8712, Sept. 9, 1960; 33 FR 2381, Jan. 31, 1968; 35 FR 11460, July 7, 1970; 37 FR 5748, Mar. 21, 1972; 39 FR 14508, Apr. 24, 1974; 39 FR 26279, July 18, 1974; 39 FR 33202, Sept. 16, 1974; 43 FR 6924, Feb. 17, 1978; 49 FR 9403, Mar. 12, 1984; 72 FR 49489, Aug. 28, 2007; 72 FR 57441, Oct. 9, 2007; 84 FR 65644, Nov. 29, 2019; 88 FR 80074, Nov. 16, 2023; 89 FR 57719, Jul. 16, 2024]
§ 50.11 Exceptions and exemptions from licensing requirements.
Nothing in this part shall be deemed to require a license for:
(a) The manufacture, production, or acquisition by the Department of Defense of any utilization facility authorized pursuant to section 91 of the Act, or the use of such facility by the
Department of Defense or by a person under contract with and for the account of the Department of Defense;
(b) Except to the extent that Administration facilities of the types subject to licensing pursuant to section 202 of the Energy Reorganization Act of 1974 are involved;
(1)(i) The processing, fabrication or refining of special nuclear material or the separation of special nuclear material, or the separation of special nuclear material from other
substances by a prime contractor of the Department under a prime contract for:
(A) The performance of work for the Department at a United States government-owned or controlled site;
(B) Research in, or development, manufacture, storage, testing or transportation of, atomic weapons or components thereof; or
(C) The use or operation of a production or utilization facility in a United States owned vehicle or vessel; or
(ii) By a prime contractor or subcontractor of the Commission or the Department under a prime contract or subcontract when the Commission determines that the exemption of the
prime contractor or subcontractor is authorized by law; and that, under the terms of the contract or subcontract, there is adequate assurance that the work thereunder can be
accomplished without undue risk to the public health and safety;
(2)(i) The construction or operation of a production or utilization facility for the Department at a United States government-owned or controlled site, including the transportation of
the production or utilization facility to or from such site and the performance of contract services during temporary interruptions of such transportation; or the construction or
operation of a production or utilization facility for the Department in the performance of research in, or development, manufacture, storage, testing, or transportation of, atomic
weapons or components thereof; or the use or operation of a production or utilization facility for the Department in a United States government-owned vehicle or vessel: Provided,
That such activities are conducted by a prime contractor of the Department under a prime contract with the Department.
(ii) The construction or operation of a production or utilization facility by a prime contractor or subcontractor of the Commission or the Department under his prime contract or
subcontract when the Commission determines that the exemption of the prime contractor or subcontractor is authorized by law; and that, under the terms of the contract or
subcontract, there is adequate assurance that the work thereunder can be accomplished without undue risk to the public health and safety.
(c) The transportation or possession of any production or utilization
facility by a common or contract carrier or warehousemen in the regular
course of carriage for another or storage incident thereto.
[40 FR 8788, Mar. 3, 1975, as amended at 65 FR 54950, Sept. 12, 2000]
§ 50.12 Specific exemptions.
(a) The Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the
requirements of the regulations of this part, which are--
(1) Authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common
defense and security.
(2) The Commission will not consider granting an exemption unless special circumstances are present. Special
circumstances are present whenever--
(i) Application of the regulation in the particular circumstances conflicts with other rules or requirements of the
Commission; or
(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not
necessary to achieve the underlying purpose of the rule; or
(iii) Compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when
the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated; or
(iv) The exemption would result in benefit to the public health and safety that compensates for any decrease in safety that
may result from the grant of the exemption; or
(v) The exemption would provide only temporary relief from the applicable regulation and the licensee or applicant has
made good faith efforts to comply with the regulation; or
(vi) There is present any other material circumstance not considered when the regulation was adopted for which it would be
in the public interest to grant an exemption. If such condition is relied on exclusively for satisfying paragraph (a)(2) of this
section, the exemption may not be granted until the Executive Director for Operations has consulted with the Commission.
(b) Any person may request an exemption permitting the conduct of activities prior to the issuance of a construction permit
prohibited by § 50.10. The Commission may grant such an exemption upon considering and balancing the following
factors:
(1) Whether conduct of the proposed activities will give rise to a significant adverse impact on the environment and the
nature and extent of such impact, if any;
(2) Whether redress of any adverse environment impact from conduct of the proposed activities can reasonably be effected
should such redress be necessary;
(3) Whether conduct of the proposed activities would foreclose subsequent adoption of alternatives; and
(4) The effect of delay in conducting such activities on the public interest, including the power needs to be used by the
proposed facility, the availability of alternative sources, if any, to meet those needs on a timely basis and delay costs to the
applicant and to consumers.
Issuance of such an exemption shall not be deemed to constitute a commitment to issue a construction permit. During the
period of any exemption granted pursuant to this paragraph (b), any activities conducted shall be carried out in such a
manner as will minimize or reduce their environmental impact.
[37 FR 5748, Mar. 21, 1972, as amended at 40 FR 8789, Mar. 3, 1975; 50 FR 50777, Dec. 12, 1985]
§ 50.13 Attacks and destructive acts by enemies of the United States; and defense activities.
An applicant for a license to construct and operate a production or utilization facility, or for an amendment to such license,
is not required to provide for design features or other measures for the specific purpose of protection against the effects of
(a) attacks and destructive acts, including sabotage, directed against the facility by an enemy of the United States, whether a
foreign government or other person, or (b) use or deployment of weapons incident to U.S. defense activities.
[32 FR 13445, Sept. 26, 1967]
Classification and Description of Licenses
§ 50.20 Two classes of licenses.
Licenses will be issued to named persons applying to the Commission therefore,
and will be either class 104 or class 103.
§ 50.21 Class 104 licenses; for medical therapy and research and development facilities.
A class 104 license will be issued, to an applicant who qualifies, for any one or more of the following: to transfer or receive
in interstate commerce, manufacture, produce, transfer, acquire, possess, or use.
(a) A utilization facility for use in medical therapy; or
(b)(1) A production or utilization facility the construction or operation of which was licensed pursuant to subsection 104b
of the Act prior to December 19, 1970;
(2) A production or utilization facility for industrial or commercial purposes constructed or operated under an arrangement
with the Administration entered into under the Cooperative Power Reactor Demonstration Program, except as otherwise
specifically required by applicable law; and
(3) A production or utilization facility for industrial or commercial purposes, when specifically authorized by law.
(c) A production or utilization facility, which is useful in the conduct of research and development activities of the types
specified in section 31 of the Act, and which is not a facility of the type specified in paragraph (b) of this section or in
§ 50.22.
[21 FR 355, Jan. 19, 1956, as amended at 31 FR 15145 Dec. 2, 1966; 35 FR 19659, Dec. 29, 1970; 38 FR 11446, May 8,
1973; 43 FR 6924, Feb. 17, 1978]
§ 50.22 Class 103 licenses; for commercial and industrial facilities.
A class 103 license will be issued, to an applicant who qualifies, for any one or more of the following: To transfer or
receive in interstate commerce, manufacture, produce, transfer, acquire, possess, or use a production or utilization facility
for industrial or commercial purposes; Provided, however, That in the case of a production or utilization facility which is
useful in the conduct of research and development activities of the types specified in section 31 of the Act, such facility is
deemed to be for industrial or commercial purposes if the facility is to be used so that more than 50 percent of the annual
cost of owning and operating the facility is devoted to the production of materials, products, or energy for sale or
commercial distribution, or to the sale of services, other than research and development or education or training.
[38 FR 11446, May 8, 1973, as amended at 43 FR 6924, Feb. 17, 1978]
§ 50.23 Construction permits.
A construction permit for the construction of a production or utilization facility will be issued before
the issuance of a license if the application is otherwise acceptable, and will be converted upon completion of the facility and Commission action, into a license as provided in § 50.56. However, if a combined license for a nuclear power reactor is issued under part 52 of this chapter, the construction
permit and operating license are deemed to be combined in a single license. A construction permit for the
alteration of a production or utilization facility will be issued before the issuance of an amendment of a license, if the application for amendment is otherwise acceptable, as provided in § 50.92.
[21 FR 355, June 19, 1956, as amended at 35 FR 11461, July 17, 1970; 72 FR 49490, Aug. 28, 2007; 81 FR 86909, Dec. 2, 2016]
Applications for Licenses, Certifications, and Regulatory Approvals; Form; Contents; Ineligibility
of Certain Applicants
§ 50.30 Filing of application for licenses; oath or affirmation.
(a) Serving of applications. (1) Each filing of an application for a standard design approval or license to construct and/or operate, or manufacture, a production or utilization facility (including an early site permit, combined license, and manufacturing license under part 52 of this chapter), and any amendments to the applications, must be submitted to the U.S. Nuclear Regulatory Commission in accordance with § 50.4 or § 52.3 of this chapter, as applicable.
(2) The applicant shall maintain the capability to generate additional copies of the general information and the safety analysis report, or part thereof or amendment thereto, for subsequent distribution in accordance with the written instructions of the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as appropriate.
(3) Each applicant for a construction permit under this part, or an early site permit, combined license, or manufacturing license under part 52 of this chapter, shall, upon notification by the Atomic Safety and Licensing Board appointed to conduct the public hearing required by the Atomic Energy Act, update the application and serve the updated copies of the application or parts of it, eliminating all superseded
information, together with an index of the updated application, as directed by the Atomic Safety and Licensing Board. Any subsequent amendment to the application must be served on those served copies of the application and must be submitted to the U.S. Nuclear Regulatory Commission as specified in § 50.4 or § 52.3 of this chapter, as applicable.
(4) The applicant must make a copy of the updated application available at the public hearing for the use of any other parties to the proceeding, and shall certify that the updated copies of the application contain the current contents of the application submitted in accordance with the requirements of this part.
(5) At the time of filing an application, the Commission will make available at the NRC Web site, http://www.nrc.gov, a copy of the application, subsequent amendments, and other records pertinent to the matter which is the subject of the application for public inspection and copying.
(6) The serving of copies required by this section must not occur until the application has been docketed under § 2.101(a) of this chapter. Copies must be submitted to the Commission, as specified in § 50.4 or § 52.3 of this chapter, as applicable, to enable the Director, Office of Nuclear Reactor Regulation, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, to determine whether the application is sufficiently complete to permit docketing.
(b) Oath or affirmation. Each application for a standard design approval or license, including,
whenever appropriate, a construction permit or early site permit, or amendment of it, and each amendment
of each application must be executed in a signed original by the applicant or duly authorized officer thereof under oath or affirmation.
(c) [Reserved]
(d) Application for operating licenses. The holder of a construction permit for
a production or utilization facility shall,
at the time of submission of the final
safety analysis report, file an application
for an operating license. The application
shall state the name of the applicant, the
name, location and power level, if any,
of the facility and the time when the
facility is expected to be ready for
operation and may incorporate by
reference any pertinent information
submitted in accordance with § 50.33
with the application for a construction
permit.
(e) Filing fees. Each application for a standard design approval or production or utilization facility license, including, whenever appropriate, a construction permit or early site permit, other than a
license exempted from part 170 of this chapter, shall be accompanied by the fee prescribed in part 170 of this chapter. No fee will be required to accompany an application for renewal, amendment, or termination of a construction permit, operating license, combined license, or manufacturing license, except as
provided in § 170.21 of this chapter.
(f) Environmental report. An application for a construction permit, operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor, testing facility, fuel reprocessing plant, or other production or utilization facility whose construction or operation may be determined by the Commission to have a significant impact in the environment, shall be accompanied by
an Environmental Report required under subpart A of part 51 of this chapter.
[23 FR 3115, May 10, 1958, as amended at 33 FR 10924, Aug. 1, 1968; 34 FR 6307, Apr. 3, 1969; 35 FR 19660, Dec. 29, 1970; 37 FR 5749, Mar. 21, 1972; 51 FR 40307, Nov 6. 1986; 64 FR 48951, Sept. 9, 1999; 68 FR 58809, Oct. 10, 2003; 72 FR 49490, Aug. 28, 2007; 73 FR 5721, Jan. 31, 2008; 84 FR 65644, Nov. 29, 2019; 89 FR 57719, Jul. 16, 2024]
§ 50.31 Combining applications.
An applicant may combine in one his several applications for different kinds of licenses under the regulations in this
chapter.
§ 50.32 Elimination of repetition.
In his application, the applicant may incorporate by reference information contained in previous applications, statements or
reports filed with the Commission: Provided, That such references are clear and specific.
§ 50.33 Contents of applications; general information.
Each application shall state:
(a) Name of applicant;
(b) Address of applicant;
(c) Description of business or occupation of applicant;
(d)(1) If applicant is an individual, state citizenship.
(2) If applicant is a partnership, state name, citizenship and address of each partner and the principal location where the partnership does business.
(3) If applicant is a corporation or an unincorporated association, state:
(i) The state where it is incorporated or organized and the principal location where it does business;
(ii) The names, addresses and citizenship of its directors and of its principal officers;
(iii) Whether it is owned, controlled, or dominated by an alien, a foreign corporation, or foreign government, and if so, give details.
(4) If the applicant is acting as agent or representative of another person in filing the application, identify the principal and furnish information required under this paragraph with respect to such principal.
(e) The class of license applied for, the use to which the facility will be put, the period of time for which the license is sought, and a list of other licenses, except operator's licenses, issued or applied for in connection with the proposed facility.
(f) Except for an electric utility applicant for a license to operate a utilization facility of the type described in § 50.21(b) or § 50.22, information sufficient to demonstrate to the Commission the financial qualification of the applicant to carry out, in accordance with regulations in this chapter, the activities for which the permit or license is sought. As applicable, the following should be provided:
(1) If the application is for a construction permit, the applicant shall submit information that demonstrates that the applicant possesses or has reasonable assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle costs. The applicant shall submit estimates of the total construction costs of the facility and related fuel cycle costs, and shall indicate the source(s) of funds to cover these costs.
(2) If the application is for an operating license, the applicant shall submit information that demonstrates the applicant possesses or has reasonable assurance of obtaining the funds necessary to cover
estimated operation costs for the period of the license. The applicant shall submit estimates for total annual operating costs for each of the first five years of operation of the facility. The applicant shall also indicate the source(s) of funds to cover these costs. An applicant seeking to renew or extend the term of an operating license for a power reactor need not submit the financial information that is required in
an application for an initial license. Applicants to renew or extend the term of an operating license for a nonpower reactor shall include the financial information that is required in an application for an initial license.
(3) If the application is for a combined license under subpart C of part 52 of this chapter, the applicant shall submit the information described in paragraphs (f)(1) and (f)(2) of this section.
(4) Each application for a construction permit, operating license, or combined license submitted by a newly-formed entity organized for the primary purpose of constructing and/or operating a facility must also include information showing:
(i) The legal and financial relationships it has or proposes to have with its stockholders or owners;
(ii) The stockholders' or owners' financial ability to meet any contractual obligation to the entity which they have incurred or proposed to incur; and
(iii) Any other information considered necessary by the Commission to enable it to determine the applicant's financial qualification.
(5) The Commission may request an established entity or newly-formed entity to submit additional or more
detailed information respecting its financial arrangements and status of funds if the Commission considers this information appropriate. This may include information regarding a licensee’s ability to continue the conduct of the activities authorized by the license and to decommission the facility.
(g)(1) Except as provided in paragraph
(g)(2) of this section, if the application
is for an operating license or combined
license for a nuclear power reactor, or
if the application is for an early site
permit and contains plans for coping
with emergencies under § 52.17(b)(2)(ii)
of this chapter, the applicant shall
submit the radiological emergency
response plans of State and local
governmental entities in the United
States that are wholly or partially within
the plume exposure pathway emergency
planning zone (EPZ),4 as well as the
plans of State governments wholly or
partially within the ingestion pathway
EPZ.5 If the application is for an early
site permit that, under 10 CFR
52.17(b)(2)(i), proposes major features of
the emergency plans describing the
EPZs, then the descriptions of the EPZs
must meet the requirements of this
paragraph. Generally, the plume
exposure pathway EPZ for nuclear
power reactors shall consist of an area
about 10 miles (16 km) in radius and the
ingestion pathway EPZ shall consist of
an area about 50 miles (80 km) in
radius. The exact size and configuration
of the EPZs surrounding a particular
nuclear power reactor shall be
determined in relation to the local
emergency response needs and
capabilities as they are affected by such
conditions as demography, topography,
land characteristics, access routes, and
jurisdictional boundaries. The size of
the EPZs also may be determined on a
case-by-case basis for gas-cooled
reactors and for reactors with an
authorized power level less than 250
MW thermal. The plans for the ingestion
pathway shall focus on such actions as
are appropriate to protect the food
ingestion pathway.
(2) Small modular reactor, non-lightwater
reactor, or non-power production
or utilization facility applicants
complying with § 50.160 who apply for
a construction permit or an operating
license under this part, or small
modular reactor or non-light-water
reactor applicants complying with
§ 50.160 who apply for a combined
license or an early site permit under
part 52 of this chapter, must submit as
part of the application the analysis used
to determine whether the criteria in
§ 50.33(g)(2)(i)(A) and (B) are met and,
if they are met, the size of the plume
exposure pathway EPZ.
(i) The plume exposure pathway EPZ
is the area within which:
(A) Public dose, as defined in
§ 20.1003 of this chapter, is projected to
exceed 10 mSv (1 rem) total effective
dose equivalent over 96 hours from the
release of radioactive materials from the
facility considering accident likelihood
and source term, timing of the accident
sequence, and meteorology; and
(B) Pre-determined, prompt protective
measures are necessary.
(ii) If the application is for an
operating license or combined license or
if the application is for an early site
permit and contains plans for coping
with emergencies under § 52.17(b)(2)(ii)
of this chapter, and if the plume
exposure pathway EPZ extends beyond
the site boundary:
(A) The applicant shall submit
radiological emergency response plans
of State, local, and participating Tribal
governmental entities in the United
States that are wholly or partially within
the plume exposure pathway EPZ.
(B) The exact configuration of the
plume exposure pathway EPZ
surrounding the facility shall be
determined in relation to the local
emergency response needs and
capabilities as they are affected by such
conditions as demography, topography,
land characteristics, access routes, and
jurisdictional boundaries.
(iii) If the application is for an early
site permit that, under § 52.17(b)(2)(i) of
this chapter, proposes major features of
the emergency plans and describes the
EPZ, and if the EPZ extends beyond the
site boundary, then the exact
configuration of the plume exposure
pathway EPZ surrounding the facility
shall be determined in relation to the
local emergency response needs and
capabilities as they are affected by such
conditions as demography, topography,
land characteristics, access routes, and
jurisdictional boundaries.
(h) If the applicant, other than an applicant for a combined license, proposes to construct or alter a
production or utilization facility, the application shall state the earliest and latest dates for completion of the construction or alteration.
(i) If the proposed activity is the generation and distribution of electric energy under a class 103 license, a list of the names and addresses of such regulatory agencies as may have jurisdiction over the rates and services incident to the proposed activity, and a list of trade and news publications which circulate in the area where the proposed activity will be conducted and which are considered appropriate to give reasonable notice of the application to those municipalities, private utilities, public bodies, and cooperatives, which might have a potential interest in the facility.
(j) If the application contains Restricted Data or classified National Security Information, it shall be prepared in such manner that all Restricted Data and classified National Security Information are separated from the unclassified information.
(k) (1) For an application for an operating license or combined license for a production or utilization facility, information in the form of a report, as described in § 50.75, indicating how reasonable assurance will be provided that funds will be available to decommission the facility.
(2) On or before July 26, 1990, each holder of an operating license for a production or utilization facility in effect on July 27, 1990, shall submit information in the form of a report as described in § 50.75 of this part, indicating how reasonable assurance will be provided that funds will be available to decommission the facility.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 19660, Dec. 29, 1970; 38 FR 3956, Feb. 9, 1973; 45 FR 55408, Aug. 19, 1980; 49 FR 35752, Sept. 12, 1984; 53 FR 24049, June 27, 1988; 69 FR 4448, Jan. 30, 2004; 72 FR 49490, Aug. 28, 2007; 88 FR 80074, Nov. 16, 2023; 89 FR 57719, Jul. 16, 2024]
4 Emergency planning zones (EPZs) are
discussed in NUREG–0396, EPA 520/1–78–
016, ‘‘Planning Basis for the Development of
State and Local Government Radiological
Emergency Response Plans in Support of
Light Water Nuclear Power Plants,’’
December 1978.
5 If the State and local emergency response
plans have been previously provided to the
NRC for inclusion in the facility docket, the
applicant need only provide the appropriate
reference to meet this requirement.
§ 50.34 Contents of applications; technical information.
(a) Preliminary safety analysis report. Each application for a construction permit shall include a preliminary safety analysis report. The minimum information5 to be included shall consist of the following:
(1) Stationary power reactor applicants for a construction permit who apply on or after January 10, 1997, shall comply with paragraph (a)(1)(ii) of this section. All other applicants for a construction permit shall comply with paragraph (a)(1)(i) of this section.
(i) A description and safety assessment of the site on which the facility is to be located, with appropriate attention to features affecting facility design. Special attention should be directed to the site evaluation factors identified in part 100 of this chapter. The assessment must contain an analysis and evaluation of the major structures, systems and components of the facility which bear significantly on the acceptability of the site under the site evaluation factors identified in part 100 of this chapter, assuming that the facility will be operated at the ultimate power level which is contemplated by the applicant. With respect to operation at the projected initial power level, the applicant is required to submit information prescribed in paragraphs (a)(2) through (a)(8) of this section, as well as the information required by this paragraph, in support of the application for a construction permit, or a design approval.
(ii) A description and safety assessment of the site and a safety assessment of the facility. It is expected that reactors will reflect through their design, construction and operation an extremely low probability for accidents that could result in the release of significant quantities of radioactive fission products. The following power reactor design characteristics and proposed operation will be taken into consideration by the Commission:
(A) Intended use of the reactor including the proposed maximum power level and the nature and inventory of contained radioactive materials;
(B) The extent to which generally accepted engineering standards are applied to the design of the reactor;
(C) The extent to which the reactor incorporates unique, unusual or enhanced safety features having a significant bearing on the probability or consequences of accidental release of radioactive materials;
(D) The safety features that are to be engineered into the facility and those barriers that must be breached as a result of an accident before a release of radioactive material to the environment can occur. Special attention must be directed to plant design features intended to mitigate the radiological consequences of accidents. In performing this assessment, an applicant shall assume a fission product release6 from the core into the containment assuming that the facility is operated at the ultimate power level contemplated. The applicant shall perform an evaluation and analysis of the postulated fission product release, using the expected demonstrable containment leak rate and any fission product cleanup systems intended to mitigate the consequences of the accidents, together with applicable site characteristics, including site meteorology, to evaluate the offsite radiological consequences. Site characteristics must comply with part 100 of this chapter. The evaluation must determine that:
(1) An individual located at any point on the boundary of the exclusion area for any 2 hour period following the onset of the postulated fission product release, would not receive a radiation dose in excess of 25 rem7 total effective dose equivalent (TEDE).
(2) An individual located at any point on the outer boundary of the low population zone, who is exposed to the radioactive cloud resulting from the postulated fission product release (during the entire period of its passage) would not receive a radiation dose in excess of 25 rem total effective dose equivalent (TEDE);
(E) With respect to operation at the projected initial power level, the applicant is required to submit
information prescribed in paragraphs (a)(2) through (a)(8) of this section, as well as the information required by paragraph (a)(1)(i) of this section, in support of the application for a construction permit.
(2) A summary description and discussion of the facility, with special attention to design and operating characteristics, unusual or novel design features, and principal safety considerations.
(3) The preliminary design of the facility including:
(i) The principal design criteria for the facility.8 Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum requirements for the principal design criteria for watercooled nuclear power plants similar in design and location to plants for which construction permits have previously been issued by the Commission and provides guidance to applicants for
construction permits in establishing principal design criteria for other types of nuclear power units;
(ii) The design bases and the relation of the design bases to the principal design criteria;
(iii) Information relative to materials of construction, general arrangement, and approximate dimensions, sufficient to provide reasonable assurance that the final design will conform
to the design bases with adequate margin for safety.
(4) A preliminary analysis and evaluation of the design and performance of structures, systems, and components of the facility with the objective of assessing the risk to public health and safety resulting from operation of the facility and including determination of the margins of safety during normal operations and transient conditions anticipated during the life of the facility, and the adequacy of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents. Analysis and evaluation of ECCS cooling performance and the need for high point vents following postulated loss-of-coolant accidents must be performed in accordance with the requirements of § 50.46 and § 50.46a of this part for facilities for which construction permits may be issued after December 28, 1974.
(5) An identification and justification for the selection of those variables, conditions, or other items which are determined as the result of preliminary safety analysis and evaluation to be probable subjects of technical specifications for the facility, with special attention given to those items which may significantly influence the final design: Provided, however, That this requirement is not applicable to an application for a construction permit filed prior to January 16, 1969.
(6) A preliminary plan for the applicant's organization, training of personnel, and conduct of operations.
(7) A description of the quality assurance program to be applied to the design, fabrication, construction, and testing of the structures, systems, and components of the facility. Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," sets forth the requirements for quality assurance programs for nuclear power plants and fuel reprocessing plants. The description of the quality assurance program for a nuclear power plant or a fuel reprocessing plant shall include a discussion of how the applicable requirements of appendix B will be satisfied.
(8) An identification of those structures, systems, or components of the facility, if any, which require research and development to confirm the adequacy of their design; and identification and description of the research and development program which will be conducted to resolve any safety questions associated with such structures, systems or components; and a schedule of the research and development program showing that such safety questions will be resolved at or before the latest date stated in the application for
completion of construction of the facility.
(9) The technical qualifications of the applicant to engage in the proposed activities in accordance with the regulations in this chapter.
(10) A discussion of the applicant’s
preliminary plans for coping with
emergencies based on:
(i) Except as provided in paragraph
(a)(10)(ii) of this section, the
requirements in appendix E to this part.
(ii) For a small modular reactor, a
non-light-water reactor, or non-power
production or utilization facility
construction permit applicant, the
requirements in either § 50.160 or
appendix E to this part.
(11) On or after February 5, 1979, applicants who apply for construction permits for nuclear powerplants to be built on multiunit sites shall identify potential hazards to the structures, systems and components important to safety of operating nuclear facilities from construction activities. A discussion shall also be included of any managerial and administrative controls that will be used during construction to assure the safety of the operating unit.
(12) On or after January 10, 1997, stationary power reactor applicants who apply for a construction permit, as partial conformance to General Design Criterion 2 of appendix A to this part, shall comply with the earthquake engineering criteria in appendix S to this part.
(13) On or after July 13, 2009, power reactor applicants who apply for a construction permit shall submit the information required by 10 CFR 50.150(b) as a part of their preliminary safety analysis report.
(b) Final safety analysis report. Each application for an operating license shall include a final safety analysis report. The final safety analysis report shall include information that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures, systems, and components and of the facility as a whole, and shall include the following:
(1) All current information, such as the results of environmental and meteorological monitoring programs, which has been developed since issuance of the construction permit, relating to site evaluation factors identified in part 100 of this chapter.
(2) A description and analysis of the structures, systems, and components of the facility, with emphasis upon performance requirements, the bases, with technical justification therefor, upon which such requirements have been established, and the evaluations required to show that safety functions will be accomplished. The description shall be sufficient to permit understanding of the system designs and their relationship to safety evaluations.
(i) For nuclear reactors, such items as the reactor core, reactor coolant system, instrumentation and control systems, electrical systems, containment system, other engineered safety features, auxiliary and emergency systems, power conversion systems, radioactive waste handling systems, and fuel handling systems shall be discussed insofar as they are pertinent.
(ii) For facilities other than nuclear reactors, such items as the chemical, physical, metallurgical, or nuclear process to be performed, instrumentation and control systems, ventilation and filter systems, electrical systems, auxiliary and emergency systems, and radioactive waste handling systems shall be discussed insofar as they are pertinent.
(3) The kinds and quantities of radioactive materials expected to be produced in the operation and the means for controlling and limiting radioactive effluents and radiation exposures within the limits set forth in part 20 of this chapter.
(4) A final analysis and evaluation of the design and performance of structures, systems, and components with the objective stated in paragraph (a)(4) of this section and taking into account any pertinent information developed since the submittal of the preliminary safety analysis report. Analysis and evaluation of ECCS cooling performance following postulated loss-of-coolant accidents shall be performed in accordance with the requirements of § 50.46 for facilities for which a license to operate may be issued after December 28, 1974.
(5) A description and evaluation of the results of the applicant's programs, including research and development, if any, to demonstrate that any safety questions identified at the construction permit stage have been resolved.
(6) The following information concerning facility operation:
(i) The applicant's organizational structure, allocations or responsibilities and authorities, and personnel qualifications requirements.
(ii) Managerial and administrative controls to be used to assure safe operation. Appendix B, “Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants,” sets forth the requirements for such controls for nuclear power plants and fuel reprocessing plants. The information on the controls to be used for a nuclear power plant or a fuel reprocessing plant shall include a discussion of how the applicable requirements of appendix B will be satisfied.
(iii) Plans for preoperational testing and initial operations.
(iv) Plans for conduct of normal operations, including maintenance, surveillance, and periodic testing of structures, systems, and components.
(v) Plans for coping with emergencies
based on:
(A) Except as provided in paragraph
(b)(6)(v)(B) of this section, the
requirements in appendix E to this part.
(B) For a small modular reactor, a
non-light-water reactor, or a non-power
production or utilization facility
operating license applicant, the
requirements in either § 50.160 or
appendix E to this part.
(vi) Proposed technical specifications prepared in accordance with the requirements of § 50.36.
(vii) On or after February 5, 1979, applicants who apply for operating licenses for nuclear powerplants to be operated on multiunit sites shall include an evaluation of the potential hazards to the structures, systems, and components important to safety of operating units resulting from construction activities, as well as a description of the managerial and administrative controls to be used to provide assurance that the limiting conditions for operation are not exceeded as a result of construction activities at the multiunit sites.
(7) The technical qualifications of the applicant to engage in the proposed activities in accordance with the regulations in this chapter.
(8) A description and plans for implementation of an operator requalification program. The operator requalification program must as a minimum, meet the requirements for those programs contained in § 55.59 of part 55 of this chapter.
(9) A description of protection provided against pressurized thermal shock events, including projected values of the reference temperature for reactor vessel beltline materials as defined in § 50.61 (b)(1) and (b)(2).
(10) On or after January 10, 1997, stationary power reactor applicants who apply for an operating license, as partial conformance to General Design Criterion 2 of appendix A to this part, shall comply with the earthquake engineering criteria of appendix S to this part. However, for those operating license applicants and holders whose construction permit was issued before January 10, 1997, the earthquake engineering criteria in Section VI of appendix A to part 100 of this chapter continues to apply.
(11) On or after January 10, 1997, stationary power reactor applicants who apply for an operating license, shall provide a description and safety assessment of the site and of the facility as in § 50.34(a)(1)(ii). However, for either an operating license applicant or holder whose construction permit was issued before January 10, 1997, the reactor site criteria in part 100 of this chapter and the seismic and geologic siting criteria in appendix A to part 100 of this chapter continues to apply.
(12) On or after July 13, 2009, power reactor applicants who apply for an operating license which is subject to 10 CFR 50.150(a) shall submit the information required by 10 CFR 50.150(b) as a part of their final safety analysis report.
(c) Physical Security Plan. (1) Each applicant for an operating license for a production or utilization facility that will be subject to §§ 73.50 and 73.60 of this chapter must include a physical security plan.
(2) Each applicant for an operating license for a utilization facility that will be subject to the requirements of § 73.55 of this chapter must include a physical security plan, a training and qualification plan in accordance with the criteria set forth in appendix B to part 73 of this chapter, and a cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter.
(3) The physical security plan must describe how the applicant will meet the requirements of part 73 of this chapter (and part 11 of this chapter, if applicable, including the identification and description of jobs as required by § 11.11(a) of this chapter, at the proposed facility). Security plans must list tests, inspections, audits, and other means to be used to demonstrate compliance with the requirements of 10 CFR parts 11 and 73, if applicable.
(d) Safeguards contingency plan. (1) Each application for a license to operate a production or utilization facility that will be subject to §§ 73.50 and 73.60 of this chapter must include a licensee safeguards contingency plan in accordance with the criteria set forth in section I of appendix C to part 73 of this chapter. The “implementation procedures” required per section I of appendix C to part 73 of this chapter do not have to be submitted to the Commission for approval.
(2) Each application for a license to operate a utilization facility that will be subject to § 73.55 of this chapter must include a licensee safeguards contingency plan in accordance with the criteria set forth in section II of appendix C to part 73 of this chapter. The “implementing procedures” required in section II of appendix C to part 73 of this chapter do not have to be submitted to the Commission for approval.
(e) Protection against unauthorized disclosure. Each applicant for an operating license for a production or utilization facility, who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and other related Safeguards Information against unauthorized disclosure in accordance with the requirements of § 73.21 of this chapter.
(f) Additional TMI-related requirements. In addition to the requirements of paragraph (a) of this section, each applicant for a light-water-reactor construction permit or manufacturing license whose
application was pending as of February 16, 1982, shall meet the requirements in paragraphs (f)(1) through (3) of this section. This regulation applies to the pending applications by Duke Power Company (Perkins Nuclear Station, Units 1, 2, and 3), Houston Lighting & Power Company (Allens Creek Nuclear Generating Station, Unit 1), Portland General Electric Company (Pebble Springs Nuclear Plant, Units 1 and 2), Public Service Company of Oklahoma (Black Fox Station, Units 1 and 2), Puget Sound Power & Light Company (Skagit/Hanford Nuclear Power Project, Units 1 and 2), and Offshore Power Systems (License to Manufacture Floating Nuclear Plants). The number of units that will be specified in the manufacturing license above, if issued, will be that number whose start of manufacture, as defined in the license application, can practically begin within a 10-year period commencing on the date of issuance of the manufacturing license, but in no event will that number be in excess of ten. The manufacturing license will require the plant design to be updated no later than 5 years after its approval. Paragraphs (f)(1)(xii), (2)(ix), and (3)(v) of this section, pertaining to hydrogen control measures, must be met by all applicants covered by this regulation. However, the Commission may decide to impose additional requirements and the issue of whether compliance with these provisions, together with 10 CFR 50.44 and criterion 50 of appendix A to 10 CFR part 50, is sufficient for issuance of that manufacturing license which may be considered in the manufacturing license proceeding. In addition, each applicant for a design certification, design approval, combined license, or manufacturing license under part 52 of this chapter shall demonstrate compliance with the technically relevant portions of the requirements in paragraphs (f)(1) through (3) of this section, except for paragraphs (f)(1)(xii), (f)(2)(ix), and (f)(3)(v).
(1) To satisfy the following requirements, the application shall provide sufficient information to describe the nature of the studies, how they are to be conducted, estimated submittal dates, and a program to ensure that the results of these studies are factored into the final design of the facility. For licensees identified in the introduction to paragraph (f) of this section, all studies must be completed no later than 2 years following the issuance of the construction permit or manufacturing license.10 For all other applicants, the studies must be submitted as part of the final safety analysis report.10
(i) Perform a plant/site specific probabilistic risk assessment, the aim of which is to seek such improvements in the reliability of core and containment heat removal systems as are significant and practical and do not impact excessively on the plant. (II.B.8)
(ii) Perform an evaluation of the proposed auxiliary feedwater system (AFWS), to include (applicable to PWR's only) (II.E.1.1):
(A) A simplified AFWS reliability analysis using event-tree and fault-tree logic techniques.
(B) A design review of AFWS.
(C) An evaluation of AFWS flow design bases and criteria.
(iii) Perform an evaluation of the potential for and impact of reactor coolant pump seal damage following small-break LOCA with loss of offsite power. If damage cannot be precluded, provide an analysis of the limiting small-break loss-of-coolant accident with subsequent reactor coolant pump seal damage. (II.K.2.16 and II.K.3.25)
(iv) Perform an analysis of the probability of a small-break loss-of-coolant accident (LOCA) caused by a stuck-open power-operated relief valve (PORV). If this probability is a significant contributor to the probability of small-break LOCA's from all causes, provide a description and evaluation of the effect on small-break LOCA probability of an automatic PORV isolation system that would operate when the reactor coolant system pressure falls after the PORV has opened. (Applicable to PWR's only). (II.K.3.2)
(v) Perform an evaluation of the safety effectiveness of providing for separation of high pressure coolant injection (HPCI) and reactor core isolation cooling (RCIC) system initiation levels so that the RCIC system initiates at a higher water level than the HPCI system, and of providing that both systems restart on low water level. (For plants with high pressure core spray systems in lieu of high pressure coolant injection systems, substitute the words, “high pressure core spray” for “high pressure coolant injection” and “HPCS” for “HPCI”)
(Applicable to BWR's only). (II.K.3.13)
(vi) Perform a study to identify practicable system modifications that would reduce challenges and failures of relief valves, without compromising the performance of the valves or other systems. (Applicable to BWR's only). (II.K.3.16)
(vii) Perform a feasibility and risk assessment study to determine the optimum automatic depressurization system (ADS) design modifications that would eliminate the need for manual activation to ensure adequate core cooling. (Applicable to BWR's only). (II.K.3.18)
(viii) Perform a study of the effect on all core-cooling modes under accident conditions of designing the core spray and low pressure coolant injection systems to ensure that the systems will automatically restart on loss of water level, after having been manually stopped, if an initiation signal is still present. (Applicable to BWR's only). (II.K.3.21)
(ix) Perform a study to determine the need for additional space cooling to ensure reliable long-term operation of the reactor core isolation cooling (RCIC) and high-pressure coolant injection (HPCI) systems, following a complete loss of offsite power to the plant for at least two (2) hours. (For plants with high pressure core spray systems in lieu of high pressure coolant injection systems, substitute the words, “high pressure core spray” for “high pressure coolant injection” and “HPCS” for “HPCI”) (Applicable to BWR's only). (II.K.3.24)
(x) Perform a study to ensure that the Automatic Depressurization System, valves, accumulators, and associated equipment and instrumentation will be capable of performing their intended functions during and following an accident situation, taking no credit for non-safety related equipment or instrumentation, and accounting for normal expected air (or nitrogen) leakage through valves. (Applicable to BWR's only). (II.K.3.28)
(xi) Provide an evaluation of depressurization methods, other than by full actuation of the automatic depressurization system, that would reduce the possibility of exceeding vessel integrity limits during rapid cooldown. (Applicable to BWR's only) (II.K.3.45)
(xii) Perform an evaluation of alternative hydrogen control systems that would satisfy the requirements of paragraph (f)(2)(ix) of this section. As a minimum include consideration of a hydrogen ignition and post-accident inerting system. The evaluation shall include:
(A) A comparison of costs and benefits of the alternative systems considered.
(B) For the selected system, analyses and test data to verify compliance with the requirements of (f)(2)(ix) of this section.
(C) For the selected system, preliminary design descriptions of equipment, function, and layout.
(2) To satisfy the following requirements, the application shall provide sufficient information to demonstrate that the required actions will be satisfactorily completed by the operating license stage. This information is of the type customarily required to satisfy 10 CFR 50.35(a)(2) or to address unresolved generic safety issues.
(i) Provide simulator capability that correctly models the control room and includes the capability to simulate small-break LOCA's. (Applicable to construction permit applicants only) (I.A.4.2.)
(ii) Establish a program, to begin during construction and follow into operation, for integrating and expanding current efforts to improve plant procedures. The scope of the program shall include emergency procedures, reliability analyses, human factors engineering, crisis management, operator training, and coordination with INPO and other industry efforts. (Applicable to construction permit applicants only) (I.C.9)
(iii) Provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts. (I.D.1)
(iv) Provide a plant safety parameter display console that will display to operators a minimum set of parameters defining the safety status of the plant, capable of displaying a full range of important plant parameters and data trends on demand, and capable of indicating when process limits are being approached or exceeded. (I.D.2)
(v) Provide for automatic indication of the bypassed and operable status of safety systems. (I.D.3)
(vi) Provide the capability of high point venting of noncondensible gases from the reactor coolant system, and other systems that may be required to maintain adequate core cooling. Systems to achieve this capability shall be capable of being operated from the control room and their operation shall not lead to an unacceptable increase in the probability of loss-of-coolant accident or an unacceptable challenge to containment integrity. (II.B.1)
(vii) Perform radiation and shielding design reviews of spaces around systems that may, as a result of an accident, contain accident source term1A11 radioactive materials, and design as necessary to permit adequate access to important areas and to protect safety equipment from the radiation environment. (II.B.2)
(viii) Provide a capability to promptly obtain and analyze samples from the reactor coolant system and containment that may contain accident source term1A11 radioactive materials without radiation exposures to any individual exceeding 5 rems to the whole body or 50 rems to the extremities. Materials to be analyzed and quantified include certain radionuclides that are indicators of the degree of core damage (e.g., noble gases, radioiodines and cesiums, and nonvolatile isotopes), hydrogen in the containment atmosphere, dissolved gases, chloride, and boron concentrations. (II.B.3)
(ix) Provide a system for hydrogen control that can safely accommodate hydrogen generated by the equivalent of a 100% fuel-clad metal water reaction. Preliminary design information on the tentatively preferred system option of those being evaluated in paragraph (f)(1)(xii) of this section is sufficient at the construction permit stage. The hydrogen control system and associated systems shall provide, with reasonable assurance, that: (II.B.8)
(A) Uniformly distributed hydrogen concentrations in the containment do not exceed 10% during and following an accident that releases an equivalent amount of hydrogen as would be generated from a 100% fuel clad metal-water reaction, or that the post-accident atmosphere will not support hydrogen combustion.
(B) Combustible concentrations of hydrogen will not collect in areas where unintended combustion or detonation could cause loss of containment integrity or loss of appropriate mitigating features.
(C) Equipment necessary for achieving and maintaining safe shutdown of the plant and maintaining containment integrity will perform its safety function during and after being exposed to the environmental conditions attendant with the release of hydrogen generated by the equivalent of a 100% fuel-clad metal water reaction including the environmental conditions created by activation of the hydrogen control system.
(D) If the method chosen for hydrogen control is a post-accident inerting system, inadvertent actuation of the system can be safely accommodated during plant operation.
(x) Provide a test program and associated model development and conduct tests to qualify reactor coolant system relief and safety valves and, for PWR's, PORV block valves, for all fluid conditions expected under operating conditions, transients and accidents. Consideration of anticipated transients without scram (ATWS) conditions shall be included in the test program. Actual testing under ATWS conditions need not be carried out until subsequent phases of the test program are developed. (II.D.1)
(xi) Provide direct indication of relief and safety valve position (open or closed) in the control room. (II.D.3)
(xii) Provide automatic and manual auxiliary feedwater (AFW) system initiation, and provide auxiliary feedwater system flow indication in the control room. (Applicable to PWR's only) (II.E.1.2)
(xiii) Provide pressurizer heater power supply and associated motive and control power interfaces sufficient to establish and maintain natural circulation in hot standby conditions with only onsite power available. (Applicable to PWR's only) (II.E.3.1)
(xiv) Provide containment isolation systems that: (II.E.4.2)
(A) Ensure all non-essential systems are isolated automatically by the containment isolation system,
(B) For each non-essential penetration (except instrument lines) have two isolation barriers in series,
(C) Do not result in reopening of the containment isolation valves on resetting of the isolation signal,
(D) Utilize a containment set point pressure for initiating containment isolation as low as is compatible with normal operation,
(E) Include automatic closing on a high radiation signal for all systems that provide a path to the environs.
(xv) Provide a capability for containment purging/venting designed to minimize the purging time consistent with ALARA principles for occupational exposure. Provide and demonstrate high assurance that the purge system will reliably isolate under accident conditions. (II.E.4.4)
(xvi) Establish a design criterion for the allowable number of actuation cycles of the emergency core cooling system and reactor protection system consistent with the expected occurrence rates of severe overcooling events (considering both anticipated transients and accidents). (Applicable to B&W designs only). (II.E.5.1)
(xvii) Provide instrumentation to measure, record and readout in the control room: (A) containment pressure, (B) containment water level, (C) containment hydrogen concentration, (D) containment radiation intensity (high level), and (E) noble gas effluents at all potential, accident release points. Provide for continuous sampling of radioactive iodines and particulates in gaseous effluents from all potential accident release points, and for onsite capability to analyze and measure these samples. (II.F.1)
(xviii) Provide instruments that provide in the control room an unambiguous indication of inadequate core cooling, such as primary coolant saturation meters in PWR's, and a suitable combination of signals from indicators of coolant level in the reactor vessel and in-core thermocouples in PWR's and BWR's. (II.F.2)
(xix) Provide instrumentation adequate for monitoring plant conditions following an accident that includes core damage. (II.F.3)
(xx) Provide power supplies for pressurizer relief valves, block valves, and level indicators such that: (A) Level indicators are powered from vital buses; (B) motive and control power connections to the emergency power sources are through devices qualified in accordance with requirements applicable to systems important to safety and (C) electric power is provided from emergency power sources. (Applicable to PWR's only). (II.G.1)
(xxi) Design auxiliary heat removal systems such that necessary automatic and manual actions can be taken to ensure proper functioning when the main feedwater system is not operable. (Applicable to BWR's only). (II.K.1.22)
(xxii) Perform a failure modes and effects analysis of the integrated control system (ICS) to include consideration of failures and effects of input and output signals to the ICS. (Applicable to B&W-designed plants only). (II.K.2.9)
(xxiii) Provide, as part of the reactor protection system, an anticipatory reactor trip that would be actuated on loss of main feedwater and on turbine trip. (Applicable to B&W-designed plants only). (II.K.2.10)
(xxiv) Provide the capability to record reactor vessel water level in one location on recorders that meet normal post-accident recording requirements. (Applicable to BWR's only). (II.K.3.23)
(xxv) Provide an onsite Technical Support Center, an onsite Operational Support Center, and, for construction permit applications only, a nearsite Emergency Operations Facility. (III.A.1.2).
(xxvi) Provide for leakage control and detection in the design of systems outside containment that contain (or might contain) accident source term1A11 radioactive materials following an accident. Applicants shall submit a leakage control program, including an initial test program, a schedule for re-testing these systems, and the actions to be taken for minimizing leakage from such systems. The goal is to minimize potential exposures to workers and public, and to provide reasonable assurance that excessive leakage will not prevent the use of systems needed in an emergency. (III.D.1.1)
(xxvii) Provide for monitoring of inplant radiation and airborne radioactivity as appropriate for a broad range of routine and accident conditions. (III.D.3.3)
(xxviii) Evaluate potential pathways for radioactivity and radiation that may lead to control room habitability problems under accident conditions resulting in an accident source term11 release, and make necessary design provisions to preclude such problems. (III.D.3.4)
(3) To satisfy the following requirements, the application shall provide sufficient information to demonstrate that the requirement has been met. This information is of the type customarily required to satisfy paragraph (a)(1) of this section or to address the applicant's technical qualifications and management structure and competence.
(i) Provide administrative procedures for evaluating operating, design and construction experience and for ensuring that applicable important industry experiences will be provided in a timely manner to those designing and constructing the plant. (I.C.5)
(ii) Ensure that the quality assurance (QA) list required by Criterion II, app. B, 10 CFR part 50 includes all structures, systems, and components important to safety. (I.F.1)
(iii) Establish a quality assurance (QA) program based on consideration of: (A) Ensuring independence of the organization performing checking functions from the organization responsible for performing the functions; (B) performing quality assurance/quality control functions at construction sites to the maximum feasible extent; (C) including QA personnel in the documented review of and concurrence in quality related procedures associated with design, construction and installation; (D) establishing criteria for determining
QA programmatic requirements; (E) establishing qualification requirements for QA and QC personnel; (F) sizing the QA staff commensurate with its duties and responsibilities; (G) establishing procedures for maintenance of “as-built” documentation; and (H) providing a QA role in design and analysis activities. (I.F.2)
(iv) Provide one or more dedicated containment penetrations, equivalent in size to a single 3-foot diameter opening, in order not to preclude future installation of systems to prevent containment failure, such as a filtered vented containment system. (II.B.8)
(v) Provide preliminary design information at a level of detail consistent with that normally required at the construction permit stage of review sufficient to demonstrate that: (II.B.8)
(A)(1) Containment integrity will be maintained (i.e., for steel containments by meeting the requirements of the ASME Boiler and Pressure Vessel Code, Section III, Division 1, subarticle NE-3220, Service Level C Limits, except that evaluation of instability is not required, considering pressure and dead load alone. For concrete containments by meeting the requirements of the ASME Boiler Pressure Vessel Code, Section III, Division 2 subarticle CC-3720, Factored Load Category, considering pressure and dead load alone) during an accident that releases hydrogen generated from 100% fuel clad metal-water reaction accompanied by either hydrogen burning or the added pressure from post-accident inerting assuming carbon dioxide is the inerting agent. As a minimum, the specific code requirements set forth above appropriate for each type of containment will be met for a combination of dead load and an internal pressure of 45 psig. Modest deviations from these criteria will be considered by the staff, if good cause is shown by an applicant. Systems necessary to ensure containment integrity shall also be demonstrated to perform their function under these conditions.
(2) Subarticle NE-3220, Division 1, and subarticle CC-3720, Division 2, of section III of the July 1, 1980 ASME Boiler and Pressure Vessel Code, which are referenced in paragraphs (f)(3)(v)(A)(1) and (f)(3)(v)(B)(1) of this section, were approved for incorporation by reference by the Director of the Office of the Federal Register. A notice of any changes made to the material incorporated by reference will be published in the Federal Register. Copies of the ASME Boiler and Pressure Vessel Code may be purchased from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th St., New York, NY 10017. It is also available for inspection at the NRC Library, 11545 Rockville Pike, Rockville, Maryland 20852-2738.
(B)(1) Containment structure loadings produced by an inadvertent full actuation of a post-accident inerting hydrogen control system (assuming carbon dioxide), but not including seismic or design basis accident loadings will not produce stresses in steel containments in excess of the limits set forth in the ASME Boiler and Pressure Vessel Code, Section III, Division 1, subarticle NE-3220, Service Level A Limits, except that evaluation of instability is not required (for concrete containments the loadings specified above will not produce strains in the containment liner in excess of the limits set forth in the ASME Boiler and Pressure Vessel Code, Section III, Division 2, subarticle CC-3720, Service Load Category, (2) The containment has the capability to safely withstand pressure tests at 1.10 and 1.15 times (for steel and concrete containments, respectively) the pressure calculated to result from carbon dioxide inerting.
(vi) For plant designs with external hydrogen recombiners, provide redundant dedicated containment penetrations so that, assuming a single failure, the recombiner systems can be connected to the containment atmosphere. (II.E.4.1)
(vii) Provide a description of the management plan for design and construction activities, to include: (A) The organizational and management structure singularly responsible for direction of design and construction of the proposed plant; (B) technical resources director by the applicant; (C) details of the interaction of design and construction within the applicant's organization and the manner by which the applicant will ensure close integration of the architect engineer and the nuclear steam supply vendor; (D) proposed procedures for handling the transition to operation; (E) the degree of top level management oversight and technical control to be exercised by the applicant during design and construction, including the preparation and implementation of procedures necessary to guide the effort. (II.J.3.1)
(g) Combustible gas control. All applicants for a reactor construction permit or operating license whose application is submitted after October 16, 2003, shall include the analyses, and the descriptions of the equipment and systems required by § 50.44 as a part of their application.
(h) Conformance with the Standard Review Plan (SRP). (1)(i) Applications for light water cooled nuclear power plant operating licenses docketed after May 17, 1982 shall include an evaluation of the facility against the Standard Review Plan (SRP) in effect on May 17, 1982 or the SRP revision in effect six months prior to the docket date of the application, whichever is later.
(ii) Applications for light-watercooled nuclear power plant construction permits docketed after May 17, 1982, shall include an evaluation of the facility against the SRP in effect on May 17, 1982, or the SRP revision in effect six months before the docket date of the application, whichever is later.
(2) The evaluation required by this section shall include an identification and description of all differences in design features, analytical techniques, and procedural measures proposed for a facility and those corresponding features, techniques, and measures given in the SRP acceptance criteria. Where such a difference exists, the evaluation shall discuss how the alternative proposed provides an acceptable method of complying with those rules or regulations of Commission, or portions thereof, that underlie the corresponding SRP acceptance criteria.
(3) The SRP was issued to establish criteria that the NRC staff intends to use in evaluating whether an applicant/licensee meets the Commission's regulations. The SRP is not a substitute for the regulations, and compliance is not a requirement. Applicants shall identify differences from the SRP acceptance criteria and evaluate how the proposed alternatives to the SRP criteria provide an acceptable method of complying with the Commission's regulations.
(i) Mitigation of beyond-design-basis events. Each application for a power reactor operating license under this part must include the applicant's plans for implementing the requirements of § 50.155, including a schedule for achieving full compliance with these requirements and a description of the equipment upon which the strategies and guidelines required by § 50.155(b)(1) rely, including the planned locations of the equipment and how the equipment meets the requirements of § 50.155(c).
Editorial Note: For Federal Register citations affecting § 50.34, see
the List of CFR Sections Affected.
5 The applicant may provide information required by this paragraph in the form of a discussion, with specific references, of similarities to and differences from, facilities of similar design for which applications have previously been filed with the Commission.
6 The fission product release assumed for this evaluation should be based upon a major accident, hypothesized for purposes of site analysis or postulated from considerations of possible accidental events. Such accidents have generally been assumed to result in substantial meltdown of the core with subsequent release into the containment of appreciable quantities of fission products.
7 A whole body dose of 25 rem has been stated to correspond numerically to the once in a lifetime accidental or emergency dose for radiation workers which, according to NCRP recommendations at the time could be disregarded in the determination of their radiation exposure status (see NBS Handbook 69 dated June 5, 1959). However, its use is not intended to imply that this number constitutes an acceptable limit for an emergency dose to the public under accident conditions. Rather, this dose value has been set forth in this section as a reference value, which can be used in the evaluation of plant design features with respect to postulated reactor accidents, in order to assure that such designs provide assurance of low risk of public exposure to radiation, in the event of such accidents.
8 General design criteria for chemical processing facilities are being developed.
9 [Reserved].
10Alphanumeric designations correspond to the related action plan items in NUREG 0718 and NUREG–0660, "NRC Action Plan Developed as a Result of the TMI–2 Accident." They are provided herein for information only.
11 The fission product release assumed for these calculations should be based upon a major accident, hypothesized for purposes of site analysis or postulated from considerations of possible accidental events, that would result in potential hazards not exceeded by those from any accident considered credible. Such accidents have generally been assumed to result in substantial meltdown of the core with subsequent release of appreciable quantities of fission products.
[33 FR 18612, Dec. 17, 1968; 72 FR 49491, Aug. 28, 2007; 73 FR 63571, Oct. 24, 2008; 74 FR 13969, Mar. 27, 2009; 74 FR 28146, Jun. 12, 2009; 80 FR 74980, Dec. 1, 2015; 81 FR 86909, Dec. 2, 2016; 84 FR 39718, Aug. 9, 2019; 88 FR 80075, Nov. 16, 2023]
§ 50.34a Design objectives for equipment to control releases of radioactive
material in effluents—nuclear power reactors.
(a) An application for a construction permit shall include a description of the preliminary design of equipment to be installed to maintain control over radioactive materials in gaseous and liquid effluents produced during normal reactor operations, including expected operational occurrences. In the case of an application filed on or after January 2, 1971, the application shall also identify the design objectives, and the means to be employed, for keeping levels of radioactive material in effluents to unrestricted areas as low as is reasonably achievable. The term "as low as is reasonably achievable" as used
in this part means as low as is reasonably achievable taking into account the state of technology, and the economics of improvements in relation to benefits to the public health and safety and other societal and socioeconomic considerations, and in relation to the use of atomic energy in the public interest. The guides set out in appendix I to this part provide numerical guidance on design objectives for light-water-cooled nuclear power reactors to meet the requirements that radioactive material in effluents
released to unrestricted areas be kept as low as is reasonably achievable. These numerical guides for design objectives and limiting conditions for operation are not to be construed as radiation protection standards.
(b) Each application for a construction permit shall include:
(1) A description of the preliminary design of equipment to be installed under paragraph (a) of this section;
(2) An estimate of:
(i) The quantity of each of the principal radionuclides expected to be released annually to unrestricted areas in liquid effluents produced during normal reactor operations; and
(ii) The quantity of each of the principal radionuclides of the gases, halides, and particulates expected to be released annually to unrestricted areas in gaseous effluents produced during normal reactor operations.
(3) A general description of the provisions for packaging, storage, and shipment offsite of solid waste
containing radioactive materials resulting from treatment of gaseous and liquid effluents and from other sources.
(c) Each application for an operating license shall include:
(1) A description of the equipment and procedures for the control of gaseous and liquid effluents and for the maintenance and use of equipment installed in radioactive waste systems, under paragraph (a) of this section; and
(2) A revised estimate of the information required in paragraph (b)(2) of this section if the expected releases and exposures differ significantly from the estimates submitted in the application for a construction permit.
(d) Each application for a combined license under part 52 of this chapter shall include:
(1) A description of the equipment and procedures for the control of gaseous and liquid effluents and for the maintenance and use of equipment installed in radioactive waste systems, under paragraph (a) of this section; and
(2) The information required in paragraph (b)(2) of this section.
(e) Each application for a design approval, a design certification, or a manufacturing license under part 52 of this chapter shall include:
(1) A description of the equipment for the control of gaseous and liquid effluents and for the maintenance and use of equipment installed in radioactive waste systems, under paragraph (a) of this section; and
(2) The information required in paragraph (b)(2) of this section.
[35 FR 18387, Dec. 3, 1970, as amended at 40 FR 58847, Dec. 19, 1975; 61 FR 65172, Dec. 11, 1996; 72 FR 49492, Aug. 28, 2007]
§ 50.35 Issuance of construction permits.1
(a) When an applicant has not supplied initially all of the technical information required to complete the application and support the issuance of a construction permit which approves all proposed design features, the Commission may issue a construction permit if the Commission finds that (1) the applicant has described the proposed design of the facility, including, but not limited to, the principal architectural and engineering criteria for the design, and has identified the major features or components incorporated therein for the protection of the health and safety of the public; (2) such further technical or design information as may be required to complete the safety analysis, and which can reasonably be left for later consideration, will be supplied in the final safety analysis report; (3) safety features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program reasonably designed to resolve any safety questions associated with such features or components; and that (4) on the basis of the foregoing, there is reasonable assurance that, (i) such safety questions will be satisfactorily resolved at or before the latest date stated in the application for completion of construction of the proposed facility, and (ii) taking into consideration the site criteria contained in part 100 of this chapter, the proposed facility can be constructed and operated at the proposed location without undue risk to the health and safety of the public.
Note: When an applicant has supplied initially all of the technical information required to complete the application, including the final design of the facility, the findings required above will be appropriately modified to reflect that fact.
(b) A construction permit will constitute an authorization to the applicant to proceed with construction but will not constitute Commission approval of the safety of any design feature or specification unless the applicant specifically requests such approval and such approval is incorporated in the permit. The applicant, at his option, may request such approvals in the construction permit or, from time to time, by amendment of his construction permit. The Commission may, in its discretion, incorporate in any construction permit provisions requiring the applicant to furnish periodic reports of the progress and results of research and development programs designed to resolve safety questions.
(c) Any construction permit will be subject to the limitation that a license authorizing operation of the facility will not be issued by the Commission until (1) the applicant has submitted to the Commission, by amendment to the application, the complete final safety analysis report, portions of which may be submitted and evaluated from time to time, and (2) the Commission has found that the final design provides reasonable assurance that the health and safety of the public will not be endangered by operation of the facility in accordance with the requirements of the license and the regulations in this chapter.
[27 FR 12915, Dec. 29, 1962, as amended at 31 FR 12780, Sept. 30, 1966; 35 FR 5318, Mar. 31, 1970; 35 FR 6644, Apr.
25, 1970; 35 FR 11461, July 7, 1970]
1 The Commission may issue a provisional construction permit pursuant to the regulations in this part in effect on March
30, 1970, for any facility for which a notice of hearing on an application for a provisional construction permit has been
published on or before that date.
§ 50.36 Technical specifications.
(a)(1) Each applicant for a license authorizing operation of a production or utilization facility shall include in his application proposed technical specifications in accordance with the requirements of this section. A summary statement of the bases or reasons for such specifications, other than those covering administrative controls, shall also be included in the application, but shall not become part of the technical specifications.
(2) Each applicant for a design certification or manufacturing license under part 52 of this chapter shall include in its application proposed generic technical specifications in
accordance with the requirements of this section for the portion of the plant that is within the scope of the design certification or manufacturing license application.
(b) Each license authorizing operation of a production or utilization facility of a type described in § 50.21 or § 50.22 will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to § 50.34. The Commission may include such additional technical specifications as the Commission finds appropriate.
(c) Technical specifications will include items in the following categories:
(1) Safety limits, limiting safety system settings, and limiting control settings. (i)(A) Safety limits for nuclear reactors are limits upon important process variables that are found to be necessary to reasonably protect the integrity of certain physical barriers that guard against the uncontrolled release of radioactivity. If any safety limit is exceeded, the reactor must be shut down. The licensee shall notify the Commission, review the matter, and record the results of the review, including the cause of the condition and the basis for corrective action taken to preclude recurrence. Operation must not be resumed until authorized by the Commission. The licensee shall retain the record of the results of each review until the Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b) or § 50.22 of this part. For these reactors, the licensee shall notify the Commission as required by § 50.72 and submit a Licensee Event Report to the Commission as required by § 50.73. Licensees in these cases shall retain the records of the review for a period of three years following issuance of a Licensee Event Report.
(B) Safety limits for fuel reprocessing plants are those bounds within which the process variables must be maintained for adequate control of the operation and that must not be exceeded in order to protect the integrity of the physical system that is designed to guard against the uncontrolled release or radioactivity. If any safety limit for a fuel reprocessing plant is
exceeded, corrective action must be taken as stated in the technical specification or the affected part of the process, or the entire process if required, must be shut down, unless this action would further reduce the margin of safety. The licensee shall notify the Commission, review the matter, and record the results of the review, including the cause of the condition
and the basis for corrective action taken to preclude recurrence. If a portion of the process or the entire process has been shutdown, operation must not be resumed until authorized by the Commission. The licensee shall retain the record of the results of each review until the Commission terminates the license for the plant.
(ii)(A) Limiting safety system settings for nuclear reactors are settings for automatic protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded. If, during operation, it is determined that the automatic safety system does not function as required, the licensee shall take appropriate action, which may include shutting down the reactor. The licensee shall notify the Commission, review the matter, and record the results of the review, including the cause of the condition and the basis for corrective action taken to preclude recurrence. The licensee shall retain the record of the results of each review until the Commission terminates the license for the reactor except for nuclear power reactors licensed under § 50.21(b) or § 50.22 of this part. For these reactors, the licensee shall notify the Commission as required by § 50.72 and submit a Licensee Event Report to the Commission as required by § 50.73. Licensees in these cases shall retain the records of the review for a period of three years following issuance of a Licensee Event Report.
(B) Limiting control settings for fuel reprocessing plants are settings for automatic alarm or protective devices related to those variables having significant safety functions. Where a limiting control setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that protective action, either automatic or manual, will correct
the abnormal situation before a safety limit is exceeded. If, during operation, the automatic alarm or protective devices do not function as required, the licensee shall take appropriate action to maintain the variables within the limiting control-setting values and to repair promptly the automatic devices or to shut down the affected part of the process and, if required, to shut down the entire process for repair of automatic devices. The licensee shall notify the Commission, review the matter, and record the results of the review, including the cause of the condition and the basis for corrective action taken to preclude recurrence. The licensee shall retain the record of the results of each review until the Commission terminates the license for the plant.
(2) Limiting conditions for operation. (i) Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical
specifications until the condition can be met. When a limiting condition for operation of any process step in the system of a fuel reprocessing plant is not met, the licensee shall shut down that part of the operation or follow any remedial action permitted by the technical specifications until the condition can be met. In the case of a nuclear reactor not licensed under § 50.21(b) or § 50.22 of this part or fuel reprocessing plant, the licensee shall notify the Commission, review the matter, and record the results of the review, including the cause of the condition and the basis for corrective action taken to preclude recurrence. The licensee shall retain the record of the results of each review until the Commission terminates the license for the nuclear reactor or the fuel reprocessing plant. In the case of nuclear power reactors licensed under § 50.21(b) or § 50.22, the licensee shall notify the Commission if required by § 50.72 and shall submit a Licensee Event Report to the Commission as required by § 50.73. In this case, licensees shall retain records associated with preparation of a Licensee Event Report for a period of three years following issuance of the report. For events which do not require a Licensee Event Report, the licensee shall retain each record as required by the technical specifications.
(ii) A technical specification limiting condition for operation of a nuclear reactor must be established for each item meeting one or more of the following criteria:
(A) Criterion 1. Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
(B) Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(C) Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
(D) Criterion 4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
(iii) A licensee is not required to propose to modify technical specifications that are included in any license issued before August 18, 1995, to satisfy the criteria in paragraph (c)(2)(ii) of this section.
(3) Surveillance requirements. Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
(4) Design features. Design features to be included are those features of the facility such as materials of construction and geometric arrangements, which, if altered or modified, would have a significant effect on safety and are not covered in categories described in paragraphs (c) (1), (2), and (3) of this section.
(5) Administrative controls. Administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. Each licensee shall submit any reports to the Commission pursuant to approved technical specifications as specified in
§ 50.4.
(6) Decommissioning. This paragraph applies only to nuclear power reactor facilities that have submitted the certifications required by § 50.82(a)(1) and to non-power reactor facilities which are not authorized to operate. Technical specifications involving safety limits, limiting safety system settings, and limiting control system settings; limiting conditions for operation; surveillance requirements; design features; and administrative controls will be developed on a case-by-case basis.
(7) Initial notification. Reports made to the Commission by licensees in response to the requirements of this section must be made as follows:
(i) Licensees that have an installed Emergency Notification System shall make the initial notification to the NRC Operations Center in accordance with §50.72 of this part.
(ii) All other licensees shall make the initial notification by telephone to the Administrator of the appropriate NRC Regional Office listed in appendix D, part 20, of this chapter.
(8) Written Reports. Licensees for nuclear power reactors licensed under § 50.21(b) and § 50.22 of this part shall submit written reports to the Commission in accordance with § 50.73 of this part for events described in paragraphs (c)(1) and(c)(2) of this section. For all licensees, the Commission may require Special Reports as appropriate.
(d)(1) This section shall not be deemed to modify the technical specifications included in any license issued prior to January 16, 1969. A license in which technical specifications have not been designated shall be deemed to include the entire safety analysis report as technical specifications.
(2) An applicant for a license authorizing operation of a production or utilization facility to whom a construction permit has been issued prior to January 16, 1969, may submit technical specifications in accordance with this section, or in accordance with the requirements of this part in effect prior to January 16, 1969.
(3) At the initiative of the Commission or the licensee, any license may be amended to include technical specifications of the scope and content which would be required if a new license were being issued.
(e) The provisions of this section apply to each nuclear reactor licensee whose authority to operate the reactor has been removed by license amendment, order, or regulation.
[33 FR 18612, Dec. 17, 1968, as amended at 48 FR 33860, July 26, 1983; 51 FR 40308, Nov. 6, 1986; 53 FR 19249, May 27, 1988; 60 FR 36959, July 19, 1995; 61 FR 39299, July 29, 1996; 72 FR 49493, Aug. 28, 2007; 73 FR 54932, Sep. 24, 2008; 84 FR 63568, Nov. 18, 2019]
§ 50.36a Technical specifications on effluents from nuclear power reactors.
(a) To keep releases of radioactive materials to unrestricted areas during normal conditions, including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor and each applicant for a design certification or a manufacturing license will include technical specifications that, in addition to requiring compliance with applicable provisions of § 20.1301 of this chapter,
require that:
(1) Operating procedures developed pursuant to § 50.34a(c) for the control of effluents be established and followed and that the radioactive waste system, pursuant to § 50.34a, be maintained and used. The licensee shall retain the operating procedures in effect as a record until the Commission terminates the license and shall retain each superseded revision of the procedures for 3 years from the date it was superseded.
(2) Each holder of an operating license, and each holder of a combined license after the Commission has made the finding under § 52.103(g) of this chapter, shall submit a report to the Commission annually that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and in gaseous effluents during the previous 12 months, including any other information as may be required by the Commission to estimate maximum potential annual radiation doses to the public resulting from effluent releases. The report must be submitted as specified in § 50.4, and the time between submission of the reports must be no longer than 12 months. If quantities of radioactive materials released during the reporting period are significantly above design objectives, the report must cover this
specifically. On the basis of these reports and any additional information the Commission may obtain from the licensee or others, the Commission may require the licensee to take action as the Commission deems appropriate.
(b) In establishing and implementing the operating procedures described in paragraph (a) of this section, the licensee shall be guided by the following considerations: Experience with the design, construction, and operation of nuclear power reactors indicates that compliance with the technical specifications described in this section will keep average annual releases of radioactive material in effluents and their resultant committed effective dose equivalents at small percentages of the dose limits specified in § 20.1301 and in the license. At the same time, the licensee is permitted the flexibility of operation, compatible with considerations of health and safety, to assure that the public is provided a dependable source of power even under unusual conditions which may temporarily result in releases higher than such small percentages, but still within the limits specified in § 20.1301 of this chapter and in the license. It is expected that in using this flexibility under unusual conditions, the licensee will exert its best efforts to keep levels of radioactive material in effluents as low as is reasonably achievable. The guides set out in appendix I, provide numerical guidance on limiting conditions for operation for light-water cooled nuclear power reactors to meet the requirement that radioactive materials in effluents released to unrestricted areas be kept as low as is reasonably achievable.
[61 FR 39299, July 29, 1996; 72 FR 49493, Aug. 28, 2007]
§ 50.36b Environmental conditions.
(a) Each construction permit under this part, each early site permit under part 52 of this chapter, and each combined license under part 52 of this chapter may include conditions to protect the environment during construction. These conditions are to be set out in an attachment to the permit or license, which is incorporated in and made a part of the permit or license. These conditions will be derived from
information contained in the environmental report submitted pursuant to § 51.50 of this chapter as
analyzed and evaluated in the NRC record of decision, and will identify the obligations of the licensee in the environmental area, including, as appropriate, requirements for reporting and keeping records of environmental data, and any conditions and monitoring requirement for the protection of the nonaquatic
environment.
(b) Each license authorizing operation
of a production or utilization facility,
including a combined license under part
52 of this chapter, and each license for
a nuclear power reactor facility that no
longer authorizes operation of the
reactor under § 50.82(a)(1) or § 52.110(a)
of this chapter has been submitted,
which is of a type described in
§ 50.21(b)(2) or (3) or § 50.22 or is a
testing facility, may include conditions
to protect the environment during
operation and decommissioning. These
conditions are to be set out in an
attachment to the license, which is
incorporated in and made a part of the
license. These conditions will be
derived from information contained in
the environmental report or the
supplement to the environmental report
submitted pursuant to §§ 51.50 and
51.53 of this chapter as analyzed and
evaluated in the NRC record of decision,
and will identify the obligations of the
licensee in the environmental area,
including, as appropriate, requirements
for reporting and keeping records of
environmental data, and any conditions
and monitoring requirement for the
protection of the nonaquatic
environment.
[61 FR 39299, July 29, 1996; 72 FR 49493, Aug. 28, 2007; 89 FR 57719, Jul. 16, 2024]
§ 50.37 Agreement limiting access to Classified Information.
As part of its application and in any
event before the receipt of Restricted Data or classified National Security
Information or the issuance of a license,
construction permit, early site permit, or
standard design approval, or before the
Commission has adopted a final
standard design certification rule under
part 52 of this chapter, the applicant
shall agree in writing that it will not
permit any individual to have access to,
or any facility to possess, Restricted
Data or classified National Security
Information until the individual and/or
facility has been approved for access
under the provisions of 10 CFR parts 25
and/or 95. The agreement of the
applicant becomes part of the license, or
construction permit, or standard design
approval.
[62 FR 17690, Apr. 11, 1997; 72 FR 49493, Aug. 28, 2007; 89 FR 57719, Jul. 16, 2024]
§ 50.38 Ineligibility of certain applicants.
Any person who is a citizen, national, or agent of a foreign country, or any corporation, or other entity which the
Commission knows or has reason to believe is owned, controlled, or dominated by an alien, a foreign corporation, or a
foreign government, shall be ineligible to apply for and obtain a license.
[21 FR 355, Jan. 16, 1956, as amended at 43 FR 6924, Feb. 17, 1978]
§ 50.39 Public inspection of applications.
Applications and documents submitted to the Commission in connection with applications may be made available for
public inspection in accordance with the provisions of the regulations contained in part 2 of this chapter.
Standards for Licenses, Certifications, and Regulatory Approvals
§ 50.40 Common standards.
In determining that a construction permit or operating license in this part, or early site permit, combined license, or manufacturing license in part 52 of this chapter will be issued to an applicant, the Commission will be guided by the following considerations:
(a) Except for an early site permit or manufacturing license, the processes to be performed, the operating procedures, the facility and equipment, the use of the facility, and other technical specifications, or the proposals, in regard to any of the foregoing collectively provide reasonable
assurance that the applicant will comply with the regulations in this chapter, including the regulations in part 20 of this chapter, and that the health and safety of the public will not be endangered.
(b) The applicant for a construction permit, operating license, combined license, or manufacturing license is technically and financially qualified to engage in the proposed activities in accordance with the regulations in this chapter. However, no consideration of financial qualification is necessary for
an electric utility applicant for an operating license for a utilization facility of the type described in § 50.21(b) or § 50.22 or for an applicant for a manufacturing license.
(c) The issuance of a construction permit, operating license, early site permit, combined license, or
manufacturing license to the applicant will not, in the opinion of the Commission, be inimical to the common defense and security or to the health and safety of the public.
(d) Any applicable requirements of subpart A of 10 CFR part 51 have been satisfied.
[21 FR 355, Jan. 19, 1956, as amended at 36 FR 12731, July 7, 1971; 49 FR 9404, Mar. 12, 1984; 49 FR 35753, Sept. 12,
1984; 72 FR 49493, Aug. 28, 2007]
§ 50.41 Additional standards for class 104 licenses.
In determining that a class 104 license will be issued to an applicant, the Commission will, in addition to applying the
standards set forth in § 50.40 be guided by the following considerations:
(a) The Commission will permit the widest amount of effective medical therapy possible with the amount of special nuclear
material available for such purposes.
(b) The Commission will permit the conduct of widespread and diverse research and development.
(c) Reserved.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 19660, Dec. 29, 1970; 73 FR 44620, Jul. 31, 2008]
§ 50.42 Additional standard for class 103 licenses.
In determining whether a class 103 license will be issued to an applicant, the Commission will, in addition to applying the standards set forth in § 50.40, consider whether the proposed activities will serve a useful purpose proportionate to the quantities of special nuclear material or source material to be utilized.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 11461, July 17, 1970;
35 FR 19660, Dec. 29, 1970; 65 FR 44660, July 19, 2000; 73 FR 44620, Jul. 31, 2008]
§ 50.43 Additional standards and provisions affecting class 103 licenses and certifications for commercial power.
In addition to applying the standards set forth in §§ 50.40 and 50.42, paragraphs (a) through (e) of this section apply in the case of a class 103 license for a facility for the generation of commercial power. For a design certification under part 52 of this chapter, only paragraph (e) of this
section applies.
(a) The NRC will:
(1) Give notice in writing of each application to the regulatory agency or State as may have jurisdiction over the rates and services incident to the proposed activity;
(2) Publish notice of the application in trade or news publications as it deems appropriate to give reasonable notice to municipalities, private utilities, public bodies, and cooperatives which might have a potential interest in the utilization or production facility; and
(3) Publish notice of the application once each week for 4 consecutive weeks in the Federal Register. No license will be issued by the NRC prior to the giving of these notices and until 4 weeks after the last notice is published in the Federal Register.
(b) If there are conflicting applications for a limited opportunity for such license, the Commission will give preferred consideration in the following order: First, to applications submitted by public or cooperative bodies for facilities to be located in high cost power areas in the United States; second, to applications submitted by others for facilities to be located in such areas; third, to applications submitted by public or cooperative bodies for facilities to be located in other than high cost power areas; and, fourth, to all other applicants.
(c) The licensee who transmits electric energy in interstate commerce, or sells it at wholesale in interstate commerce, shall be subject to the regulatory provisions of the Federal Power Act.
(d) Nothing shall preclude any government agency, now or hereafter authorized by law to engage in the
production, marketing, or distribution of electric energy, if otherwise qualified, from obtaining a construction permit or operating license under this part, or a combined license under part 52 of this
chapter for a utilization facility for the primary purpose of producing electric energy for disposition for ultimate public consumption.
(e) Applications for a design
certification, combined license,
manufacturing license, operating license
or standard design approval that
propose nuclear reactor designs that
differ significantly from light-water
reactor designs that were licensed before
1997, or use simplified, inherent,
passive, or other innovative means to
accomplish their safety functions will
be approved only if:
(1)(i) The performance of each safety feature of the design has been demonstrated through either analysis, appropriate test programs, experience, or a combination thereof;
(ii) Interdependent effects among the safety features of the design are acceptable, as demonstrated by analysis, appropriate test programs, experience, or a combination thereof; and
(iii) Sufficient data exist on the safety features of the design to assess the analytical tools used for safety analyses over a sufficient range of normal operating conditions, transient conditions, and specified accident sequences, including equilibrium core conditions; or
(2) There has been acceptable testing of a prototype plant over a sufficient range of normal operating conditions, transient conditions, and specified accident sequences, including equilibrium core conditions. If a prototype plant is used to comply with the testing requirements, then the NRC may impose additional requirements on siting, safety features, or operational conditions for the prototype plant to protect the public and the plant staff from the possible consequences of accidents during the testing period.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 19660, Dec. 29, 1970; 63 FR 50480, Sept. 22, 1998; 72 FR 49494, Aug. 28, 2007; 82 FR 52825, Nov. 15, 2017; 89 FR 57719, Jul. 16, 2024]
§ 50.44 Combustible gas control for nuclear power reactors.
(a) Definitions.
(1) Inerted atmosphere means a containment atmosphere with less than 4 percent oxygen by volume.
(2) Mixed atmosphere means that the concentration of combustible gases in any part of the containment is below a level that supports combustion or detonation that could cause loss of containment integrity.
(b) Requirements for currently-licensed reactors. Each boiling or pressurized water nuclear power reactor with an operating license on October 16, 2003, except for those facilities for which the certifications required under § 50.82(a)(1) have been submitted, must comply with the following requirements, as applicable:
(1) Mixed atmosphere. All containments must have a capability for ensuring a mixed atmosphere.
(2) Combustible gas control. (i) All boiling water reactors with Mark I or Mark II type containments must have an inerted atmosphere.
(ii) All boiling water reactors with Mark III type containments and all pressurized water reactors with ice condenser containments must have the capability for controlling combustible gas generated from a metal-water reaction involving 75 percent of the fuel cladding surrounding the active fuel region (excluding the cladding surrounding the plenum volume) so that there is no loss of containment structural integrity.
(3) Equipment Survivability. All boiling water reactors with Mark III containments and all pressurized water reactors with ice condenser containments that do not rely upon an inerted atmosphere inside containment to control combustible gases must be able to establish and maintain safe shutdown and containment structural integrity with systems and components capable of performing their functions during and after exposure to the environmental conditions created by the burning of hydrogen. Environmental
conditions caused by local detonations of hydrogen must also be included, unless such detonations can be shown unlikely to occur. The amount of hydrogen to be considered must be equivalent to that generated from a metal-water reaction involving 75 percent of the fuel cladding surrounding the active fuel region (excluding the cladding surrounding the plenum volume).
(4) Monitoring. (i) Equipment must be provided for monitoring oxygen in containments that use an inerted atmosphere for combustible gas control. Equipment for monitoring oxygen must be functional, reliable, and capable of continuously measuring the concentration of oxygen in the containment atmosphere following a significant beyond design-basis accident for combustible gas control and accident management, including emergency planning.
(ii) Equipment must be provided for monitoring hydrogen in the containment. Equipment for monitoring hydrogen must be functional, reliable, and capable of continuously measuring the concentration of hydrogen in the containment atmosphere following a significant beyond design-basis accident for accident management, including emergency planning.
(5) Analyses. Each holder of an operating license for a boiling water reactor with a Mark III type of containment or for a pressurized water reactor with an ice condenser type of containment, shall perform an analysis that:
(i) Provides an evaluation of the consequences of large amounts of hydrogen generated after the start of an accident (hydrogen resulting from the metal-water reaction of up to and including 75 percent of the fuel cladding surrounding the active fuel region, excluding the cladding surrounding the plenum volume) and include consideration of hydrogen control measures as appropriate;
(ii) Includes the period of recovery from the degraded condition;
(iii) Uses accident scenarios that are accepted by the NRC staff. These scenarios must be accompanied by sufficient supporting justification to show that they describe the behavior of the reactor system during and following an accident resulting in a degraded core.
(iv) Supports the design of the hydrogen control system selected to meet the requirements of this section; and,
(v) Demonstrates, for those reactors that do not rely upon an inerted atmosphere to comply with paragraph (b)(2)(ii) of this section, that:
(A) Containment structural integrity is maintained. Containment structural integrity must be demonstrated by use of an analytical technique that is accepted by the NRC staff in accordance with § 50.90. This demonstration must include sufficient supporting justification to show that the technique describes the containment response to the structural loads involved. This method could include the use of actual material properties with suitable margins to account for uncertainties in modeling, in material properties, in construction tolerances, and so on; and
(B) Systems and components necessary to establish and maintain safe shutdown and to maintain containment integrity will be capable of performing their functions during and after exposure to the environmental conditions created by the burning of hydrogen, including local detonations, unless such detonations can be shown unlikely to occur.
(c) Requirements for future water-cooled reactor applicants and licensees.2 The requirements in this paragraph apply to all water-cooled reactor construction permits or operating licenses under this part, and to all water-cooled reactor design approvals, design certifications, combined licenses or manufacturing licenses under part 52 of this chapter, any of which are issued after October 16, 2003.
(1) Mixed atmosphere. All containments must have a capability for ensuring a mixed atmosphere during design-basis and significant beyond design-basis accidents.
(2) Combustible gas control. All containments must have an inerted atmosphere, or must limit hydrogen concentrations in containment during and following an accident that releases an equivalent amount of hydrogen as would be generated from a 100 percent fuel clad-coolant reaction, uniformly distributed, to less than 10 percent (by volume) and maintain containment structural integrity and appropriate accident mitigating features.
(3) Equipment Survivability. Containments that do not rely upon an inerted atmosphere to control combustible gases must be able to establish and maintain safe shutdown and containment structural integrity with systems and components capable of performing their functions during and after exposure to the environmental conditions created by the burning of hydrogen. Environmental conditions caused by local detonations of hydrogen must also be included, unless such detonations can be shown unlikely to occur. The amount of hydrogen to be considered must be equivalent to that generated from a fuel clad-coolant reaction involving 100 percent of the fuel cladding surrounding the active fuel region.
(4) Monitoring. (i) Equipment must be provided for monitoring oxygen in containments that use an inerted atmosphere for combustible gas control. Equipment for monitoring oxygen must be functional, reliable, and capable of continuously measuring the concentration of oxygen in the containment atmosphere following a significant beyond design-basis accident for combustible gas control and accident management, including emergency planning.
(ii) Equipment must be provided for monitoring hydrogen in the containment. Equipment for monitoring hydrogen must be functional, reliable, and capable of continuously measuring the concentration of hydrogen in the containment atmosphere following a significant beyond design-basis accident for accident management, including emergency planning.
(5) Structural analysis. An applicant must perform an analysis that demonstrates containment structural integrity. This demonstration must use an analytical technique that is accepted by the NRC and include sufficient supporting justification to show that the technique describes the containment response to the structural loads involved. The analysis must address an accident that releases hydrogen generated from 100 percent fuel clad-coolant reaction accompanied by hydrogen burning. Systems necessary to ensure containment integrity must also be demonstrated to perform their function under these conditions.
(d) Requirements for future non water-cooled reactor applicants and licensees and certain water-cooled reactor applicants and licensees. The requirements in this paragraph apply to all construction permits and operating licenses under this part, and to all design approvals, design certifications, combined licenses, or manufacturing licenses under part 52 of this chapter, for non water-cooled reactors and water-cooled reactors that do not fall within the description in paragraph (c), footnote 1 of this section, any of which are issued after October 16, 2003. Applications subject to this paragraph must include:
(1) Information addressing whether accidents involving combustible gases are technically relevant for their design, and
(2) If accidents involving combustible gases are found to be technically relevant, information (including a design-specific probabilistic risk assessment) demonstrating that the safety impacts of combustible gases during design-basis and significant beyond design-basis accidents have been addressed to ensure adequate protection of public health and safety and common defense and security.
[43 FR 50163, Oct. 27, 1978, as amended at 46 FR 58486, Dec. 2, 1981; 50 FR 3504, Jan. 25, 1985; 50 FR 5567, Feb. 11, 1985; 51 FR 40308, Nov. 6, 1986; 53 FR 43420, Oct. 27, 1988; 57 FR 39358, Aug. 31, 1992, 61 FR 39299, July 29, 1996; 64 FR 48951, Sept. 9, 1999; 68 FR 54141, Sep. 16, 2003]
2 The requirements of this paragraph apply only to water-cooled reactor designs with characteristics (e.g., type and quantity of cladding materials) such that the potential for production of combustible gases is comparable to light water reactor designs licensed as of October 16, 2003.
§ 50.45 Standards for construction permits, operating licenses, and combined licenses.
(a) An applicant for an operating license or an amendment of an operating license who proposes to
construct or alter a production or utilization facility will be initially granted a construction permit if the application is in conformity with and acceptable under the criteria of §§ 50.31 through 50.38, and the standards of §§ 50.40 through 50.43, as applicable.
(b) A holder of a combined license who proposes, after the Commission makes the finding under § 52.103(g) of this chapter, to alter the licensed facility will be initially granted a construction permit if the application is in conformity with and acceptable under the criteria of §§ 50.30 through 50.33, § 50.34(f), §§ 50.34a through 50.38, the standards of §§ 50.40 through 50.43, as applicable, and §§ 52.79 and 52.80 of this chapter.
[72 FR 49494, Aug. 28, 2007]
§ 50.46 Acceptance criteria for emergency core cooling systems for light-water nuclear power
reactors
(a)(1)(i) Each boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding must be provided with an emergency core cooling system (ECCS) that must be designed so that its calculated cooling performance following postulated loss-of-coolant accidents conforms to the criteria set forth in paragraph (b) of this section. ECCS cooling performance must be calculated in accordance with an acceptable evaluation model and must be calculated for a number of postulated loss-of-coolant accidents of different sizes, locations, and other properties sufficient to provide assurance that the most severe postulated loss-of-coolant accidents are calculated. Except as provided in paragraph (a)(1)(ii) of this section, the evaluation model must include sufficient supporting justification to show that the analytical technique realistically describes the behavior of the reactor system during a loss-of-coolant accident. Comparisons to applicable experimental data must be made and uncertainties in the analysis method and inputs must be identified and assessed so that the uncertainty in the calculated results can be estimated. This uncertainty must be accounted for, so that, when the calculated ECCS cooling performance is compared to the criteria set forth in paragraph (b) of this section, there is a high level of probability that the criteria would not be exceeded. Appendix K, Part II Required
Documentation, sets forth the documentation requirements for each evaluation model. This section does not apply to a nuclear power reactor facility for which the certifications required under § 50.82(a)(1) have been submitted.
(ii) Alternatively, an ECCS evaluation model may be developed in conformance with the required and acceptable features
of appendix K ECCS Evaluation Models.
(2) The Director of Nuclear Reactor Regulation may impose restrictions on reactor operation if it is found that the
evaluations of ECCS cooling performance submitted are not consistent with paragraphs (a)(1) (i) and (ii) of this section.
(3)(i) Each applicant for or holder of an operating license or construction permit issued under this part, applicant for a standard design certification under part 52 of this chapter (including an applicant after the Commission has adopted a final design certification regulation), or an applicant for or holder
of a standard design approval, a combined license or a manufacturing license issued under part 52 of this chapter, shall estimate the effect of any change to or error in an acceptable evaluation model or in the application of such a model to determine if the change or error is significant. For this purpose, a significant change or error is one which results in a calculated peak fuel cladding temperature different by more than 50 °F from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes of the respective temperature changes is greater than 50 °F.
(ii) For each change to or error discovered in an acceptable evaluation model or in the application of such a model that affects the temperature calculation, the applicant or holder of a construction permit, operating license, combined license, or manufacturing license shall report the nature of the change or error and its estimated effect on the limiting ECCS analysis to the Commission at least annually as specified in § 50.4 or § 52.3 of this chapter, as applicable. If the change or error is significant, the applicant or licensee shall provide this report within 30 days and include with the report a proposed schedule for providing a reanalysis or taking other action as may be needed to show compliance with § 50.46 requirements. This schedule may be developed using an integrated scheduling system previously approved for the facility by the NRC. For those facilities not using an NRC approved integrated scheduling system, a schedule will be established by the NRC staff within 60 days of receipt of the
proposed schedule. Any change or error correction that results in a calculated ECCS performance that does not conform to the criteria set forth in paragraph (b) of this section is a reportable event as described in §§ 50.55(e), 50.72, and 50.73. The affected applicant or licensee shall propose immediate steps to demonstrate compliance or bring plant design or operation into compliance with § 50.46 requirements.
(iii) For each change to or error discovered in an acceptable evaluation model or in the application of such a model that affects the temperature calculation, the applicant or holder of a standard design approval or the applicant for a standard design certification (including an applicant after the Commission has adopted a final design certification rule) shall report the nature of the change or error and its estimated effect on the limiting ECCS analysis to the Commission and to any applicant or licensee referencing the design approval or design certification at least annually as specified in § 52.3 of this chapter. If the change or error is significant, the applicant or holder of the design approval or the applicant for the design certification shall provide this report within 30 days and include with the report a proposed schedule for providing a reanalysis or taking other action as may be needed to show compliance with § 50.46 requirements. The affected applicant or holder shall propose immediate steps to demonstrate compliance or bring plant design into compliance with § 50.46 requirements.
(b)(1) Peak cladding temperature. The calculated maximum fuel element cladding temperature shall not exceed 2200° F.
(2) Maximum cladding oxidation. The calculated total oxidation of the cladding shall nowhere exceed 0.17 times the total cladding thickness before oxidation. As used in this subparagraph total oxidation means the total thickness of cladding metal that would be locally converted to oxide if all the oxygen absorbed by and reacted with the cladding locally were converted to stoichiometric zirconium dioxide. If cladding rupture is calculated to occur, the inside surfaces of the cladding shall be included in the oxidation, beginning at the calculated time of rupture. Cladding thickness before oxidation means the radial distance from inside to outside the cladding, after any calculated rupture or swelling has occurred but before significant oxidation. Where the calculated conditions of transient pressure and temperature lead to a prediction of cladding swelling, with or without cladding rupture, the unoxidized cladding thickness shall be defined as the cladding cross-sectional area, taken at a horizontal plane at the elevation of the rupture, if it occurs, or at the elevation of the highest cladding temperature if no rupture is calculated to occur, divided by the average circumference at that elevation. For ruptured cladding the circumference does not include the rupture opening.
(3) Maximum hydrogen generation. The calculated total amount of hydrogen generated from the chemical reaction of the cladding with water or steam shall not exceed 0.01 times the hypothetical amount that would be generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react.
(4) Coolable geometry. Calculated changes in core geometry shall be such that the core remains amenable to cooling.
(5) Long-term cooling. After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long-lived radioactivity remaining in the core.
(c) As used in this section: (1) Loss-of-coolant accidents (LOCA's) are hypothetical accidents that would result from the loss of reactor coolant, at a rate in excess of the capability of the reactor coolant makeup system, from breaks in pipes in the reactor coolant pressure boundary up to and including a break equivalent in size to the double-ended rupture of the largest pipe in the reactor coolant system.
(2) An evaluation model is the calculational framework for evaluating the behavior of the reactor system during a postulated loss-of-coolant accident (LOCA). It includes one or more computer programs and all other information necessary for application of the calculational framework to a specific LOCA, such as mathematical models used, assumptions included in the programs, procedure for treating the program input and output information, specification of those portions of analysis not included in computer programs, values of parameters, and all other information necessary to specify the calculational procedure.
(d) The requirements of this section are in addition to any other requirements applicable to ECCS set forth in this part. The criteria set forth in paragraph (b), with cooling performance calculated in accordance with an acceptable evaluation model, are in implementation of the general requirements with respect to ECCS cooling performance design set forth in this part, including in particular Criterion 35 of appendix A.
[39 FR 1002, Jan. 4, 1974, as amended at 53 FR 36004, Sept. 16, 1988; 57 FR 39358, Aug. 31, 1992; 61 FR 39299, July 29, 1996; 62 FR 59726, Nov. 3, 1997; 72 FR 49494, Aug. 28, 2007]
§ 50.46a Acceptance criteria for reactor coolant system venting systems.
Each nuclear power reactor must be provided with high point vents for
the reactor coolant system, for the reactor vessel head, and for other
systems required to maintain adequate core cooling if the accumulation
of noncondensible gases would cause the loss of function of these systems.
High point vents are not required for the tubes in U-tube steam generators.
Acceptable venting systems must meet the following criteria:
(a) The high point vents must be remotely operated from the control room.
(b) The design of the vents and associated controls, instruments and
power sources must conform to appendix A and appendix B of this part.
(c) The vent system must be designed to ensure that:
(1) The vents will perform their safety functions; and
(2) There would not be inadvertent or irreversible actuation of a vent.
[68 FR 54142, Sep. 16, 2003]
§ 50.47 Emergency plans.
(a)(1)(i) Except as provided in paragraph (d) of this section, no initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. No finding under this section is necessary for issuance of a renewed nuclear power reactor operating license.
(ii) No initial combined license under part 52 of this chapter will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. No finding under this section is necessary for issuance of a renewed combined license.
(iii) If an application for an early site permit under subpart A of part 52 of this chapter includes complete and integrated emergency plans under 10 CFR 52.17(b)(2)(ii), no early site permit will be issued unless a finding is made by the NRC that the emergency plans provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.
(iv) If an application for an early site
permit proposes major features of the
emergency plans under 10 CFR
52.17(b)(2)(i), no early site permit will
be issued unless a finding is made by
the NRC that the major features are
acceptable in accordance with the
applicable standards of either this
section and appendix E to this part, or
the applicable requirements of § 50.160,
within the scope of emergency
preparedness matters addressed in the
major features.
(2) The NRC will base its finding on a review of the Federal Emergency Management Agency (FEMA) findings and determinations as to whether State and local emergency plans are adequate and whether there is reasonable assurance that they can be implemented, and on the NRC assessment as to whether the applicant's onsite emergency plans are adequate and whether there is reasonable assurance that they can be implemented. A FEMA finding will primarily be based on a review of the plans. Any other information already available
to FEMA may be considered in assessing whether there is reasonable assurance that the plans can be implemented. In any NRC licensing proceeding, a FEMA finding will constitute a rebuttable presumption on questions of adequacy and implementation capability.
(b) The onsite and, except as provided
in paragraphs (d) and (f) of this section,
offsite emergency response plans for
nuclear power reactors must meet the
following standards:
(1) Primary responsibilities for emergency response by the nuclear facility licensee and by State and local organizations within the Emergency Planning Zones have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis.
(2) On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
(3) Arrangements for requesting and effectively using assistance resources have been made, arrangements to
accommodate State and local staff at the licensee's Emergency Operations Facility have been made, and other
organizations capable of augmenting the planned response have been identified.
(4) A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee, and State and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures.
(5) Procedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations and the public has been established; and means to provide early notification and clear instruction to the populace within the plume exposure pathway Emergency Planning Zone have been established.
(6) Provisions exist for prompt communications among principal response organizations to emergency personnel and to the public.
(7) Information is made available to the public on a periodic basis on how they will be notified and what their initial actions should be in an emergency (e.g., listening to a local broadcast station and remaining indoors), the principal points of contact with the news media for dissemination of information during an emergency (including the physical location or locations) are established in advance, and procedures for coordinated dissemination of information to the public are established.
(8) Adequate emergency facilities and equipment to support the emergency response are provided and maintained.
(9) Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.
(10) A range of protective actions has been developed for the plume exposure pathway EPZ for emergency workers
and the public. In developing this range of actions, consideration has been given to evacuation, sheltering, and, as a supplement to these, the prophylactic use of potassium iodide (KI), as appropriate. Evacuation time estimates have been developed by applicants and licensees. Licensees shall update the evacuation time estimates on a periodic basis. Guidelines for the choice of protective actions during an emergency, consistent with Federal guidance, are developed and in place, and protective actions for the ingestion exposure pathway EPZ appropriate to the locale have been developed.
(11) Means for controlling radiological exposures, in an emergency, are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.
(12) Arrangements are made for medical services for contaminated injured individuals.
(13) General plans for recovery and reentry are developed.
(14) Periodic exercises are (will be) conducted to evaluate major portions of emergency response capabilities, periodic drills are (will be) conducted to develop and maintain key skills, and deficiencies identified as a result of exercises or drills are (will be) corrected.
(15) Radiological emergency response training is provided to those who may be called on to assist in an emergency.
(16) Responsibilities for plan development and review and for distribution of emergency plans are established, and planners are properly trained.
(c)(1) Failure to meet the applicable
standards set forth in either § 50.160 or
paragraph (b) of this section may result
in the Commission declining to issue an
operating license; however, the
applicant will have an opportunity to
demonstrate to the satisfaction of the
Commission that deficiencies in the
plans are not significant for the plant in
question, that adequate interim
compensating actions have been or will
be taken promptly, or that there are
other compelling reasons to permit
plant operations. Where an applicant for
an operating license asserts that its
inability to demonstrate compliance
with the requirements in either § 50.160
or paragraph (b) of this section results
wholly or substantially from the
decision of State and/or local
governments not to participate further
in emergency planning, an operating
license may be issued if the applicant
demonstrates to the Commission’s
satisfaction that:
(i) The applicant’s inability to comply
with the requirements in either § 50.160
or paragraph (b) of this section is wholly
or substantially the result of the nonparticipation
of State and/or local
governments.
(ii) The applicant has made a sustained, good faith effort to secure and retain the participation of the pertinent state and/or local governmental authorities, including the furnishing of copies of its emergency plan.
(iii) The applicant's emergency plan provides reasonable assurance that public health and safety is not endangered by operation of the facility concerned. To make that finding, the applicant must demonstrate that, as outlined below, adequate protective measures can and will be taken in the event of an emergency. A utility plan will be evaluated against the same planning standards applicable to a state or local plan, as listed in paragraph (b) of this section, with due allowance made both for—
(A) Those elements for which state and/or local non-participation makes compliance infeasible and
(B) The utility's measures designed to compensate for any deficiencies resulting from state and/or local non-participation.
In making its determination on the adequacy of a utility plan, the NRC will recognize the reality that in an actual emergency, state and local government officials will exercise their best efforts to protect the health and safety of the public. The NRC will determine the adequacy of that expected response, in combination with the utility's compensating measures, on a case-by-case basis, subject to the following guidance. In addressing the circumstance where applicant's inability to comply with the requirements of paragraph (b) of this section is wholly or substantially the result of non-participation of state and/or local governments, it may be presumed that in the event of an actual radiological emergency state and local
officials would generally follow the utility plan. However, this presumption may be rebutted by, for example, a good faith and timely proffer of an adequate and feasible state and/or local radiological emergency plan that would in fact be relied upon in a radiological emergency.
(2) Generally, the plume exposure pathway EPZ for nuclear power plants shall consist of an area about 10 miles (16 km) in radius and the ingestion pathway EPZ shall consist of an area about 50 miles (80 km) in radius. The exact size and configuration of the EPZs surrounding a particular nuclear power reactor shall be determined in relation to local emergency response needs and capabilities as they are affected by such conditions as demography, topography, land characteristics, access routes, and jurisdictional boundaries. The size of the EPZs also may be determined on a case-by-case basis for gas-cooled nuclear reactors and for reactors with an authorized power level less than 250 MW thermal. The plans for the ingestion pathway shall focus on such actions as are appropriate to protect the food ingestion pathway.
(d) Notwithstanding the requirements of paragraphs (a) and (b) of this section, and except as specified by this paragraph, no NRC or FEMA review, findings, or determinations concerning the state of offsite emergency preparedness or the adequacy of and capability to implement State and local or utility offsite emergency plans are required prior to issuance of an operating license authorizing only fuel loading or low power testing and training (up to 5 percent of the rated thermal power). Insofar as emergency planning and preparedness requirements are concerned, a license authorizing fuel loading and/or low power testing and training may be issued after a finding is made by the NRC that the state of onsite emergency preparedness provides reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. The NRC will base this finding on its assessment of the applicant's onsite emergency plans against the pertinent standards in paragraph (b) of this section and appendix E. Review of applicant's emergency plans will include the following standards with offsite aspects:
(1) Arrangements for requesting and effectively using offsite assistance on site have been made, arrangements to accommodate State and local staff at the licensee's Emergency Operations Facility have been made, and other organizations capable of augmenting the planned onsite response have been identified.
(2) Procedures have been established for licensee communications with State and local response organizations, including initial notification of the declaration of emergency and periodic provision of plant and response status reports.
(3) Provisions exist for prompt communications among principal response organizations to offsite emergency personnel who would be responding onsite.
(4) Adequate emergency facilities and equipment to support the emergency response onsite are provided and maintained.
(5) Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use onsite.
(6) Arrangements are made for medical services for contaminated and injured onsite individuals.
(7) Radiological emergency response training has been made available to those offsite who may be called to assist in an emergency onsite.
(e) Notwithstanding the requirements
of paragraph (b) of this section and the
provisions of § 52.103 of this chapter, a
holder of a combined license under part
52 of this chapter that is complying with
the requirements of paragraph (b) of this
section and appendix E to this part may
not load fuel or operate except as
provided in accordance with appendix
E to this part and § 50.54(gg), and a
holder of a combined license under part
52 of this chapter that is complying with
the requirements of § 50.160 may not
load fuel or operate except as provided
in accordance with § 50.160(c)(2) and
§ 50.54(gg).
(f) Paragraphs (a)(2), (b), and (c)(2) of
this section do not apply to offsite
radiological emergency response plans
if the onsite emergency plan is not
required to meet paragraph (b) of this
section or if the plume exposure
pathway EPZ does not extend beyond
the site boundary.
[45 FR 55409, Aug. 8, 1980, as amended at 47 FR 30235, July 13, 1982; 47 FR 40537, Sept. 15, 1982; 49 FR 27736, July 6, 1984; 50 FR 19324, May 8, 1985; 52 FR 42085, Nov. 3, 1987; 53 FR 36959, Sept. 23, 1988; 56 FR 64976, Dec. 13, 1991; 61 FR 30132, June 14, 1996; 66 FR 5440, Jan. 19, 2001; 72 FR 49495, Aug. 28, 2007; 76 FR 72595, Nov. 23, 2011; 78 FR 34248, Jun. 7, 2013; 88 FR 80075; Nov. 16, 2023]
§ 50.48 Fire protection.
(a)(1) Each holder of an operating
license issued under this part or a
combined license issued under part 52
of this chapter must have a fire
protection plan that satisfies Criterion 3
of appendix A to this part. This fire
protection plan must:
(i) Describe the overall fire protection program for the facility;
(ii) Identify the various positions within the licensee's organization that are responsible for the program;
(iii) State the authorities that are delegated to each of these positions to implement those responsibilities; and
(iv) Outline the plans for fire protection, fire detection and suppression capability, and limitation of fire damage.
(2) The plan must also describe specific features necessary to implement the program described in paragraph (a)(1) of this section such as--
(i) Administrative controls and personnel requirements for fire prevention and manual fire suppression activities;
(ii) Automatic and manually operated fire detection and suppression systems; and
(iii) The means to limit fire damage to structures, systems, or components important to safety so that the capability to shut down the plant safely is ensured.
(3) The licensee shall retain the fire protection plan and each change to the plan as a record until the Commission terminates the reactor license. The licensee shall retain each
superseded revision of the procedures for 3 years from the date it was superseded.
(4) Each applicant for a design
approval, design certification, or
manufacturing license under part 52 of
this chapter must have a description
and analysis of the fire protection
design features for the standard plant
necessary to demonstrate compliance
with Criterion 3 of appendix A to this
part.
(b) Appendix R to this part establishes fire protection features required to satisfy Criterion 3 of appendix A to this part with respect to certain generic issues for nuclear power plants
licensed to operate before January 1, 1979.
(1) Except for the requirements of Sections III.G, III.J, and III.O, the provisions of Appendix R to this part do not apply to nuclear power plants licensed to operate before January 1,
1979, to the extent that--
(i) Fire protection features proposed or implemented by the licensee have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position
(BTP) APCSB 9.5-1 reflected in NRC fire protection safety evaluation reports issued before the effective date of February 19, 1981; or
(ii) Fire protection features were accepted by the NRC staff in comprehensive fire protection safety evaluation reports issued before Appendix A to Branch Technical Position (BTP)
APCSB 9.5-1 was published in August 1976.
(2) With respect to all other fire protection features covered by Appendix
R, all nuclear power plants licensed to operate before January 1, 1979,
must satisfy the applicable requirements of Appendix R to this part, including
specifically the requirements of Sections III.G, III.J, and III.O.
(c) National Fire Protection Association Standard NFPA 805.
(1) Approval of incorporation by reference. National Fire Protection
Association (NFPA) Standard 805, "Performance-Based Standard for
Fire Protection for Light Water Reactor Electric Generating Plants, 2001
Edition" (NFPA 805), which is referenced in this section, was approved
for incorporation by reference by the Director of the Federal Register
pursuant to 5 U.S.C. 552(a) and 1 CFR part 51. Copies of NFPA 805 may
be purchased from the NFPA Customer Service Department, 1 Batterymarch
Park, P.O. Box 9101, Quincy, MA 02269-9101 and in PDF format through the
NFPA Online Catalog (http://www.nfpa.org) or by calling 1-800-344-3555
or (617) 770-3000. Copies are also available for inspection at the NRC
Library, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland
20852-2738, and at the NRC Public Document Room, Building One White Flint
North, Room O1-F15, 11555 Rockville Pike, Rockville, Maryland 20852-2738.
Copies are also available at the National Archives and Records Administration
(NARA). For information on the availability of this material at NARA,
call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(2) Exceptions, modifications, and supplementation of NFPA 805.
As used in this section, references to NFPA 805 are to the 2001 Edition,
with the following exceptions, modifications, and supplementation:
(i) Life Safety Goal, Objectives, and Criteria. The Life Safety
Goal, Objectives, and Criteria of Chapter 1 are not endorsed.
(ii) Plant Damage/Business Interruption Goal, Objectives, and Criteria.
The Plant Damage/Business Interruption Goal, Objectives, and Criteria
of Chapter 1 are not endorsed.
(iii) Use of feed-and-bleed. In demonstrating compliance with
the performance criteria of Sections 1.5.1(b) and (c), a high-pressure
charging/injection pump coupled with the pressurizer power-operated relief
valves (PORVs) as the sole fire-protected safe shutdown path for maintaining
reactor coolant inventory, pressure control, and decay heat removal capability
(i.e., feed-and-bleed) for pressurized-water reactors (PWRs) is not permitted.
(iv) Uncertainty analysis. An uncertainty analysis performed
in accordance with Section 2.7.3.5 is not required to support deterministic
approach calculations.
(v) Existing cables. In lieu of installing cables meeting flame
propagation tests as required by Section 3.3.5.3, a flame-retardant coating
may be applied to the electric cables, or an automatic fixed fire suppression
system may be installed to provide an equivalent level of protection.
In addition, the italicized exception to Section 3.3.5.3 is not endorsed.
(vi) Water supply and distribution. The italicized exception
to Section 3.6.4 is not endorsed. Licensees who wish to use the exception
to Section 3.6.4 must submit a request for a license amendment in accordance
with paragraph (c)(2)(vii) of this section.
(vii) Performance-based methods. Notwithstanding the prohibition
in Section 3.1 against the use of performance-based methods, the fire
protection program elements and minimum design requirements of Chapter
3 may be subject to the performance-based methods permitted elsewhere
in the standard. Licensees who wish to use performance-based methods for
these fire protection program elements and minimum design requirements
shall submit a request in the form of an application for license amendment
under § 50.90. The Director of the Office of Nuclear Reactor Regulation,
or a designee of the Director, may approve the application if the Director
or designee determines that the performance-based approach;
(A) Satisfies the performance goals, performance objectives, and performance criteria specified in NFPA 805 related to nuclear safety and
radiological release;
(B) Maintains safety margins; and
(C) Maintains fire protection defense-in-depth (fire prevention, fire detection, fire suppression, mitigation, and post-fire safe shutdown capability).
(3) Compliance with NFPA 805.
(i) A licensee may maintain a fire protection program that complies with NFPA 805 as an alternative to complying with paragraph (b) of this section for plants licensed to operate before January 1, 1979, or the fire protection license conditions for plants licensed to operate after January 1, 1979. The licensee shall submit a request to comply with NFPA 805 in the form of an application for license amendment under § 50.90. The application must identify any orders and license conditions that must be revised or superseded, and contain any necessary revisions to the plant's technical specifications and the bases thereof. The Director of the Office of Nuclear Reactor Regulation, or a designee of the Director, may approve the application if the Director or designee determines that the licensee has identified orders, license conditions, and the technical specifications that must be revised or superseded, and that any necessary revisions are adequate. Any approval by the Director or the designee must be in the form of a license amendment approving the use of NFPA 805 together with any necessary revisions to the technical specifications.
(ii) The licensee shall complete its implementation of the methodology in Chapter 2 of NFPA 805 (including all required evaluations and analyses) and, upon completion, modify the fire protection plan required by paragraph (a) of this section to reflect the licensee's decision to comply with NFPA 805, before changing its fire protection program or nuclear power plant as permitted by NFPA 805.
(4) Risk-informed or performance-based alternatives to compliance
with NFPA 805. A licensee may submit a request to use risk-informed
or performance-based alternatives to compliance with NFPA 805. The request
must be in the form of an application for license amendment under §
50.90 of this chapter. The Director of the Office of Nuclear Reactor Regulation,
or designee of the Director, may approve the application if the Director
or designee determines that the proposed alternatives:
(i) Satisfy the performance goals, performance objectives, and performance criteria specified in NFPA 805 related to nuclear safety and radiological release;
(ii) Maintain safety margins; and
(iii) Maintain fire protection defense-in-depth (fire prevention, fire detection, fire suppression, mitigation, and post-fire safe shutdown capability).
(d) [Reserved].
(e) [Reserved].
(f) Licensees that have submitted the certifications required under §
50.82(a)(1) shall maintain a fire protection program to address the potential
for fires that could cause the release or spread of radioactive materials
(i.e., that could result in a radiological hazard). A fire protection
program that complies with NFPA 805 shall be deemed to be acceptable for
complying with the requirements of this paragraph.
(1) The objectives of the fire protection program are to--
(i) Reasonably prevent these fires from occurring;
(ii) Rapidly detect, control, and extinguish those fires that do occur and that could result in a radiological hazard; and
(iii) Ensure that the risk of fire-induced radiological hazards to the public, environment and plant personnel is minimized.
(2) The licensee shall assess the fire protection program on a regular basis. The licensee shall revise the plan as appropriate throughout the various stages of facility
decommissioning.
(3) The licensee may make changes to the fire protection program without
NRC approval if these changes do not reduce the effectiveness of fire
protection for facilities, systems, and equipment that could result in
a radiological hazard, taking into account the decommissioning plant conditions
and activities.
[65 FR 38190, June 20, 2000; 69 FR 33550, June 16, 2004; 72 FR 49495, Aug. 28, 2007]
§ 50.49 Environmental qualification of electric equipment important to safety for nuclear power plants.
(a) Each holder of or an applicant for an operating license issued under this part, or a combined license or manufacturing license issued under part 52 of this chapter, other than a nuclear power plant for which the certifications required under § 50.82(a)(1) or § 52.110(a)(1) of this chapter have been submitted, shall establish a program for qualifying the electric equipment defined in paragraph (b) of this section. For a manufacturing license, only electric equipment defined in paragraph (b) which is within the scope of the manufactured reactor must be included in the program.
(b) Electric equipment important to safety covered by this section is:
(1) Safety-related electric equipment.3
(i) This equipment is that relied upon to remain functional during and following design basis events to ensure—
(A) The integrity of the reactor coolant pressure boundary;
(B) The capability to shut down the reactor and maintain it in a safe shutdown condition; or
(C) The capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposures comparable to the guidelines in § 50.34(a)(1), § 50.67(b)(2), or § 100.11 of this chapter, as applicable.
(ii) Design basis events are defined as conditions of normal operation, including anticipated operational occurrences, design basis accidents, external events, and natural phenomena for which the plant must be designed to ensure functions (b)(1)(i) (A) through (C) of this section.
(2) Nonsafety-related electric equipment whose failure under postulated environmental conditions could prevent satisfactory accomplishment of safety functions specified in subparagraphs (b)(1) (i) (A) through (C) of paragraph (b)(1) of this section by the safety-related equipment.
(3) Certain post-accident monitoring equipment.4
(c) Requirements for (1) dynamic and seismic qualification of electric equipment important to safety, (2) protection of electric equipment important to safety against other natural phenomena and external events, and (3) environmental qualification of electric equipment important to safety located in a mild environment are not included within the scope of this section. A mild environment is an environment that would at no time be significantly more severe than the environment that would occur during normal plant operation, including anticipated operational occurrences.
(d) The applicant or licensee shall prepare a list of electric equipment important to safety covered by this section. In addition, the applicant or licensee shall include the information in paragraphs (d)(1), (2), and (3) of this section for this electric equipment important to safety in a qualification file. The applicant or licensee shall keep the list and information in the file current and retain the file in auditable form for the entire period during which the covered item is installed in the nuclear power plant or is stored for future use to permit verification that each item of electric equipment is important to safely meet the requirements of paragraph (j) of this section.
(1) The performance specifications under conditions existing during and following design basis accidents.
(2) The voltage, frequency, load, and other electrical characteristics for which the performance specified in accordance with paragraph (d)(1) of this section can be ensured.
(3) The environmental conditions, including temperature, pressure, humidity, radiation, chemicals, and submergence at the location where the equipment must perform as specified in accordance with paragraphs (d)(1) and (2) of this section.
(e) The electric equipment qualification program must include and be based on the following:
(1) Temperature and pressure. The time-dependent temperature and pressure at the location of the electric equipment important to safety must be established for the most severe design basis accident during or following which this equipment is required to remain functional.
(2) Humidity. Humidity during design basis accidents must be considered.
(3) Chemical effects. The composition of chemicals used must be at least as severe as that resulting from the most limiting mode of plant operation (e.g., containment spray, emergency core cooling, or recirculation from containment sump). If the composition of the chemical spray can be affected by equipment malfunctions, the most severe chemical spray environment that results from a single failure in the spray system must be assumed.
(4) Radiation. The radiation environment must be based on the type of radiation, the total dose expected during normal operation over the installed life of the equipment, and the radiation environment associated with the most severe design basis accident during or following which the equipment is required to remain functional, including the radiation resulting from recirculating fluids for equipment located near the recirculating lines and including dose-rate effects.
(5) Aging. Equipment qualified by test must be preconditioned by natural or artificial (accelerated) aging to its end-of-installed life condition. Consideration must be given to all
significant types of degradation which can have an effect on the functional capability of the equipment. If preconditioning to an end-of-installed life condition is not practicable, the equipment may be preconditioned to a shorter designated life. The equipment must be replaced or refurbished at the end of this designated life unless ongoing qualification demonstrates that the item has additional life.
(6) Submergence (if subject to being submerged).
(7) Synergistic effects. Synergistic effects must be considered when these effects are believed to have a significant effect on equipment performance.
(8) Margins. Margins must be applied to account for unquantified uncertainty, such as the effects of production variations and inaccuracies in test instruments. These margins are in addition to any conservatisms applied during the derivation of local environmental conditions of the equipment unless these conservatisms can be quantified and shown to contain appropriate margins.
(f) Each item of electric equipment important to safety must be qualified by one of the following methods:
(1) Testing an identical item of equipment under identical conditions or under similar conditions with a supporting analysis to show that the equipment to be qualified is acceptable.
(2) Testing a similar item of equipment with a supporting analysis to show that the equipment to be qualified is acceptable.
(3) Experience with identical or similar equipment under similar conditions with a supporting analysis to show that the equipment to be qualified is acceptable.
(4) Analysis in combination with partial type test data that supports the analytical assumptions and conclusions.
(g) Each holder of an operating license issued prior to February 22, 1983, shall, by May 20, 1983, identify the electric equipment important to safety within the scope of this section already qualified and submit a schedule for either the qualification to the provisions of this section or for the replacement of the remaining electric equipment important to safety within the scope of this section. This schedule must establish a goal of final environmental qualification of the electric equipment within the scope of this section by the end of the second refueling outage after March 31, 1982 or by March 31, 1985, whichever is earlier. The Director of the Office of Nuclear Reactor Regulation may grant requests for extensions of this deadline to a date no later than November 30, 1985, for specific pieces of equipment if these requests are filed on a timely basis and demonstrate good cause for the extension, such as procurement lead time, test complications, and installation problems. In exceptional cases, the Commission itself may consider and grant extensions beyond November 30, 1985, for completion of environmental qualification.
The schedule in this paragraph supersedes the June 30, 1982, deadline, or any other previously imposed date, for environmental qualification of electric equipment contained in certain nuclear power operating licenses.
(h) Each license shall notify the Commission as specified in § 50.4 of any significant equipment qualification problem that may require extension of the completion date provided in accordance with paragraph (g) of this section within 60 days of its discovery.
(i) Applicants for operating licenses granted after February 22, 1983, but prior to November 30, 1985, shall perform an analysis to ensure that the plant can be safely operated pending completion of equipment qualification required by this section. This analysis must be submitted, as specified in § 50.4, for consideration prior to the granting of an operating license and must include, where appropriate, consideration of:
(1) Accomplishing the safety function by some designated alternative equipment if the principal equipment has not been demonstrated to be fully qualified.
(2) The validity of partial test data in support of the original qualification.
(3) Limited use of administrative controls over equipment that has not been demonstrated to be fully qualified.
(4) Completion of the safety function prior to exposure to the accident environment resulting from a design basis event and ensuring that the subsequent failure of the equipment does not degrade any safety function or mislead the operator.
(5) No significant degradation of any safety function or misleading information to the operator as a result of failure of equipment under the accident environment resulting from a design basis event.
(j) A record of the qualification, including documentation in paragraph (d) of this section, must be maintained in an auditable form for the entire period during which the covered item is installed in the nuclear power plant or is stored for future use to permit verification that each item of electric equipment important to safety covered by this section:
(1) Is qualified for its application; and
(2) Meets its specified performance requirements when it is subjected to the conditions predicted to be present when it must perform its safety function up to the end of its qualified life.
(k) Applicants for and holders of operating licenses are not required to requalify electric equipment important to safety in accordance with the provisions of this section if the Commission has previously required qualification of that equipment in accordance with "Guidelines for Evaluating Environmental Qualification of Class 1E Electrical Equipment in Operating Reactors," November 1979 (DOR Guidelines), or NUREG-0588 (For Comment version), "Interim Staff Position on Environmental Qualification of Safety-Related
Electrical Equipment."
(l) Replacement equipment must be qualified in accordance with the provisions of this section unless there are sound reasons to the contrary.
[48 FR 2733, Jan. 21, 1983, as amended at 49 FR 45576, Nov. 19, 1984; 51 FR 40308, Nov. 6, 1986; 51 FR 43709, Dec. 3, 1986; 52 FR 31611, Aug. 21, 1987; 53 FR 19250, May 27, 1988; 61 FR 39300, July 29, 1996; 61 FR 65173, Dec. 11, 1996; 62 FR 47271, Sept. 8, 1997; 64 FR 72001, Dec. 23, 1999; 66 FR 64738, Dec. 14, 2001; 72 FR 49495, Aug. 28, 2007; 80 FR 45843, Aug. 3, 2015]
3 Safety-related electric equipment is referred to as "Class 1E" equipment in IEEE 323–1974. Copies of this standard may be obtained from the Institute of Electrical and Electronics Engineers, Inc., 345 East 47th Street, New York, NY 10017.
4 Specific guidance concerning the types of variables to be monitored is provided in Revision 2 of Regulatory Guide 1.97, "Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident." Copies of the Regulatory Guide may be purchased through the U.S. Government Publishing Office by calling 202–512–1800 or by writing to the U.S. Government Publishing Office, P.O. Box 37082, Washington, DC 20013–7082.
Issuance, Limitations, and Conditions of Licenses and Construction Permits
§ 50.50 Issuance of licenses and construction permits.
Upon determination that an application for a license meets the standards and requirements of the act and regulations, and
that notifications, if any, to other agencies or bodies have been duly made, the Commission will issue a license, or if
appropriate a construction permit, in such form and containing such conditions and limitations including technical
specifications, as it deems appropriate and necessary.
§ 50.51 Continuation of license.
(a) Each license will be issued for a fixed period of time to be specified in the license but in no case to exceed 40 years
from date of issuance. Where the operation of a facility is involved, the Commission will issue the license for the term
requested by the applicant or for the estimated useful life of the facility if the Commission determines that the estimated
useful life is less than the term requested. Where construction of a facility is involved, the Commission may specify in the
construction permit the period for which the license will be issued if approved pursuant to § 50.56. Licenses may be
renewed by the Commission upon the expiration of the period. Renewal of operating licenses for nuclear power plants is
governed by 10 CFR part 54. Application for termination of license is to be made pursuant to § 50.82.
(b) Each license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to
authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in
writing that the license is terminated. During such period of continued effectiveness the licensee shall--
(1) Take actions necessary to decommission and decontaminate the facility and continue to maintain the facility, including,
where applicable, the storage, control and maintenance of the spent fuel, in a safe condition, and
(2) Conduct activities in accordance with all other restrictions applicable to the facility in accordance with the NRC
regulations and the provisions of the specific 10 CFR part 50 license for the facility.
[56 FR 64976, Dec. 13, 1991, as amended at 61 FR 39300, July 29, 1996]
§ 50.52 Combining licenses.
The Commission may combine in a single license the activities of an applicant which would otherwise be licensed
severally.
§ 50.53 Jurisdictional limitations.
No license under this part shall be deemed to have been issued for activities which are not under or within the jurisdiction
of the United States.
[21 FR 355, Jan. 19, 1956, as amended at 43 FR 6924, Feb. 17, 1978]
§ 50.54 Conditions of licenses.
The following paragraphs of this section, with the exception of paragraphs (r) and (gg), and the applicable requirements of 10 CFR 50.55a, are conditions in every nuclear power reactor operating license issued under this part. The following paragraphs with the exception of paragraph (r), (s), and (u) of this section are conditions in every combined license issued under
part 52 of this chapter, provided, however, that paragraphs (i) introductory text, (i)(1), (j), (k), (l), (m), (n), (w), (x), (y), (z), and (hh) of this section are only applicable after the
Commission makes the finding under § 52.103(g) of this chapter.
(a)(1) Each nuclear power plant or fuel reprocessing plant licensee subject to the quality assurance criteria in appendix B of this part shall implement, under § 50.34(b)(6)(ii) or § 52.79 of this chapter, the quality assurance program described or referenced in the safety analysis report, including changes to that report. However, a holder of a combined license under part 52 of this chapter shall implement the quality assurance program described or referenced in the safety analysis report applicable to operation 30 days prior to the scheduled date for the initial loading of fuel.
(2) Each licensee described in paragraph (a)(1) of this section shall, by June 10, 1983, submit to the appropriate NRC Regional Office shown in appendix D of part 20 of this chapter the current description of the quality assurance program it is implementing for inclusion in the Safety Analysis Report, unless there are no changes to the description previously accepted by NRC. This submittal must identify changes made to the quality assurance program description since the description was submitted to NRC. (Should a licensee need additional time beyond June 10, 1983 to submit its current quality assurance program description to NRC, it shall notify the appropriate NRC Regional Office in writing, explain why additional time is needed, and provide a schedule for NRC approval showing when its current quality assurance program description will be submitted.)
(3) Each licensee described in paragraph (a)(1) of this section may make a change to a previously accepted quality assurance program description included or referenced in the Safety Analysis Report without prior NRC approval, provided the change does not reduce the commitments in the program description as accepted by the NRC. Changes to the quality assurance program description that do not reduce the commitments must be submitted to the NRC in accordance with the requirements of Sec. 50.71(e). In addition to quality assurance program changes involving administrative improvements and clarifications, spelling corrections, punctuation, or editorial items, the following changes are not considered to be reductions in commitment:
(i) The use of a QA standard approved by the NRC which is more recent than the QA standard in the licensee's current QA program at the time of the change;
(ii) The use of a quality assurance alternative or exception approved by an NRC safety evaluation, provided that the bases of the NRC approval are applicable to the licensee's facility;
(iii) The use of generic organizational position titles that clearly denote the position function, supplemented as necessary by descriptive text, rather than specific titles;
(iv) The use of generic organizational charts to indicate functional relationships, authorities, and responsibilities, or, alternately, the use of descriptive text;
(v) The elimination of quality assurance program information that duplicates language in quality assurance regulatory guides and quality assurance standards to which the licensee is committed; and
(vi) Organizational revisions that ensure that persons and organizations performing quality assurance functions continue to have the requisite authority and organizational freedom, including sufficient independence from cost and schedule when opposed to safety considerations.
(4) Changes to the quality assurance program description that do reduce the commitments must be submitted to the NRC and receive NRC approval prior to implementation, as follows:
(i) Changes made to the quality assurance program description as presented in the Safety Analysis Report or in a topical report must be submitted as specified in Sec. 50.4.
(ii) The submittal of a change to the Safety Analysis Report quality assurance program description must include all pages affected by that change and must be accompanied by a forwarding letter identifying the change, the reason for the change, and the basis for concluding that the revised program incorporating the change continues to satisfy the criteria of appendix B of this part and the Safety Analysis Report quality assurance program description commitments previously accepted by the NRC (the letter need not provide the basis for changes that correct spelling, punctuation, or editorial items).
(iii) A copy of the forwarding letter identifying the change must be maintained as a facility record for three years.
(iv) Changes to the quality assurance program description included or referenced in the Safety Analysis Report shall be regarded as accepted by the Commission upon receipt of a letter to this effect from the appropriate reviewing office of the Commission or 60 days after submittal to the Commission, whichever occurs first.
(b) No right to the special nuclear material shall be conferred by the license except as may be defined by the license.
(c) Neither the license, nor any right thereunder, nor any right to utilize or produce special nuclear material shall be transferred, assigned, or disposed of in any manner, either voluntarily or involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission shall, after securing full information, find that the transfer is in accordance with the provisions of the act and give its consent in writing.
(d) The license shall be subject to suspension and to the rights of recapture of the material or control of the facility reserved to the Commission under section 108 of the act in a state of war or national emergency declared by Congress.
(e) The license shall be subject to revocation, suspension, modification, or amendment for cause as provided in the act and regulations, in accordance with the procedures provided by the act and regulations.
(f) The licensee shall at any time before expiration of the license, upon request of the Commission, submit, as specified in § 50.4, written statements, signed under oath or affirmation, to enable the Commission to determine whether or not the license should be modified, suspended, or revoked. Except for information sought to verify licensee compliance with the current licensing basis for that facility, the NRC must prepare the reason or reasons for each information request prior to issuance to ensure that the burden to be imposed on respondents is justified in view of the potential safety significance of the issue to be addressed in the requested information. Each such justification provided for an evaluation performed by the NRC staff must be approved by the Executive Director for Operations or his or her designee prior to issuance of the request.
(g) The issuance or existence of the license shall not be deemed to waive, or relieve the licensee from compliance with, the antitrust laws, as specified in subsection 105a of the Act. In the event that the licensee should be found by a court of competent jurisdiction to have violated any provision of such antitrust laws in the conduct of the licensed activity, the Commission may suspend or revoke the license or take such other action with respect to it as shall be deemed necessary.
(h) The license shall be subject to the provisions of the Act now or hereafter in effect and to all rules, regulations, and orders of the Commission. The terms and conditions of the license shall be subject to amendment, revision, or modification, by reason of amendments of the Act or by reason of rules, regulations, and orders issued in accordance with the terms of the act.
(i) Except as provided in § 55.13 of this chapter, the licensee may not permit the manipulation of the controls of any facility by anyone who is not a licensed operator or senior operator as provided in part 55 of this chapter.
(i-1) Within 3 months after either the issuance of an operating license or the date that the Commission makes the finding under § 52.103(g) of this chapter for a combined license, as applicable, the licensee shall have in effect an operator requalification program. The operator requalification program must, as a minimum, meet the requirements of § 55.59(c) of this chapter. Notwithstanding the provisions of § 50.59, the licensee may not, except as specifically authorized by the Commission decrease the scope of an approved operator requalification program.
(j) Apparatus and mechanisms other than controls, the operation of which may affect the reactivity or power level of a reactor shall be manipulated only with the knowledge and consent of an operator or senior operator licensed pursuant to part 55 of this chapter present at the controls.
(k) An operator or senior operator licensed pursuant to part 55 of this chapter shall be present at the controls at all times during the operation of the facility.
(l) The licensee shall designate individuals to be responsible for directing the licensed activities of licensed operators. These individuals shall be licensed as senior operators pursuant to part 55 of this chapter.
(m)(1) A senior operator licensed pursuant to part 55 of this chapter shall be present at the facility or readily available on call at all times during its operation, and shall be present at the facility during initial start-up and approach to power, recovery from an unplanned or unscheduled shut-down or significant reduction in power, and refueling, or as otherwise prescribed in the facility license.
(2) Notwithstanding any other provisions of this section, by January 1, 1984, licensees of nuclear power units shall meet the following requirements:
(i) Each licensee shall meet the minimum licensed operator staffing requirements in the following table:
Minimum Requirements1 Per Shift for On-Site Staffing of Nuclear Power Units by Operators and Senior Operators Licensed Under 10 CFR Part 55
Number of nuclear power units operating2 |
Position |
One Unit |
Two units |
Three units |
One control room |
One control room |
Two control rooms |
Two control rooms |
Three control rooms |
None |
Senior Operator |
1 |
1 |
1 |
1 |
1 |
Operator |
1 |
2 |
2 |
3 |
3 |
One |
Senior Operator |
2 |
2 |
2 |
2 |
2 |
Operator |
2 |
3 |
3 |
4 |
4 |
Two |
Senior Operator |
|
2 |
3 |
33 |
3 |
Operator |
|
3 |
4 |
35 |
5 |
Three |
Senior Operator |
|
|
|
3 |
4 |
Operator |
|
|
|
5 |
6 |
1Temporary deviations from the numbers required by this table shall be in accordance with criteria established in the unit's technical specifications.
2For the purpose of this table, a nuclear power unit is considered to be operating when it is in a mode other than cold shutdown or refueling as defined by the unit's technical specifications.
3The number of required licensed personnel when the operating nuclear power units are controlled from a common control room are two senior operators and four operators.
(ii) Each licensee shall have at its site a person holding a senior operator license for all fueled units at the site who is assigned responsibility for overall plant operation at all times there is fuel in any unit. If a single senior operator does not hold a senior operator license on all fueled units at the site, then the licensee must have at the site two or more senior operators, who in combination are licensed as senior operators on all fueled units.
(iii) When a nuclear power unit is in an operational mode other than cold shutdown or refueling, as defined by the unit's technical specifications, each licensee shall have a person holding a senior operator license for the nuclear power unit in the control room at all times. In addition to this senior operator, for each fueled nuclear power unit, a licensed operator or senior operator shall be present at the controls at all times.
(iv) Each licensee shall have present, during alteration of the core of a nuclear power unit (including fuel loading or transfer), a person holding a senior operator license or a senior operator license limited to fuel handling to directly supervise the activity and, during this time, the licensee shall not assign other duties to this person.
(3) Licensees who cannot meet the January 1, 1984 deadline must submit by October 1, 1983 a request for an extension to the Director of the Office of Nuclear Regulation and demonstrate good cause for the request.
(n) The licensee shall not, except as authorized pursuant to a construction permit, make any alteration in the facility constituting a change from the technical specifications previously incorporated in a license or construction permit pursuant to § 50.36 of this part.
(o) Primary reactor containments for water cooled power reactors, other than facilities for which the certifications required under §§ 50.82(a)(1) or 52.110(a)(1) of this chapter have been submitted, shall be subject to the requirements set forth in appendix J to this part.
(p)(1) The licensee shall prepare and maintain safeguards contingency plan procedures in accordance with appendix C of part 73 of this chapter for affecting the actions and decisions contained in the Responsibility Matrix of the safeguards contingency plan. The licensee may not make a change which would decrease the effectiveness of a physical security plan, or guard training and qualification plan, or cyber security plan prepared under § 50.34(c) or § 52.79(a), or part 73 of this chapter, or of the first four categories of information (Background, Generic Planning Base, Licensee Planning Base, Responsibility Matrix) contained in a licensee safeguards contingency plan prepared under § 50.34(d) or § 52.79(a), or part 73 of this chapter, as applicable, without prior approval of the Commission. A licensee desiring to make such a change shall submit an application for amendment to the licensee’s license under § 50.90.
(2) The licensee may make changes to the plans referenced in paragraph (p)(1) of this section, without prior Commission approval if the changes do not decrease the safeguards effectiveness of the plan. The licensee shall maintain records of changes to the plans made without prior Commission approval for a period of 3 years from the date of the change, and shall submit, as specified in § 50.4 or § 52.3 of this chapter, a report containing a description of each change within 2 months after the change is made. Prior to the safeguards contingency plan being put into effect, the licensee shall have:
(i) All safeguards capabilities specified in the safeguards contingency plan available and functional;
(ii) Detailed procedures developed according to appendix C to part 73 of this chapter available at the licensee's site; and
(iii) All appropriate personnel trained to respond to safeguards incidents as outlined in the plan and specified in the detailed procedures.
(3) The licensee shall provide for the development, revision, implementation, and maintenance of its safeguards contingency plan. The licensee shall ensure that all program elements are reviewed by individuals independent of both security program management and personnel who have direct responsibility for implementation of the security program either:
(i) At intervals not to exceed 12 months; or
(ii) As necessary, based on an assessment by the licensee against performance indicators, and as soon as
reasonably practicable after a change occurs in personnel, procedures, equipment, or facilities that potentially could adversely affect security, but no longer than 12 months after the change. In any case, all elements of the safeguards contingency plan must be reviewed at least once every 24 months.
(4) The review must include a review and audit of safeguards contingency procedures and practices, an audit of the security system testing and maintenance program, and a test of the safeguards systems along with commitments established for response by local law enforcement authorities. The results of the review and audit, along with recommendations for improvements, must be documented, reported to the licensee’s corporate and plant management, and kept available at the plant for inspection for a period of 3 years.
(q) Emergency plans.
(1) Definitions for the purpose of this section:
(i) Change means an action that results in modification or addition to, or removal from, the licensee's emergency plan. All such changes are subject to the provisions of this section except where the applicable regulations establish specific criteria for accomplishing a particular change.
(ii) Emergency plan means the document(s), prepared and maintained by the licensee, that identify and
describe the licensee's methods for maintaining emergency preparedness and responding to emergencies. An emergency plan includes the plan as originally approved by the NRC and all subsequent changes made by the licensee with, and without, prior NRC review and approval under paragraph (q) of this section.
(iii) Emergency planning function means a capability or resource necessary
to prepare for and respond to a
radiological emergency.
(iv) Reduction in effectiveness means a change in an emergency plan that results in reducing the licensee's capability to perform an emergency planning function in the event of a radiological emergency.
(2)(i) Except as provided in paragraph
(q)(2)(ii) of this section, a holder of a
license under this part, or a combined
license under part 52 of this chapter
after the Commission makes the finding
under § 52.103(g) of this chapter, shall
follow and maintain the effectiveness of
an emergency plan that meets the
requirements in appendix E to this part
and, for nuclear power reactor licensees,
the planning standards of § 50.47(b).
(ii) A holder of a license under this
part for a non-power production or
utilization facility, a holder of a license
under this part for a small modular
reactor or a non-light water reactor, or
a holder of a combined license under
part 52 of this chapter after the
Commission makes the finding under
§ 52.103(g) of this chapter for a small
modular reactor or a non-light-water
reactor, shall follow and maintain the
effectiveness of either an emergency
plan that meets the requirements in
§ 50.160 or an emergency plan that
meets the requirements in appendix E to
this part and, for nuclear power reactor
licensees, the planning standards of
§ 50.47(b).
(3)(i) Except as provided in paragraph
(q)(3)(ii) of this section, the licensee
may make changes to its emergency
plan without NRC approval only if the
licensee performs and retains an
analysis demonstrating that the changes
do not reduce the effectiveness of the
plan and the plan, as changed,
continues to meet the requirements in
appendix E to this part and, for nuclear
power reactor licensees, the planning
standards of § 50.47(b).
(ii) A non-power production or
utilization facility, small modular
reactor, or non-light-water reactor
licensee may make changes to its
emergency plan without NRC approval
only if the licensee performs and retains
an analysis demonstrating that the
changes do not reduce the effectiveness
of the plan and the plan, as changed,
continues to meet either the
requirements in § 50.160 or the
requirements in appendix E to this part
and, for nuclear power reactor licensees,
the planning standards of § 50.47(b).
(4) The changes to a licensee’s
emergency plan that reduce the
effectiveness of the plan as defined in
paragraph (q)(1)(iv) of this section may
not be implemented without prior
approval by the NRC. A licensee desiring to make such a change shall
submit an application for an
amendment to its license. In addition to
the filing requirements of §§ 50.90 and
50.91, the request must include all
emergency plan pages affected by that
change and must be accompanied by a
forwarding letter identifying the change,
the reason for the change, and the basis
for concluding that the licensee’s
emergency plan, as revised, will
continue to meet either the
requirements in § 50.160 or the
requirements in appendix E to this part
and, for nuclear power reactor licensees,
the planning standards of § 50.47(b).
(5) The licensee shall retain a record of each change to the emergency plan made without prior NRC approval for a
period of three years from the date of the change and shall submit, as specified in § 50.4, a report of each such change, including a summary of its analysis, within 30 days after the change is put in effect.
(6) The nuclear power reactor licensee shall retain the emergency plan and each change for which prior NRC approval was obtained pursuant to paragraph (q)(4) of this section as a record until the Commission terminates the license for the nuclear power reactor.
(7) Each holder of an operating license
under this part or a combined license
under part 52 of this chapter for a small
modular reactor or non-light-water
reactor or each holder of an operating
license under this part issued after
December 18, 2023 for a non-power
production or utilization facility that
wishes to transition to § 50.160 shall
submit to the Commission, as specified
in § 50.90, a license amendment request
for implementing an emergency
preparedness program with the
associated plan modification necessary
to meet the requirements of § 50.160(b).
This submittal must include an
explanation of the schedule and
analyses supporting the implementation
of the emergency preparedness program.
(r) [Reserved]
(s)(1) [Reserved]
(2)(i) [Reserved]
(ii) If the NRC finds that the state of emergency preparedness does not provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency (including findings based on requirements of appendix E, section IV.D.3) and if the deficiencies (including deficiencies based on requirements of appendix E, section IV.D.3) are not corrected within four months of that finding, the Commission will determine whether the facility shall be shut down or cease operation until such deficiencies are remedied or whether other enforcement action is appropriate. In determining whether a shutdown or other enforcement action is appropriate, the Commission shall take into account, among other factors, whether the licensee can demonstrate to the Commission's satisfaction that the deficiencies in the plan are not significant for the plant in question, or that adequate interim compensating actions have been or will be taken promptly, or that that there are other compelling reasons for continued operation.
(3) If the planning standards for
radiological emergency preparedness
apply to offsite emergency response
plans, or if the planning activities in
§ 50.160(b)(1)(iv)(B) apply, then the
NRC will base its finding on a review of
the FEMA findings and determinations
as to whether State and local emergency
plans are adequate and capable of being
implemented, and on the NRC
assessment as to whether the licensee’s
emergency plans are adequate and
capable of being implemented. Nothing
in this paragraph shall be construed as
limiting the authority of the
Commission to take action under any
other regulation or authority of the
Commission or at any time other than
that specified in this paragraph.
(t)(1) The licensee shall provide for the development, revision, implementation, and maintenance of its emergency preparedness program. The licensee shall ensure that all program elements are reviewed by persons who have no direct responsibility for the implementation of the emergency preparedness program either:
(i) At intervals not to exceed 12 months or,
(ii) As necessary, based on an assessment by the licensee against performance indicators, and as soon as reasonably practicable after a change occurs in personnel, procedures, equipment, or facilities that potentially could adversely affect emergency preparedness, but no longer than 12 months after the change. In any case, all elements of the emergency preparedness program must be reviewed at least once every 24 months.
(2) The review must include an evaluation for adequacy of interfaces with State and local governments and of licensee drills, exercises, capabilities, and procedures. The results of the review, along with recommendations for improvements, must be documented, reported to the licensee's corporate and plant management, and retained for a period of 5 years. The part of the review involving the evaluation for adequacy of interface with State and local governments must be available to the appropriate State and local governments.
(u) [Reserved]
(v) Each licensee subject to the requirements of Part 73 of this chapter shall ensure that Safeguards Information is protected against unauthorized disclosure in accordance with the requirements in § 73.21 and the requirements in § 73.22 or § 73.23 of this chapter, as applicable.
(w) Each power reactor licensee under this part for a production or utilization facility of the type described in §§ 50.21(b) or 50.22 shall take reasonable steps to obtain insurance available at reasonable costs and on reasonable terms from private sources or to demonstrate to the satisfaction of the NRC that it possesses an equivalent amount of protection covering the licensee's obligation, in the event of an accident at the licensee's reactor, to stabilize and decontaminate the reactor and the reactor station site at which the reactor experiencing the accident is located, provided that:
(1) The insurance required by paragraph (w) of this section must have a minimum coverage limit for each reactor station site of either $1.06 billion or whatever amount of insurance is generally available from private sources, whichever is less. The required insurance must clearly state that, as and to the extent provided in paragraph (w)(4) of this section, any proceeds must be payable first for stabilization of the reactor and next for decontamination of the reactor and the reactor station site. If a licensee's coverage falls below the required minimum, the licensee shall within 60 days take all reasonable steps to restore its coverage to the required minimum. The required insurance may, at the option of the licensee, be included within policies that also provide coverage for other risks, including, but not limited to, the risk of direct physical damage.
(2)(i) With respect to policies issued or annually renewed on or after April 2, 1991, the proceeds of such required insurance must be dedicated, as and to the extent provided in this paragraph, to reimbursement or payment on behalf of the insured of reasonable expenses incurred or estimated to be incurred by the licensee in taking action to fulfill the licensee's obligation, in the event of an accident at the licensee's reactor, to ensure that the reactor is in, or is returned to, and maintained in, a safe and stable condition and that radioactive contamination is removed or controlled such that personnel exposures are consistent with the occupational exposure limits in 10 CFR part 20. These actions must be consistent with any other obligation the licensee may have under this chapter and must be subject to paragraph (w)(4) of this section. As used in this section, an "accident" means an event that involves the release of radioactive material from its intended place of confinement within the reactor or on the reactor station site such that there is a present danger of release off site in amounts that would pose a threat to the public health and safety.
(ii) The stabilization and decontamination requirements set forth in paragraph (w)(4) of this section must apply uniformly to all insurance policies required under paragraph (w) of this section.
(3) The licensee shall report to the NRC on April 1 of each year the current levels of this insurance or financial security it maintains and the sources of this insurance or financial security.
(4)(i) In the event of an accident at the licensee's reactor, whenever the estimated costs of stabilizing the licensed reactor and of decontaminating the reactor and the reactor station site exceed $100 million, the proceeds of the insurance required by paragraph (w) of this section must be dedicated to and used, first, to ensure that the licensed reactor is in, or is returned to, and can be maintained in, a safe and stable condition so as to prevent any significant risk to the public health and safety and, second, to decontaminate the reactor and the reactor station site in accordance with the licensee's cleanup plan as approved by order of the Director of the Office of Nuclear Reactor Regulation. This priority on insurance proceeds must remain in effect for 60 days or, upon order of the Director, for such longer periods, in increments not to exceed 60 days except as provided for activities under the cleanup plan required in paragraphs (w)(4)(iii) and (w)(4)(iv) of this section, as the Director may find necessary to protect the public health and safety. Actions needed to bring the reactor to and maintain the reactor in a safe and stable condition may include one or more of the following, as appropriate: (A) Shutdown of the reactor; (B) Establishment and maintenance of long-term cooling with stable decay heat removal; (C) Maintenance of sub-criticality; (D) Control of radioactive releases; and (E) Securing of structures, systems, or components to minimize radiation exposure to onsite personnel or to the offsite public or to facilitate later decontamination or both.
(ii) The licensee shall inform the Director of the Office of Nuclear Reactor Regulation in writing when the reactor is and can be maintained in a safe and stable condition so as to prevent any significant risk to the public health and safety. Within 30 days after the licensee informs the Director that the reactor is in this condition, or at such earlier time as the licensee may elect or the Director may for good cause direct, the licensee shall prepare and submit a cleanup plan for the Director's approval. The cleanup plan must identify and contain an estimate of the cost of each cleanup operation that will be required to decontaminate the reactor sufficiently to permit the licensee either to resume operation of the reactor or to apply to the Commission under § 50.82 for authority to decommission the reactor and to surrender the license voluntarily. Cleanup operations may include one or more of the following, as appropriate: (A) Processing any contaminated water generated by the accident and by decontamination operations to remove radioactive materials; (B) Decontamination of surfaces inside the auxiliary and fuel-handling buildings and the reactor building to levels consistent with the Commission's occupational exposure limits in 10 CFR part 20, and decontamination or disposal of equipment; (C) Decontamination or removal and disposal of internal parts and damaged fuel from the reactor vessel; and (D) Cleanup of the reactor coolant system.
(iii) Following review of the licensee's cleanup plan, the Director will order the licensee to complete all operations that the Director finds are necessary to decontaminate the reactor sufficiently to permit the licensee either to resume operation of the reactor or to apply to the Commission under § 50.82 for authority to decommission the reactor and to surrender the license voluntarily. The Director shall approve or disapprove, in whole or in part for stated reasons, the licensee's estimate of cleanup costs for such operations. Such order may not be effective for more than 1 year, at which time it may be renewed. Each subsequent renewal order, if imposed, may be effective for not more than 6 months.
(iv) Of the balance of the proceeds of the required insurance not already expended to place the reactor in a safe and stable condition pursuant to paragraph (w)(2)(i) of this section, an amount sufficient to cover the expenses of completion of those decontamination operations that are the subject of the Director's order shall be dedicated to such use, provided that, upon certification to the Director of the amounts expended previously and from time to time for stabilization and decontamination and upon further certification to the Director as to the sufficiency of the dedicated amount remaining, policies of insurance may provide for payment to the licensee or other loss payees of amounts not so dedicated, and the licensee may proceed to use in parallel (and not in preference thereto) any insurance proceeds not so dedicated for other purposes.
(x) A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent.
(y) Licensee action permitted by paragraph (x) of this section shall be approved, as a minimum, by a licensed senior operator, or, at a nuclear power reactor facility for which the certifications required under § 50.82(a)(1) have been submitted, by either a licensed senior operator or a certified fuel handler, prior to taking the action.
(z) Each licensee with a utilization facility licensed pursuant to sections 103 or 104b. of the Act shall immediately notify the NRC Operations Center of the occurrence of any event specified in § 50.72 of this part.
(aa) The license shall be subject to all conditions deemed imposed as a matter of law by sections 401(a)(2) and 401(d) of the Federal Water Pollution Control Act, as amended (33 U.S.C.A. 1341(a)(2) and (d).)
(bb) For nuclear power reactors licensed by the NRC, the licensee shall, within 2 years following permanent cessation of operation of the reactor or 5 years before expiration of the reactor operating license, whichever occurs first, submit written notification to the Commission for its review and preliminary approval of the program by which the licensee intends to manage and provide funding for the management of all irradiated fuel at the reactor following permanent cessation of operation of the reactor until title to the irradiated fuel and possession of the fuel is transferred to the Secretary of Energy for its ultimate disposal in a repository. Licensees of nuclear power reactors that have permanently ceased operation by April 4, 1994 are required to submit such written notification by April 4, 1996. Final Commission review will be undertaken as part of any proceeding for continued licensing under part 50 or part 72 of this chapter. The licensee must demonstrate to NRC that the elected actions will be consistent with NRC requirements for licensed possession of irradiated nuclear fuel and that the actions will be implemented on a timely basis. Where implementation of such actions requires NRC authorizations, the licensee shall verify in the notification that submittals for such actions have been or will be made to NRC and shall identify them. A copy of the notification shall be retained by the licensee as a record until expiration of the reactor operating license. The licensee shall notify the NRC of any significant changes in the proposed waste management program as described in the initial notification.
(cc)(1) Each licensee shall notify the appropriate NRC Regional Administrator, in writing, immediately following the filing of a voluntary or involuntary petition for bankruptcy under any chapter of title 11 (Bankruptcy) of the United States Code by or against:
(i) The licensee;
(ii) An entity (as that term is defined in 11 U.S.C. 101(14)) controlling the licensee or listing the license or licensee as property of the estate; or
(iii) An affiliate (as that term is defined in 11 U.S.C. 101(2)) of the licensee.
(2) This notification must indicate:
(i) The bankruptcy court in which the petition for bankruptcy was filed; and
(ii) The date of the filing of the petition.
(dd) A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in a national security emergency:
(1) When this action is immediately needed to implement national security objectives as designated by the national command authority through the Commission, and
(2) No action consistent with license conditions and technical specifications that can meet national security objectives is immediately apparent.
A national security emergency is established by a law enacted by the Congress or by an order or directive issued by the President pursuant to statutes or the Constitution of the United States. The authority under this paragraph must be exercised in accordance with law, including section 57e of the Act, and is in addition to the authority granted under paragraph (x) of this section, which remains in effect unless otherwise directed by the Commission during a national security emergency.
(ee)(1) Each license issued under this part authorizing the possession of byproduct and special nuclear material produced in the operation of the licensed reactor includes, whether stated in the license or not, the authorization to receive back that same material, in the same or altered form or combined with byproduct or special nuclear material produced in the operation of another reactor of the same licensee located at that site, from a licensee of the Commission or an Agreement State, or from a non-licensed entity authorized to possess the material.
(2) The authorizations in this subsection are subject to the same limitations and requirements applicable to the original possession of the material.
(3) This paragraph does not authorize the receipt of any material recovered from the reprocessing of irradiated fuel.
(ff) For licensees of nuclear power plants that have implemented the earthquake engineering criteria in Appendix S to this part, plant shutdown is required as provided in Paragraph IV(a)(3) of Appendix S to this part. Prior to resuming operations, the licensee shall demonstrate to the Commission that no functional damage has occurred to those features necessary for continued operation without undue risk to the health and safety of the public and the licensing basis is maintained.
(gg)(1) Notwithstanding § 52.103 of
this chapter, if, following the conduct of
the exercise required by either
paragraph IV.f.2.a of appendix E to this
part or § 50.160(c)(2), as applicable,
FEMA identifies one or more
deficiencies in the state of offsite
emergency preparedness, the holder of a
combined license under part 52 of this
chapter may operate at up to 5 percent
of rated thermal power only if the
Commission finds that the state of
onsite emergency preparedness provides
reasonable assurance that adequate
protective measures can and will be
taken in the event of a radiological
emergency. The NRC will base this
finding on its assessment of the
applicant’s onsite emergency plans
against the pertinent standards in either
§ 50.47 and appendix E to this part, or
§ 50.160, as applicable. Review of the
applicant’s emergency plans will
include the following standards with
offsite aspects:
(i) Arrangements for requesting and effectively using offsite assistance onsite have been made, arrangements to
accommodate State and local staff at the licensee's Emergency Operations Facility have been made, and other
organizations capable of augmenting the planned onsite response have been identified.
(ii) Procedures have been established for licensee communications with State and local response organizations, including initial notification of the declaration of emergency and periodic provision of plant and response status reports.
(iii) Provisions exist for prompt communications among principal response organizations to offsite emergency personnel who would be responding onsite.
(iv) Adequate emergency facilities and equipment to support the emergency response onsite are provided and maintained.
(v) Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use onsite.
(vi) Arrangements are made for medical services for contaminated and injured onsite individuals.
(vii) Radiological emergency response training has been made available to those offsite who may be called to assist in an emergency onsite.
(2) The condition in this paragraph, regarding operation at up to 5 percent power, ceases to apply 30 days after
FEMA informs the NRC that the offsite deficiencies have been corrected, unless the NRC notifies the combined license holder before the expiration of the 30-day period that the Commission finds under paragraphs (s)(2) and (3) of this section that the state of emergency preparedness does not provide reasonable assurance that adequate
protective measures can and will be taken in the event of a radiological emergency.
(hh) (1) Each licensee shall develop, implement and maintain procedures that describe how the licensee will address the following areas if the licensee is notified of a potential aircraft threat:
(i) Verification of the authenticity of threat notifications;
(ii) Maintenance of continuous communication with threat notification sources;
(iii) Contacting all onsite personnel and applicable offsite response organizations;
(iv) Onsite actions necessary to enhance the capability of the facility to mitigate the consequences of an aircraft impact;
(v) Measures to reduce visual discrimination of the site relative to its surroundings or individual buildings within the protected area;
(vi) Dispersal of equipment and personnel, as well as rapid entry into site protected areas for essential onsite personnel and offsite responders who are necessary to mitigate the event; and
(vii) Recall of site personnel.
(2) Paragraph (hh)(1) of this section does not apply to a licensee that has submitted the certifications required under § 50.82(a)(1) or § 52.110(a) of this chapter.
(jj) Structures, systems, and components subject to the codes and standards in 10 CFR 50.55a must be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed.
[21 FR 355, Jan. 19, 1956; 72 FR 49495, Aug. 28, 2007; 73 FR 63571, Oct. 24, 2008; 74 FR 13969, Mar. 27, 2009; 76 FR 72595, Nov. 23, 2011; 78 FR 34248, Jun. 7, 2013; 79 FR 65798, Nov. 5, 2014; 80 FR 45843, Aug. 3, 2015; 84 FR 39718, Aug. 9, 2019; 88 FR 80075, Nov. 16, 2023]
EDITORIAL NOTE: For Federal Register citations affecting § 50.54, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and on GPO Access.
§ 50.55 Conditions of construction permits, early site permits, combined licenses, and manufacturing licenses.
Each construction permit for a utilization facility is subject to the following terms and conditions and the applicable requirements of § 50.55a; each construction permit for a
production facility is subject to the following terms and conditions with the exception of paragraph (i); each early site permit is subject to the terms and conditions in paragraph (f) of this section; each manufacturing license is subject to the terms and conditions in paragraphs (e), (f), and (i) of this section and the applicable requirements of § 50.55a; and each combined license is subject to the terms and conditions in paragraphs (e), (f), and (i) of this section and the applicable requirements of § 50.55a until the date that the Commission makes the finding under § 52.103(g) of this chapter:
(a) The construction permit shall state the earliest and latest dates for completion of the construction or modification.
(b) If the proposed construction or modification of the facility is not completed by the latest completion date, the construction permit shall expire and all rights are forfeited. However, upon good cause shown, the Commission will extend the completion date for a reasonable period of time. The Commission will recognize, among other things, developmental problems attributable to the experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy action, an act of the elements, and other acts beyond the control of the permit holder, as a basis for extending the completion date.
(c) Except as modified by this section and § 50.55a, the construction permit shall be subject to the same conditions to which a license is subject.
(d) At or about the time of completion of the construction or modification of the facility, the applicant will file any additional information needed to bring the original application for license up to date, and will file an application for an operating license or an amendment to an application for a license to construct and operate the facility for the issuance of an operating license, as appropriate, as specified in § 50.30(d) of this part.
(e)(1) Definitions. For purposes of this paragraph, the definitions in § 21.3 of this chapter apply.
(2) Posting requirements.
(i) Each individual, partnership,
corporation, dedicating entity, or other
entity subject to the regulations in this
part (i.e., holders of a construction
permit, combined license, or a
manufacturing license) must post
current copies of the regulations in this
part, Section 206 of the Energy
Reorganization Act of 1974 (ERA), and
procedures adopted under the
regulations in this part. These
documents must be posted in a
conspicuous position on any premises
within the United States where the
activities subject to this part are
conducted.
(ii) If posting of the regulations in this part or the procedures adopted under the regulations in this part is not practicable, the licensee or firm subject to the regulations in this part may, in addition to posting Section 206 of the ERA, post a notice which describes the regulations/procedures, including the
name of the individual to whom reports may be made, and states where the regulation, procedures, and reports may be examined.
(3) Procedures. Each individual, corporation, partnership, or other entity holding a facility construction permit subject to this part, combined license (until the Commission makes the finding under 10 CFR 52.103(g)), and manufacturing license under 10 CFR part 52 must adopt appropriate procedures to—
(i) Evaluate deviations and failures to comply to identify defects and failures to comply associated with substantial safety hazards as soon as practicable, and, except as provided in paragraph (e)(3)(ii) of this section, in all cases within 60 days of discovery, to identify a reportable defect or failure to comply that could create a substantial safety hazard, were it to remain uncorrected.
(ii) Ensure that if an evaluation of an identified deviation or failure to comply potentially associated with a substantial safety hazard cannot be completed within 60 days from discovery of the
deviation or failure to comply, an interim report is prepared and submitted to the Commission through a
director or responsible officer or designated person as discussed in paragraph (e)(4)(v) of this section. The interim report should describe the deviation or failure to comply that is being evaluated and should also state when the evaluation will be completed. This interim report must be submitted in writing within 60 days of discovery of the deviation or failure to comply.
(iii) Ensure that a director or
responsible officer of the holder of a
facility construction permit subject to
this part, combined license (until the
Commission makes the finding under 10
CFR 52.103(g)), and manufacturing
license under 10 CFR part 52 is
informed as soon as practicable, and, in
all cases, within the 5 working days
after completion of the evaluation
described in paragraph (e)(3)(i) or
(e)(3)(ii) of this section, if the
construction or manufacture of a facility
or activity or manufactured reactor, or a
basic component supplied for such
facility or activity—
(A) Fails to comply with the AEA, as amended, or any applicable regulation, order, or license of the Commission, relating to a substantial safety hazard;
(B) Contains a defect; or
(C) Undergoes any significant breakdown in any portion of the quality assurance program conducted under the requirements of appendix B to 10 CFR part 50 which could have produced a defect in a basic component. These breakdowns in the quality assurance program are reportable whether or not the breakdown actually resulted in a defect in a design approved and released for construction, installation, or manufacture.
(4) (i) The holder of a facility construction permit subject to this part, combined license (until the Commission makes the finding under 10 CFR 52.103(g)), and manufacturing license who obtains information reasonably indicating that the facility fails to comply with the AEA, as amended, or any applicable regulation, order, or license of the Commission relating to a substantial safety hazard must notify the Commission of the failure to comply through a director or responsible officer or designated person as discussed in paragraph (e)(4)(v) of this section.
(ii) The holder of a facility
construction permit subject to this part,
combined license, or manufacturing
license, who obtains information
reasonably indicating the existence of
any defect found in the construction or
manufacture, or any defect found in the
final design of a facility or
manufactured reactor as approved and
released for construction or
manufacture, must notify the
Commission of the defect through a
director or responsible officer or
designated person as discussed in
paragraph (e)(4)(v) of this section.
(iii) The holder of a facility construction permit subject to this part, combined license, or manufacturing license, who obtains information reasonably indicating that the quality assurance program has undergone any significant breakdown discussed in paragraph (e)(3)(iii)(C) of this section must notify the Commission of the breakdown in the quality assurance program through a director or responsible officer or designated person as discussed in paragraph (e)(4)(v) of this section.
(iv) A dedicating entity is responsible for identifying and evaluating deviations and reporting defects and failures to comply associated with substantial safety hazards for dedicated items; and maintaining auditable records for the dedication process.
(v) The notification requirements of this paragraph apply to all defects and failures to comply associated with a substantial safety hazard regardless of whether extensive evaluation, redesign, or repair is required to conform to the criteria and bases stated in the safety analysis report, construction permit, combined license, or manufacturing license. Evaluation of potential defects and failures to comply and reporting of defects and failures to comply under this section satisfies the construction permit holder's, combined license holder's, and manufacturing license holder's evaluation and notification obligations under part 21 of this chapter, and satisfies the responsibility of individual directors or responsible officers of holders of construction permits issued under § 50.23, holders of combined licenses (until the Commission makes the finding under § 52.103 of this chapter), and holders of
manufacturing licenses to report defects, and failures to comply associated with substantial safety hazards under Section 206 of the ERA. The director or responsible officer may authorize an individual to provide the notification required by this section, provided that this must not relieve the director or
responsible officer of his or her responsibility under this section.
(5) Notification—timing and where sent. The notification required by paragraph (e)(4) of this section must consist of—
(i) Initial notification by email, which
is the preferred method of notification,
or facsimile to the NRC Operations
Center at (301) 816—5151 or by
telephone at
(301) 816—5100 within 2 days
following receipt of information by the
director or responsible corporate officer
under paragraph (e)(3)(iii) of this
section, on the identification of a defect
or a failure to comply. Verification that
the email or facsimile has been received
should be made by calling the NRC
Operations Center. This paragraph does
not apply to interim reports described in
paragraph (e)(3)(ii) of this section.
(ii) Written notification submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed in § 50.4, with a copy to the appropriate Regional Administrator at the address specified in appendix D to part 20 of this chapter and a copy to the appropriate NRC resident inspector within 30 days following receipt of information by the director or responsible corporate officer
under paragraph (e)(3)(iii) of this section, on the identification of a defect or failure to comply.
(6) Content of notification. The written notification required by paragraph (e)(5)(ii) of this section must clearly indicate that the written notification is being submitted under
§ 50.55(e) and include the following information, to the extent known.
(i) Name and address of the individual or individuals informing the Commission.
(ii) Identification of the facility, the activity, or the basic component supplied for the facility or the activity within the United States which contains a defect or fails to comply.
(iii) Identification of the firm constructing or manufacturing the facility or supplying the basic component which fails to comply or contains a defect.
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by the defect or failure to comply.
(v) The date on which the information of a defect or failure to comply was obtained.
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all the basic components in use at the facility subject to the regulations in this part.
(vii) In the case of a completed reactor manufactured under part 52 of this chapter, the entities to which the reactor was supplied.
(viii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
(ix) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to other entities.
(7) Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part shall ensure that each procurement document for a facility, or a basic component specifies or is issued by the entity subject to the regulations, when applicable, that the provisions of 10 CFR part 21 or 10 CFR 50.55(e) applies, as applicable.
(8) Coordination with 10 CFR part 21. The requirements of § 50.55(e) are satisfied when the defect or failure to comply associated with a substantial safety hazard has been previously reported under part 21 of this chapter, under § 73.1205 of this chapter, or under §§ 50.55(e) or 50.73. For holders of construction permits issued before October 29, 1991, evaluation, reporting and recordkeeping requirements of § 50.55(e) may be met by complying with the comparable requirements of
part 21 of this chapter.
(9) Records retention. The holder of a construction permit, combined license, and manufacturing license must prepare and maintain records necessary to accomplish the purposes of this section, specifically—
(i) Retain procurement documents, which define the requirements that facilities or basic components must
meet in order to be considered acceptable, for the lifetime of the facility or basic component.
(ii) Retain records of evaluations of all deviations and failures to comply under paragraph (e)(3)(i) of this section for the longest of:
(A) Ten (10) years from the date of the evaluation;
(B) Five (5) years from the date that an early site permit is referenced in an application for a combined license; or
(C) Five (5) years from the date of delivery of a manufactured reactor.
(iii) Retain records of all interim reports to the Commission made under paragraph (e)(3)(ii) of this section, or notifications to the Commission made under paragraph (e)(4) of this section for the minimum time periods stated in paragraph (e)(9)(ii) of this section;
(iv) Suppliers of basic components must retain records of:
(A) All notifications sent to affected licensees or purchasers under paragraph (e)(4)(iv) of this section for a minimum of ten (10) years following the date of the notification;
(B) The facilities or other purchasers to whom basic components or associated services were supplied for a minimum of fifteen (15) years from the delivery of the basic component or associated services.
(v) Maintaining records in accordance with this section satisfies the recordkeeping obligations under part 21 of this chapter of the entities, including directors or responsible officers thereof, subject to this section.
(f)(1) Each nuclear power plant or fuel reprocessing plant construction permit holder subject to the quality assurance criteria in appendix B of this part shall implement, pursuant to § 50.34(a)(7) of this part, the quality assurance program described or referenced in the Safety Analysis Report, including changes to that report.
(2) Each construction permit holder described in paragraph (f)(1) of this section shall, by June 10, 1983, submit to the appropriate NRC Regional Office shown in appendix D of part 20 of this chapter the current description of the quality assurance program it is implementing for inclusion in the Safety Analysis Report, unless there are no changes to the description previously accepted by NRC. This submittal must identify changes made to the quality assurance program description since the description was submitted to NRC. (Should a permit holder need additional time beyond June 10, 1983 to submit its current quality assurance program description to NRC, it shall notify the appropriate NRC Regional Office in writing, explain why additional time is needed, and provide a schedule for NRC approval showing when its current quality assurance program description will be submitted.)
(3) After March 11, 1983, each construction permit holder described in paragraph (f)(1) of this section may make a change to a previously accepted quality assurance program description included or referenced in the Safety Analysis Report, provided the change does not reduce the commitments in the program description previously accepted by the NRC. Changes to the quality assurance program description that do not reduce the commitments must be submitted to NRC within 90 days. Changes to the quality assurance program description that do reduce the commitments must be submitted to NRC and receive NRC approval before implementation, as follows:
(i) Changes to the Safety Analysis Report must be submitted for review as specified in § 50.4. Changes made to NRC-accepted quality assurance topical report descriptions must be submitted as specified in § 50.4.
(ii) The submittal of a change to the Safety Analysis Report quality assurance program description must include all pages affected by that change and must be accompanied by a forwarding letter identifying the change, the reason for the change, and the basis for concluding that the revised program incorporating the change continues to satisfy the criteria of appendix B of this part and the Safety Analysis Report quality assurance program description commitments previously accepted by the NRC (the letter need not provide the basis for changes that correct spelling, punctuation, or editorial items).
(iii) A copy of the forwarding letter identifying the changes must be maintained as a facility record for three years.
(iv) Changes to the quality assurance program description included or referenced in the Safety Analysis Report shall be regarded as accepted by the Commission upon receipt of a letter to this effect from the appropriate reviewing office of the Commission or 60 days after submittal to the Commission, whichever occurs first.
(4) Each holder of an early site permit or a manufacturing license under part 52 of this chapter shall implement the quality assurance program described or referenced in the safety analysis report, including changes to that report. Each holder of a combined license shall implement the quality assurance program for design and construction described or referenced in the safety analysis report, including changes to that report, provided, however, that the holder of a combined license is not subject to the terms and conditions in this paragraph after the Commission makes the finding under § 52.103(g) of
this chapter.
(i) Each holder described in paragraph (f)(4) of this section may make a change to a previously accepted quality assurance program description included or referenced in the safety analysis report, if the change does not reduce the commitments in the program description previously accepted by the NRC. Changes to the quality assurance program description that do not reduce the commitments must be submitted to NRC within 90 days. Changes to the quality assurance program description that reduce the commitments must be submitted to NRC and receive NRC approval before implementation, as follows:
(A) Changes to the safety analysis report must be submitted for review as specified in § 50.4. Changes made to NRC-accepted quality assurance topical report descriptions must be submitted as specified in § 50.4.
(B) The submittal of a change to the safety analysis report quality assurance program description must include all pages affected by that change and must be accompanied by a forwarding letter identifying the change, the reason for the change, and the basis for concluding that the revised program incorporating the change continues to satisfy the criteria of appendix B of this part and the safety analysis report quality
assurance program description commitments previously accepted by the NRC (the letter need not provide the
basis for changes that correct spelling, punctuation, or editorial items).
(C) A copy of the forwarding letter identifying the changes must be maintained as a facility record for three (3) years.
(D) Changes to the quality assurance program description included or referenced in the safety analysis report shall be regarded as accepted by the Commission upon receipt of a letter to this effect from the appropriate reviewing office of the Commission or 60 days after submittal to the Commission, whichever occurs first.
(ii) [Reserved]
(g) [Reserved]
(h) [Reserved]
(i) Structures, systems, and components subject to the codes and standards in 10 CFR 50.55a must be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed.
[21 FR 355, Jan. 19, 1956, as amended at 32 FR 4055, Mar. 15, 1967; 35 FR 11461, Jul. 17, 1970; 35 FR 19661, Dec. 29, 1970; 36 FR 11424, Jun. 12, 1971; 37 FR 6460, Mar. 30, 1972; 38 FR 1272, Jan. 11, 1973; 41 FR 16446, Apr. 19, 1976; 42 FR 43385, Aug. 29, 1977; 48 FR 1029, Jan. 10, 1983; 51 FR 40309, Nov. 6, 1986; 56 FR 36091, Jul. 31, 1991; 59 FR 14087, Mar. 25, 1994; 68 FR 58809, Oct. 10, 2003; 72 FR 49497, Aug. 28, 2007; 78 FR 34248, Jun. 7, 2013; 79 FR 65798, Nov. 5, 2014; 88 FR 15880, Mar. 14, 2023; 89 FR 57719, Jul 16. 2024]
§ 50.55a Codes and standards.
(a) Documents approved for incorporation by reference. The material listed in this paragraph (a) is incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at the Nuclear Regulatory Commission (NRC) and at the National Archives and Records Administration (NARA). Contact the NRC at NRC Technical Library, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852; telephone: 301–415–7000; email: Library.Resource@nrc.gov. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ ibr-locations or email fr.inspection@ nara.gov. The material may be obtained from the following sources in this paragraph (a). |
|
(1) American Society of Mechanical Engineers (ASME), Three Park Avenue, New York, NY 10016; telephone: 1–800–843–2763; https://www.asme.org/Codes/. |
|
(i) |
ASME Boiler and Pressure Vessel Code, Section III. The editions and addenda for Section III of the ASME Boiler and Pressure Vessel Code (excluding Nonmandatory Appendices) are listed in this paragraph (a)(1)(i), but limited by those provisions identified in paragraph (b)(1) of this section. |
(A) "Rules for Construction of Nuclear Vessels:" |
|
(1) |
1963 Edition, |
(2) |
Summer 1964 Addenda, |
(3) |
Winter 1964 Addenda, |
(4) |
1965 Edition, |
(5) |
1965 Summer Addenda, |
(6) |
1965 Winter Addenda, |
(7) |
1966 Summer Addenda, |
(8) |
1966 Winter Addenda, |
(9) |
1967 Summer Addenda, |
(10) |
1967 Winter Addenda, |
(11) |
1968 Edition, |
(12) |
1968 Summer Addenda, |
(13) |
1968 Winter Addenda, |
(14) |
1969 Summer Addenda, |
(15) |
1969 Winter Addenda, |
(16) |
1970 Summer Addenda, and |
(17) |
1970 Winter Addenda. |
(B) "Rules for Construction of Nuclear Power Plant Components:" |
|
(1) |
1971 Edition, |
(2) |
1971 Summer Addenda, |
(3) |
1971 Winter Addenda, |
(4) |
1972 Summer Addenda, |
(5) |
1972 Winter Addenda, |
(6) |
1973 Summer Addenda, and |
(7) |
1973 Winter Addenda. |
(C) "Division 1 Rules for Construction of Nuclear Power Plant Components:" |
|
(1) |
1974 Edition, |
(2) |
1974 Summer Addenda, |
(3) |
1974 Winter Addenda, |
(4) |
1975 Summer Addenda, |
(5) |
1975 Winter Addenda, |
(6) |
1976 Summer Addenda, and |
(7) |
1976 Winter Addenda; |
(D) "Rules for Construction of Nuclear Power Plant Components—Division 1"; |
|
(1) |
1977 Edition, |
(2) |
1977 Summer Addenda, |
(3) |
1977 Winter Addenda, |
(4) |
1978 Summer Addenda, |
(5) |
1978 Winter Addenda, |
(6) |
1979 Summer Addenda, |
(7) |
1979 Winter Addenda, |
(8) |
1980 Edition, |
(9) |
1980 Summer Addenda, |
(10) |
1980 Winter Addenda, |
(11) |
1981 Summer Addenda, |
(12) |
1981 Winter Addenda, |
(13) |
1982 Summer Addenda, |
(14) |
1982 Winter Addenda, |
(15) |
1983 Edition, |
(16) |
1983 Summer Addenda, |
(17) |
1983 Winter Addenda, |
(18) |
1984 Summer Addenda, |
(19) |
1984 Winter Addenda, |
(20) |
1985 Summer Addenda, |
(21) |
1985 Winter Addenda, |
(22) |
1986 Edition, |
(23) |
1986 Addenda, |
(24) |
1987 Addenda, |
(25) |
1988 Addenda, |
(26) |
1989 Edition, |
(27) |
1989 Addenda, |
(28) |
1990 Addenda, |
(29) |
1991 Addenda, |
(30) |
1992 Edition, |
(31) |
1992 Addenda, |
(32) |
1993 Addenda, |
(33) |
1994 Addenda, |
(34) |
1995 Edition, |
(35) |
1995 Addenda, |
(36) |
1996 Addenda, and |
(37) |
1997 Addenda. |
(E) "Rules for Construction of Nuclear Facility Components—Division 1:" |
|
(1) |
1998 Edition, |
(2) |
1998 Addenda, |
(3) |
1999 Addenda, |
(4) |
2000 Addenda, |
(5) |
2001 Edition, |
(6) |
2001 Addenda, |
(7) |
2002 Addenda, |
(8) |
2003 Addenda, |
(9) |
2004 Edition, |
(10) |
2005 Addenda, |
(11) |
2006 Addenda, |
(12) |
2007 Edition, |
(13) |
2008 Addenda, |
(14) |
2009b Addenda (including Subsection NCA; and Division 1 subsections NB through NH and Appendices), |
(15) |
2010 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices), |
(16) |
2011a Addenda (including Subsection NCA; and Division 1 subsections NB through NH and Appendices), |
(17) |
2013 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices), |
(18) |
2015 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices); |
(19) |
2017 Edition (including Subsection NCA; and Division 1 subsections NB through NG and Appendices); and |
(20) |
2019 Edition (including Subsection NCA; and Division 1 subsections NB through NG and Appendices). |
(ii) |
ASME Boiler and Pressure Vessel Code, Section XI. The editions and addenda for Section XI of the ASME Boiler and Pressure Vessel Code are listed in this paragraph (a)(1)(ii), but limited by those provisions identified in paragraph (b)(2) of this section. |
(A) [Reserved] |
(B) "Rules for Inservice Inspection of Nuclear Power Plant Components:" |
|
(1) |
1974 Edition; |
(2) |
1974 Summer Addenda; |
(3) |
1974 Winter Addenda; and |
(4) |
1975 Summer Addenda. |
(C) "Rules for Inservice Inspection of Nuclear Power Plant Components—Division 1:" |
|
(1)-(32) |
[Reserved] |
(33) |
1995 Edition; |
(34) |
1995 Addenda; |
(35) |
1996 Addenda; |
(36) |
1997 Addenda; |
(37)-(40) |
[Reserved] |
(41) |
2001 Edition; |
(42) |
2001 Addenda; |
(43) |
2002 Addenda; |
(44) |
2003 Addenda; |
(45) |
2004 Edition; |
(46) |
2005 Addenda; |
(47) |
2006 Addenda; |
(48) |
2007 Edition; |
(49) |
2008 Addenda; |
(50) |
2009b Addenda; |
(51) |
2010 Edition; |
(52) |
2011a Addenda; |
(53) |
2013 Edition; |
(54) |
2015 Edition; |
(55) |
2017 Edition; and |
(56) |
2019 Edition. |
(iii) |
ASME Code Cases: Nuclear Components—(A) ASME BPV Code Case N–513–3 Mandatory Appendix I. ASME BPV Code Case N–513–3, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1," Mandatory Appendix I, "Relations for Fm, Fb, and F for Through-Wall Flaws" (Approval Date: January 26, 2009). ASME BPV Code Case N–513–3 Mandatory Appendix I is referenced in paragraph (b)(2)(xxxiv)(B) of this section. |
(B) ASME BPV Code Case N–722–1. ASME BPV Code Case N–722–1, "Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Section XI, Division 1" (Approval Date: January 26, 2009), with the conditions in paragraph (g)(6)(ii)(E) of this section. |
(C) ASME BPV Code Case N–729–6. ASME BPV Code Case N–729–6, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds Section XI, Division 1" (Approval Date: March 3, 2016), with the conditions in paragraph (g)(6)(ii)(D) of this section. |
(D) ASME BPV Code Case N–770–5. ASME BPV Code Case N–770–5, "Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities Section XI, Division 1’’ (Approval Date: November 7, 2016), with the conditions in paragraph (g)(6)(ii)(F) of this section. |
(E) [Reserved] |
(F) ASME BPV Code Case N–852. ASME BPV Code Case N–852, "Application of the ASME NPT Stamp, Section III, Division 1; Section III, Division 2; Section III, Division 3; Section III, Division 5" (Approval Date: February 9, 2015). ASME BPV Code Case N–852 is referenced in paragraph (b)(1)(ix) of this section. |
(G) [Reserved] |
(H) ASME OM Code Case OMN–28. ASME OM Case OMN–28, "Alternative Valve Position Verification Approach to Satisfy ISTC–3700 for Valves Not Susceptible to Stem-Disk Separation." Issued March 4, 2021. OMN–28 is referenced in paragraph (b)(3)(xi) of this section. |
(iv) |
ASME Operation and Maintenance Code. The editions and addenda for the ASME Operation and Maintenance of Nuclear Power Plants are listed in this paragraph (a)(1)(iv), but limited by those provisions identified in paragraph (b)(3) of this section. |
(A) "Code for Operation and Maintenance of Nuclear Power Plants:" |
|
(1) |
1995 Edition; |
(2) |
1996 Addenda; |
(3) |
1997 Addenda; |
(4) |
1998 Edition; |
(5) |
1999 Addenda; |
(6) |
2000 Addenda; |
(7) |
2001 Edition; |
(8) |
2002 Addenda; |
(9) |
2003 Addenda; |
(10) |
2004 Edition; |
(11) |
2005 Addenda; and |
(12) |
2006 Addenda; |
(B) "Operation and Maintenance of Nuclear Power Plants, Division 1: Section IST Rules for Inservice Testing of Light-Water Reactor Power Plants:" |
|
(1) |
2009 Edition. |
(2) |
[Reserved] |
(C) Operation and Maintenance of Nuclear Power Plants: |
|
(1) |
2012 Edition, "Division 1: OM Code: Section IST" |
(2) |
2017 Edition; and |
(3) |
2020 Edition. |
(v) |
ASME Quality Assurance Requirements. (A) ASME NQA–1, "Quality Assurance Program Requirements for Nuclear Facilities:" |
|
(1) |
NQA–1—1983 Edition; |
(2) |
NQA–1a—1983 Addenda; |
(3) |
NQA–1b—1984 Addenda; |
(4) |
NQA–1c—1985 Addenda; |
(5) |
NQA–1—1986 Edition; |
(6) |
NQA–1a—1986 Addenda; |
(7) |
NQA–1b—1987 Addenda; |
(8) |
NQA–1c—1988 Addenda; |
(9) |
NQA–1—1989 Edition; |
(10) |
NQA–1a—1989 Addenda; |
(11) |
NQA–1b—1991 Addenda; and |
(12) |
NQA–1c—1992 Addenda. |
(B) ASME NQA–1, "Quality Assurance Requirements for Nuclear Facility Applications:" |
|
(1) |
NQA–1—1994 Edition; |
(2) |
NQA–1—2008 Edition; |
(3) |
NQA–1a—2009; |
(4) |
NQA–1b—2011 Addenda; |
(5) |
NQA–1—2012; and |
(6) |
NQA–1—2015. |
(2) Institute of Electrical and Electronics Engineers (IEEE) Service Center, 445 Hoes Lane, Piscataway, NJ 08855; telephone: 1–800–678–4333; http://ieeexplore.ieee.org. |
|
(i) |
IEEE standard 279–1968. (IEEE Std 279–1968), "Proposed IEEE Criteria for Nuclear Power Plant Protection Systems" (Approval Date: August 30, 1968), referenced in paragraph (h)(2) of this section. (Copies of this document may be purchased from IHS Global, 15 Inverness Way East, Englewood, CO 80112; https://global.ihs.com.) |
(ii) |
IEEE standard 279–1971. (IEEE Std 279–1971), "Criteria for Protection Systems for Nuclear Power Generating Stations" (Approval Date: June 3, 1971), referenced in paragraph (h)(2) of this section. |
(iii) |
IEEE standard 603–1991. (IEEE Std 603–1991), "Standard Criteria for Safety Systems for Nuclear Power Generating Stations (Approval Date: June 27, 1991), referenced in paragraphs (h)(2) and (h)(3) of this section. All other standards that are referenced in IEEE Std 603–1991 are not approved for incorporation by reference. |
(iv) |
IEEE standard 603–1991, correction sheet. (IEEE Std 603–1991 correction sheet), "Standard Criteria for Safety Systems for Nuclear Power Generating Stations, Correction Sheet, Issued January 30, 1995," referenced in paragraphs (h)(2) and (h)(3) of this section. (This correction sheet is available from IEEE at http://standards.ieee.org/findstds/errata/). |
(3) U.S. Nuclear Regulatory Commission (NRC): Public Document Room, 11555 Rockville Pike, Rockville,
Maryland 20852; telephone: 1–800–397–4209; email: pdr.resource@nrc.gov; https://www.nrc.gov/reading-rm/doccollections/reg-guides/. The use of code cases listed in the NRC regulatory guides in paragraphs (a)(3)(i) through (iii) of this section is acceptable with the specified conditions in those guides when implementing the editions and addenda of the ASME BPV Code and ASME OM Code incorporated by reference in paragraph (a)(1) of this section. The NRC report in paragraph (a)(3)(iv) of this section is acceptable as specified in the conditions when implementing code cases listed in the NRC regulatory guides in paragraphs (a)(3)(i) through (iii) of this section. |
|
(i) |
NRC Regulatory Guide 1.84, Revision 40. NRC Regulatory Guide 1.84, Revision 40, ‘‘Design, Fabrication, and Materials Code Case Acceptability, ASME Section III,’’ issued March 2024, with the requirements in paragraph (b)(4) of this section. |
(ii) |
NRC Regulatory Guide 1.147, Revision 21. NRC Regulatory Guide 1.147, Revision 21, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," issued March 2024, which lists ASME Code Cases that the NRC has approved in accordance with the requirements in paragraph (b)(5) of this section. |
(iii) |
NRC Regulatory Guide 1.192, Revision 5. NRC Regulatory Guide 1.192, Revision 5, ‘‘Operation and Maintenance Code Case Acceptability, ASME OM Code,’’ issued March 2024, which lists ASME Code Cases that the NRC has approved in accordance with the requirements in paragraph (b)(6) of this section. |
(iv) |
NUREG–2228. NUREG–2228, ‘‘Weld Residual Stress Finite Element Analysis Validation: Part II—Proposed Validation Procedure,’’ published July 2020 (including Errata September 22, 2021), which is referenced in RG 1.147, Revision 21. |
(4) Electric Power Research Institute, Materials Reliability Program, 3420 Hillview Avenue, Palo Alto, CA 94304–1338; telephone: 1–650–855–2000; http://www.epri.com. |
|
(i) |
"Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP–335, Revision 3–A)", EPRI approval date: November 2016. |
(ii) |
[Reserved] |
(b) Use and conditions on the use of standards. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code and the ASME OM Code as specified in this paragraph (b). Each combined license for a utilization facility is subject to the following conditions. |
|
(1) Conditions on ASME BPV Code Section III. Each manufacturing license, standard design approval, and design certification under 10 CFR part 52 is subject to the following conditions. As used in this section, references to Section III refer to Section III of the ASME BPV Code and include the 1963 Edition through 1973 Winter Addenda and the 1974 Edition (Division 1) through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, subject to the following conditions: |
|
(i) |
Section III condition: Section III materials. When applying the 1992 Edition of Section III, applicants or licensees must apply the 1992 Edition with the 1992 Addenda of Section II of the ASME Boiler and Pressure Vessel Code. |
(ii) |
Section III condition: Weld leg dimensions. When applying the 1989 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section, applicants and licensees may not apply the Section III provisions identified in table 1 to this paragraph (b)(1)(ii) for welds with leg size less than 1.09 tn. |
Table 1 to Paragraph (b)(1)(ii)—Prohibited Code Provisions
Editions and addenda |
Code provision |
1989 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section. |
Subparagraph NB–3683.4(c)(1); Subparagraph NB–3683.4(c)(2). |
1989 Addenda through 2003 Addenda |
Footnote 11 to Figure NC–3673.2(b)–1; Note 11 to Figure ND–3673.2(b)–1. |
2004 Edition through 2010 Edition |
Footnote 13 to Figure NC–3673.2(b)–1; Note 13 to Figure ND–3673.2(b)–1. |
2011 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section. |
Footnote 11 to Table NC–3673.2(b)–1; Note 11 to Table ND–3673.2(b)–1. |
|
|
(iii) |
Section III condition: Seismic design of piping. Applicants or licensees may use Subarticles NB–3200, NB–3600, NC–3600, and ND–3600 for seismic design of piping, up to and including the 1993 Addenda, subject to the condition specified in paragraph (b)(1)(ii) of this section. Applicants or licensees may not use these subarticles for seismic design of piping in the 1994 Addenda through the 2005 Addenda incorporated by reference in paragraph (a)(1) of this section, except that Subarticle NB–3200 in the 2004 Edition through the 2017 Edition may be used by applicants and licensees, subject to the condition in paragraph (b)(1)(iii)(A) of this section. Applicants or licensees may use Subarticles NB–3600, NC–3600, and ND–3600 for the seismic design of piping in the 2006 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, subject to the conditions of this paragraph (b)(1)(iii) corresponding to those subarticles. |
(A) Seismic design of piping: First provision. When applying Note (1) of Figure NB–3222–1 for Level B service limits, the calculation of Pb stresses must include reversing dynamic loads (including inertia earthquake effects) if evaluation of these loads is required by NB–3223(b). |
(B) Seismic design of piping: Second provision. For Class 1 piping, the material and Do/t requirements of NB–3656(b) must be met for all Service Limits when the Service Limits include reversing dynamic loads, and the alternative rules for reversing dynamic loads are used. |
(iv) |
Section III condition: Quality assurance. When applying editions and addenda later than the 1989 Edition of Section III, an applicant or licensee may use the requirements of NQA–1, ‘‘Quality Assurance Requirements for Nuclear Facility Applications,’’ that is both incorporated by reference in paragraph (a)(1)(v) of this section and specified in either NCA–4000 or NCA–7000 of that Edition and Addenda of Section III, provided that the administrative, quality, and technical provisions contained in that Edition and Addenda of Section III are used in conjunction with the applicant’s or licensee’s appendix B to this part quality assurance program; and that the applicant’s or licensee’s Section III activities comply with those commitments contained in the applicant’s or licensee’s quality assurance program description. Where NQA–1 and Section III do not address the commitments contained in the applicant’s or licensee’s appendix B quality assurance program description, those licensee commitments must be applied to Section III activities. |
(v) |
Section III condition: Independence of inspection. Applicants or licensees may not apply the exception in NCA–4134.10(a) of Section III, 1995 Edition through 2009b Addenda of the 2007 Edition, from paragraph 3.1 of Supplement 10S–1 of NQA–1–1994 Edition. |
(vi) |
Section III condition: Subsection NH. The provisions in Subsection NH, ‘‘Class 1 Components in Elevated Temperature Service,’’ 1995 Addenda through all editions and addenda up to and including the 2013 Edition incorporated by reference in paragraph (a)(1) of this section, may only be used for the design and construction of Type 316 stainless steel pressurizer heater sleeves where service conditions do not cause the components to reach temperatures exceeding 900 °F. |
(vii) |
Section III condition: Capacity certification and demonstration of function of incompressible-fluid pressure-relief valves. When applying the 2006 Addenda through all editions and addenda up to and including the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, applicants and licensees may use paragraph NB–7742, except that paragraph NB–7742(a)(2) may not be used. For a valve design of a single size to be certified over a range of set pressures, the demonstration of function tests under paragraph NB–7742 must be conducted as prescribed in NB–7732.2 on two valves covering the minimum set pressure for the design and the maximum set pressure that can be accommodated at the demonstration facility selected for the test. |
(viii) |
Section III condition: Use of ASME certification marks. When applying editions and addenda earlier than the 2011 Addenda to the 2010 Edition, licensees may use either the ASME BPV Code Symbol Stamps or the ASME Certification Marks with the appropriate certification designators and class designators as specified in the 2013 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section. |
(ix) |
Section III Condition: NPT Code Symbol Stamps. Licensees may use the NPT Code Symbol Stamp with the letters arranged horizontally as specified in ASME BPV Code Case N–852 for the service life of a component that had the NPT Code Symbol Stamp applied during the time period from January 1, 2005, through December 31, 2015. |
(x) |
Section III Condition: Visual examination of bolts, studs and nuts. Applicants or licensees applying the provisions of NB–2582, NC–2582, ND–2582, NE–2582, NF–2582, NG–2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, must apply paragraphs (b)(1)(x)(A) and (B) of this section. |
(A) Visual examination of bolts, studs, and nuts: First provision. When applying the provisions of NB–2582, NC–2582, ND–2582, NE–2582, NF–2582, NG–2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, the visual examinations are required to be performed in accordance with procedures qualified to NB–5100, NC–5100, ND–5100, NE–5100, NF–5100, NG–5100 and performed by personnel qualified in accordance with NB–5500, NC–5500, ND–5500, NE–5500, NF–5500, and NG–5500. |
(B) Visual examination of bolts, studs, and nuts: Second provision. When applying the provisions of NB–2582, NC–2582, ND–2582, NE–2582, NF–2582, and NG–2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, bolts, studs, and nuts must be visually examined for discontinuities including cracks, bursts, seams, folds, thread lap, voids, and tool marks. |
(xi) |
Section III condition: Mandatory Appendix XXVI. When applying the 2015 and 2017 Editions of Section III, Mandatory Appendix XXVI, ‘‘Rules for Construction of Class 3 Buried Polyethylene Pressure Piping,’’ applicants or licensees must meet the following conditions: |
(A) Mandatory Appendix XXVI: First provision. When performing fusing procedure qualification testing in accordance with XXVI–2300 and XXVI–4330 the following essential variables must be used for the performance qualification tests of butt fusion joints: |
|
(1) |
Joint Type: A change in the type of joint from that qualified, except that a square butt joint qualifies as a mitered joint. |
|
(2) |
Pipe Surface Alignment: A change in the pipe outside diameter (O.D.) surface misalignment of more than 10 percent of the wall thickness of the thinner member to be fused. |
|
(3) |
PE Material: Each lot of polyethylene source material to be used in production (XXVI–2310(c)). |
|
(4) |
Wall Thickness: Each thickness to be fused in production (XXVI–2310(c)). |
|
(5) |
Diameter: Each diameter to be fused in production (XXVI–2310(c)). |
|
(6) |
Cross-sectional Area: Each combination of thickness and diameter (XXVI–2310(c)). |
|
(7) |
Position: Maximum machine carriage slope when greater than 20 degrees from horizontal (XXVI–4321(c)). |
|
(8) |
Heater Surface Temperature: A change in the heater surface temperature to a value beyond the range tested (XXVI–2321). |
|
(9) |
Ambient Temperature: A change in ambient temperature to less than 50 °F (10 °C) or greater than 125 °F (52 °C) (XXVI–4412(b)). |
|
(10) |
Interfacial Pressure: A change in interfacial pressure to a value beyond the range tested (XXVI–2321). |
|
(11) |
Decrease in Melt Bead Width: A decrease in melt bead size from that qualified. |
|
(12) |
Increase in Heater Removal Time: An increase in heater plate removal time from that qualified. |
|
(13) |
Decrease in Cool-down Time: A decrease in the cooling time at pressure from that qualified. |
|
(14) |
Fusing Machine Carriage Model: A change in the fusing machine carriage model from that tested (XXVI–2310(d)). |
(B) Mandatory Appendix XXVI: Second provision. When performing procedure qualification for high speed tensile impact testing of butt fusion joints in accordance with XXVI–2300 or XXVI–4330, breaks in the specimen that are away from the fusion zone must be retested. When performing fusing operator qualification bend tests of butt fusion joints in accordance with XXVI–4342, guided side bend testing must be used for all thicknesses greater than 1.25 inches. |
(C) Mandatory Appendix XXVI: Third provision. When performing fusing procedure qualification tests in accordance with 2017 Edition of BPV Code Section III XXVI–2300 and XXVI–4330, the following essential variables must be used for the testing of electrofusion joints: |
|
(1) |
Joint Design: A change in the design of an electrofusion joint. |
|
(2) |
Fit-up Gap: An increase in the maximum radial fit-up gap qualified. |
|
(3) |
Pipe PE Material: A change in the PE designation or cell classification of the pipe from that tested (XXVI–2322(a)). |
|
(4) |
Fitting PE Material: A change in the manufacturing facility or production lot from that tested (XXVI–2322(b)). |
|
(5) |
Pipe Wall Thickness: Each thickness to be fused in production (XXVI–2310(c)). |
|
(6) |
Fitting Manufacturer: A change in fitting manufacturer. |
|
(7) |
Pipe Diameter: Each diameter to be fused in production (XXVI–2310(c)). |
|
(8) |
Cool-down Time: A decrease in the cool time at pressure from that qualified. |
|
(9) |
Fusion Voltage: A change in fusion voltage. |
|
(10) |
Nominal Fusion Time: A change in the nominal fusion time. |
|
(11) |
Material Temperature Range: A change in material fusing temperature beyond the range qualified. |
|
(12) |
Power Supply: A change in the make or model of electrofusion control box (XXVI–2310(f)). |
|
(13) |
Power Cord: A change in power cord material, length, or diameter that reduces current at the coil to below the minimum qualified. |
|
(14) |
Processor: A change in the manufacturer or model number of the processor. (XXVI–2310(f)). |
|
(15) |
Saddle Clamp: A change in the type of saddle clamp. |
|
(16) |
Scraping Device: A change from a clean peeling scraping tool to any other type of tool. |
(xii) |
Section III condition: Certifying Engineer. When applying the 2017 and later editions of ASME BPV Code Section III, the NRC does not permit applicants and licensees to use a Certifying Engineer who is not a Registered Professional Engineer qualified in accordance with paragraph XXIII–1222 for Code-related activities that are applicable to U.S. nuclear facilities regulated by the NRC. The use of paragraph XXIII–1223 is prohibited. |
(xiii) |
Section III Condition: Preservice Inspection of Steam Generator Tubes. Applicants or licensees applying the provisions of NB–5283 and NB–5360 in the 2019 Edition of Section III, must apply paragraphs (b)(1)(xiii)(A) and (B) of this section. |
(A) Preservice Inspection of Steam Generator Tubes: First provision. When applying the provisions of NB–5283 in the 2019 Edition of Section III, a full-length preservice examination of 100 percent of the steam generator tubing in each newly installed steam generator must be performed prior to plant startup. |
(B) Preservice Inspection of Steam Generator Tubes: Second provision. When applying the provisions of NB–5360 in the 2019 Edition of Section III, flaws revealed during preservice examination of steam generator tubing performed in accordance with paragraph (b)(1)(xiii)(A) of this section must be evaluated using the criteria in the design specifications. |
|
(2) Conditions on ASME BPV Code, Section XI. As used in this section, references to Section XI refer to Section XI, Division 1, of the ASME BPV Code, and include the 1970 Edition through the 1976 Winter Addenda and the 1977 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section, subject to the following conditions: |
|
|
(i) |
[Reserved] |
(ii) |
Section XI condition: Pressure-retaining welds in ASME Code Class 1 piping (applies to Table IWB–2500 and IWB–2500–1 and Category B–J). If the facility's application for a construction permit was docketed prior to July 1, 1978, the extent of examination for Code Class 1 pipe welds may be determined by the requirements of Table IWB–2500 and Table IWB–2600 Category B–J of Section XI of the ASME BPV Code in the 1974 Edition and Addenda through the Summer 1975 Addenda or other requirements the NRC may adopt. |
(iii) |
[Reserved] |
(iv) |
[Reserved] |
(v) |
[Reserved] |
(vi) |
[Reserved] |
(vii) |
[Reserved] |
(viii) |
Section XI condition: Concrete containment examinations. Applicants or licensees applying Subsection IWL, 2001 Edition through the 2004 Edition, up to and including the 2006 Addenda, must apply paragraphs (b)(2)(viii)(E) through (G) of this section. Applicants or licensees applying Subsection IWL, 2007 Edition up to and including the 2008 Addenda must apply paragraph (b)(2)(viii)(E) of this section. Applicants or licensees applying Subsection IWL, 2007 Edition with the 2009 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, must apply paragraphs (b)(2)(viii)(H) and (I) of this section. |
(A)–(D) [Reserved] |
(E) Concrete containment examinations: Fifth provision. For Class CC applications, the applicant or licensee must evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or the result in degradation to such inaccessible areas. For each inaccessible area identified, the applicant or licensee must provide the following in the ISI Summary Report required by IWA–6000: |
|
(1) |
A description of the type and estimated extent of degradation, and the conditions that led to the degradation; |
(2) |
An evaluation of each area, and the result of the evaluation; and |
(3) |
A description of necessary corrective actions. |
(F) Concrete containment examinations: Sixth provision. Personnel that examine containment concrete surfaces and tendon hardware, wires, or strands must meet the qualification provisions in IWA–2300. The ‘‘owner-defined’’ personnel qualification provisions in IWL–2310(d) are not approved for use. |
(G) Concrete containment examinations: Seventh provision. Corrosion protection material must be restored following concrete containment post-tensioning system repair and replacement activities in accordance with the quality assurance program requirements specified in IWA–1400. |
(H) Concrete containment examinations: Eighth provision. For each inaccessible area of concrete identified for evaluation under IWL–2512(a), or identified as susceptible to deterioration under IWL–2512(b), the licensee must provide the applicable information specified in paragraphs (b)(2)(viii)(E)(1), (2), and (3) of this section in the ISI Summary Report required by IWA–6000. |
(I) Concrete containment examinations: Ninth provision. During the period of extended operation of a renewed license under part 54 of this chapter, the licensee must perform the technical evaluation under IWL–2512(b) of inaccessible below-grade concrete surfaces exposed to foundation soil, backfill, or groundwater at periodic intervals not to exceed 5 years. In addition, the licensee must examine representative samples of the exposed portions of the below-grade concrete, when such below-grade concrete is excavated for any reason. |
(ix) |
Section XI condition: Metal containment examinations. Applicants or licensees applying Subsection IWE, 2001 Edition up to and including the 2003 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A) and (B), (F) through (I), and (K) of this section. Applicants or licensees applying Subsection IWE, 2004 Edition, up to and including the 2005 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A) and (B), (F) through (H), and (K) of this section. Applicants or licensees applying Subsection IWE, 2004 Edition with the 2006 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A)(2) and (b)(2)(ix)(B) and (K) of this section. Applicants or licensees applying Subsection IWE, 2007 Edition through the 2015 Edition, must satisfy the requirements of paragraphs (b)(2)(ix)(A)(2) and (b)(2)(ix)(B), (J), and (K) of this section. Applicants or licensees applying Subsection IWE, 2017 Edition, through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section must satisfy the requirements of paragraphs (b)(2)(ix)(A)(2) and (b)(2)(ix)(B) and (J) of this section. |
(A) Metal containment examinations: First provision. For Class MC applications, the following apply to inaccessible areas. |
|
(1) |
The applicant or licensee must evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or could result in degradation to such inaccessible areas. |
(2) |
For each inaccessible area identified for evaluation, the applicant or licensee must provide the following in the ISI Summary Report as required by IWA–6000: |
|
(i) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; |
(ii) An evaluation of each area, and the result of the evaluation; and |
(iii) A description of necessary corrective actions. |
(B) Metal containment examinations: Second provision. When performing remotely the visual examinations required by Subsection IWE, the maximum direct examination distance specified in Table IWA–2210–1 (2001 Edition through 2004 Edition) or Table IWA–2211–1 (2005 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section) may be extended and the minimum illumination requirements specified may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination. |
(C)–(E) [Reserved] |
(F) Metal containment examinations: Sixth provision. VT–1 and VT–3 examinations must be conducted in accordance with IWA–2200. Personnel conducting examinations in accordance with the VT–1 or VT–3 examination method must be qualified in accordance with IWA–2300. The ‘‘owner-defined’’ personnel qualification provisions in IWE–2330(a) for personnel that conduct VT–1 and VT–3 examinations are not approved for use. |
(G) Metal containment examinations: Seventh provision. The VT–3 examination method must be used to conduct the examinations in Items E1.12 and E1.20 of Table IWE–2500–1, and the VT–1 examination method must be used to conduct the examination in Item E4.11 of Table IWE–2500–1. An examination of the pressure-retaining bolted connections in Item E1.11 of Table IWE–2500–1 using the VT–3 examination method must be conducted once each interval. The ‘‘ownerdefined’’ visual examination provisions in IWE–2310(a) are not approved for use for VT–1 and VT–3 examinations. |
(H) Metal containment examinations: Eighth provision. Containment bolted connections that are disassembled during the scheduled performance of the examinations in Item E1.11 of Table IWE–2500–1 must be examined using the VT–3 examination method. Flaws or degradation identified during the performance of a VT–3 examination must be examined in accordance with the VT–1 examination method. The criteria in the material specification or IWB–3517.1 must be used to evaluate containment bolting flaws or degradation. As an alternative to performing VT–3 examinations of containment bolted connections that are disassembled during the scheduled performance of Item E1.11, VT–3 examinations of containment bolted connections may be conducted whenever containment bolted connections are disassembled for any reason. |
(I) Metal containment examinations: Ninth provision. The ultrasonic examination acceptance standard specified in IWE–3511.3 for Class MC pressure-retaining components must also be applied to metallic liners of Class CC pressure-retaining components. |
(J) Metal containment examinations: Tenth provision. In general, a repair/replacement activity such as replacing a large containment penetration, cutting a large construction opening in the containment pressure boundary to replace steam generators, reactor vessel heads, pressurizers, or other major equipment; or other similar modification is considered a major containment modification. When applying IWE–5000 to Class MC pressure-retaining components, any major containment modification or repair/replacement must be followed by a Type A test to provide assurance of both containment structural integrity and leak-tight integrity prior to returning to service, in accordance with appendix J to this part, Option A or Option B, on which the applicant’s or licensee’s Containment Leak-Rate Testing Program is based. When applying IWE–5000, if a Type A, B, or C Test is performed, the test pressure and acceptance standard for the test must be in accordance with appendix J to this part. |
(K) Metal Containment Examinations: Eleventh provision. A general visual examination of containment leak chase channel moisture barriers must be performed once each interval, in accordance with the completion percentages in Table IWE 2411–1 of the 2017 Edition. Examination shall include the moisture barrier materials (caulking, gaskets, coatings, etc.) that prevent water from accessing the embedded containment liner within the leak chase channel system. Caps of stub tubes extending to or above the concrete floor interface may be inspected, provided the configuration of the cap functions as a moisture barrier as described previously. Leak chase channel system closures need not be disassembled for performance of examinations if the moisture barrier material is clearly visible without disassembly, or coatings are intact. The closures are acceptable if no damage or degradation exists that would allow intrusion of moisture against inaccessible surfaces of the metal containment shell or liner within the leak chase channel system. Examinations that identify flaws or relevant conditions shall be extended in accordance with paragraph IWE 2430 of the 2017 Edition. |
(x) |
Section XI condition: Quality assurance. When applying the editions and addenda later than the 1989 Edition of ASME BPV Code, Section XI, licensees may use any edition or addenda of NQA–1, ‘‘Quality Assurance Requirements for Nuclear Facility Applications,’’ that is both incorporated by reference in paragraph (a)(1)(v) of this section and specified in Table IWA 1600–1 of that edition and addenda of Section XI, provided that the licensee uses its appendix B to this part quality assurance program in conjunction with Section XI requirements and the commitments contained in the licensee’s quality assurance program description. Where NQA–1 and Section XI do not address the commitments contained in the licensee’s appendix B quality assurance program description, those licensee commitments must be applied to Section XI activities. |
(xi) |
[Reserved] |
(xii) |
Section XI condition: Underwater welding. The provisions in IWA–4660, ‘‘Underwater Welding,’’ of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, are approved for use on irradiated material with the following conditions: |
(A) Underwater welding: First provision. Licensees must obtain NRC approval in accordance with paragraph (z) of this section regarding the welding technique to be used prior to performing welding on ferritic material exposed to fast neutron fluence greater than 1 × 1017 n/cm2 (E > 1 MeV). |
(B) Underwater welding: Second provision. Licensees must obtain NRC approval in accordance with paragraph (z) of this section regarding the welding technique to be used prior to performing welding on austenitic material other than P–No. 8 material exposed to thermal neutron fluence greater than 1 × 1017 n/cm2 (E < 0.5 eV). Licensees must obtain NRC approval in accordance with paragraph (z) regarding the welding technique to be used prior to performing welding on P–No. 8 austenitic material exposed to thermal neutron fluence greater than 1 × 1017 n/cm2 (E < 0.5 eV) and measured or calculated helium concentration of the material greater than 0.1 atomic parts per million. |
(xiii) |
[Reserved] |
(xiv) |
Section XI condition: Appendix VIII personnel qualification. All personnel qualified for performing ultrasonic examinations in accordance with Appendix VIII must receive 8 hours of annual hands-on training on specimens that contain cracks. Licensees applying the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section may use the annual practice requirements in VII–4240 of Appendix VII of Section XI in place of the 8 hours of annual hands-on training provided that the supplemental practice is performed on material or welds that contain cracks, or by analyzing prerecorded data from material or welds that contain cracks. In either case, training must be completed no earlier than 6 months prior to performing ultrasonic examinations at a licensee’s facility. |
(xv) |
Section XI condition: Appendix VIII specimen set and qualification requirements. Licensees using Appendix VIII in the 2001 Edition of the ASME Boiler and Pressure Vessel Code may elect to comply with all of the provisions in paragraphs (b)(2)(xv)(A) through (M) of this section, except for paragraph (b)(2)(xv)(F) of this section, which may be used at the licensee's option. Licensees using editions and addenda after 2001 Edition through the 2006 Addenda must use the 2001 Edition of Appendix VIII and may elect to comply with all of the provisions in paragraphs (b)(2)(xv)(A) through (M) of this section, except for paragraph (b)(2)(xv)(F) of this section, which may be used at the licensee's option. |
(A) Specimen set and qualification: First provision. When applying Supplements 2, 3, and 10 to Appendix VIII, the following examination coverage criteria requirements must be used: |
|
(1) |
Piping must be examined in two axial directions, and when examination in the circumferential direction is required, the circumferential examination must be performed in two directions, provided access is available. Dissimilar metal welds must be examined axially and circumferentially. |
(2) |
Where examination from both sides is not possible, full coverage credit may be claimed from a single side for ferritic welds. Where examination from both sides is not possible on austenitic welds or dissimilar metal welds, full coverage credit from a single side may be claimed only after completing a successful single-sided Appendix VIII demonstration using flaws on the opposite side of the weld. Dissimilar metal weld qualifications must be demonstrated from the austenitic side of the weld, and the qualification may be expanded for austenitic welds with no austenitic sides using a separate add-on performance demonstration. Dissimilar metal welds may be examined from either side of the weld. |
(B) Specimen set and qualification: Second provision. The following conditions must be used in addition to the requirements of Supplement 4 to Appendix VIII: |
|
(1) |
Paragraph 3.1, Detection acceptance criteria—Personnel are qualified for detection if the results of the performance demonstration satisfy the detection requirements of ASME Section XI, Appendix VIII, Table VIII–S4–1, and no flaw greater than 0.25 inch through-wall dimension is missed. |
(2) |
Paragraph 1.1(c), Detection test matrix—Flaws smaller than the 50 percent of allowable flaw size, as defined in IWB–3500, need not be included as detection flaws. For procedures applied from the inside surface, use the minimum thickness specified in the scope of the procedure to calculate a/t. For procedures applied from the outside surface, the actual thickness of the test specimen is to be used to calculate a/t. |
(C) Specimen set and qualification: Third provision. When applying Supplement 4 to Appendix VIII, the following conditions must be used: |
|
(1) |
A depth sizing requirement of 0.15 inch RMS must be used in lieu of the requirements in Subparagraphs 3.2(a) and 3.2(c), and a length sizing requirement of 0.75 inch RMS must be used in lieu of the requirement in Subparagraph 3.2(b). |
(2) |
In lieu of the location acceptance criteria requirements of Subparagraph 2.1(b), a flaw will be considered detected when reported within 1.0 inch or 10 percent of the metal path to the flaw, whichever is greater, of its true location in the X and Y directions. |
(3) |
In lieu of the flaw type requirements of Subparagraph 1.1(e)(1), a minimum of 70 percent of the flaws in the detection and sizing tests must be cracks. Notches, if used, must be limited by the following: |
|
(i) Notches must be limited to the case where examinations are performed from the clad surface. |
(ii) Notches must be semielliptical with a tip width of less than or equal to 0.010 inches. |
(iii) Notches must be perpendicular to the surface within ±2 degrees. |
(4) |
In lieu of the detection test matrix requirements in paragraphs 1.1(e)(2) and 1.1(e)(3), personnel demonstration test sets must contain a representative distribution of flaw orientations, sizes, and locations. |
(D) Specimen set and qualification: Fourth provision. The following conditions must be used in addition to the requirements of Supplement 6 to Appendix VIII: |
|
(1) |
Paragraph 3.1, Detection Acceptance Criteria—Personnel are qualified for detection if: |
|
(i) No surface connected flaw greater than 0.25 inch through-wall has been missed. |
(ii) No embedded flaw greater than 0.50 inch through-wall has been missed. |
(2) |
Paragraph 3.1, Detection Acceptance Criteria—For procedure qualification, all flaws within the scope of the procedure are detected. |
(3) |
Paragraph 1.1(b) for detection and sizing test flaws and locations—Flaws smaller than the 50 percent of allowable flaw size, as defined in IWB–3500, need not be included as detection flaws. Flaws that are less than the allowable flaw size, as defined in IWB–3500, may be used as detection and sizing flaws. |
(4) |
Notches are not permitted. |
(E) Specimen set and qualification: Fifth provision. When applying Supplement 6 to Appendix VIII, the following conditions must be used: |
|
(1) |
A depth sizing requirement of 0.25 inch RMS must be used in lieu of the requirements of subparagraphs 3.2(a), 3.2(c)(2), and 3.2(c)(3). |
(2) |
In lieu of the location acceptance criteria requirements in Subparagraph 2.1(b), a flaw will be considered detected when reported within 1.0 inch or 10 percent of the metal path to the flaw, whichever is greater, of its true location in the X and Y directions. |
(3) |
In lieu of the length sizing criteria requirements of Subparagraph 3.2(b), a length sizing acceptance criteria of 0.75 inch RMS must be used. |
(4) |
In lieu of the detection specimen requirements in Subparagraph 1.1(e)(1), a minimum of 55 percent of the flaws must be cracks. The remaining flaws may be cracks or fabrication type flaws, such as slag and lack of fusion. The use of notches is not allowed. |
(5) |
In lieu of paragraphs 1.1(e)(2) and 1.1(e)(3) detection test matrix, personnel demonstration test sets must contain a representative distribution of flaw orientations, sizes, and locations. |
(F) Specimen set and qualification: Sixth provision. The following conditions may be used for personnel qualification for combined Supplement 4 to Appendix VIII and Supplement 6 to Appendix VIII qualification. Licensees choosing to apply this combined qualification must apply all of the provisions of Supplements 4 and 6 including the following conditions: |
|
(1) |
For detection and sizing, the total number of flaws must be at least 10. A minimum of 5 flaws must be from Supplement 4, and a minimum of 50 percent of the flaws must be from Supplement 6. At least 50 percent of the flaws in any sizing must be cracks. Notches are not acceptable for Supplement 6. |
(2) |
Examination personnel are qualified for detection and length sizing when the results of any combined performance demonstration satisfy the acceptance criteria of Supplement 4 to Appendix VIII. |
(3) |
Examination personnel are qualified for depth sizing when Supplement 4 to Appendix VIII and Supplement 6 to Appendix VIII flaws are sized within the respective acceptance criteria of those supplements. |
(G) Specimen set and qualification: Seventh provision. When applying Supplement 4 to Appendix VIII, Supplement 6 to Appendix VIII, or combined Supplement 4 and Supplement 6 qualification, the following additional conditions must be used, and examination coverage must include: |
|
(1) |
The clad-to-base-metal-interface, including a minimum of 15 percent T (measured from the clad-to-base-metal-interface), must be examined from four orthogonal directions using procedures and personnel qualified in accordance with Supplement 4 to Appendix VIII. |
(2) |
If the clad-to-base-metal-interface procedure demonstrates detectability of flaws with a tilt angle relative to the weld centerline of at least 45 degrees, the remainder of the examination volume is considered fully examined if coverage is obtained in one parallel and one perpendicular direction. This must be accomplished using a procedure and personnel qualified for single-side examination in accordance with Supplement 6. Subsequent examinations of this volume may be performed using examination techniques qualified for a tilt angle of at least 10 degrees. |
(3) |
The examination volume not addressed by paragraph (b)(2)(xv)(G)(1) of this section is considered fully examined if coverage is obtained in one parallel and one perpendicular direction, using a procedure and personnel qualified for single sided examination when the conditions in paragraph (b)(2)(xv)(G)(2) are met. |
(H) Specimen set and qualification: Eighth provision. When applying Supplement 5 to Appendix VIII, at least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks. Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches. |
(I) Specimen set and qualification: Ninth provision. When applying Supplement 5, Paragraph (a), to Appendix VIII, the number of false calls allowed must be D/10, with a maximum of 3, where D is the diameter of the nozzle. |
(J) [Reserved] |
(K) Specimen set and qualification: Eleventh provision. When performing nozzle-to-vessel weld examinations, the following conditions must be used when the requirements contained in Supplement 7 to Appendix VIII are applied for nozzle-to-vessel welds in conjunction with Supplement 4 to Appendix VIII, Supplement 6 to Appendix VIII, or combined Supplement 4 and Supplement 6 qualification. |
|
(1) |
For examination of nozzle-to-vessel welds conducted from the bore, the following conditions are required to qualify the procedures, equipment, and personnel: |
|
(i) For detection, a minimum of four flaws in one or more full-scale nozzle mock-ups must be added to the test set. The specimens must comply with Supplement 6, paragraph 1.1, to Appendix VIII, except for flaw locations specified in Table VIII S6–1. Flaws may be notches, fabrication flaws, or cracks. Seventy-five (75) percent of the flaws must be cracks or fabrication flaws. Flaw locations and orientations must be selected from the choices shown in paragraph (b)(2)(xv)(K)(4) of this section, Table VIII–S7–1—Modified, with the exception that flaws in the outer eighty-five (85) percent of the weld need not be perpendicular to the weld. There may be no more than two flaws from each category, and at least one subsurface flaw must be included. |
(ii) For length sizing, a minimum of four flaws as in paragraph (b)(2)(xv)(K)(1)(i) of this section must be included in the test set. The length sizing results must be added to the results of combined Supplement 4 to Appendix VIII and Supplement 6 to Appendix VIII. The combined results must meet the acceptance standards contained in paragraph (b)(2)(xv)(E)(3) of this section. |
(iii) For depth sizing, a minimum of four flaws as in paragraph (b)(2)(xv)(K)(1)(i) of this section must be included in the test set. Their depths must be distributed over the ranges of Supplement 4, Paragraph 1.1, to Appendix VIII, for the inner 15 percent of the wall thickness and Supplement 6, Paragraph 1.1, to Appendix VIII, for the remainder of the wall thickness. The depth sizing results must be combined with the sizing results from Supplement 4 to Appendix VIII for the inner 15 percent and to Supplement 6 to Appendix VIII for the remainder of the wall thickness. The combined results must meet the depth sizing acceptance criteria contained in paragraphs (b)(2)(xv)(C)(1), (b)(2)(xv)(E)(1), and (b)(2)(xv)(F)(3) of this section. |
(2) |
For examination of reactor pressure vessel nozzle-to-vessel welds conducted from the inside of the vessel, the following conditions are required: |
|
(i) The clad-to-base-metal-interface and the adjacent examination volume to a minimum depth of 15 percent T (measured from the clad-to-base-metal-interface) must be examined from four orthogonal directions using a procedure and personnel qualified in accordance with Supplement 4 to Appendix VIII as conditioned by paragraphs (b)(2)(xv)(B) and (C) of this section. |
(ii) When the examination volume defined in paragraph (b)(2)(xv)(K)(2)(i) of this section cannot be effectively examined in all four directions, the examination must be augmented by examination from the nozzle bore using a procedure and personnel qualified in accordance with paragraph (b)(2)(xv)(K)(1) of this section. |
(iii) The remainder of the examination volume not covered by paragraph (b)(2)(xv)(K)(2)(ii) of this section or a combination of paragraphs (b)(2)(xv)(K)(2)(i) and (ii) of this section, must be examined from the nozzle bore using a procedure and personnel qualified in accordance with paragraph (b)(2)(xv)(K)(1) of this section, or from the vessel shell using a procedure and personnel qualified for single sided examination in accordance with Supplement 6 to Appendix VIII, as conditioned by paragraphs (b)(2)(xv)(D) through (G) of this section. |
(3) |
For examination of reactor pressure vessel nozzle-to-shell welds conducted from the outside of the vessel, the following conditions are required: |
|
(i) The clad-to-base-metal-interface and the adjacent metal to a depth of 15 percent T (measured from the clad-to-base-metal-interface) must be examined from one radial and two opposing circumferential directions using a procedure and personnel qualified in accordance with Supplement 4 to Appendix VIII, as conditioned by paragraphs (b)(2)(xv)(B) and (C) of this section, for examinations performed in the radial direction, and Supplement 5 to Appendix VIII, as conditioned by paragraph (b)(2)(xv)(J) of this section, for examinations performed in the circumferential direction. |
(ii) The examination volume not addressed by paragraph (b)(2)(xv)(K)(3)(i) of this section must be examined in a minimum of one radial direction using a procedure and personnel qualified for single sided examination in accordance with Supplement 6 to Appendix VIII, as conditioned by paragraphs (b)(2)(xv)(D) through (G) of this section. |
(4) |
Table VIII–S7–1, "Flaw Locations and Orientations," Supplement 7 to Appendix VIII, is conditioned as follows: |
Table 2 to Paragraph (b)(2)(xv)(K)(4)—Table VIII: S7–1—Modified
[Flaw Locations and Orientations]
|
Parallel to weld |
Perpendicular to weld |
Inner 15 percent |
X |
X |
Outside Diameter Surface |
X |
..... |
Subsurface |
X |
..... |
|
|
|
(L) Specimen set and qualification: Twelfth provision. As a condition to the requirements of Supplement 8, Subparagraph 1.1(c), to Appendix VIII, notches may be located within one diameter of each end of the bolt or stud. |
(M) Specimen set and qualification: Thirteenth provision. When implementing Supplement 12 to Appendix VIII, only the provisions related to the coordinated implementation of Supplement 3 to Supplement 2 performance demonstrations are to be applied. |
|
(xvi) |
Section XI condition: Appendix VIII single side ferritic vessel and piping and stainless steel piping examinations. When applying editions and addenda prior to the 2007 Edition of Section XI, the following conditions apply. |
(A) Ferritic and stainless steel piping examinations: First provision. Examinations performed from one side of a ferritic vessel weld must be conducted with equipment, procedures, and personnel that have demonstrated proficiency with single side examinations. To demonstrate equivalency to two sided examinations, the demonstration must be performed to the requirements of Appendix VIII, as conditioned by this paragraph and paragraphs (b)(2)(xv)(B) through (G) of this section, on specimens containing flaws with non-optimum sound energy reflecting characteristics or flaws similar to those in the vessel being examined. |
(B) Ferritic and stainless steel piping examinations: Second provision. Examinations performed from one side of a ferritic or stainless steel pipe weld must be conducted with equipment, procedures, and personnel that have demonstrated proficiency with single side examinations. To demonstrate equivalency to two sided examinations, the demonstration must be performed to the requirements of Appendix VIII, as conditioned by this paragraph and paragraph (b)(2)(xv)(A) of this section. |
|
(xvii) |
[Reserved] |
|
(xviii) |
Section XI condition: NDE personnel certification—(A) NDE personnel certification: First provision. Level I and II nondestructive examination personnel must be recertified on a 3-year interval in lieu of the 5-year interval specified in IWA–2314(a) and IWA–2314(b) of the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section. |
(B) NDE personnel certification: Second provision. When applying editions and addenda prior to the 2007 Edition of Section XI, paragraph IWA–2316 may only be used to qualify personnel that observe leakage during system leakage and hydrostatic tests conducted in accordance with IWA 5211(a) and (b). |
(C) NDE personnel certification: Third provision. When applying editions and addenda prior to the 2005 Addenda of Section XI, licensee’s qualifying visual examination personnel for VT–3 visual examination under paragraph IWA–2317 of Section XI must demonstrate the proficiency of the training by administering an initial qualification examination and administering subsequent examinations on a 3-year interval. |
(D) NDE personnel certification: Fourth provision. The use of Appendix VII, Table VII–4110–1 and Appendix VIII, Subarticle VIII–2200 of the 2011 Addenda through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section is prohibited. When using ASME BPV Code, Section XI editions and addenda later than the 2010 Edition, licensees and applicants must use the prerequisites for ultrasonic examination personnel certifications in Appendix VII, Table VII–4110–1 and Appendix VIII, Subarticle VIII–2200 in the 2010 Edition. |
|
(1) |
As an alternative to Note (c) in Table VII–4110–1 of ASME BPV Code, Section XI, 2010 Edition, the 250 hours of Level I experience time may be reduced to 175 hours, if the experience time includes a minimum of 125 hours of field experience and 50 hours of laboratory practice beyond the requirements of for training in accordance with Appendix VII Subarticle 4220, provided those practice hours are dedicated to the Level I or Level II skill areas as described in ANSI/ASNT CP–189. |
(2) |
As an alternative to Note (d) in Table VII–4110–1 of ASME BPV Code, Section XI, 2010 Edition, the 800 hours of Level II experience time may be reduced to 720 hours, if the experience time includes a minimum of 400 hours of field experience and a minimum of 320 hours of laboratory practice. The practice must be dedicated to scanning specimens containing flaws in materials representative of those in actual power plant components. Additionally, for Level II Certification, the candidate must pass a Mandatory Appendix VIII, Supplement 2 performance demonstration for detection and length sizing. |
|
(xix) |
Section XI condition: Substitution of alternative methods. The provisions for substituting alternative examination methods, a combination of techniques in the 1997 Addenda of IWA–2240 must be applied when using the 2001 Edition through the 2004 Edition of Section XI of the ASME BPV Code. The provisions in IWA–4520(c), 2001 Edition through the 2004 Edition, allowing the substitution of alternative methods, a combination of methods, or newly developed techniques for the methods specified in the Construction Code, are not approved for use. The provisions in IWA–4520(b)(2) and IWA–4521 of the 2008 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, allowing the substitution of ultrasonic examination for radiographic examination specified in the Construction Code, are not approved for use. |
|
(xx) |
Section XI condition: System leakage tests—(A) System leakage tests: First provision. When performing system leakage tests in accordance with IWA–5213(a), 2001 Edition through 2002 Addenda, the licensee must maintain a 10-minute hold time after test pressure has been reached for Class 2 and Class 3 components that are not in use during normal operating conditions. No hold time is required for the remaining Class 2 and Class 3 components provided that the system has been in operation for at least 4 hours for insulated components or 10 minutes for uninsulated components. |
(B) System leakage tests: Second provision. The nondestructive examination method and acceptance criteria of the 1992 Edition or later of Section III shall be met when performing system leakage tests (in lieu of a hydrostatic test) in accordance with IWA–4520 after repair and replacement activities performed by welding or brazing on a pressure retaining boundary using the 2003 Addenda through the latest edition and addenda of Section XI incorporated by reference in paragraph (a)(1)(ii) of this section. The nondestructive examination and pressure testing may be performed using procedures and personnel meeting the requirements of the licensee’s/applicant’s current ISI code of record. |
(C) System leakage tests: Third provision. The use of the provisions for an alternative BWR pressure test at reduced pressure to satisfy IWA–4540 requirements as described in IWB–5210(c) of Section XI, 2017 Edition and IWA–5213(b)(2) and IWB–5221(d) of Section XI, 2017 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section may be used subject to the following conditions: |
|
(1) |
The use of nuclear heat to conduct the BWR Class 1 system leakage test is prohibited (i.e., the reactor must be in a non-critical state), except during refueling outages in which the ASME Section XI Category B–P pressure test has already been performed, or at the end of mid-cycle maintenance outages fourteen (14) days or less in duration. |
(2) |
In lieu of the test condition holding time of IWA–5213(b)(2), after pressurization to test conditions, and before the visual examinations commence, the holding time shall be 1 hour for non-insulated components. |
|
(xxi) |
Section XI condition: Table IWB–2500–1 examination requirements. (A) [Reserved] |
(B) Table IWB–2500–1 examination. Use of the provisions of IWB–2500(f) and (g) and Table IWB–2500–1 Notes 6 and 7 of Section XI, 2017 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section, for examination of Examination Category B–D Item Numbers B3.90 and B3.100 shall be subject to the following conditions: |
|
(1) |
A plant-specific evaluation demonstrating the criteria of IWB–2500(f) are met must be maintained in accordance with IWA–1400(l). |
(2) |
The use of the provisions of IWB–2500(f) and Table IWB–2500–1 Note 6 for examination of Examination Category B–D Item Numbers B3.90 is prohibited for plants with renewed licenses in accordance with 10 CFR part 54. |
(3) |
The provisions of IWB–2500(g) and Table IWB–2500–1 Notes 6 and 7 for examination of Examination Category B–D Item Numbers B3.90 and B3.100 shall not be used to eliminate the preservice or inservice volumetric examination of plants with a Combined Operating License pursuant to 10 CFR part 52, or a plant that receives its operating license after October 22, 2015. |
(xxii) |
Section XI condition: Surface examination. The use of the provision in IWA–2220, "Surface Examination," of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, that allows use of an ultrasonic examination method is prohibited. |
|
(xxiii) |
Section XI condition: Evaluation of thermally cut surfaces. The use of the provisions for eliminating mechanical processing of thermally cut surfaces in IWA–4461.4.2 of Section XI, 2001 Edition through the 2009 Addenda, is prohibited. |
|
(xxiv) |
Section XI condition: Incorporation of the performance demonstration initiative and addition of ultrasonic examination criteria. The use of Appendix VIII and the supplements to Appendix VIII and Article I–3000 of Section XI of the ASME BPV Code, 2002 Addenda through the 2006 Addenda, is prohibited. |
|
(xxv) |
Section XI condition: Mitigation of defects by modification. Use of the provisions of IWA–4340 must be subject to the following conditions: |
(A) Mitigation of defects by modification: First provision. The use of the provisions for mitigation of defects by modification in IWA–4340 of Section XI 2001 Edition through the 2010 Addenda, is prohibited. |
(B) Mitigation of defects by modification: Second provision. The provisions for mitigation of defects by modification in IWA–4340 of Section XI, 2011 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section, may be used subject to the following conditions: |
|
(1) |
The use of the provisions in IWA 4340 to mitigate crack-like defects or those associated with flow accelerated corrosion are prohibited. |
(2) |
The design of a modification that mitigates a defect must incorporate a loss of material rate either 2 times the actual measured corrosion rate, which must be established based on wall thickness measurements conducted at least twice, in that pipe location or another location with similar corrosion conditions, similar flow characteristics, and the same piping configuration (e.g., straight run of pipe, elbow, tee) as the encapsulated area, or 4 times the estimated maximum corrosion rate for the piping system. |
(3) |
The licensee must perform a wall thickness examination in the vicinity of the modification and relevant pipe base metal at half its expected life or, if the modification has an expected life greater than 19 years, once per interval starting with the interval subsequent to the mitigation, and the results must be used to confirm corrosion rates, determine the next inspection date, and confirm the design inputs. |
|
|
(i) For buried pipe locations where the loss of material has occurred due to internal corrosion, the wall thickness examinations may be conducted at a different location in the same system as long as: Wall thickness measurements were conducted at the different location at the same time as installation of the modification; the flow rate is the same or higher at the different location; the piping configuration is the same (e.g., straight run of pipe, elbow, tee); and if pitting occurred at the modification location, but not the different location, wall loss values must be multiplied by four (instead of two) times the actual measured corrosion rate. Where wall loss values are greater than that assumed during the design of the modification, the structural integrity of the modification must be reanalyzed. Additionally, if the extent of degradation is different (i.e., percent wall loss plus or minus 25 percent) or the corrosion mechanism (e.g., general, pitting) is not the same at the different location as at the modification location, the modification must be examined at half its expected life or 10 years, whichever is sooner. |
|
(ii) For buried pipe locations where loss of material has occurred due to external corrosion, the modification must be examined at half its expected life or 10 years, whichever is sooner. Alternatively, when the modification has been recoated prior to return to service, the modification may be examined at half its expected life or during the subsequent 10-year inspection interval after installation, whichever is sooner. |
|
(xxvi) |
Section XI condition: Pressure Testing of Class 1, 2, and 3 Mechanical Joints.. Mechanical joints in Class 1, 2, and 3 piping and components greater than NPS–1 that are disassembled and reassembled during the performance of a Section XI repair/replacement activity requiring documentation on a Form NIS–2 must be verified to be leak tight. The verification must be performed to the standards of the licensee’s appendix B to this part quality assurance program. |
|
(xxvii) |
Section XI condition: Removal of insulation. When performing visual examination in accordance with IWA–5242 of Section XI of the ASME BPV Code, 2003 Addenda through the 2006 Addenda, or IWA–5241 of the 2007 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, insulation must be removed from 17–4 PH or 410 stainless steel studs or bolts aged at a temperature below 1100 °F or having a Rockwell Method C hardness value above 30, and from A–286 stainless steel studs or bolts preloaded to 100,000 pounds per square inch or higher. |
|
(xxviii) |
Section XI condition: Analysis of flaws. Licensees using ASME BPV Code, Section XI, Appendix A, must use the following conditions when implementing Equation (2) in A–4300(b)(1): |
|
|
For R < 0, ΔKI depends on the crack depth (a), and the flow stress (σf). The flow stress is defined by σf = 1/2(σys + σult), where σys is the yield strength and σult is the ultimate tensile strength in units ksi (MPa) and (a) is in units in. (mm). For – 2 ≤ R ≤ 0 and Kmax – Kmin ≤ 0.8 × 1.12 σf√(πa), S = 1 and ΔKI= Kmax. For R < – 2 and Kmax – Kmin ≤ 0.8 × 1.12 σf√(πa), S = 1 and ΔKI = (1 – R) Kmax/3. For R < 0 and Kmax – Kmin > 0.8 × 1.12 σf√(πa), S = 1 and ΔKI = Kmax – Kmin. |
|
(xxix) |
Section XI condition: Nonmandatory Appendix R. (A) Nonmandatory Appendix R, ‘‘Risk-Informed Inspection Requirements for Piping Supplement 1—Risk-Informed Selection Process—Method A,’’ of Section XI, 2005 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, may not be implemented without prior NRC authorization of the proposed alternative in accordance with paragraph (z) of this section. |
(B) Nonmandatory Appendix R, ‘‘Risk-Informed Inspection Requirements for Piping, Supplement 2—Risk-Informed Selection Process—Method B’’ of Section XI, 2005 Addenda through the 2015 Edition, may not be implemented without prior NRC authorization of the proposed alternative in accordance with paragraph (z) of this section. |
(C) Nonmandatory Appendix R, ‘‘Risk-Informed Inspection Requirements for Piping, Supplement 2—Risk-Informed Selection Process—Method B’’ of Section XI, 2017 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, may be implemented without prior NRC authorization of the proposed alternative in accordance with paragraph (z) of this section. |
|
(xxx) |
[Reserved] |
|
(xxxi) |
Section XI condition: Mechanical clamping devices. When installing a mechanical clamping device on an ASME BPV Code class piping system, Appendix W of Section XI shall be treated as a mandatory appendix and all of the provisions of Appendix W shall be met for the mechanical clamping device being installed. Additionally, use of IWA–4131.1(c) of the 2010 Edition of Section XI and IWA–4131.1(d) of the 2011 Addenda of the 2010 Edition and later versions of Section XI is prohibited on small item Class 1 piping and portions of a piping system that form the containment boundary. |
|
(xxxii) |
Section XI condition: Summary report submittal. When using ASME BPV Code, Section XI, 2010 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, Summary Reports and Owner’s Activity Reports described in IWA–6230 must be submitted to the NRC. Preservice inspection reports for examinations prior to commercial service must be submitted prior to the date of placement of the unit into commercial service. For preservice and inservice examinations performed following placement of the unit into commercial service, reports must be submitted within 120 calendar days of the completion of each refueling outage. |
|
(xxxiii) |
Section XI condition: Risk-Informed allowable pressure. The use of Paragraph G–2216 in Appendix G in the 2011 Addenda and later editions and addenda of the ASME BPV Code, Section XI is prohibited. |
|
(xxxiv) |
Section XI condition: Nonmandatory Appendix U. When using Nonmandatory Appendix U of the ASME BPV Code, Section XI, 2013 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section, the following conditions apply: |
(A) The repair or replacement activities temporarily deferred under the provisions of Nonmandatory Appendix U must be performed during the next scheduled refueling outage. |
(B) In lieu of the appendix referenced in paragraph U–S1–4.2.1(c) of Appendix U of the 2013 and the 2015 Editions the mandatory appendix in ASME BPV Code Case N–513–3 must be used. |
|
(xxxv) |
Section XI condition: Use of RTT0 in the KIa and KIc equations. |
(A) When using the 2013 Edition of the ASME BPV Code, Section XI, Appendix A, paragraph A–4200, if T0 is available, then RTT0 may be used in place of RTNDT for applications using the KIc equation and the associated KIc curve, but not for applications using the KIa equation and the associated KIa curve. |
(B) When using the 2015 Edition of the ASME BPV Code, Section XI, Appendix A, paragraph A–4200 subparagraph (c) RTKIa shall be defined as RTKIa = T0 + 90.267 exp(–0.003406T0) for U.S. Customary Units. |
|
(xxxvi) |
Section XI condition: Fracture toughness of irradiated materials. When using the 2013 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section of the ASME BPV Code, Section XI, Appendix A paragraph A–4400, the licensee shall obtain NRC approval under paragraph (z) of this section before using irradiated T0 and the associated RTT0 in establishing fracture toughness of irradiated materials. |
|
(xxxvii) |
[Reserved] |
|
(xxxviii) |
Section XI condition: ASME Code Section XI Appendix III Supplement 2. Licensees applying the provisions of ASME Code Section XI Appendix III Supplement 2, "Welds in Cast Austenitic Materials," are subject to the following conditions: |
(A) ASME Code Section XI Appendix III Supplement 2: First provision. In lieu of Paragraph (c)(1)(–c)(–2), licensees shall use a search unit with a center frequency of 500 kHz with a tolerance of +/– 20 percent. |
(B) ASME Code Section XI Appendix III Supplement 2: Second provision. In lieu of Paragraph (c)(1)(–d), the search unit shall produce angles including, but not limited to, 30 to 55 degrees with a maximum increment of 5 degrees. |
|
(xxxix) |
Section XI condition: Defect Removal. The use of the provisions for removal of defects by welding or brazing in IWA–4421(c)(1) and IWA–4421(c)(2) of Section XI, 2017 Edition may be used subject to the following conditions: |
(A) Defect removal requirements: First provision. The provisions of subparagraph IWA 4421(c)(1) shall not be used to contain or isolate a defective area without removal of the defect. |
(B) Defect removal requirements: Second provision. The provisions of subparagraph IWA–4421(c)(2) shall not be used for crack-like defects. |
|
(xl) |
Section XI condition: Prohibitions on use of IWB–3510.4(b). The use of ASME BPV Code, Section XI, 2017 Edition, Subparagraphs IWB–3510.4(b)(4) and IWB–3510.4(b)(5) is prohibited. |
|
(xli) |
Section XI condition: Preservice Volumetric and Surface Examinations Acceptance. The use of the provisions for accepting flaws by analytical evaluation during preservice inspection in IWB–3112(a)(3) and IWC–3112(a)(3) of Section XI, 2013 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section is prohibited. |
|
(xlii) |
Section XI condition: Steam Generator Nozzle-to-Component welds and Reactor Vessel Nozzle-to-Component welds. Licensees applying the provisions of Table IWB–2500–1, Examination Category B–F, Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles, Item B5.11 (NPS 4 or Larger Nozzle-to-Component Butt Welds) of the 2013 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section and Item B5.71 (NPS 4 or Larger Nozzle-to-Component Butt Welds) of the 2011a Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section must also meet the following conditions: |
(A) Ultrasonic examination procedures, equipment, and personnel shall be qualified by performance demonstration in accordance with Mandatory Appendix VIII. |
(B) When applying the examination requirements of Figure IWB–2500–8, the volumetric examination volume shall be extended to include 100 percent of the weld volume, except as provided in paragraph (b)(2)(xlii)(B)(1) of this section: |
|
(1) |
If the examination volume that can be obtained by performance demonstration qualified procedures is less than 100 percent of the weld volume, the licensee may ultrasonically examine the qualified volume and perform a flaw evaluation of the largest hypothetical crack that could exist in the volume not qualified for ultrasonic examination, subject to prior NRC authorization in accordance with paragraph (z) of this section. |
(2) |
[Reserved] |
|
(xliii) |
Section XI condition: Regulatory Submittal Requirements. Licensees shall submit for NRC review and approval the following analyses: |
(A) The analytical evaluation determining the effects of an out-of-limit condition on the structural integrity of the Reactor Coolant System, as described in IWB–3720(a); |
(B) Determination of T0 and RTT0, as described in Nonmandatory Appendix A, A–4200(c); and |
(C) Determination of T0 and RTT0, as described in Nonmandatory Appendix G, G–2110(c). |
|
(3) Conditions on ASME OM Code. As used in this section, references to the ASME OM Code are to the ASME OM Code, Subsections ISTA, ISTB, ISTC, ISTD, ISTE, and ISTF; Mandatory Appendices I, II, III, IV, and V; and Nonmandatory Appendices A through H and J through M, in the 1995 Edition through the latest edition and addenda of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section. Mandatory appendices must be used if required by the OM Code; nonmandatory appendices are approved for use by the NRC but need not be used. When implementing the ASME OM Code, conditions are applicable only as specified in the following paragraphs: |
|
|
(i) |
OM condition: Quality assurance. When applying editions and addenda of the ASME OM Code, the requirements of ASME Standard NQA–1, "Quality Assurance Requirements for Nuclear Facility Applications, 1994 Edition, 2008 Edition, and 2009–1a Addenda, are acceptable as permitted by either ISTA 1.4 of the 1995 Edition through 1997 Addenda or ISTA–1500 of the 1998 Edition through the latest edition and addenda of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section, provided the licensee uses its appendix B to this part quality assurance program in conjunction with the ASME OM Code requirements and the commitments contained in the licensee's quality assurance program description. Where NQA–1 and the ASME OM Code do not address the commitments contained in the licensee's appendix B quality assurance program description, the commitments must be applied to ASME OM Code activities. |
|
(ii) |
OM condition: Motor-Operated Valve (MOV) testing. Licensees must comply with the provisions for testing MOVs in ASME OM Code, ISTC 4.2, 1995 Edition with the 1996 and 1997 Addenda, or ISTC–3500, 1998 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(iv) of this section, and must establish a program to ensure that MOVs continue to be capable of performing their design basis safety functions. Licensees implementing ASME OM Code, Mandatory Appendix III, "Preservice and Inservice Testing of Active Electric Motor Operated Valve Assemblies in Light-Water Reactor Power Plants," of the 2009 Edition through the latest edition and addenda of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section shall comply with the following conditions: |
(A) MOV diagnostic test interval. Licensees shall evaluate the adequacy of the diagnostic test intervals established for MOVs within the scope of ASME OM Code, Appendix III, not later than 5 years or three refueling outages (whichever is longer) from initial implementation of ASME OM Code, Appendix III. |
(B) MOV testing impact on risk. Licensees shall ensure that the potential increase in core damage frequency and large early release frequency associated with the extension is acceptably small when extending exercise test intervals for high risk MOVs beyond a quarterly frequency. |
(C) MOV risk categorization. When applying Appendix III to the ASME OM Code, licensees shall categorize MOVs according to their safety significance using the methodology described in ASME OM Code Case OMN–3, "Requirements for Safety Significance Categorization of Components Using Risk Insights for Inservice Testing of LWR Power Plants," subject to the conditions applicable to OMN–3 which are set forth in Regulatory Guide 1.192, or using an MOV risk ranking methodology accepted by the NRC on a plant-specific or industry-wide basis in accordance with the conditions in the applicable safety evaluation. |
(D) MOV stroke time. When applying Paragraph III–3600, "MOV Exercising Requirements," of Appendix III to the ASME OM Code, licensees shall verify that the stroke time of MOVs specified in plant technical specifications satisfies the assumptions in the plant's safety analyses. |
|
(iii) |
OM condition: New reactors. In addition to complying with the provisions in the ASME OM Code with the conditions specified in paragraph (b)(3) of this section, holders of operating licenses for nuclear power reactors that received construction permits under this part on or after August 17, 2018, and holders of combined licenses issued under 10 CFR part 52, whose initial fuel loading occurs on or after August 17, 2018, must also comply with the following conditions, as applicable: |
(A) Power-operated valves. Licensees must periodically verify the capability of power-operated valves to perform their design-basis safety functions. |
(B) Check valves. Licensees must perform bi-directional testing of check valves within the IST program where practicable. |
(C) Flow-induced vibration. Licensees must monitor flow-induced vibration from hydrodynamic loads and acoustic resonance during preservice testing or inservice testing to identify potential adverse flow effects on components within the scope of the IST program. |
(D) High risk non-safety systems. Licensees must assess the operational readiness of pumps, valves, and dynamic restraints within the scope of the Regulatory Treatment of Non-Safety Systems for applicable reactor designs. |
|
(iv) |
OM condition: Check valves (Appendix II). Appendix II of the ASME OM Code, 2003 Addenda through the 2012 Edition, is acceptable for use with the following requirements. Trending and evaluation must support the determination that the valve or group of valves is capable of performing its intended function(s) over the entire interval. At least one of the Appendix II condition monitoring activities for a valve group must be performed on each valve of the group at approximate equal intervals not to exceed the maximum interval shown in the following table: |
|
Table 3 to Paragraph (b)(3)(iv)—Maximum Intervals For Use When Applying Internal Extensions
Group size |
Maximum interval between activities of member valves in the groups (years) |
Maximum interval between activities of each valve in the group (years) |
≥4 |
4.5 |
16 |
3 |
4.5 |
12 |
2 |
6 |
12 |
1 |
Not applicable |
10 |
|
|
(v) |
OM condition: Snubbers ISTD. Article IWF–5000, "Inservice Inspection Requirements for Snubbers," of the ASME BPV Code, Section XI, must be used when performing inservice inspection examinations and tests of snubbers at nuclear power plants, except as conditioned in paragraphs (b)(3)(v)(A) and (B) of this section. |
(A) Snubbers: First provision. Licensees may use Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Power Plants," ASME OM Code, 1995 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(iv) of this section, in place of the requirements for snubbers in the editions and addenda up to the 2005 Addenda of the ASME BPV Code, Section XI, IWF–5200(a) and (b) and IWF–5300(a) and (b), by making appropriate changes to their technical specifications or licensee-controlled documents. Preservice and inservice examinations must be performed using the VT–3 visual examination method described in IWA–2213. |
(B) Snubbers: Second provision. Licensees must comply with the provisions for examining and testing snubbers in Subsection ISTD of the ASME OM Code and make appropriate changes to their technical specifications or licensee-controlled documents when using the 2006 Addenda and later editions and addenda of Section XI of the ASME BPV Code. |
|
|
(vi) |
OM condition: Exercise interval for manual valves. Manual valves must be exercised on a 2-year interval rather than the 5-year interval specified in paragraph ISTC–3540 of the 1999 through the 2005 Addenda of the ASME OM Code, provided that adverse conditions do not require more frequent testing. |
|
|
(vii) |
[Reserved] |
|
|
(viii) |
OM condition: Subsection ISTE. Licensees may not implement the risk-informed approach for inservice testing (IST) of pumps and valves specified in Subsection ISTE, ‘‘Risk-Informed Inservice Testing of Components in Light-Water Reactor Nuclear Power Plants,’’ in the ASME OM Code, 2009 Edition through the 2017 Edition, without first obtaining NRC authorization to use Subsection ISTE as an alternative to the applicable IST requirements in the ASME OM Code, pursuant to paragraph (z) of this section. |
|
|
(ix) |
OM condition: Subsection ISTF. Licensees applying Subsection ISTF, 2012 Edition must satisfy the requirements of Mandatory Appendix V ‘‘Pump Periodic Verification Test Program,’’ of the ASME OM Code in that edition. |
|
|
(x) |
[Reserved] |
|
|
(xi) |
OM condition: Valve Position Indication. When implementing paragraph ISTC–3700, ‘‘Position Verification Testing,’’ in the ASME OM Code, 2012 Edition through the latest edition of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section, licensees must verify that valve operation is accurately indicated by supplementing valve position indicating lights with other indications, such as flow meters or other suitable instrumentation to provide assurance of proper obturator position for valves with remote position indication within the scope of Subsection ISTC including its mandatory appendices and their verification methods and frequencies. For valves not susceptible to stem-disk separation, licensees may implement ASME OM Code Case OMN–28, ‘‘Alternative Valve Position Verification Approach to Satisfy ISTC–3700 for Valves Not Susceptible to Stem-Disk Separation,’’ which is incorporated by reference in paragraph (a)(1)(iii)(H) of this section. Where plant conditions make it impractical to perform the initial ISTC–3700 test as supplemented by paragraph (b)(3)(xi) of this section by the date 2 years following the previously performed ISTC–3700 test, a licensee may justify an extension of this initial supplemental valve position verification provided the ISTC–3700 test as supplemented by paragraph (b)(3)(xi) of this section is performed at the next available opportunity and no later than the next plant shutdown. This one-time extension of the ISTC–3700 test schedule as supplemented by paragraph (b)(3)(xi) of this section is acceptable provided the licensee has available for NRC review documented justification based on information obtained over the previous 5 years of the structural integrity of the stem-disk connection for the applicable valves. The licensee’s justification could be based on, for example, verification of the valve stemdisk connection through an appropriate weak link analysis, appropriate disk motion confirmed during diagnostic testing, or allowance and cessation of flow through the valves. The licensee’s justification must provide reasonable assurance that the remote indicating lights accurately reveal the position of the valve obturator until the next ISTC–3700 test as supplemented by paragraph (b)(3)(xi) of this section is performed. |
|
(4) Conditions on Design, Fabrication, and Materials Code Cases. Each manufacturing license, standard design approval, and design certification application under part 52 of this chapter is subject to the following conditions. Licensees may apply the ASME BPV Code Cases listed in NRC Regulatory Guide 1.84, as incorporated by reference in paragraph (a)(3)(i) of this section, without prior NRC approval, subject to the following conditions: |
|
|
(i) |
Design, Fabrication, and Materials Code Case condition: Applying Code Cases. When an applicant or licensee initially applies a listed Code Case, the applicant or licensee must apply the most recent version of that Code Case incorporated by reference in paragraph (a) of this section. |
|
|
(ii) |
Design, Fabrication, and Materials Code Case condition: Applying different revisions of Code Cases. If an applicant or licensee has previously applied a Code Case and a later version of the Code Case is incorporated by reference in paragraph (a) of this section, the applicant or licensee may continue to apply the previous version of the Code Case as authorized or may apply the later version of the Code Case, including any NRC-specified conditions placed on its use, until it updates its Code of Record for the component being constructed. |
|
|
(iii) |
Design, Fabrication, and Materials Code Case condition: Applying annulled Code Cases. Application of an annulled Code Case is prohibited unless an applicant or licensee applied the listed Code Case prior to it being listed as annulled in Regulatory Guide 1.84. If an applicant or licensee has applied a listed Code Case that is later listed as annulled in Regulatory Guide 1.84, the applicant or licensee may continue to apply the Code Case until it updates its Code of Record for the component being constructed. |
|
(5) Conditions on inservice inspection Code Cases. Licensees may apply the ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section, without prior NRC approval, subject to the following: |
|
|
(i) |
ISI Code Case condition: Applying Code Cases. When a licensee initially applies a listed Code Case, the licensee must apply the most recent version of that Code Case incorporated by reference in paragraph (a) of this section. |
|
|
(ii) |
ISI Code Case condition: Applying different revisions of Code Cases. If a licensee has previously applied a Code Case and a later version of the Code Case is incorporated by reference in paragraph (a) of this section, the licensee may continue to apply, to the end of the current code of record interval, the previous version of the Code Case, as authorized, or may apply the later version of the Code Case, including any NRC-specified conditions placed on its use. Licensees who choose to continue use of the Code Case during subsequent code of record intervals will be required to implement the latest version incorporated by reference into this section as listed in tables 1 and 2 of NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section. |
|
|
(iii) |
ISI Code Case condition: Applying annulled Code Cases. Application of an annulled Code Case is prohibited unless a licensee previously applied the listed Code Case prior to it being listed as annulled in NRC Regulatory Guide 1.147. If a licensee has applied a listed Code Case that is later listed as annulled in NRC Regulatory Guide 1.147, the licensee may continue to apply the Code Case to the end of the current code of record interval. |
|
(6) Conditions on ASME OM Code Cases. Licensees may apply the ASME OM Code Cases listed in NRC
Regulatory Guide 1.192, as incorporated by reference in paragraph (a)(3)(iii) of this section, without prior NRC approval, subject to the following: |
|
|
(i) |
OM Code Case condition: Applying Code Cases. When a licensee initially applies a listed Code Case, the licensee must apply the most recent version of that Code Case incorporated by reference in paragraph (a) of this section. |
|
|
(ii) |
OM Code Case condition: Applying different revisions of Code Cases. If a licensee has previously
applied a Code Case and a later version of the Code Case is incorporated by reference in paragraph (a) of this section, the licensee may continue to apply, to the end of the current code of record interval, the previous version of the Code Case, as authorized, or may apply the later version of the Code Case, including any NRC-specified conditions placed on its use. Licensees who choose to continue use of the Code Case during subsequent code of record intervals will be required to implement the latest version incorporated by reference into this section as listed in tables 1 and 2
of NRC Regulatory Guide 1.192, as incorporated by reference in paragraph (a)(3)(iii) of this section. |
|
|
(iii) |
OM Code Case condition: Applying annulled Code Cases. Application of an annulled Code Case is
prohibited unless a licensee previously applied the listed Code Case prior to it being listed as annulled in NRC Regulatory Guide 1.192. If a licensee has applied a listed Code Case that is later
listed as annulled in NRC Regulatory Guide 1.192, the licensee may continue to apply the Code Case to the end of the current code of record interval. |
(c) Reactor coolant pressure boundary. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code as specified in this paragraph. Each manufacturing license, standard design approval, and design certification application under part 52 of this chapter and each combined license for a utilization facility is subject to the following conditions: |
|
(1) Standards requirement for reactor coolant pressure boundary components. Components that are part of the reactor coolant pressure boundary must meet the requirements for Class 1 components in Section III 1,4 of the ASME BPV Code, except as provided in paragraphs (c)(2) through (4) of this section. |
|
(2) Exceptions to reactor coolant pressure boundary standards requirement. Components that are connected to the reactor coolant system and are part of the reactor coolant pressure boundary as defined in § 50.2 need not meet the requirements of paragraph (c)(1) of this section, provided that: |
|
|
(i) |
Exceptions: Shutdown and cooling capability. In the event of postulated failure of the component during normal reactor operation, the reactor can be shut down and cooled down in an orderly manner, assuming makeup is provided by the reactor coolant makeup system; or |
|
|
(ii) |
Exceptions: Isolation capability. The component is or can be isolated from the reactor coolant system by two valves in series (both closed, both open, or one closed and the other open). Each open valve must be capable of automatic actuation and, assuming the other valve is open, its closure time must be such that, in the event of postulated failure of the component during normal reactor operation, each valve remains operable and the reactor can be shut down and cooled down in an orderly manner, assuming makeup is provided by the reactor coolant makeup system only. |
|
(3) Applicable Code and Code Cases and conditions on their use. The Code edition, addenda, and optional ASME Code Cases to be applied to components of the reactor coolant pressure boundary must be determined by the provisions of paragraph NCA–1140, Subsection NCA of Section III of the ASME BPV Code, subject to the following conditions: |
|
|
(i) |
Reactor coolant pressure boundary condition: Code edition and addenda. The edition and addenda applied to a component must be those that are incorporated by reference in paragraph (a)(1)(i) of this section; |
|
|
(ii) |
Reactor coolant pressure boundary condition: Earliest edition and addenda for pressure vessel. The ASME Code provisions applied to the pressure vessel may be dated no earlier than the summer 1972 Addenda of the 1971 Edition; |
|
|
(iii) |
Reactor coolant pressure boundary condition: Earliest edition and addenda for piping, pumps, and valves. The ASME Code provisions applied to piping, pumps, and valves may be dated no earlier than the Winter 1972 Addenda of the 1971 Edition; and |
|
|
(iv) |
Reactor coolant pressure boundary condition: Use of Code Cases. The optional Code Cases applied to a component must be those listed in NRC Regulatory Guide 1.84 that is incorporated by reference in paragraph (a)(3)(i) of this section. |
|
(4) Standards requirement for components in older plants. For a nuclear power plant whose construction permit was issued prior to May 14, 1984, the applicable Code edition and addenda for a component of the reactor coolant pressure boundary continue to be that Code edition and addenda that were required by Commission regulations for such a component at the time of issuance of the construction permit. |
(d) Quality Group B components. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code as specified in this paragraph. Each manufacturing license, standard design approval, and design certification application under part 52 of this chapter, and each combined license for a utilization facility is subject to the following conditions: |
|
(1) Standards requirement for Quality Group B components. For a nuclear power plant whose application for a construction permit under this part, or a combined license or manufacturing license under part 52 of this chapter, docketed after May 14, 1984, or for an application for a standard design approval or a standard design certification docketed after May 14, 1984, components classified Quality Group B 7 must meet the requirements for Class 2 Components in Section III of the ASME BPV Code. |
|
(2) Quality Group B: Applicable Code and Code Cases and conditions on their use. The Code edition, addenda, and optional ASME Code Cases to be applied to the systems and components identified in paragraph (d)(1) of this section must be determined by the rules of paragraph NCA–1140, Subsection NCA of Section III of the ASME BPV Code, subject to the following conditions: |
|
|
(i) |
Quality Group B condition: Code edition and addenda. The edition and addenda must be those that are incorporated by reference in paragraph (a)(1)(i) of this section; |
|
|
(ii) |
Quality Group B condition: Earliest edition and addenda for components. The ASME Code provisions applied to the systems and components may be dated no earlier than the 1980 Edition; and |
|
|
(iii) |
Quality Group B condition: Use of Code Cases. The optional Code Cases must be those listed in NRC Regulatory Guide 1.84 that is incorporated by reference in paragraph (a)(3)(i) of this section. |
(e) Quality Group C components. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code as specified in this paragraph. Each manufacturing license, standard design approval, and design certification application under part 52 of this chapter and each combined license for a utilization facility is subject to the following conditions. |
|
(1) Standards requirement for Quality Group C components. For a nuclear power plant whose application for a construction permit under this part, or a combined license or manufacturing license under part 52 of this chapter, docketed after May 14, 1984, or for an application for a standard design approval or a standard design certification docketed after May 14, 1984, components classified Quality Group C 7 must meet the requirements for Class 3 components in Section III of the ASME BPV Code. |
|
(2) Quality Group C applicable Code and Code Cases and conditions on their use. The Code edition, addenda, and optional ASME Code Cases to be applied to the systems and components identified in paragraph (e)(1) of this section must be determined by the rules of paragraph NCA–1140, subsection NCA of Section III of the ASME BPV Code, subject to the following conditions: |
|
|
(i) |
Quality Group C condition: Code edition and addenda. The edition and addenda must be those incorporated by reference in paragraph (a)(1)(i) of this section; |
|
|
(ii) |
Quality Group C condition: Earliest edition and addenda for components. The ASME Code provisions applied to the systems and components may be dated no earlier than the 1980 Edition; and |
|
|
(iii) |
Quality Group C condition: Use of Code Cases. The optional Code Cases must be those listed in NRC Regulatory Guide 1.84 that is incorporated by reference in paragraph (a)(3)(i) of this section. |
(f) Preservice and inservice testing requirements. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements for preservice and inservice testing (referred to in this paragraph (f) collectively as inservice testing) of the ASME BPV Code and ASME OM Code as specified in this paragraph (f). Each operating license for a boiling or pressurized water-cooled nuclear facility is subject to the following conditions. Each combined license for a boiling or pressurized water-cooled nuclear facility is subject to the following conditions, but the conditions in paragraphs (f)(4) through (6) of this section must be met only after the Commission makes the finding under § 52.103(g) of this chapter. Requirements for inservice inspection of Class 1, Class 2, Class 3, Class MC, and Class CC components (including their supports) are located in paragraph (g) of this section. |
|
(1) Inservice testing requirements for older plants (pre-1971 CPs). For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued prior to January 1, 1971, pumps and valves must meet the test requirements of paragraphs (f)(4) and (5) of this section to the extent practical. Pumps and valves that are part of the reactor coolant pressure boundary must meet the requirements applicable to components that are classified as ASME Code Class 1. Other pumps and valves that perform a function to shut down the reactor or maintain the reactor in a safe shutdown condition, mitigate the consequences of an accident, or provide overpressure protection for safety-related systems (in meeting the requirements of the 1986 Edition, or later, of the BPV or OM Code) must meet the test requirements applicable to components that are classified as ASME Code Class 2 or Class 3. |
|
(2) Design and accessibility requirements for performing inservice testing in plants with CPs issued between 1971 and 1974. For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued on or after January 1, 1971, but before July 1, 1974, pumps and valves that are classified as ASME BPV Code Class 1 and Class 2 must be designed and provided with access to enable the performance of inservice tests for operational readiness set forth in editions and addenda of Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1)(ii) of this section (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192, as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively) in effect 6 months before the date of issuance of the construction permit. The pumps and valves may meet the inservice test requirements set forth in subsequent editions of this Code and addenda that are incorporated by reference in paragraph (a)(1)(ii) of this section (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192, as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively), subject to the applicable conditions listed therein. |
|
(3) Design and accessibility requirements for performing inservice testing in plants with CPs issued after 1974. For a boiling or pressurized water-cooled nuclear power facility whose construction permit under this part or design approval, design certification, combined license, or manufacturing license under part 52 of this chapter was issued on or after July 1, 1974: |
|
|
(i)–(ii) |
[Reserved] |
|
|
(iii) |
IST design and accessibility requirements: Class 1 pumps and valves. (A) Class 1 pumps and valves: First provision. In facilities whose construction permit was issued before November 22, 1999, pumps and valves that are classified as ASME BPV Code Class 1 must be designed and provided with access to enable the performance of inservice testing of the pumps and valves for assessing operational readiness set forth in the editions and addenda of Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1)(ii) of this section (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192, as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively) applied to the construction of the particular pump or valve or the summer 1973 Addenda, whichever is later. |
(B) Class 1 pumps and valves: Second provision. In facilities whose construction permit under this part, or design certification, design approval, combined license, or manufacturing license under part 52 of this chapter, issued on or after November 22, 1999, pumps and valves that are classified as ASME BPV Code Class 1 must be designed and provided with access to enable the performance of inservice testing of the pumps and valves for assessing operational readiness set forth in editions and addenda of the ASME OM Code (or the optional ASME OM Code Cases listed in NRC Regulatory Guide 1.192, as incorporated by reference in paragraph (a)(3)(iii) of this section), incorporated by reference in paragraph (a)(1)(iv) of this section at the time the construction permit, combined license, manufacturing license, design certification, or design approval is issued. |
|
|
(iv) |
IST design and accessibility requirements: Class 2 and 3 pumps and valves. (A) Class 2 and 3 pumps and valves: First provision. In facilities whose construction permit was issued before November 22, 1999, pumps and valves that are classified as ASME BPV Code Class 2 and Class 3 must be designed and be provided with access to enable the performance of inservice testing of the pumps and valves for assessing operational readiness set forth in the editions and addenda of Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1)(ii) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular pump or valve or the Summer 1973 Addenda, whichever is later. |
(B) Class 2 and 3 pumps and valves: Second provision. In facilities whose construction permit under this part, or design certification, design approval, combined license, or manufacturing license under part 52 of this chapter, issued on or after November 22, 1999, pumps and valves that are classified as ASME BPV Code Class 2 and 3 must be designed and provided with access to enable the performance of inservice testing of the pumps and valves for assessing operational readiness set forth in editions and addenda of the ASME OM Code (or the optional ASME OM Code Cases listed in NRC Regulatory Guide 1.192, as incorporated by reference in paragraph (a)(3)(iii) of this section), incorporated by reference in paragraph (a)(1)(iv) of this section at the time the construction permit, combined license, or design certification is issued. |
|
|
(v) |
IST design and accessibility requirements: Meeting later IST requirements. All pumps and valves may meet the test requirements set forth in subsequent editions of codes and addenda or portions thereof that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section. |
|
(4) Inservice testing standards requirement for operating plants. Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, pumps and valves that are within the scope of the ASME OM Code must meet the inservice test requirements (except design and access provisions) set forth in the ASME OM Code and addenda that become effective subsequent to editions and addenda specified in paragraphs (f)(2) and (3) of this section and that are incorporated by reference in paragraph (a)(1)(iv) of this section, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The inservice test requirements for pumps and valves that are within the scope of the ASME OM Code but are not classified as ASME BPV Code Class 1, Class 2, or Class 3 may be satisfied as an augmented IST program. This use of an augmented IST program is acceptable without prior NRC approval provided the basis for deviations from the ASME OM Code, as incorporated by reference in this section, demonstrates an acceptable level of quality and safety, or that implementing the Code provisions would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety, where documented and available for NRC review. When using the 2006 Addenda or later of the ASME BPV Code, Section XI, the inservice examination, testing, and service life monitoring requirements for dynamic restraints (snubbers) must meet the requirements set forth in the applicable ASME OM Code as specified in paragraph (b)(3)(v)(B) of this section. When using the 2005 Addenda or earlier edition or addenda of the ASME BPV Code, Section XI, the inservice examination, testing, and service life monitoring requirements for dynamic restraints (snubbers) must meet the requirements set forth in either the applicable ASME OM Code or ASME BPV Code, Section XI as specified in paragraph (b)(3)(v) of this section. |
|
|
(i) |
Applicable IST Code: Initial code of record interval. Inservice tests to verify operational readiness of pumps and valves, whose function is required for safety, conducted during the initial code of record interval must comply with the requirements in the latest edition and addenda of the ASME OM Code incorporated by reference in paragraph (a)(1)(iv) of this section on the date no more than 18 months before the date of issuance of the operating license under this part, or no more than 18 months before the date scheduled for initial loading of fuel under a combined license under part 52 of this chapter (or the optional ASME OM Code Cases listed in NRC Regulatory Guide 1.192, as incorporated by reference in paragraph (a)(3)(iii) of this section, subject to the conditions listed in paragraph (b) of this section). |
|
|
(ii) |
Applicable IST Code: Successive
code of record intervals. Inservice tests
to verify operational readiness of pumps
and valves, whose function is required
for safety, conducted during successive
code of record intervals must comply
with the requirements of the latest
edition and addenda of the ASME OM
Code incorporated by reference in
paragraph (a)(1)(iv) of this section no
more than18 months before the start of
the code of record interval (or the
optional ASME Code Cases listed in
NRC Regulatory Guide 1.147 or NRC
Regulatory Guide 1.192 as incorporated
by reference in paragraphs (a)(3)(ii) and
(iii) of this section, respectively), subject
to the conditions listed in paragraph (b)
of this section. |
|
|
(iii) |
[Reserved] |
|
|
(iv) |
Applicable IST Code: Use of later Code editions and addenda. Inservice tests of pumps and valves may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a)(1)(iv) of this section, subject to the conditions listed in paragraph (b) of this
section, and subject to NRC approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met. NRC approval is not required when updating the IST code of record before the start of an IST interval in which the updated IST code of record will be used and when using the latest edition incorporated by reference in (a)(1)(iv) of this section in its entirety, subject to the conditions listed in paragraph (b) of this section (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192 as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively). |
|
(5) Requirements for updating IST programs— |
|
|
(i) |
IST program update: Applicable IST Code editions and addenda. The inservice test program for a boiling or pressurized water-cooled nuclear power facility must be revised by the licensee, as necessary, to meet the requirements of paragraph (f)(4) of this section. |
|
|
(ii) |
IST program update: Conflicting IST Code requirements with technical specifications. If a revised inservice test program for a facility conflicts with the technical specifications for the facility, the licensee must apply to the Commission for amendment of the technical specifications to conform the technical specifications to the revised program. The licensee must submit this application, as specified in § 50.4, at least 6 months before the start of the period during which the provisions become applicable, as determined by paragraph (f)(4) of this section. |
|
|
(iii) |
IST program update: Notification of impractical IST Code requirements. If the licensee has determined that conformance with certain Code requirements is impractical for its facility, the licensee must notify the Commission and submit, as specified in § 50.4, information to support the determination. |
|
|
(iv) |
IST program update: Schedule for completing impracticality determinations. Where a pump or valve test requirement by the Code or addenda is determined to be impractical by the licensee and is not included in the revised inservice test program (as permitted by paragraph (f)(4) of this section), the basis for this determination must be submitted for NRC review and approval not later than 12 months after the expiration of the initial 120-month interval of operation from the start of facility commercial operation and each subsequent 120-month interval of operation during which the test is determined to be impractical. |
|
(6) Actions by the Commission for evaluating impractical and augmented IST Code requirements— |
|
|
(i) |
Impractical IST requirements: Granting of relief. The Commission will evaluate determinations under paragraph (f)(5) of this section that code requirements are impractical. The Commission may grant relief and may impose such alternative requirements as it determines are authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. |
|
|
(ii) |
Augmented IST requirements. The Commission may require the licensee to follow an augmented inservice test program for pumps and valves for which the Commission deems that added assurance of operational readiness is necessary. |
|
(7) Inservice testing reporting requirements. Inservice Testing Program Test and Examination Plans (IST Plans) for pumps, valves, and dynamic restraints (snubbers) prepared to meet the requirements of the ASME OM Code must be submitted to the NRC as specified in § 50.4. IST Plans must be submitted within 90 days of their implementation for the applicable 120-month IST Program interval. Electronic submission is preferred. |
(g) Preservice and inservice inspection requirements. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code as specified in this paragraph. Each operating license for a boiling or pressurized water-cooled nuclear facility is subject to the following conditions. Each combined license for a boiling or pressurized water-cooled nuclear facility is subject to the following conditions, but the conditions in paragraphs (g)(4) through (6) of this section must be met only after the Commission makes the finding under § 52.103(g) of this chapter. Requirements for inservice testing of Class 1, Class 2, and Class 3 pumps and valves are located in paragraph (f) of this section. |
|
(1) Inservice inspection requirements for older plants (pre-1971 CPs). For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued before January 1, 1971, components (including supports) must meet the requirements of paragraphs (g)(4) and (g)(5) of this section to the extent practical. Components that are part of the reactor coolant pressure boundary and their supports must meet the requirements applicable to components that are classified as ASME Code Class 1. Other safety-related pressure vessels, piping, pumps and valves, and their supports must meet the requirements applicable to components that are classified as ASME Code Class 2 or Class 3. |
|
(2) Accessibility requirements— |
|
|
(i) |
Accessibility requirements for plants with CPs issued between 1971 and 1974. For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued on or after January 1, 1971, but before July 1, 1974, components that are classified as ASME BPV Code Class 1 and Class 2 and supports for components that are classified as ASME BPV Code Class 1 and Class 2 must be designed and be provided with the access necessary to perform the required preservice and inservice examinations set forth in editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) in effect 6 months before the date of issuance of the construction permit. |
|
|
(ii) |
Accessibility requirements for plants with CPs issued after 1974. For a boiling or pressurized water-cooled nuclear power facility, whose construction permit under this part, or design certification, design approval, combined license, or manufacturing license under part 52 of this chapter, was issued on or after July 1, 1974, components that are classified as ASME BPV Code Class 1, Class 2, and Class 3 and supports for components that are classified as ASME BPV Code Class 1, Class 2, and Class 3 must be designed and provided with the access necessary to perform the required preservice and inservice examinations set forth in editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular component. |
|
|
(iii) |
Accessibility requirements: Meeting later Code requirements. All components (including supports) may meet the requirements set forth in subsequent editions of codes and addenda or portions thereof that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed therein. |
|
(3) Preservice examination requirements— |
|
|
(i) |
Preservice examination requirements for plants with CPs issued between 1971 and 1974. For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued on or after January 1, 1971, but before July 1, 1974, components that are classified as ASME BPV Code Class 1 and Class 2 and supports for components that are classified as ASME BPV Code Class 1 and Class 2 must meet the preservice examination requirements set forth in editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) in effect 6 months before the date of issuance of the construction permit. |
|
|
(ii) |
Preservice examination requirements for plants with CPs issued after 1974. For a boiling or pressurized water-cooled nuclear power facility, whose construction permit under this part, or design certification, design approval, combined license, or manufacturing license under part 52 of this chapter, was issued on or after July 1, 1974, components that are classified as ASME BPV Code Class 1, Class 2, and Class 3 and supports for components that are classified as ASME BPV Code Class 1, Class 2, and Class 3 must meet the preservice examination requirements set forth in the editions and addenda of Section III or Section XI of the ASME BPV Code incorporated by reference in paragraph (a)(1) of this section (or the optional ASME BPV Code Cases listed in NRC Regulatory Guide 1.147, as incorporated by reference in paragraph (a)(3)(ii) of this section) applied to the construction of the particular component. |
|
|
(iii)–(iv) |
[Reserved] |
|
|
(v) |
Preservice examination requirements: Meeting later Code requirements. All components (including supports) may meet the requirements set forth in subsequent editions of codes and addenda or portions thereof that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed therein. |
|
(4) Inservice inspection standards requirement for operating plants. Throughout the service life of a boiling
or pressurized water-cooled nuclear power facility, components (including supports) that are classified as ASME BPV Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of editions and addenda of the ASME BPV Code that become effective subsequent to editions specified in paragraphs (g)(2) and (3) of this section and that are incorporated by reference in paragraph (a)(1)(ii) or (iv) of this section for snubber examination and testing of this section, to the extent practical within the limitations of design, geometry, and materials of construction of the components. Components that are classified as Class MC pressure retaining components and their integral attachments, and components that are classified as Class CC pressure retaining components and their integral attachments, must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of the ASME BPV Code and addenda that are incorporated by reference in paragraph (a)(1)(ii) of this section subject to the condition listed in paragraph (b)(2)(vi) of this section and the conditions listed in paragraphs (b)(2)(viii) and (ix) of this section, to the extent practical within the limitation of design, geometry, and materials of construction of the components. When using the 2006 Addenda or later of the ASME BPV Code, Section XI, the inservice examination, testing, and service life monitoring requirements for dynamic restraints (snubbers) must meet the requirements set forth in the applicable ASME OM Code as specified in paragraph (b)(3)(v)(B) of this section. When using the 2005 Addenda or earlier edition or addenda of the ASME BPV Code, Section XI, the inservice examination, testing, and service life monitoring requirements for dynamic restraints (snubbers) must meet the requirements set forth in either the applicable ASME OM Code or ASME BPV Code, Section XI as specified in paragraph (b)(3)(v) of this section. |
|
|
(i) |
Applicable ISI Code: Initial code of record interval. Inservice examination of components and system pressure tests conducted during the initial code of record interval must comply with the requirements in the latest edition and addenda of the ASME BPV Code incorporated by reference in paragraph
(a) of this section on the date no more than 18 months before the date of issuance of the operating license under this part, or no more than 18 months before the date scheduled for initial loading of fuel under a combined license under part 52 of this chapter (or the optional ASME Code Cases listed in
NRC Regulatory Guide 1.147, when using ASME BPV Code, Section XI, or NRC Regulatory Guide 1.192, when using the ASME OM Code, as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively), subject to the conditions listed in paragraph (b) of this section. Licensees may, at any time in their code of record interval, elect to use the Appendix VIII in the latest edition and addenda of the ASME BPV Code incorporated by reference in paragraph (a) of this section, subject to any applicable conditions listed in paragraph (b) of this section. Licensees using this option must also use the same edition and addenda of Appendix I, Subarticle I–3200, as Appendix VIII, including any applicable conditions listed in paragraph (b) of this section. |
|
|
(ii) |
Applicable ISI Code: Successive code of record intervals. Inservice examination of components and system pressure tests conducted during successive code of record intervals must comply with the requirements of the latest edition and addenda of the ASME BPV Code incorporated by reference in
paragraph (a) of this section no more than 18 months before the start of the code of record interval (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147, when using ASME BPV Code, Section XI, or NRC Regulatory Guide 1.192, when using the ASME OM Code, as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section), subject to the conditions listed in paragraph (b) of this section. However, a licensee whose inservice inspection interval commences during the 12 through 18-month period after June 3, 2020, may delay the update of their Appendix VIII program by up to 18 months after June 3, 2020. Alternatively, licensees may, at any time in their code of record interval, elect to use the Appendix VIII in the latest edition and addenda of the ASME
BPV Code incorporated by reference in paragraph (a) of this section, subject to any applicable conditions listed in paragraph (b) of this section. Licensees using this option must also use the same
edition and addenda of Appendix I, Subarticle I–3200, as Appendix VIII, including any applicable conditions listed in paragraph (b) of this section. |
|
|
(iii) |
Applicable ISI Code: Optional surface examination requirement. When applying editions and addenda prior to the 2003 Addenda of Section XI of the ASME BPV Code, licensees may, but are
not required to, perform the surface examinations of high-pressure safety injection systems specified in Table IWB–2500–1, Examination Category B–J, Item Numbers B9.20, B9.21, and B9.22. |
|
|
(iv) |
Applicable ISI Code: Use of subsequent Code editions and addenda. Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met. NRC approval is not required when updating the ISI code of record before the start of an ISI interval in which the updated ISI code of record will be used and when using the latest edition incorporated by reference in (a)(1)(iv) of this section in its entirety, subject to the conditions
listed in paragraph (b) of this section (or the optional ASME Code Cases listed in NRC Regulatory Guide 1.147 or NRC Regulatory Guide 1.192 as incorporated by reference in paragraphs (a)(3)(ii) and (iii) of this section, respectively). |
|
|
(v) |
Applicable ISI Code: Metal and concrete containments. For a boiling or pressurized water-cooled nuclear power facility whose construction permit under this part or combined license under part 52 of this chapter was issued after January 1, 1956, the following are required: |
(A) Metal and concrete containments: First provision. Metal containment pressure retaining components and their integral attachments must meet the inservice inspection, repair, and replacement requirements applicable to components that are classified as ASME Code Class MC; |
(B) Metal and concrete containments: Second provision. Metallic shell and penetration liners that are pressure retaining components and their integral attachments in concrete containments must meet the inservice inspection, repair, and replacement requirements applicable to components that are classified as ASME Code Class MC; and |
(C) Metal and concrete containments: Third provision. Concrete containment pressure retaining components and their integral attachments, and the posttensioning systems of concrete containments, must meet the inservice inspections, repair, and replacement requirements applicable to components that are classified as ASME Code Class CC. |
|
(5) Requirements for updating ISI programs—(i) ISI program update: Applicable ISI code of record. The
inservice inspection program for a boiling or pressurized water-cooled nuclear power facility must be revised
by the licensee, as necessary, to meet the requirements of paragraph (g)(4) of this section. |
|
|
(ii) |
ISI program update: Conflicting ISI Code requirements with technical specifications. If a revised inservice inspection program for a facility conflicts with the technical specifications for the facility, the
licensee must apply to the Commission for amendment of the technical specifications to conform the technical specifications to the revised program. The licensee must submit this application, as specified in § 50.4, at least six months before the start of the code of record interval during which the
provisions become applicable, as determined by paragraph (g)(4) of this section. |
|
|
(iii) |
ISI program update: Notification of impractical ISI Code requirements. If the licensee has determined that conformance with a Code requirement is impractical for its facility the licensee must notify the NRC and submit, as specified in § 50.4, information to support the determinations. Determinations of impracticality in accordance with this section must be based on the demonstrated limitations experienced when attempting to comply with the Code requirements during the inservice inspection interval for which the request is being submitted. Requests for relief made in accordance with this
section must be submitted to the NRC no later than 12 months after the expiration of the initial or subsequent inservice inspection interval for which relief is sought. |
|
|
(iv) |
ISI program update: Schedule for completing impracticality determinations. Where the licensee determines that an examination required by Code edition or addenda is impractical, the basis for this
determination must be submitted for NRC review and approval not later than 12 months after the expiration of the initial or subsequent inservice inspection interval for which relief is sought. |
|
(6) Actions by the Commission for evaluating impractical and augmented ISI Code requirements—(i) Impractical ISI requirements: Granting of relief. The Commission will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines are authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. |
|
|
(ii) |
Augmented ISI program. The Commission may require the licensee to follow an augmented inservice inspection program for systems and components for which the Commission deems that added assurance of structural reliability is necessary. |
(A) [Reserved] |
(B) Augmented ISI requirements: Submitting containment ISI programs. Licensees do not have to submit to the NRC for approval of their containment inservice inspection programs that were developed to satisfy the requirements of Subsection IWE and Subsection IWL with specified conditions. The program elements and the required documentation must be maintained on site for audit. |
(C) [Reserved] |
(D) Augmented ISI requirements: Reactor vessel head inspections—(1) Implementation. Holders of operating licenses or combined licenses for pressurized-water reactors as of or after June 3, 2020 shall implement the requirements of ASME BPV Code Case N–729–6 instead of ASME BPV Code Case N–729–4, subject to the conditions specified in paragraphs (g)(6)(ii)(D)(2) through (8) of this section, by no later than one year after June 3, 2020. All previous NRC-approved alternatives from the requirements of paragraph (g)(6)(ii)(D) of this section remain valid. |
|
(2) |
Appendix I use. If Appendix I is used, Section I–3000 must be implemented to define an alternative examination area or volume. |
(3) |
Bare metal visual frequency. Instead of Note 4 of ASME BPV Code Case N–729–6, the following shall be implemented. If effective degradation years (EDY) < 8 and if no flaws are found that are attributed to primary water stress corrosion cracking: |
|
(i) A bare metal visual examination is not required during refueling outages when a volumetric or surface examination is performed; and |
(ii) If a wetted surface examination has been performed of all of the partial penetration welds during the previous non-visual examination, the reexamination frequency may be extended to every third refueling outage or 5 calendar years, whichever is less, provided an IWA–2212 VT–2 visual examination of the head is performed under the insulation through multiple access points in outages that the VE is not completed. This IWA–2212 VT–2 visual examination may be performed with the reactor vessel depressurized. |
(4) |
Surface exam acceptance criteria. In addition to the requirements of paragraph 3132.1(b) of ASME BPV Code Case N–729–6, a component whose surface examination detects rounded indications greater than allowed in paragraph NB–5352 in size on the partial-penetration or associated fillet weld shall be classified as having an unacceptable indication and corrected in accordance with the provisions of paragraph 3132.2 of ASME BPV Code Case N–729–6. |
(5) |
Peening. In lieu of inspection requirements of Table 1, Items B4.50 and B4.60, and all other requirements in ASME BPV Code Case N–729–6 pertaining to peening, in order for a RPV upper head with nozzles and associated J-groove welds mitigated by peening to obtain examination relief from the requirements of Table 1 for unmitigated heads, peening must meet the performance criteria, qualification, and examination requirements stated in MRP–335, Revision 3–A, with the exception that a plant-specific alternative request is not required and NRC condition 5.4 of MRP–335, Revision 3–A does not apply. |
(6) |
Baseline Examinations. In lieu of the requirements for Note 7(c) the baseline volumetric and surface examination for plants with a RPV Head with less than 8 EDY shall be performed by 2.25 reinspection years (RIY) after initial startup not to exceed 8 years. |
(7) |
Sister Plants. Note 10 of ASME BPV Code Case N–729–6 shall not be implemented without prior NRC approval. |
(8) |
Volumetric Leak Path. In lieu of paragraph 3200(b) requirement for a surface examination of the partial penetration weld, a volumetric leak path assessment of the nozzle may be performed in accordance with Note 6 of Table 1 of N–729–6. |
(E) Augmented ISI requirements: Reactor coolant pressure boundary visual inspections 10—(1) All licensees of pressurized water reactors must augment their inservice inspection program by implementing ASME Code Case N–722–1, subject to the conditions specified in paragraphs (g)(6)(ii)(E)(2) through (4) of this section. The inspection requirements of ASME Code Case N–722–1 do not apply to components with pressure retaining welds fabricated with Alloy 600/82/182 materials that have been mitigated by weld overlay or stress improvement. |
|
(2) |
If a visual examination determines that leakage is occurring from a specific item listed in Table 1 of ASME Code Case N–722–1 that is not exempted by the ASME Code, Section XI, IWB–1220(b)(1), additional actions must be performed to characterize the location, orientation, and length of a crack or cracks in Alloy 600 nozzle wrought material and location, orientation, and length of a crack or cracks in Alloy 82/182 butt welds. Alternatively, licensees may replace the Alloy 600/82/182 materials in all the components under the item number of the leaking component. |
(3) |
If the actions in paragraph (g)(6)(ii)(E)(2) of this section determine that a flaw is circumferentially oriented and potentially a result of primary water stress corrosion cracking, licensees must perform non-visual NDE inspections of components that fall under that ASME Code Case N–722–1 item number. The number of components inspected must equal or exceed the number of components found to be leaking under that item number. If circumferential cracking is identified in the sample, non-visual NDE must be performed in the remaining components under that item number. |
(4) |
If ultrasonic examinations of butt welds are used to meet the NDE requirements in paragraphs (g)(6)(ii)(E)(2) or (3) of this section, they must be performed using the appropriate supplement of Section XI, Appendix VIII, of the ASME BPV Code. |
(F) Augmented ISI requirements: Examination requirements for Class 1 piping and nozzle dissimilar-metal butt welds—(1) Implementation. Holders of operating licenses or combined licenses for pressurized-water reactors as of or after June 3, 2020, shall implement the requirements of ASME BPV Code Case N–770–5 instead of ASME BPV Code Case N–770–2, subject to the conditions specified in paragraphs (g)(6)(ii)(F)(2) through (16) of this section, by no later than one year after June 3, 2020. All NRC authorized alternatives from previous versions of paragraph (g)(6)(ii)(F) of this section remain applicable. |
|
(2) |
Categorization. (i) Welds that have been mitigated by the Mechanical Stress Improvement Process (MSIP™) may be categorized as Inspection Items D or E, as appropriate, provided the criteria in Appendix I of the code case have been met. |
|
(ii) In order to be categorized as peened welds, in lieu of inspection category L requirements and examinations, welds must meet the performance criteria, qualification and examination requirements as stated by MRP–335, Revision 3–A, with the exception that no plant-specific alternative is required. |
(iii) Other mitigated welds shall be identified as the appropriate inspection item of the NRC authorized alternative or NRC-approved code case for the mitigation type in Regulatory Guide 1.147. |
(iv) All other butt welds that rely on Alloy 82/182 for structural integrity shall be categorized as Inspection Items A–1, A–2, B–1 or B–2, as appropriate. |
(v) Paragraph -1100(e) of ASME BPV Code Case N–770–5 shall not be used to exempt welds that rely on Alloy 82/182 for structural integrity from any requirement of this section. |
(3) |
[Reserved] |
(4) |
Examination coverage. When implementing Paragraph -2500(a) of ASME BPV Code Case N–770–5, essentially 100 percent of the required volumetric examination coverage shall be obtained, including greater than 90 percent of the volumetric examination coverage for circumferential flaws. Licensees are prohibited from using Paragraphs -2500(c) and -2500(d) of ASME BPV Code Case N–770–5 to meet examination requirements. |
(5) |
Inlay/onlay inspection frequency. All hot-leg operating temperature welds in Inspection Items G, H, J, and K shall be inspected each inspection interval. A 25 percent sample of Inspection Items G, H, J, and K cold-leg operating temperature welds shall be inspected whenever the core barrel is removed (unless it has already been inspected within the past 10 years) or within 20 years, whichever is less. |
(6) |
Reporting requirements. The licensee will promptly notify the NRC regarding any volumetric examination of a mitigated weld that detects growth of existing flaws in the required examination volume that exceed the previous IWB–3600 flaw evaluations, new flaws, or any indication in the weld overlay or excavate and weld repair material characterized as stress corrosion cracking. Additionally, the licensee will submit to the NRC a report summarizing the evaluation, along with inputs, methodologies, assumptions, and causes of the new flaw or flaw growth within 30 days following plant startup. |
(7) |
Defining "t". For Inspection Items G, H, J, and K, when applying the acceptance standards of ASME BPV Code, Section XI, IWB–3514, for planar flaws contained within the inlay or onlay, the thickness "t" in IWB–3514 is the thickness of the inlay or onlay. For planar flaws in the balance of the dissimilar metal weld examination volume, the thickness "t" in IWB–3514 is the combined thickness of the inlay or onlay and the dissimilar metal weld. |
(8) |
Optimized weld overlay examination. Initial inservice examination of Inspection Item C–2 welds shall be performed between the third refueling outage and no later than 10 years after application of the overlay. |
(9) |
Deferrals. (i) The initial inservice volumetric examination of optimized weld overlays, Inspection Item C–2, shall not be deferred. |
|
(ii) Volumetric inspection of peened dissimilar metal butt welds shall not be deferred. |
(iii) For Inspection Item M–2, N–1 and N–2 welds, the second required inservice volumetric examination shall not be deferred. |
(10) |
Examination technique. Note 14(b) of Table 1 and Note (b) of Figure 5(a) of ASME BPV Code Case N–770–5 may only be implemented if the requirements of Note 14(a) of Table 1 of ASME BPV Code Case N–770–5 cannot be met. |
(11) |
[Reserved] |
(12) |
Stress improvement inspection coverage. Under Paragraph I.5.1, for cast stainless steel items, the required examination volume shall be examined by Appendix VIII procedures to the maximum extent practical including 100 percent of the susceptible material volume. |
(13) |
Encoded ultrasonic examination. Ultrasonic examinations of non-mitigated or cracked mitigated dissimilar metal butt welds in the reactor coolant pressure boundary must be performed in accordance with the requirements of Table 1 for Inspection Item A–1, A–2, B–1, B–2, E, F–2, J, K, N–1, N–2 and O. Essentially 100 percent of the required inspection volume shall be examined using an encoded method. |
(14) |
Excavate and weld repair cold leg. For cold leg temperature M–2, N–1 and N–2 welds, initial volumetric inspection after application of an excavate and weld repair (EWR) shall be performed during the second refueling outage. |
(15) |
Cracked excavate and weld repair. In lieu of the examination requirements for cracked welds with 360 excavate and weld repairs, Inspection Item N–1 of Table 1, welds shall be examined during the first or second refueling outage following EWR. Examination volumes that show no indication of crack growth or new cracking shall be examined once each inspection interval thereafter. |
(16) |
Partial arc excavate and weld repair. Inspection Item O cannot be used without NRC review and approval. |
(h) Protection and safety systems. Protection systems of nuclear power reactors of all types must meet the requirements specified in this paragraph. Each combined license for a utilization facility is subject to the following conditions. |
|
(1) [Reserved] |
|
(2) Protection systems. For nuclear power plants with construction permits issued after January 1, 1971, but before May 13, 1999, protection systems must meet the requirements in IEEE Std 279–1968, "Proposed IEEE Criteria for Nuclear Power Plant Protection Systems," or the requirements in IEEE Std 279–1971, "Criteria for Protection Systems for Nuclear Power Generating Stations," or the requirements in IEEE Std 603–1991, "Criteria for Safety Systems for Nuclear Power Generating Stations, and the correction sheet dated January 30, 1995. For nuclear power plants with construction permits issued before January 1, 1971, protection systems must be consistent with their licensing basis or may meet the requirements of IEEE Std. 603–1991 and the correction sheet dated January 30, 1995. |
|
(3) Safety systems. Applications filed on or after May 13, 1999, for construction permits and operating licenses under this part, and for design approvals, design certifications, and combined licenses under part 52 of this chapter, must meet the requirements for safety systems in IEEE Std. 603–1991 and the correction sheet dated January 30, 1995. |
(i)–(x) [Reserved] |
(y) Definitions. As used in this section: |
|
Code of record interval means the period of time between the code of record updates required by paragraphs (f)(4) and (g)(4) of this section for the inservice examination and test programs and inservice inspection programs, respectively. |
|
|
(1) For licensees with codes of record prior to ASME BPV Code, Section XI, 2017 Edition, and OM Code, 2017 Edition, as incorporated by reference in paragraph (a) of this section, the code of record interval is the same as the inservice inspection interval or inservice examination and test interval. |
|
|
(2) For licensees with codes of record of ASME BPV Code, Section XI, 2017 Edition and OM Code, 2017 Edition, or later, as incorporated by reference in paragraph (a) of this section, the code of record interval is two consecutive inservice inspection or inservice examination and test intervals. |
|
Inservice examination and test (IST) code of record means the specific edition(s) and addenda of the ASME OM Code required by (f)(4)(i) or (ii) of this section, subject to the conditions listed in paragraph (b) of this section, and applicable NRC endorsed code cases, for inservice test to verify operational readiness of pumps, valves, and dynamic restraints, whose function is required for safety. |
|
Inservice examination and test (IST) interval means the inservice examination and test interval described by the licensee’s code of record (paragraph ISTA–3120 of the ASME OM Code, 2001 Edition through 2009 Edition, or paragraph ISTA–3120 of the ASME OM Code, 2012 Edition and later). |
|
Inservice examination and testing (IST) program means the requirements for preservice and inservice examination and testing of pumps, valves, and dynamic restraints within the scope of this section to assess their operational readiness in nuclear power plants, including but not limited to: |
|
|
(1) The requirements specified in the ASME OM Code, as incorporated by reference in this section, such as for test or examination, responsibilities, methods, intervals, parameters to be measured and evaluated, criteria for evaluating the results, corrective action, personnel qualification, and recordkeeping. |
|
|
(2) Relief requested under paragraph (f)(5)(iii) of this section and granted under paragraph (f)(6)(i) of this section. |
|
|
(3) Augmented IST requirements as applied by the Commission under paragraph (f)(6)(ii) of this section. |
|
|
(4) Alternatives authorized under paragraph (z) of this section. |
|
Inservice inspection (ISI) code of record means the specific edition(s) and addenda of the ASME BPV Code, Section XI, required by paragraphs (g)(4)(i) or (ii) of this section, subject to the conditions listed in paragraph (b) of this section, and applicable NRC endorsed code cases, for the inservice examination of components and system pressure tests. |
|
Inservice inspection (ISI) interval means the inservice inspection interval described in Article IWA–2432 of ASME BPV Code, Section XI, 1989 Edition with 1991 Addenda through the 2008 Addenda, or Article IWA–2431 of ASME BPV Code, Section XI, 2009 Addenda and later. |
|
Inservice inspection (ISI) program means the set of all administrative and technical requirements pertaining to periodic examination of nuclear components, as specified in ASME BPV Code, Section XI, and this section, including but not limited to: |
|
|
(1) The requirements of IWA–2400 of ASME BPV Code, Section XI, 1991 Addenda and later. |
|
|
(2) Relief requested under paragraph (g)(5)(iii) of this section and granted under paragraph (g)(6)(i) of this section. |
|
|
(3) The augmented inspection program described in paragraph (g)(6)(ii) of this section. |
|
|
(4) Alternatives authorized under paragraph (z) of this section. |
(z) Alternatives to codes and standards requirements. Alternatives to the requirements of paragraphs (b) through (h) of this section or portions thereof may be used when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The applicant or licensee must demonstrate that: |
|
(1) Acceptable level of quality and safety. The proposed alternative would provide an acceptable level of quality and safety; or |
|
(2) Hardship without a compensating increase in quality and safety. Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Footnotes to § 50.55a: |
1 USAS and ASME Code addenda issued prior to the winter 1977 Addenda are considered to be "in effect" or "effective" 6 months after their date of issuance and after they are incorporated by reference in paragraph (a) of this section. Addenda to the ASME Code issued after the summer 1977 Addenda are considered to be "in effect" or "effective" after the date of publication of the addenda and after they are incorporated by reference in paragraph (a) of this section.
2–3 [Reserved].
4 For ASME Code editions and addenda issued prior to the winter 1977 Addenda, the Code edition and addenda applicable to the component is governed by the order or contract date for the component, not the contract date for the nuclear energy system. For the winter 1977 Addenda and subsequent editions and addenda the method for determining the applicable Code editions and addenda is contained in Paragraph NCA 1140 of Section III of the ASME Code.
5–6 [Reserved].
7 Guidance for quality group classifications of components that are to be included in the safety analysis reports pursuant to § 50.34(a) and § 50.34(b) may be found in Regulatory Guide 1.26, "Quality Group Classifications and Standards for Water-, Steam-, and Radiological-Waste-Containing Components of Nuclear Power Plants," and in Section 3.2.2 of NUREG–0800, "Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants."
8–9 [Reserved].
10 For inspections to be conducted once per interval, the inspections must be performed in accordance with the schedule in Section XI, paragraph IWB–2400, except for plants with inservice inspection programs based on a Section XI edition or addenda prior to the 1994 Addenda. For plants with inservice inspection programs based on a Section XI edition or addenda prior to the 1994 Addenda, the inspection must be performed in accordance with the schedule in Section XI, paragraph IWB–2400, of the 1994 Addenda.
[36 FR 11424, Jun. 12, 1971; 72 FR 49499, Aug. 28, 2007; 72 FR 71754, Dec. 19, 2007; 73 FR 5722, Jan. 31, 2008; 73 FR 52748, Sept. 10, 2008; 74 FR 38893, Aug. 5, 2009; 75 FR 61335, Oct. 5, 2010; 75 FR 76923, Dec. 10, 2010; 76 FR 36269, Jun. 21, 2011; 77 FR 3074, Jan. 23, 2012; 79 FR 65798, Nov. 5, 2014; 79 FR 66603, Nov. 10, 2014; 79 FR 73462, Dec. 11, 2014; 80 FR 45843, Aug. 3, 2015; 82 FR 32977, Jul. 18, 2017; 82 FR 52825, Nov. 15, 2017; 83 FR 2526, Jan. 18, 2018; 83 FR 2354, Jan. 17, 2018; 85 FR 14756, Mar. 16, 2020; 85 FR 26576, Jun. 3, 2020; 85 FR 34088, Jun. 3, 2020; 85 FR 65662, Oct. 16, 2020; 84 FR 65644, Nov. 29, 2019; 87 FR 11949, March 3, 2022; 87 FR 65148, Oct. 27, 2022; 88 FR 57873, Aug. 24, 2023; 89 FR 58055, Jul. 17, 2024; 89 FR 60795, Jul. 29, 2024]
EDITORIAL NOTE: For Federal Register citations affecting § 50.55a, see the List of CFR Sections Affected.
§ 50.56 Conversion of construction permit to license; or amendment of license.
Upon completion of the construction or alteration of a facility, in compliance with the terms and conditions of the construction permit and subject to any necessary testing of the facility for health or safety purposes, the Commission will, in the absence of good cause shown to the contrary, issue a license of the class for which the construction permit was issued or an appropriate amendment of the license, as the case may be.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 11461, July 17, 1970; 75 FR 73944, Nov. 30, 2010]
§ 50.57 Issuance of operating license.1
(a) Pursuant to § 50.56, an operating license may be issued by the Commission, up to the full term authorized by § 50.51,
upon finding that:
(1) Construction of the facility has been substantially completed, in conformity with the construction permit and the application as amended, the provisions of the Act, and the rules and regulations of the Commission; and
(2) The facility will operate in conformity with the application as amended, the provisions of the Act, and the rules and regulations of the Commission; and
(3) There is reasonable assurance (i) that the activities authorized by the operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the regulations in this chapter; and
(4) The applicant is technically and financially qualified to engage in the activities authorized by the operating license in accordance with the regulations in this chapter. However, no finding of financial qualification is necessary for an electric utility applicant for an operating license for a utilization facility of the type described in § 50.21(b) or § 50.22.
(5) The applicable provisions of Part 140 of this chapter have been satisfied; and
(6) The issuance of the license will not be inimical to the common defense and security or to the health and safety of the public.
(b) Each operating license will include appropriate provisions with respect to any uncompleted items of construction and such limitations or conditions as are required to assure that operation during the period of the completion of such items will not endanger public health and safety.
(c) An applicant may, in a case where a hearing is held in connection with a pending proceeding under this section make a motion in writing, under this paragraph (c), for an operating license authorizing low-power testing (operation at not more than 1 percent of full power for the purpose of testing the facility), and further operations short of full power operation. Action on such a motion by the presiding officer shall be taken with due regard to the rights of the parties to the proceedings, including the right of any party to be heard to the extent that his contentions are relevant to the activity to be authorized. Before taking any action on such a motion that any party opposes, the presiding officer shall make findings on the matters specified in paragraph (a) of this section as to which there is a controversy, in the form of an initial decision with respect to the contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on all other matters specified in paragraph (a) of this section. If no party opposes the motion, the presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear Reactor Regulation to make appropriate findings on the matters specified in paragraph (a) of this section and to issue a license for the requested operation.
[35 FR 5318, Mar. 31, 1970, as amended at 35 FR 6644, Apr. 25, 1970; 37 FR 11873, June 15, 1972; 37 FR 15142, July 28, 1972; 49 FR 35753, Sept. 12, 1984; 51 FR 7765, Mar. 6, 1986; 69 FR 2275, Jan. 14, 2004]
1 The Commission may issue a provisional operating license pursuant to the regulations in this part in effect on March 30, 1970, for any facility for which a notice of hearing on an application for a provisional operating license or a notice of proposed issuance of a provisional operating license has been published on or before that date.
§ 50.58 Hearings and report of the Advisory Committee on Reactor Safeguards.
(a) Each application for a construction permit or an operating license for a facility which is of a type described in § 50.21(b)
or § 50.22, or for a testing facility, shall be referred to the Advisory Committee on Reactor Safeguards for a review and
report. An application for an amendment to such a construction permit or operating license may be referred to the Advisory
Committee on Reactor Safeguards for review and report. Any report shall be made part of the record of the application and
available to the public, except to the extent that security classification prevents disclosure.
(b)(1) The Commission will hold a hearing after at least 30-days' notice and publication once in the FEDERAL REGISTER on
each application for a construction permit for a production or utilization facility which is of a type described in § 50.21(b) or
§ 50.22, or for a testing facility.
(2) When a construction permit has been issued for such a facility following the holding of a public hearing, and an
application is made for an operating license or for an amendment to a construction permit or operating license, the
Commission may hold a hearing after at least 30-days' notice and publication once in the FEDERAL REGISTER, or, in the
absence of a request therefor by any person whose interest may be affected, may issue an operating license or an
amendment to a construction permit or operating license without a hearing, upon 30-days' notice and publication once in
the FEDERAL REGISTER of its intent to do so.
(3) If the Commission finds, in an emergency situation, as defined in § 50.91, that no significant hazards consideration is
presented by an application for an amendment to an operating license, it may dispense with public notice and comment and
may issue the amendment. If the Commission finds that exigent circumstances exist, as described in § 50.91, it may reduce
the period provided for public notice and comment.
(4) Both in an emergency situation and in the case of exigent circumstances, the Commission will provide 30 days notice of
opportunity for a hearing, though this notice may be published after issuance of the amendment if the Commission
determines that no significant hazards consideration is involved.
(5) The Commission will use the standards in § 50.92 to determine whether a significant hazards consideration is presented
by an amendment to an operating license for a facility of the type described in § 50.21(b) or § 50.22, or which is a testing
facility, and may make the amendment immediately effective, notwithstanding the pendency before it of a request for a
hearing from any person, in advance of the holding and completion of any required hearing, where it has determined that no
significant hazards consideration is involved.
(6) No petition or other request for review of or hearing on the staff's significant hazards consideration determination will
be entertained by the Commission. The staff's determination is final, subject only to the Commission's discretion, on its
own initiative, to review the determination.
[27 FR 12186, Dec. 8, 1962, as amended at 35 FR 11461, July 17, 1970; 39 FR 10555, Mar. 21, 1974; 51 FR 7765, Mar. 6,
1986]
§ 50.59 Changes, tests and experiments.
(a) Definitions for the purposes of this section:
(1) Change means a modification or addition to, or removal from, the
facility or procedures that affects a design function, method of
performing or controlling the function, or an evaluation that
demonstrates that intended functions will be accomplished.
(2) Departure from a method of evaluation described in the FSAR (as
updated) used in establishing the design bases or in the safety analyses
means:
(i) Changing any of the elements of the method described in the FSAR
(as updated) unless the results of the analysis are conservative or
essentially the same; or
(ii) Changing from a method described in the FSAR to another method
unless that method has been approved by NRC for the intended
application.
(3) Facility as described in the final safety analysis report (as
updated) means:
(i) The structures, systems, and components (SSC) that are described
in the final safety analysis report (FSAR) (as updated),
(ii) The design and performance requirements for such SSCs described
in the FSAR (as updated), and
(iii) The evaluations or methods of evaluation included in the FSAR
(as updated) for such SSCs which demonstrate that their intended
function(s) will be accomplished.
(4) Final Safety Analysis Report (as updated) means the Final Safety
Analysis Report (or Final Hazards Summary Report) submitted in
accordance with Sec. 50.34, as amended and supplemented, and as updated
per the requirements of Sec. 50.71(e) or Sec. 50.71(f), as applicable.
(5) Procedures as described in the final safety analysis report (as
updated) means those procedures that contain information described in
the FSAR (as updated) such as how structures, systems, and components
are operated and controlled (including assumed operator actions and
response times).
(6) Tests or experiments not described in the final safety analysis
report (as updated) means any activity where any structure, system, or
component is utilized or controlled in a manner which is either:
(i) Outside the reference bounds of the design bases as described in
the final safety analysis report (as updated) or
(ii) Inconsistent with the analyses or descriptions in the final
safety analysis report (as updated).
(b) This section applies to each holder
of an operating license issued under this
part or a combined license issued under
part 52 of this chapter, including the
holder of a license authorizing operation
of a nuclear power reactor that has
submitted the certification of permanent
cessation of operations required under § 50.82(a)(1) or § 50.110 or a reactor
licensee whose license has been
amended to allow possession of nuclear
fuel but not operation of the facility.
(c)(1) A licensee may make changes in the facility as described in
the final safety analysis report (as updated), make changes in the
procedures as described in the final safety analysis report (as
updated), and conduct tests or experiments not described in the final
safety analysis report (as updated) without obtaining a license
amendment pursuant to Sec. 50.90 only if:
(i) An amendment to the technical specifications incorporated in the
license is not required, and
(ii) The change, test, or experiment does not meet any of the
criteria in paragraph (c)(2) of this section.
(2) A licensee shall obtain a license amendment pursuant to
Sec. 50.90 prior to implementing a proposed change, test, or experiment
if the change, test, or experiment would:
(i) Result in more than a minimal increase in the frequency of
occurrence of an accident previously evaluated in the final safety
analysis report (as updated);
(ii) Result in more than a minimal increase in the likelihood of
occurrence of a malfunction of a structure, system, or component (SSC)
important to safety previously evaluated in the final safety analysis
report (as updated);
(iii) Result in more than a minimal increase in the consequences of
an accident previously evaluated in the final safety analysis report (as
updated);
(iv) Result in more than a minimal increase in the consequences of a
malfunction of an SSC important to safety previously evaluated in the
final safety analysis report (as updated);
(v) Create a possibility for an accident of a different type than
any previously evaluated in the final safety analysis report (as
updated);
(vi) Create a possibility for a malfunction of an SSC important to
safety with a different result than any previously evaluated in the
final safety analysis report (as updated);
(vii) Result in a design basis limit for a fission product barrier
as described in the FSAR (as updated) being exceeded or altered; or
(viii) Result in a departure from a method of evaluation described
in the FSAR (as updated) used in establishing the design bases or in the
safety analyses.
(3) In implementing this paragraph, the FSAR (as updated) is
considered to include FSAR changes resulting from evaluations performed
pursuant to this section and analyses performed pursuant to Sec. 50.90
since submittal of the last update of the final safety analysis report
pursuant to Sec. 50.71 of this part.
(4) The provisions in this section do not apply to changes to the
facility or procedures when the applicable regulations establish more
specific criteria for accomplishing such changes.
(d)(1) The licensee shall maintain records of changes in the
facility, of changes in procedures, and of tests and experiments made
pursuant to paragraph (c) of this section. These records must include a
written evaluation which provides the bases for the determination that
the change, test, or experiment does not require a license amendment
pursuant to paragraph (c)(2) of this section.
(2) The licensee shall submit, as
specified in § 50.4 or § 52.3 of this
chapter, as applicable, a report
containing a brief description of any
changes, tests, and experiments,
including a summary of the evaluation
of each. A report must be submitted at
intervals not to exceed 24 months. For
combined licenses, the report must be
submitted at intervals not to exceed 6
months during the period from the date
of application for a combined license to
the date the Commission makes its
findings under 10 CFR 52.103(g).
(3) The records of changes in the
facility must be maintained until the
termination of an operating license
issued under this part, a combined
license issued under part 52 of this chapter, or the termination of a license
issued under 10 CFR part 54, whichever
is later. Records of changes in
procedures and records of tests and
experiments must be maintained for a
period of 5 years.
[64 FR 53613, Oct. 4, 1999, as amended at 66 FR 64738, Dec. 14, 2001; 72 FR 49500, Aug. 28, 2007; 89 FR 57719, Jul. 16, 2024]
§ 50.60 Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors
for normal operation.
(a) Except as provided in paragraph (b) of this section, all light-water nuclear power reactors, other than reactor facilities
for which the certifications required under § 50.82(a)(1) have been submitted, must meet the fracture toughness and material
surveillance program requirements for the reactor coolant pressure boundary set forth in appendices G and H to this part.
(b) Proposed alternatives to the described requirements in Appendices G and H of this part or portions thereof may be used
when an exemption is granted by the Commission under § 50.12.
[48 FR 24009, May 27, 1983, as amended at 50 FR 50777, Dec. 12, 1985; 61 FR 39300, July 29, 1996]
§ 50.61 Fracture toughness requirements for protection against pressurized thermal shock events.
(a) Definitions. For the purposes of this section:
(1) ASME Code means the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division I, "Rules for the Construction of Nuclear Power Plant Components," edition and addenda and any limitations and modifications thereof as specified in § 50.55a.
(2) Pressurized Thermal Shock Event means an event or transient in pressurized water reactors (PWRs) causing severe overcooling (thermal shock) concurrent with or followed by significant pressure in the reactor vessel.
(3) Reactor Vessel Beltline means the region of the reactor vessel (shell material including welds, heat affected zones and plates or forgings) that directly surrounds the effective height of the active core and adjacent regions of the reactor vessel that are predicted to experience sufficient neutron radiation damage to be considered in the selection of the most limiting material with regard to radiation damage.
(4) RTNDT means the reference temperature for a reactor vessel material, under any conditions. For the reactor vessel beltline materials, RTNDT must account for the effects of neutron radiation.
(5) RTNDT(U) means the reference temperature for a reactor vessel material in the pre-service or unirradiated condition, evaluated according to the procedures in the ASME Code, Paragraph NB–2331 or other methods approved by the Director, Office of Nuclear Reactor Regulation.
(6) EOL Fluence means the best-estimate neutron fluence projected for a specific vessel beltline material at the clad-base-metal interface on the inside surface of the vessel at the location where the material receives the highest fluence on the expiration date of the operating license.
(7) RTPTS means the reference temperature, RTNDT, evaluated for the EOL Fluence for each of the vessel beltline materials, using the procedures of paragraph (c) of this section.
(8) PTS Screening Criterion means the value of RTPTS for the vessel beltline material above which the plant cannot continue to operate without justification.
(b) Requirements. (1) For each pressurized water nuclear power reactor for which an operating license has been issued under this part or a combined license issued under Part 52 of this chapter, other than a nuclear power reactor facility for which the certification required under § 50.82(a)(1) has been submitted, the licensee shall have projected values of RTPTS or RTMAX–X, accepted by the NRC, for each reactor vessel beltline material. For pressurized water nuclear power reactors for which a construction permit was issued under this part before February 3, 2010 and whose reactor vessel was designed and fabricated to the 1998 Edition or earlier of the ASME Code, the projected values must be in accordance with this section or § 50.61a. For pressurized water nuclear power reactors for which a construction permit is issued under this part after February 3, 2010 and whose reactor vessel is designed and fabricated to an ASME Code after the 1998 Edition, or for which a combined license is issued under Part 52, the projected values must be in accordance with this section. When determining compliance with this section, the assessment of RTPTS must use the calculation procedures described in paragraph (c)(1) and perform the evaluations described in paragraphs (c)(2) and (c)(3) of this section. The assessment must specify the bases for the projected value of RTPTS for each vessel beltline material, including the assumptions regarding core loading patterns, and must specify the copper and nickel contents and the fluence value used in the calculation for each beltline material. This assessment must be updated whenever there is a significant 2 change in projected values of RTPTS, or upon request for a change in the expiration date for operation of the facility.
(2) The pressurized thermal shock (PTS) screening criterion is 270 °F for plates, forgings, and axial weld materials, and 300 °F for circumferential weld materials. For the purpose of comparison with this criterion, the value of RTPTS for the reactor vessel must be evaluated according to the procedures of paragraph (c) of this section, for each weld and plate, or forging, in the reactor vessel beltline. RTPTS must be determined for each vessel beltline material using the EOL fluence for that material.
(3) For each pressurized water nuclear power reactor for which the value of RTPTS for any material in the beltline is projected to exceed the PTS screening criterion using the EOL fluence, the licensee shall implement those flux reduction programs that are reasonably practicable to avoid exceeding the PTS screening criterion set forth in paragraph (b)(2) of this section. The schedule for implementation of flux reduction measures may take into account the schedule for submittal and anticipated approval by the Director, Office of Nuclear Reactor Regulation, of detailed plant-specific analyses, submitted to
demonstrate acceptable risk with RTPTS above the screening limit due to plant modifications, new information or new analysis techniques.
(4) For each pressurized water nuclear power reactor for which the analysis required by paragraph (b)(3) of this section indicates that no reasonably practicable flux reduction program will prevent RTPTS from exceeding the PTS screening criterion using the EOL fluence, the licensee shall submit a safety analysis to determine what, if any, modifications to equipment, systems, and operation are necessary to prevent potential failure of the reactor vessel as a result of postulated PTS events if continued operation beyond the screening criterion is allowed. In the analysis, the licensee may determine the properties of the reactor vessel materials based on available information, research results, and plant surveillance data, and may use probabilistic fracture mechanics techniques. This analysis must be submitted at least three years before RTPTS is projected to exceed the PTS screening criterion.
(5) After consideration of the licensee's analyses, including effects of proposed corrective actions, if any, submitted in accordance with paragraphs (b)(3) and (b)(4) of this section, the Director, Office of Nuclear Reactor Regulation, may, on a case-by-case basis, approve operation of the facility with RTPTS in excess of the PTS screening criterion. The Director, Office of Nuclear Reactor Regulation, will consider factors significantly affecting the potential for failure of the reactor vessel in reaching a decision.
(6) If the Director, Office of Nuclear Reactor Regulation, concludes, pursuant to paragraph (b)(5) of this section, that operation of the facility with RTPTS in excess of the PTS screening criterion cannot be approved on the basis of the licensee's analyses submitted in accordance with paragraphs (b)(3) and (b)(4) of this section, the licensee shall request and receive approval by the Director, Office of Nuclear Reactor Regulation, prior to any operation beyond the criterion. The
request must be based upon modifications to equipment, systems, and operation of the facility in addition to those previously proposed in the submitted analyses that would reduce the potential for failure of the reactor vessel due to PTS events, or upon further analyses based upon new information or improved methodology.
(7) If the limiting RTPTS value of the plant is projected to exceed the screening criteria in paragraph (b)(2), or the criteria in paragraphs (b)(3) through (b)(6) of this section cannot be satisfied, the reactor vessel beltline may be given a thermal annealing treatment to recover the fracture toughness of the material, subject to the requirements of § 50.66. The reactor vessel may continue to be operated only for that service period within which the predicted fracture toughness of the vessel
beltline materials satisfy the requirements of paragraphs (b)(2) through (b)(6) of this section, with RTPTS accounting for the effects of annealing and subsequent irradiation.
(c) Calculation of RTPTS. RTPTS must be calculated for each vessel beltline material using a fluence value, f, which is the EOL fluence for the material. RTPTS must be evaluated using the same procedures used to calculate RTNDT, as indicated in
paragraph (c)(1) of this section, and as provided in paragraphs (c)(2) and (c)(3) of this section.
(1) Equation 1 must be used to calculate values of RTNDT for each weld and plate, or forging, in the reactor vessel beltline.
Equation 1: RTNDT = RTNDT(U) + M + ΔRTNDT
(i) If a measured value of RTNDT(U) is not available, a generic mean value for the class3 of material may be used if there are sufficient test results to establish a mean and a standard deviation for the class.
(ii) For generic values of weld metal, the following generic mean values must be used unless justification for different values is provided: 0 °F for welds made with Linde 80 flux, and –56 °F for welds made with Linde 0091, 1092 and 124 and ARCOS B–5 weld fluxes.
(iii) M means the margin to be added to account for uncertainties in the values of RTNDT(U), copper and nickel contents, fluence and the calculational procedures. M is evaluated from Equation 2.
(A) In Equation 2, σU is the standard deviation for RTNDT(U). If a measured value of RTNDT(U) is used, then σU is determined from the precision of the test method. If a measured value of RTNDT(U) is not available and a generic mean value for that class of materials is used, then σU is the standard deviation obtained from the set of data used to establish the mean. If a generic mean value given in paragraph (c)(1)(i)(B) of this section for welds is used, then σU is 17 °F.
(B) In Equation 2, σΔ is the standard deviation for ΔRTNDT. The value of σΔ to be used is 28 °F for welds and 17 °F for base metal; the value of σΔ need not exceed one-half of ΔRTNDT.
(iv) ΔRTNDT is the mean value of the transition temperature shift, or change in RTNDT, due to irradiation, and must be calculated using Equation 3.
Equation 3: ΔRTNDT=(CF)f(0.28–0.10 log f)
(A) CF (°F) is the chemistry factor, which is a function of copper and nickel content. CF is given in Table 1 for welds and in Table 2 for base metal (plates and forgings). Linear interpolation is permitted. In Tables 1 and 2, "Wt-% copper" and "Wt-% nickel" are the best-estimate values for the material, which will normally be the mean of the measured values for a plate or forging. For a weld, the best estimate values will normally be the mean of the measured values for a weld deposit made using the same weld wire heat number as the critical vessel weld. If these values are not available, the upper limiting values given in the material specifications to which the vessel material was fabricated may be used. If not available, conservative estimates (mean plus one standard deviation) based on generic data4 may be used if justification is provided. If none of these alternatives are available, 0.35% copper and 1.0% nickel must be assumed.
(B) ƒ is the best estimate neutron fluence, in units of 1019 n/cm2 (E greater than 1 MeV), at the clad-base-metal interface on the inside surface of the vessel at the location where the material in question receives the highest fluence for the period of service in question. As specified in this paragraph, the EOL fluence for the vessel beltline material is used in calculating
KRTPTS.
(v) Equation 4 must be used for determining RTPTS using equation 3 with EOL fluence values for determining ΔRTPTS.
Equation 4: RTPTS=RTNDT(U)+M+ΔRTPTS
(2) To verify that RTNDT for each vessel beltline material is a bounding value for the specific reactor vessel, licensees shall consider plant-specific information that could affect the level of embrittlement. This information includes but is not limited to the reactor vessel operating temperature and any related surveillance program5 results.
(i) Results from the plant-specific surveillance program must be integrated into the RTNDT estimate if the plant-specific surveillance data has been deemed credible as judged by the following criteria:
(A) The materials in the surveillance capsules must be those which are the controlling materials with regard to radiation embrittlement.
(B) Scatter in the plots of Charpy energy versus temperature for the irradiated and unirradiated conditions must be small enough to permit the determination of the 30-foot-pound temperature unambiguously.
(C) Where there are two or more sets of surveillance data from one reactor, the scatter of ΔRTNDT values must be less than 28 °F for welds and 17 °F for base metal. Even if the range in the capsule fluences is large (two or more orders of magnitude), the scatter may not exceed twice those values.
(D) The irradiation temperature of the Charpy specimens in the capsule must equal the vessel wall temperature at the cladding/base metal interface within ±25 °F.
(E) The surveillance data for the correlation monitor material in the capsule, if present, must fall within the scatter band of the data base for the material.
(ii)(A) Surveillance data deemed credible according to the criteria of paragraph (c)(2)(i) of this section must be used to determine a material-specific value of CF for use in Equation 3. A material-specific value of CF is determined from Equation 5.
Equation 5: |
|
(B) In Equation 5, "n" is the number of surveillance data points, "Ai" is the measured value of ΔRTNDT
and "fi" is the fluence for each surveillance data point. If there is clear evidence that the copper and nickel content of the surveillance weld differs from the vessel weld, i.e., differs from the average for the weld wire heat number associated with the vessel weld and the surveillance weld, the measured values of ΔRTNDT must be adjusted for differences in copper and nickel content by multiplying them by the ratio of the chemistry factor for the vessel material to that for the surveillance weld.
(iii) For cases in which the results from a credible plant-specific surveillance program are used, the value of σΔ to be used is 14 °F for welds and 8.5 °F for base metal; the value of σΔ need not exceed one-half of ΔRTNDT.
(iv) The use of results from the plant-specific surveillance program may result in an RTNDT that is higher or lower than those determined in paragraph (c)(1).
(3) Any information that is believed to improve the accuracy of the RTPTS value significantly must be reported to the Director, Office of Nuclear Reactor Regulation. Any value of RTPTS that has been modified using the procedures of paragraph (c)(2) of this section is subject to the approval of the Director, Office of Nuclear Reactor Regulation, when used as provided in this section.
Table 1. Chemistry Factor for Weld Metals, °F
Copper, wt-% |
Nickel, wt-% |
0.00 |
0.20 |
0.40 |
0.60 |
0.80 |
1.00 |
1.20 |
0.00 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.01 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.02 |
21 |
26 |
27 |
27 |
27 |
27 |
27 |
0.03 |
22 |
35 |
41 |
41 |
41 |
41 |
41 |
0.04 |
24 |
43 |
54 |
54 |
54 |
54 |
54 |
0.05 |
26 |
49 |
67 |
68 |
68 |
68 |
68 |
0.06 |
29 |
52 |
77 |
82 |
82 |
82 |
82 |
0.07 |
32 |
55 |
85 |
95 |
95 |
95 |
95 |
0.08 |
36 |
58 |
90 |
106 |
108 |
108 |
108 |
0.09 |
40 |
61 |
94 |
115 |
122 |
122 |
122 |
0.10 |
44 |
65 |
97 |
122 |
133 |
135 |
135 |
0.11 |
49 |
68 |
101 |
130 |
144 |
148 |
148 |
0.12 |
52 |
72 |
103 |
135 |
153 |
161 |
161 |
0.13 |
58 |
76 |
106 |
139 |
162 |
172 |
176 |
0.14 |
61 |
79 |
109 |
142 |
168 |
182 |
188 |
0.15 |
66 |
84 |
112 |
146 |
175 |
191 |
200 |
0.16 |
70 |
88 |
115 |
149 |
178 |
199 |
211 |
0.17 |
75 |
92 |
119 |
151 |
184 |
207 |
221 |
0.18 |
79 |
95 |
122 |
154 |
187 |
214 |
230 |
0.19 |
83 |
100 |
126 |
157 |
191 |
220 |
238 |
0.20 |
88 |
104 |
129 |
160 |
194 |
223 |
245 |
0.21 |
92 |
108 |
133 |
164 |
197 |
229 |
252 |
0.22 |
97 |
112 |
137 |
167 |
200 |
232 |
257 |
0.23 |
101 |
117 |
140 |
169 |
203 |
236 |
263 |
0.24 |
105 |
121 |
144 |
173 |
206 |
239 |
268 |
0.25 |
110 |
126 |
148 |
176 |
209 |
243 |
272 |
0.26 |
113 |
130 |
151 |
180 |
212 |
246 |
276 |
0.27 |
119 |
134 |
155 |
184 |
216 |
249 |
280 |
0.28 |
122 |
138 |
160 |
187 |
218 |
251 |
284 |
0.29 |
128 |
142 |
164 |
191 |
222 |
254 |
287 |
0.30 |
131 |
146 |
167 |
194 |
225 |
257 |
290 |
0.31 |
136 |
151 |
172 |
198 |
228 |
260 |
293 |
0.32 |
140 |
155 |
175 |
202 |
231 |
263 |
296 |
0.33 |
144 |
160 |
180 |
205 |
234 |
266 |
299 |
0.34 |
149 |
164 |
184 |
209 |
238 |
269 |
302 |
0.35 |
153 |
168 |
187 |
212 |
241 |
272 |
305 |
0.36 |
158 |
172 |
191 |
216 |
245 |
275 |
308 |
0.37 |
162 |
177 |
196 |
220 |
248 |
278 |
311 |
0.38 |
166 |
182 |
200 |
223 |
250 |
281 |
314 |
0.39 |
171 |
185 |
203 |
227 |
254 |
285 |
317 |
0.40 |
175 |
189 |
207 |
231 |
257 |
288 |
320 |
Table 2. Chemistry Factor for Base Metals, °F
Copper, wt-% |
Nickel, wt-% |
0.00 |
0.20 |
0.40 |
0.60 |
0.80 |
1.00 |
1.20 |
0.00 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.01 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.02 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.03 |
20 |
20 |
20 |
20 |
20 |
20 |
20 |
0.04 |
22 |
26 |
26 |
26 |
26 |
26 |
26 |
0.05 |
25 |
31 |
31 |
31 |
31 |
31 |
31 |
0.06 |
28 |
37 |
37 |
37 |
37 |
37 |
37 |
0.07 |
31 |
43 |
44 |
44 |
44 |
44 |
44 |
0.08 |
34 |
48 |
51 |
51 |
51 |
51 |
51 |
0.09 |
37 |
53 |
58 |
58 |
58 |
58 |
58 |
0.10 |
41 |
58 |
65 |
65 |
67 |
67 |
67 |
0.11 |
45 |
62 |
72 |
74 |
77 |
77 |
77 |
0.12 |
49 |
67 |
79 |
83 |
86 |
86 |
86 |
0.13 |
53 |
71 |
85 |
91 |
96 |
96 |
96 |
0.14 |
57 |
75 |
91 |
100 |
105 |
106 |
106 |
0.15 |
61 |
80 |
99 |
110 |
115 |
117 |
117 |
0.16 |
65 |
84 |
104 |
118 |
123 |
125 |
125 |
0.17 |
69 |
88 |
110 |
127 |
132 |
135 |
135 |
0.18 |
73 |
92 |
115 |
134 |
141 |
144 |
144 |
0.19 |
78 |
97 |
120 |
142 |
150 |
154 |
154 |
0.20 |
82 |
102 |
125 |
149 |
159 |
164 |
165 |
0.21 |
86 |
107 |
129 |
155 |
167 |
172 |
174 |
0.22 |
91 |
112 |
134 |
161 |
176 |
181 |
184 |
0.23 |
95 |
117 |
138 |
167 |
184 |
190 |
194 |
0.24 |
100 |
121 |
143 |
172 |
191 |
199 |
204 |
0.25 |
104 |
126 |
148 |
176 |
199 |
208 |
214 |
0.26 |
109 |
130 |
151 |
180 |
205 |
216 |
221 |
0.27 |
114 |
134 |
155 |
184 |
211 |
225 |
230 |
0.28 |
119 |
138 |
160 |
187 |
216 |
233 |
239 |
0.29 |
124 |
142 |
164 |
191 |
221 |
241 |
248 |
0.30 |
129 |
146 |
167 |
194 |
225 |
249 |
257 |
0.31 |
134 |
151 |
172 |
198 |
228 |
255 |
266 |
0.32 |
139 |
155 |
175 |
202 |
231 |
260 |
274 |
0.33 |
144 |
160 |
180 |
205 |
234 |
264 |
282 |
0.34 |
149 |
164 |
184 |
209 |
238 |
268 |
290 |
0.35 |
153 |
168 |
187 |
212 |
241 |
272 |
298 |
0.36 |
158 |
173 |
191 |
216 |
245 |
275 |
303 |
0.37 |
162 |
177 |
196 |
220 |
248 |
278 |
308 |
0.38 |
166 |
182 |
200 |
223 |
250 |
281 |
313 |
0.39 |
171 |
185 |
203 |
227 |
254 |
285 |
317 |
0.40 |
175 |
189 |
207 |
231 |
257 |
288 |
320 |
2 Changes to RTPTS values are considered significant if either the previous value or the current value, or both values, exceed the screening criterion before the expiration of the operating license or the combined license under part 52 of this chapter, including any renewed term, if applicable for the plant.
3 The class of material for estimating RTNDT(U) is generally determined for welds by the type of welding flux (Linde 80, or other), and for base metal by the material specification.
4 Data from reactor vessels fabricated to the same material specification in the same shop as the vessel in question and in the same time period is an example of "generic data."
5 Surveillance program results means any data that demonstrates the embrittlement trends for the limiting beltline material, including but not limited to data from test reactors or from surveillance programs at other plants with or without surveillance program integrated per 10 CFR part 50, appendix H.
[60 FR 65468, Dec. 19, 1995, as amended at 61 FR 39300, July 29, 1996; 72 FR 49500, Aug. 28, 2007; 73 FR 5722, Jan. 31, 2008; 75 FR 23, Jan. 4, 2010; 84 FR 65644, Nov. 29, 2019]
§ 50.61a Alternate fracture toughness requirements for protection against pressurized thermal shock events.
(a) Definitions. Terms in this section have the same meaning as those presented in 10 CFR 50.61(a), with the exception of the term “ASME Code.”
(1) ASME Code means the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division I, “Rules for the Construction of Nuclear Power Plant Components,” and Section XI, Division I, “Rules for
Inservice Inspection of Nuclear Power Plant Components,” edition and addenda and any limitations and modifications thereof as specified in § 50.55a.
(2) RTMAX–AW means the material property which characterizes the reactor vessel’s resistance to fracture initiating from flaws found along axial weld fusion lines. RTMAX–AW is determined under the provisions of paragraph (f) of this section and has units of °F.
(3) RTMAX–PL means the material property which characterizes the reactor vessel’s resistance to fracture initiating from flaws found in plates in regions that are not associated with welds found in plates. RTMAX–PL is determined under
the provisions of paragraph (f) of this section and has units of °F.
(4) RTMAX–FO means the material property which characterizes the reactor vessel’s resistance to fracture initiating from flaws in forgings that are not associated with welds found in forgings. RTMAX–FO is determined under the provisions of paragraph (f) of this section and has units of °F.
(5) RTMAX–CW means the material property which characterizes the reactor vessel’s resistance to fracture initiating from flaws found along the circumferential weld fusion lines. RTMAX–CW is determined under the provisions of paragraph (f) of this section and has units of °F.
(6) RTMAX–X means any or all of the material properties RTMAX–AW, RTMAX–PL, RTMAX–FO, RTMAX–CW, or sum of RTMAX–AW and RTMAX–PL, for a particular reactor vessel.
(7) φt means fast neutron fluence for neutrons with energies greater than 1.0 MeV. φt is utilized under the provisions of paragraph (g) of this section and has units of n/cm2.
(8) φ means average neutron flux for neutrons with energies greater than 1.0 MeV. φ is utilized under the provisions of paragraph (g) of this section and has units of n/cm2/sec.
(9) ΔT30 means the shift in the Charpy V-notch transition temperature at the 30 ft-lb energy level produced by irradiation. The ΔT30 value is utilized under the provisions of paragraph (g) of this section and has units of °F.
(10) Surveillance data means any data that demonstrates the embrittlement trends for the beltline materials, including, but not limited to, surveillance programs at other plants with or without a surveillance program integrated under 10 CFR Part 50, Appendix H.
(11) TC means cold leg temperature under normal full power operating conditions, as a time-weighted average from the start of full power operation through the end of licensed operation. TC has units of °F.
(12) CRP means the copper rich precipitate term in the embrittlement model from this section. The CRP term is defined in paragraph (g) of this section.
(13) MD means the matrix damage term in the embrittlement model for this section. The MD term is defined in paragraph (g) of this section.
(b) Applicability. The requirements of this section apply to each holder of an operating license for a pressurized water nuclear power reactor whose construction permit was issued before February 3, 2010 and whose reactor vessel was designed and fabricated to the ASME Boiler and Pressure Vessel Code, 1998 Edition or earlier. The requirements of this section may be implemented as an alternative to the requirements of 10 CFR 50.61.
(c) Request for Approval. Before the implementation of this section, each licensee shall submit a request for approval in the form of an application for a license amendment in accordance with § 50.90 together with the documentation required by paragraphs (c)(1), (c)(2), and (c)(3) of this section for review and approval by the Director of the Office of Nuclear Reactor Regulation (Director). The application must be submitted for review and approval by the Director at least three years before the limiting RTPTS value calculated under 10 CFR 50.61 is projected to
exceed the PTS screening criteria in 10 CFR 50.61 for plants licensed under this part.
(1) Each licensee shall have projected values of RTMAX–X for each reactor vessel beltline material for the EOL fluence of the material. The assessment of RTMAX–X values must use the calculation procedures given in paragraphs (f) and (g) of this section.
The assessment must specify the bases for the projected value of RTMAX–X for each reactor vessel beltline material, including the assumptions regarding future plant operation (e.g., core loading patterns, projected capacity factors); the copper (Cu), phosphorus (P), manganese (Mn), and nickel (Ni) contents; the reactor cold leg temperature (TC); and the neutron flux and fluence values used in the calculation for each beltline material. Assessments performed under paragraphs (f)(6) and (f)(7) of this section, shall be submitted by the
licensee to the Director in its license amendment application to utilize § 50.61a.
(2) Each licensee shall perform an examination and an assessment of flaws in the reactor vessel beltline as required by paragraph (e) of this section. The licensee shall verify that the requirements of paragraphs (e), (e)(1), (e)(2), and (e)(3) of this section have been met. The licensee must submit to the Director, in its application to use § 50.61a, the adjustments made to the volumetric test data to account for NDE-related
uncertainties as described in paragraph (e)(1) of this section, all information required by paragraph (e)(1)(iii) of this section, and, if
applicable, analyses performed under paragraphs (e)(4), (e)(5) and (e)(6) of this section.
(3) Each licensee shall compare the projected RTMAX–X values for plates, forgings, axial welds, and circumferential welds to the PTS screening criteria in Table 1 of this section, for the purpose of evaluating a reactor vessel’s susceptibility to fracture due to a PTS event. If any of the projected RTMAX–X values are greater than the PTS screening criteria in Table 1 of this section, then the licensee may propose the compensatory actions or plant-specific analyses as required in paragraphs (d)(3) through (d)(7) of this section, as applicable, to justify operation beyond the PTS screening criteria in Table 1 of this section.
(d) Subsequent Requirements. Licensees who have been approved to use 10 CFR 50.61a under the requirements of paragraph (c) of this
section shall comply with the requirements of this paragraph.
(1) Whenever there is a significant change in projected values of RTMAX–X, so that the previous value, the current value, or both values, exceed the screening criteria before the expiration of the plant operating license; or upon the licensee’s request for a change in the
expiration date for operation of the facility; a re-assessment of RTMAX–X values documented consistent with the requirements of paragraph (c)(1) and (c)(3) of this section must be submitted in the form of a license amendment for review and approval by the Director. If the surveillance data used to perform the re-assessment of RTMAX–X values meet the requirements of paragraph (f)(6)(v) of this section, the licensee shall submit the data and the results of the analysis of the data to the Director for review and approval within one year after the capsule is withdrawn from the vessel. If the surveillance data meet the requirements of paragraph (f)(6)(vi) of this section, the licensee shall submit the data, the results of the analysis of the data, and proposed ΔT30 and RTMAX–X values considering the
surveillance data in the form of a license amendment to the Director for review and approval within two years after the capsule is withdrawn from the vessel. If the Director does not approve the assessment of RTMAX–X values, then the licensee shall perform the actions
required in paragraphs (d)(3) through (d)(7) of this section, as necessary, before operation beyond the PTS screening criteria in Table 1 of this
section.
(2) The licensee shall verify that the requirements of paragraphs (e), (e)(1), (e)(2), and (e)(3) of this section have been met. The licensee must submit, within 120 days after completing a volumetric examination of reactor vessel beltline materials as required by ASME Code, Section XI, the adjustments made to the volumetric test data to account for NDE-related uncertainties as described in paragraph (e)(1) of this section and all
information required by paragraph (e)(1)(iii) of this section in the form of a license amendment for review and approval by the Director. If a licensee is required to implement paragraphs (e)(4), (e)(5), and (e)(6) of this section, the information required in these paragraphs must be submitted in the form of a license amendment for review and approval by the Director within one year after completing a volumetric examination of reactor vessel materials as required by ASME Code, Section XI.
(3) If the value of RTMAX–X is projected to exceed the PTS screening criteria, then the licensee shall implement those flux reduction programs that are reasonably practicable to avoid exceeding the PTS screening criteria. The schedule for implementation of flux reduction
measures may take into account the schedule for review and anticipated approval by the Director of detailed plant-specific analyses which
demonstrate acceptable risk with RTMAX–X values above the PTS screening criteria due to plant modifications, new information, or new analysis techniques.
(4) If the analysis required by paragraph (d)(3) of this section indicates that no reasonably practicable flux reduction program will prevent the
RTMAX–X value for one or more reactor vessel beltline materials from exceeding the PTS screening criteria, then the licensee shall perform a safety analysis to determine what, if any, modifications to equipment, systems, and operation are necessary to prevent the potential for an unacceptably high probability of failure of the reactor vessel as a result of postulated PTS events. In the analysis, the licensee may determine the properties of the reactor vessel materials based on available information, research results and plant surveillance data, and may use probabilistic fracture mechanics techniques. This analysis and the description of the modifications must be submitted to the Director in the form of a license amendment at least three years before RTMAX–X is projected to exceed the PTS screening criteria.
(5) After consideration of the licensee’s analyses, including effects of proposed corrective actions, if any, submitted under paragraphs (d)(3) and (d)(4) of this section, the Director may, on a case-by-case basis, approve operation of the facility with RTMAX–X values in excess of the PTS screening criteria. The Director will consider factors significantly affecting the potential for failure of the reactor vessel
in reaching a decision. The Director shall impose the modifications to equipment, systems and operations described to meet paragraph (d)(4) of
this section.
(6) If the Director concludes, under paragraph (d)(5) of this section, that operation of the facility with RTMAX–X values in excess of the PTS screening criteria cannot be approved on the basis of the licensee’s analyses submitted under paragraphs (d)(3) and (d)(4) of
this section, then the licensee shall request a license amendment, and receive approval by the Director, before any operation beyond the PTS screening criteria. The request must be based on modifications to equipment, systems, and operation of the facility in addition to those previously proposed in the submitted analyses that would reduce the potential for failure of the reactor vessel due to PTS events, or on further analyses based on new information or improved methodology. The licensee must show that the proposed alternatives provide reasonable assurance of adequate protection of the public health and safety.
(7) If the limiting RTMAX–X value of the facility is projected to exceed the PTS screening criteria and the requirements of paragraphs (d)(3) through (d)(6) of this section cannot be satisfied, the reactor vessel beltline may be given a thermal annealing treatment under the requirements of § 50.66 to recover the fracture toughness of the material. The reactor vessel may be used only for that service period within
which the predicted fracture toughness of the reactor vessel beltline materials satisfy the requirements of paragraphs (d)(1) through (d)(6) of this section, with RTMAX–X values accounting for the effects of annealing and subsequent irradiation.
(e) Examination and Flaw Assessment Requirements. The volumetric examination results evaluated under paragraphs (e)(1), (e)(2), and (e)(3) of this section must be acquired using procedures, equipment and personnel that have been qualified under the ASME Code, Section XI, Appendix VIII,
Supplement 4 and Supplement 6, as specified in 10 CFR 50.55a(b)(2)(xv).
(1) The licensee shall verify that the flaw density and size distributions within the volume described in ASME Code, Section XI,1 Figures IWB–2500–1 and IWB–2500–2 and limited to a depth from the clad-to-base metal interface of
1-inch or 10 percent of the vessel thickness, whichever is greater, do not exceed the limits in Tables 2 and 3 of this section based on the test results from the volumetric examination. The values in Tables 2 and 3 represent actual flaw sizes. Test results from the volumetric examination may be
adjusted to account for the effects of NDE-related uncertainties. The methodology to account for NDE-related uncertainties must be based on statistical data from the qualification tests and any other tests that measure the difference between the actual flaw size and the NDE detected flaw size. Licensees who adjust their test data to account for NDE-related uncertainties to verify conformance with the values in Tables 2 and 3 shall prepare and submit the methodology used to estimate the NDE uncertainty, the statistical data used to adjust the test data and an explanation of how the data was analyzed for review and approval by the Director in accordance with paragraphs (c)(2) and (d)(2) of this section. The verification of the flaw density and size distributions shall be performed line-by-line for Tables 2 and 3. If the flaw density and size distribution exceeds the limitations specified in Tables 2 and 3 of this section, the licensee shall perform the analyses required by paragraph (e)(4) of this section. If
analyses are required in accordance with paragraph (e)(4) of this section, the licensee must address the effects on through-wall crack frequency (TWCF) in accordance with paragraph (e)(5) of this section and must prepare and submit a neutron fluence map in accordance with the requirements of paragraph (e)(6) of this section.
(i) The licensee shall determine the allowable number of weld flaws in the reactor vessel beltline by multiplying the values in Table 2 of this section by the total length of the reactor vessel beltline welds that were volumetrically inspected and dividing by 1000 inches of weld length.
(ii) The licensee shall determine the allowable number of plate or forging flaws in their reactor vessel beltline by multiplying the values in Table 3 of this section by the total surface area of the reactor vessel beltline plates or forgings that were volumetrically inspected and dividing by 1000 square inches.
(iii) For each flaw detected in the inspection volume described in paragraph (e)(1) with a through-wall extent equal to or greater than 0.075
inches, the licensee shall document the dimensions of the flaw, including through-wall extent and length, whether the flaw is axial or circumferential in orientation and its location within the reactor vessel, including its azimuthal and axial positions and its depth embedded from the clad-to-base metal interface.
(2) The licensee shall identify, as part of the examination required by paragraph (c)(2) of this section and any subsequent ASME Code, Section XI
ultrasonic examination of the beltline welds, any flaws within the inspection volume described in paragraph (e)(1) of this section that are equal to or greater than 0.075 inches in through-wall depth, axially-oriented, and located at the clad-to-base metal interface. The licensee shall verify that these flaws do not open to the vessel inside surface using surface or visual examination technique capable of detecting and characterizing service induced cracking of the reactor vessel cladding.
(3) The licensee shall verify, as part of the examination required by paragraph (c)(2) of this section and any subsequent ASME Code, Section XI ultrasonic examination of the beltline welds, that all flaws between the clad-to-base metal interface and three-eights of the reactor vessel thickness from the interior surface are within the allowable values in ASME Code, Section XI, Table IWB–3510–1.
(4) The licensee shall perform analyses to demonstrate that the reactor vessel will have a TWCF of less than 1 × 10–6 per reactor year if the ASME Code, Section XI volumetric examination required by paragraph (c)(2) or (d)(2) of this section indicates any of the following:
(i) The flaw density and size in the inspection volume described in paragraph (e)(1) exceed the limits in Tables 2 or 3 of this section;
(ii) There are axial flaws that penetrate through the clad into the low alloy steel reactor vessel shell, at a depth equal to or greater than 0.075
inches in through-wall extent from the clad-to-base metal interface; or
(iii) Any flaws between the clad-to-base metal interface and three-eighths 2 of the vessel thickness exceed the size allowable in ASME Code, Section XI, Table IWB–3510–1.
(5) The analyses required by paragraph (e)(4) of this section must address the effects on TWCF of the known sizes and locations of all flaws
detected by the ASME Code, Section XI, Appendix VIII, Supplement 4 and Supplement 6 ultrasonic examination out to three-eights of the vessel
thickness from the inner surface, and may also take into account other reactor vessel-specific information, including fracture toughness information.
(6) For all flaw assessments performed in accordance with paragraph (e)(4) of this section, the licensee shall prepare and submit a neutron fluence map, projected to the date of license expiration, for the reactor vessel beltline clad-to-base metal interface and indexed in a manner that allows the determination of the neutron fluence at the location of the detected flaws.
(f) Calculation of RTMAX–X values. Each licensee shall calculate RTMAX–X values for each reactor vessel beltline material using φt. The neutron flux (φ[t]), must be calculated using a methodology that has been benchmarked to experimental measurements and with quantified uncertainties and possible biases.3
(1) The values of RTMAX–AW, RTMAX–PL, RTMAX–FO, and RTMAX–CW must be determined using Equations 1 through 4 of this section. When calculating RTMAX–AW using Equation 1, RTMAX–AW is the maximum value of (RTNDT(U) + ΔT30) for the weld and for the adjoining plates. When calculating RTMAX–CW using Equation 4, RTMAX–CW is the maximum value of (RTNDT(U) + ΔT30) for the circumferential weld and
for the adjoining plates or forgings.
(2) The values of ΔT30 must be determined using Equations 5, 6 and 7 of this section, unless the conditions specified in paragraph (f)(6)(v) of this section are not met, for each axial weld, plate, forging, and circumferential weld. The ΔT30 value for each axial weld calculated as specified by Equation 1 of this section must be calculated for the maximum fluence (φtAXIAL–WELD) occurring along a particular axial weld at the clad-to-base metal interface. The ΔT30 value for each plate calculated as specified by Equation 1 of this section must also be calculated using the same value of φtAXIAL–WELD used for the axial weld. The ΔT30 values in Equation 1 shall be calculated for the weld itself and each adjoining plate. The ΔT30 value for each plate or forging
calculated as specified by Equations 2 and 3 of this section must be calculated for the maximum fluence (φtMAX) occurring at the clad-to-base metal interface over the entire area of each plate or forging. In Equation 4, the fluence (φtWELD–CIRC) value used for calculating the plate, forging, and circumferential weld ΔT30 value is the maximum fluence occurring for each material along the circumferential weld at the clad-to-base metal interface. The ΔT30 values in Equation 4 shall be calculated for the circumferential weld and for the adjoining plates or forgings. If the conditions specified in paragraph (f)(6)(v) of this section are not met, licensees must propose ΔT30 and RTMAX–X values in accordance with paragraph (f)(6)(vi) of this section.
(3) The values of Cu, Mn, P, and Ni in Equations 6 and 7 of this section must represent the best estimate values for the material. For a plate or forging, the best estimate value is normally the mean of the measured values for that plate or forging. For a weld, the best estimate value is normally the mean of the measured values for a weld deposit made using the same weld wire heat number as the critical vessel weld. If these values are not available, either the upper limiting values given in the material specifications to which the vessel material was fabricated, or conservative estimates (i.e., mean plus one standard deviation) based on generic data 4 as shown in Table 4 of
this section for P and Mn, must be used.
(4) The values of RTNDT(U) must be evaluated according to the procedures in the ASME Code, Section III, paragraph NB–2331. If any other method is used for this evaluation, the licensee shall submit the proposed method for review and approval by the Director along with the calculation of RTMAX–X values required in paragraph (c)(1) of this section.
(i) If a measured value of RTNDT(U) is not available, a generic mean value of RTNDT(U) for the class 5 of material must be used if there are sufficient test results to establish a mean.
(ii) The following generic mean values of RTNDT(U) must be used unless justification for different values is provided: 0 °F for welds made with Linde 80 weld flux; and –56 °F for welds made with Linde 0091, 1092, and 124 and ARCOS B–5 weld fluxes.
(5) The value of TC in Equation 6 of this section must represent the time-weighted average of the reactor cold leg temperature under normal operating full power conditions from the beginning of full power operation through the end of licensed operation.
(6) The licensee shall verify that an appropriate RTMAX–X value has been calculated for each reactor vessel beltline material by considering plant-specific information that could affect the use of the model (i.e., Equations 5, 6 and 7) of this section for the
determination of a material’s ΔT30 value.
(i) The licensee shall evaluate the results from a plant-specific or integrated surveillance program if the surveillance data satisfy the criteria
described in paragraphs (f)(6)(i)(A) and (f)(6)(i)(B) of this section:
(A) The surveillance material must be a heat-specific match for one or more of the materials for which RTMAX–X is being calculated. The 30-foot-pound transition temperature must be determined as specified by the requirements of 10 CFR Part 50, Appendix H.
(B) If three or more surveillance data points measured at three or more different neutron fluences exist for a specific material, the licensee shall determine if the surveillance data show a significantly different trend than the embrittlement model predicts. This must be achieved by evaluating the surveillance data for consistency with the embrittlement model by following the procedures specified by paragraphs (f)(6)(ii), (f)(6)(iii), and (f)(6)(iv) of this section. If fewer than three surveillance data points exist for a specific material, then the embrittlement model must be used without performing the consistency check.
(ii) The licensee shall estimate the mean deviation from the embrittlement model for the specific data set (i.e., a group of surveillance data points representative of a given material). The mean deviation from the embrittlement model for a given data set must be calculated using Equations 8 and 9 of this section. The mean deviation for the data set must be compared to the maximum heat-average residual given in Table 5 or derived using Equation 10 of this section. The maximum heat-average residual is based on the material group into which the surveillance material falls and the number of surveillance data points. For surveillance data sets with greater than 8 data points, the maximum credible heat-average residual must be calculated using Equation 10 of this section. The value of σ used in Equation 10 of this section must be obtained from Table 5 of this section.
(iii) The licensee shall estimate the slope of the embrittlement model residuals (estimated using Equation 8) plotted as a function of the base 10
logarithm of neutron fluence for the specific data set. The licensee shall estimate the T-statistic for this slope (TSURV) using Equation 11 and compare this value to the maximum permissible T-statistic (TMAX) in Table 6. For surveillance data sets with greater than
15 data points, the TMAX value must be calculated using Student’s T distribution with a significance level (α) of 1 percent for a one-tailed test.
(iv) The licensee shall estimate the two largest positive deviations (i.e., outliers) from the embrittlement model for the specific data set using Equations 8 and 12. The licensee shall compare the largest normalized residual (r *) to the appropriate allowable value from the third column in Table 7 and the second largest normalized residual to the appropriate allowable value from the second column in Table 7.
(v) The ΔT30 value must be determined using Equations 5, 6, and 7 of this section if all three of the following criteria are satisfied:
(A) The mean deviation from the embrittlement model for the data set is equal to or less than the value in Table 5 or the value derived using Equation 10 of this section;
(B) The T-statistic for the slope (TSURV) estimated using Equation 11 is equal to or less than the Maximum permissible T-statistic (TMAX) in Table 6; and
(C) The largest normalized residual value is equal to or less than the appropriate allowable value from the third column in Table 7 and the second
largest normalized residual value is equal to or less than the appropriate allowable value from the second column in Table 7. If any of these criteria is not satisfied, the licensee must propose ΔT30 and RTMAX–X values in accordance with paragraph (f)(6)(vi) of this section.
(vi) If any of the criteria described in paragraph (f)(6)(v) of this section are not satisfied, the licensee shall review the data base for that heat in detail, including all parameters used in Equations 5, 6, and 7 of this section and the data used to determine the baseline Charpy V-notch curve for the material in an unirradiated condition. The licensee shall submit an evaluation of the surveillance data to the NRC and shall propose ΔT30 and RTMAX–X values, considering their plant-specific surveillance data, to be used for evaluation relative to the acceptance criteria of this rule. These evaluations must be submitted for review and approval by the Director in the form of a license amendment in accordance with the requirements of paragraphs (c)(1) and (d)(1) of this section.
(7) The licensee shall report any information that significantly influences the RTMAX–X value to the Director in accordance with the requirements of paragraphs (c)(1) and (d)(1) of this section.
(g) Equations and variables used in this section.
Equation 1: RTMAX – AW = MAX {[ RTNDT(U) – plate + ΔT30 – plate ], [ RTNDT(U) – axial weld + ΔT30 – axial weld ]}
Equation 2: RTMAX – PL = RTNDT(U) – plate + ΔT30 – plate
Equation 3: RTMAX – FO = RTNDT(U) – forging + ΔT30 – forging
Equation 4: RTMAX – CW = MAX {[ RTNDT(U) – plate + ΔT30 – plate ], [ RTNDT(U) – circweld + ΔT30 – circweld ],
[ RTNDT(U) – forging + ΔT30 – forging ]}
Equation 5: ΔT30 = MD + CRP
Equation 6: MD = A × (1 – 0.001718 × TC) × (1 + 6.13 × P × Mn2.471) × φte0.5
Equation 7: CRP = B × (1 + 3.77 × Ni1.191) × f(Cue,P) × g(Cue,Ni,φte )
where:
P [wt-&%] = phosphorus content
Mn [wt-%] = manganese content
Ni [wt-%] = nickel content
Cu [wt-%] = copper content
A = 1.140 × 10–7 for forgings
A = 1.561 × 10–7 for plates
A = 1.417 × 10–7 for welds
B = 102.3 for forgings
B = 102.5 for plates in non-Combustion
Engineering manufactured vessels
B = 135.2 for plates in Combustion
Engineering vessels
B = 155.0 for welds
φte = φt for φ ≥ 4.39 × 1010 n/cm2/sec
φte = φt × (4.39 × 1010/φ)0.2595 for φ < 4.39 × 1010 n/cm2/sec
|
|
where:
φ [n/cm2/sec] = average neutron flux
t [sec] = time that the reactor has been in full power operation
φt [n/cm2] = φ × t
f(Cue,P) = 0 for Cu ≤ 0.072
f(Cue,P) = [Cue – 0.072]0.668 for Cu > 0.072 and P ≤ 0.008
f(Cue,P) = [Cue – 0.072 + 1.359 × (P–0.008)]0.668 for Cu > 0.072 and P > 0.008
where:
Cue = 0 for Cu ≤ 0.072
Cue = MIN (Cu, maximum Cue) for Cu > 0.072
maximum Cue = 0.243 for Linde 80 welds
maximum Cue = 0.301 for all other materials
g(Cue,Ni,φte) = 0.5 + 0.5 × tanh
{[log10(φte) + (1.1390 × Cue)–(0.448
× Ni)–18.120]/0.629}
|
Equation 8: Residual (r) = measured ΔT30 – predicted ΔT30 (by Equations
5, 6 and 7)
Equation 9: Mean deviation for a data set of n data points =
Equation 10: Maximum credible heat-average residual = 2.33σ/n0.5
where:
n = number of surveillance data points (sample size) in the specific data set
σ = standard deviation of the residuals about the model for a relevant material group given in Table 5.
where:
m is the slope of a plot of all of the r values (estimated using Equation 8) versus the base 10 logarithm of the neutron fluence for each r value. The slope shall be estimated using the method of least squares. se(m) is the least squares estimate of the standard-error associated with the estimated slope value m.
where:
r is defined using Equation 8 and σ is given in Table 5.
TABLE 1—PTS Screening Criteria
Product form and RTMAX–X
values |
RTMAX–X limits [°F] for different vessel wall thicknesses 6
(TWALL) |
TWALL ≤ 9.5 in. |
9.5 in. < TWALL
≤ 10.5 in. |
10.5 in. < TWALL
≤ 11.5 in. |
Axial Weld—RTMAX–AW |
269 |
230 |
222 |
Plate—RTMAX–PL |
356 |
305 |
293 |
Forging without underclad cracks—RTMAX–FO7 |
356 |
305 |
293 |
Axial Weld and Plate—RTMAX–AW + RTMAX–PL |
538 |
476 |
445 |
Circumferential Weld—RTMAX–CW8 |
312 |
277 |
269 |
Forging with underclad cracks—RTMAX–FO9 |
246 |
241 |
239 |
6 Wall thickness is the beltline wall thickness including the clad thickness.
7 Forgings without underclad cracks apply to forgings for which no underclad cracks have been detected and that were fabricated in accordance
with Regulatory Guide 1.43.
8 RTPTS limits contribute 1 × 10–8 per reactor year to the reactor vessel TWCF.
9 Forgings with underclad cracks apply to forgings that have detected underclad cracking or were not fabricated in accordance with Regulatory
Guide 1.43.
Table 2—Allowable Number of Flaws in Welds
Through–wall extent, TWE [in.] |
Maximum number of flaws per 1000-inches of weld length in the inspection volume that are greater than or equal to TWEMIN and less than TWEMAX |
TWEMIN |
TWEMAX |
0 |
0.075 |
No Limit |
0.075 |
0.475 |
166.70 |
0.125 |
0.475 |
90.80 |
0.175 |
0.475 |
22.82 |
0.225 |
0.475 |
8.66 |
0.275 |
0.475 |
4.01 |
0.325 |
0.475 |
3.01 |
0.375 |
0.475 |
1.49 |
0.425 |
0.475 |
1.00 |
0.475 |
Infinite |
0.00 |
Table 3—Allowable Number of Flaws in Plates and Forgings
Through–wall extent, TWE [in.] |
Maximum number of flaws per 1000 square-inches of inside surface area in the inspection volume that are greater than or equal to TWEMIN and less than TWEMAX. This flaw density does not include underclad cracks in forgings. |
TWEMIN |
TWEMAX |
0 |
0.075 |
No Limit |
0.075 |
0.375 |
8.05 |
0.125 |
0.375 |
3.15 |
0.175 |
0.375 |
0.85 |
0.225 |
0.375 |
0.29 |
0.275 |
0.375 |
0.08 |
0.325 |
0.375 |
0.01 |
0.375 |
Infinite |
0.00 |
Table 4—Conservative Estimates for Chemical Element Weight Percentages
Materials |
P |
Mn |
Plates |
0.014 |
1.45 |
Forgings |
0.016 |
1.11 |
Welds |
0.019 |
1.63 |
Table 5—Maximum Heat-Average Residual [ °F] for Relevant Material Groups by Number of Available Data Points
(Significance Level = 1%)
Material group |
σ [°F] |
Number of available data points |
3 |
4 |
5 |
6 |
7 |
8 |
Welds, for Cu > 0.072 |
26.4 |
35.5 |
30.8 |
27.5 |
25.1 |
23.2 |
21.7 |
Plates, for Cu > 0.072 |
21.2 |
28.5 |
24.7 |
22.1 |
20.2 |
18.7 |
17.5 |
Forgings, for Cu > 0.072 |
19.6 |
26.4 |
22.8 |
20.4 |
18.6 |
17.3 |
16.1 |
Weld, Plate or Forging, for Cu ≤ 0.072 |
18.6 |
25.0 |
21.7 |
19.4 |
17.7 |
16.4 |
15.3 |
Table 6—TMAX Values for the Slope Deviation Test (Significance Level = 1%)
Number of available data points (n) |
TMAX |
3 |
31.82 |
4 |
6.96 |
5 |
4.54 |
6 |
3.75 |
7 |
3.36 |
8 |
3.14 |
9 |
3.00 |
10 |
2.90 |
11 |
2.82 |
12 |
2.76 |
13 |
2.72 |
14 |
2.68 |
15 |
2.65 |
Table 7-Threshold Values for the Outlier Deviation Test [Significance Level = 1%]
Number of available data points (n) |
Second largest allowable normalized residual value (r*) |
Largest allowable normalized residual value (r*) |
3 |
1.55 |
2.71 |
4 |
1.73 |
2.81 |
5 |
1.84 |
2.88 |
6 |
1.93 |
2.93 |
7 |
2.00 |
2.98 |
8 |
2.05 |
3.02 |
9 |
2.11 |
3.06 |
10 |
2.16 |
3.09 |
11 |
2.19 |
3.12 |
12 |
2.23 |
3.14 |
13 |
2.26 |
3.17 |
14 |
2.29 |
3.19 |
15 |
2.32 |
3.21 |
1 For forgings susceptible to underclad cracking the determination of the flaw density for that forging from the licensee’s inspection shall exclude those indications identified as underclad cracks.
2 Because flaws greater than three-eights of the vessel wall thickness from the inside surface do not contribute to TWCF, flaws greater than three-eights of the vessel wall thickness from the inside surface need not be analyzed for their contribution to PTS.
3 Regulatory Guide 1.190 dated March 2001, establishes acceptable methods for determining neutron flux.
4 Data from reactor vessels fabricated to the same material specification in the same shop as the vessel in question and in the same time is an example of “generic data.”
5 The class of material for estimating RTNDT(U) must be determined by the type of welding flux (Linde 80, or other) for welds or by the material specification for base metal.
[75 FR 23, Jan. 4, 2010; 75 FR 5495, Feb. 3, 2010; 75 FR 10411, Mar. 8, 2010; 75 FR 72653, Nov. 26, 2010]
§ 50.62 Requirements for reduction of risk from anticipated transients without scram (ATWS)
events for light-water-cooled nuclear power plants.
(a) Applicability. The requirements of this section apply to all commercial light-water-cooled nuclear power plants, other
than nuclear power reactor facilities for which the certifications required under § 50.82(a)(1) have been submitted.
(b) Definition. For purposes of this section, Anticipated Transient Without Scram (ATWS) means an anticipated operational
occurrence as defined in appendix A of this part followed by the failure of the reactor trip portion of the protection system
specified in General Design Criterion 20 of appendix A of this part.
(c) Requirements. (1) Each pressurized water reactor must have equipment from sensor output to final actuation device, that
is diverse from the reactor trip system, to automatically initiate the auxiliary (or emergency) feedwater system and initiate a
turbine trip under conditions indicative of an ATWS. This equipment must be designed to perform its function in a reliable
manner and be independent (from sensor output to the final actuation device) from the existing reactor trip system.
(2) Each pressurized water reactor manufactured by Combustion Engineering or by Babcock and Wilcox must have a
diverse scram system from the sensor output to interruption of power to the control rods. This scram system must be
designed to perform its function in a reliable manner and be independent from the existing reactor trip system (from sensor
output to interruption of power to the control rods).
(3) Each boiling water reactor must have an alternate rod injection (ARI) system that is diverse (from the reactor trip
system) from sensor output to the final actuation device. The ARI system must have redundant scram air header exhaust
valves. The ARI must be designed to perform its function in a reliable manner and be independent (from the existing
reactor trip system) from sensor output to the final actuation device.
(4) Each boiling water reactor must have a standby liquid control system (SLCS) with the capability of injecting into the
reactor pressure vessel a borated water solution at such a flow rate, level of boron concentration and boron-10 isotope
enrichment, and accounting for reactor pressure vessel volume, that the resulting reactivity control is at least equivalent to
that resulting from injection of 86 gallons per minute of 13 weight percent sodium pentaborate decahydrate solution at the
natural boron-10 isotope abundance into a 251-inch inside diameter reactor pressure vessel for a given core design. The
SLCS and its injection location must be designed to perform its function in a reliable manner. The SLCS initiation must be
automatic and must be designed to perform its function in a reliable manner for plants granted a construction permit after
July 26, 1984, and for plants granted a construction permit prior to July 26, 1984, that have already been designed and built
to include this feature.
(5) Each boiling water reactor must have equipment to trip the reactor coolant recirculating pumps automatically under
conditions indicative of an ATWS. This equipment must be designed to perform its function in a reliable manner.
(6) Information sufficient to demonstrate to the Commission the adequacy of items in paragraphs (c)(1) through (c)(5) of
this section shall be submitted to the Commission as specified in § 50.4.
(d) Implementation. For each light-water-cooled nuclear power plant
operating license issued before
September 27, 2007, by 180 days after
the issuance of the QA guidance for
non-safety related components, each
licensee shall develop and submit to the
Commission, as specified in § 50.4, a
proposed schedule for meeting the requirements of paragraphs (c)(1)
through (c)(5) of this section. Each shall
include an explanation of the schedule
along with a justification if the schedule
calls for final implementation later than
the second refueling outage after July
26, 1984, or the date of issuance of a
license authorizing operation above 5
percent of full power. A final schedule
shall then be mutually agreed upon by
the Commission and licensee. For each
light-water-cooled nuclear power plant
operating license application submitted
after September 27, 2007, the applicant
shall submit information in its final
safety analysis report demonstrating
how it will comply with paragraphs
(c)(1) through (c)(5) of this section.
[49 FR 26044, June 26, 1984; 49 FR 27736, July 6, 1984, as amended at 51 FR 40310, Nov. 6, 1986; 54 FR 13362, Apr. 3,
1989; 61 FR 39301, July 29, 1996; 72 FR 49500, Aug. 28, 2007]
§ 50.63 Loss of all alternating current power.
(a) Requirements. (1) Each light-water-cooled nuclear power plant licensed to operate under this part, each light-water-cooled nuclear power plant licensed under subpart C of 10 CFR part 52 after the Commission makes the finding under § 52.103(g) of this chapter, and each design for a light-water-cooled nuclear power plant approved under a standard design approval, standard design certification, and manufacturing license under part 52 of this chapter must be able to withstand for a specified duration and recover from a station blackout as defined in § 50.2. The
specified station blackout duration shall be based on the following factors:
(i) The redundancy of the onsite emergency ac power sources;
(ii) The reliability of the onsite emergency ac power sources;
(iii) The expected frequency of loss of offsite power; and
(iv) The probable time needed to restore offsite power.
(2) The reactor core and associated coolant, control, and protection systems, including station batteries and any other necessary support systems, must provide sufficient capacity and capability to ensure that the core is cooled and appropriate containment integrity is maintained in the event of a station blackout for the specified duration. The capability for coping with a station blackout of specified duration shall be determined by an appropriate coping analysis. Licensees are expected to have the baseline assumptions, analyses, and related information used in their coping evaluations available for NRC review.
(b) Limitation of scope. Paragraph (c) of this section does not apply to those plants licensed to operate prior to July 21, 1988, if the capability to withstand station blackout was specifically addressed in the operating license proceeding and was explicitly approved by the NRC.
(c) Implementation. (1) Information Submittal. For each light-water-cooled nuclear power plant operating license application submitted after September 27, 2007, the applicant shall submit the information defined below in its final safety analysis report.
(i) A proposed station blackout duration to be used in determining compliance with paragraph (a) of this section, including a justification for the selection based on the four factors identified in paragraph (a) of this section;
(ii) A description of the procedures that will be implemented for station blackout events for the duration determined in paragraph (c)(1)(i) of this section and for recovery therefrom; and
(iii) A list of modifications to equipment and associated procedures, if any, necessary to meet the requirements of paragraph (a) of this section, for the specified station blackout duration determined in paragraph (c)(1)(i) of this section, and a proposed schedule for implementing the stated modifications.
(2) Alternate ac source: The alternate ac power source(s), as defined in § 50.2, will constitute acceptable capability to withstand station blackout provided an analysis is performed which demonstrates that the plant has this capability from onset of the station blackout until the alternate ac source(s) and required shutdown equipment are started and lined up to operate. The time required for startup and alignment of the alternate ac power source(s) and this equipment shall be demonstrated by test. Alternate ac source(s) serving a multiple unit site where onsite emergency ac sources are not shared between units must have, as a minimum, the capacity and capability for coping with a station blackout in any of the units. At sites where onsite emergency ac sources are shared between units, the alternate ac source(s) must have the capacity and capability as required to ensure that all units can be brought to and maintained in safe shutdown (non-DBA) as defined in § 50.2. If the alternate ac source(s) meets the above requirements and can be demonstrated by test to be available to power the shutdown buses within 10 minutes of the onset of station blackout, then no coping analysis is required.
(3) Regulatory Assessment: After consideration of the information submitted in accordance with paragraph (c)(1) of this section, the Director, Office of Nuclear Reactor Regulation, will notify the licensee of the Director's conclusions regarding the adequacy of the proposed specified station blackout duration, the proposed equipment modifications and procedures, and the proposed schedule for implementing the procedures and modifications for compliance with paragraph (a) this section.
[53 FR 23215, June 21, 1988 as amended at 63 FR 50480, Sept. 22, 1998; 72 FR 49501, Aug. 28, 2007; 86 FR 43402, Aug. 9, 2021]
§ 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
(a) Applicability. The requirements of this section apply to all non-power reactors.
(b) Requirements. (1) The Commission will not issue a construction permit after March 27, 1986 for a non-power reactor
where the applicant proposes to use highly enriched uranium (HEU) fuel, unless the applicant demonstrates that the
proposed reactor will have a unique purpose as defined in § 50.2.
(2) Unless the Commission has determined, based on a request submitted in accordance with paragraph (c)(1) of this
section, that the non-power reactor has a unique purpose, each licensee authorized to possess and use HEU fuel in
connection with the reactor's operation shall:
(i) Not initiate acquisition of additional HEU fuel, if low enriched uranium (LEU) fuel acceptable to the Commission for
that reactor is available when it proposes that acquisition; and
(ii) Replace all HEU fuel in its possession with available LEU fuel acceptable to the Commission for that reactor, in
accordance with a schedule determined pursuant to paragraph (c)(2) of this section.
(3) If not required by paragraphs (b) (1) and (2) of this section to use LEU fuel, the applicant or licensee must use HEU fuel
of enrichment as close to 20% as is available and acceptable to the Commisson.
(c) Implementation. (1) Any request by a licensee for a determination that a non-power reactor has a unique purpose as
defined in § 50.2 should be submitted with supporting documentation to the Director of the Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555, by September 29, 1986.
(2) (i) By March 27, 1987 and at 12-month intervals thereafter, each licensee of a non-power reactor authorized to possess
and use HEU fuel shall develop and submit to the Director of the Office of Nuclear Reactor Regulation a written proposal
for meeting the requirements of paragraph (b) (2) or (3) of this section. The licensee shall include in the proposal a
certification that Federal Government funding for conversion is available through the Department of Energy (DOE) or other
appropriate Federal Agency. The licensee shall also include in the proposal a schedule for conversion, based upon
availability of replacement fuel acceptable to the Commisson for that reactor and upon consideration of other factors such
as the availability of shipping casks, implementation of arrangements for the available financial support, and reactor usage.
(ii) If Federal Government funding for conversion cannot be certified, the proposal's contents may be limited to a statement
of this fact. If a statement of non-availability of Federal Government funding for conversion is submitted by a licensee, then
it shall be required to resubmit a proposal for meeting the requirements of paragraph (b) (2) or (3) of this section at
12-month intervals.
(iii) The proposal shall include, to the extent required to effect the conversion, all necessary changes in the license, facility,
or procedures. Supporting safety analyses should be provided so as to meet the schedule established for conversion. As
long as Federal Government funding for conversion is not available, the resubmittal may be a reiteration of the original
proposal. The Director of the Office of Nuclear Reactor Regulation shall review the proposal and confirm the status of
Federal Government funding for conversion and, if a schedule for conversion has been submitted by the licensee, will then
determine a final schedule.
(3) After review of the safety analysis required by paragraph (c)(2), the Director of the Office of Nuclear Reactor
Regulation will issue an appropriate enforcement order directing both the conversion and, to the extent consistent with
protection of the public health and safety, any necessary changes to the license, facility, or procedures.
[51 FR 6519, Feb. 25, 1986]
§ 50.65 Requirements for monitoring the effectiveness of maintenance at nuclear power plants.
The requirements of this section are applicable during all conditions of plant operation, including normal shutdown operations.
(a)(1) Each holder of an operating license for a nuclear power plant under this part and each holder of a combined license under part 52 of this chapter after the Commission makes the finding under § 52.103(g) of this chapter, shall monitor the performance or condition of structures, systems, or components, against licensee-established goals, in a manner sufficient to provide reasonable assurance that these structures, systems, and components, as defined in paragraph (b) of this section, are capable of fulfilling their intended functions. These goals shall be established commensurate with safety and, where practical, take into account industrywide operating experience. When the performance or condition of a structure, system, or component does not meet established
goals, appropriate corrective action shall be taken. For a nuclear power plant for which the licensee has submitted the certifications specified in § 50.82(a)(1) or 52.110(a)(1) of this chapter, as applicable, this section shall only apply to the extent that the licensee shall monitor the performance or condition of all structures, systems, or components associated with the storage, control, and maintenance of spent fuel in a safe condition, in a manner sufficient to provide reasonable assurance that these structures, systems, and components are capable of fulfilling their intended
functions.
(2) Monitoring as specified in paragraph (a)(1) of this section is not required where it has been demonstrated that the performance or condition of a structure, system, or component is being effectively controlled through the performance of appropriate preventive maintenance, such that the structure, system, or component remains capable of performing its intended function.
(3) Performance and condition monitoring activities and associated goals and preventive maintenance activities shall be evaluated at least every refueling cycle provided the interval between evaluations does not exceed 24 months. The evaluations shall take into account, where practical, industry-wide operating experience. Adjustments shall be made where necessary to ensure that the
objective of preventing failures of structures, systems, and components through maintenance is appropriately balanced against the objective of minimizing unavailability of structures, systems, and components due to monitoring or preventive maintenance.
(4) Before performing maintenance activities (including but not limited to surveillance, post-maintenance testing, and corrective and preventive maintenance), the licensee shall assess and manage the increase in risk that may result from the proposed maintenance activities. The scope of the assessment may be limited to structures, systems, and components that a risk-informed evaluation process has shown to be significant to public health and safety.
(b) The scope of the monitoring program specified in paragraph (a)(1) of this section shall include safety related and nonsafety related structures, systems, and components, as follows:
(1) Safety-related structures, systems and components that are relied upon to remain functional during and following design basis events to ensure the integrity of the reactor coolant pressure boundary, the capability to shut down the reactor and maintain it in a safe shutdown condition, or the capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposure comparable to the guidelines in Sec. 50.34(a)(1), Sec. 50.67(b)(2), or Sec. 100.11 of this chapter, as applicable.
(2) Nonsafety related structures, systems, or components:
(i) That are relied upon to mitigate accidents or transients or are used in plant emergency operating procedures (EOPs); or
(ii) Whose failure could prevent safety-related structures, systems, and components from fulfilling their safety-related function; or
(iii) Whose failure could cause a reactor scram or actuation of a safety-related system.
(c) The requirements of this section shall be implemented by each licensee no later than July 10, 1996.
[56 FR 31324, July 10, 1991, as amended at 58 FR 33996, June 23, 1993; 61 FR 39301, July 29, 1996; 61 FR 65173, Dec. 11, 1996; 62 FR 47271, Sept. 8, 1997; 62 FR 59276, Nov. 3, 1997; 64 FR 38557, July 19, 1999; 64 FR 72001, Dec. 23, 1999; 72 FR 49501, Aug. 28, 2007]
§ 50.66 Requirements for thermal annealing of the reactor pressure vessel.
(a) For those light water nuclear power reactors where neutron radiation has reduced the fracture toughness of the reactor vessel materials, a thermal annealing may be applied to the
reactor vessel to recover the fracture toughness of the material. The use of a thermal annealing treatment is subject to the requirements in this section. A report describing the
licensee's plan for conducting the thermal annealing must be submitted in accordance with § 50.4 at least three years prior to the date at which the limiting fracture toughness criteria
in § 50.61 or appendix G to part 50 would be exceeded. Within three years of the submittal of the Thermal Annealing Report and at least thirty days prior to the start of the thermal
annealing, the NRC will review the Thermal Annealing Report and make available the results of its evaluation at the NRC Web site, http://www.nrc.gov. The licensee may begin the
thermal anneal after:
(1) Submitting the Thermal Annealing Report required by paragraph (b) of this section;
(2) The NRC makes available the results of its evaluation of the Thermal Annealing Report at the NRC Web site, http://www.nrc.gov; and
(3) The requirements of paragraph (f)(1) of this section have been satisfied.
(b) Thermal Annealing Report. The Thermal Annealing Report must include: a Thermal Annealing Operating Plan; a Requalification Inspection and Test Program; a Fracture
Toughness Recovery and Reembrittlement Trend Assurance Program; and Identification of Unreviewed Safety Questions and Technical Specification Changes.
(1) Thermal Annealing Operating Plan.
The thermal annealing operating plan must include:
(i) A detailed description of the pressure vessel and all structures and components that are expected to experience significant thermal or stress effects during the thermal annealing
operation;
(ii) An evaluation of the effects of mechanical and thermal stresses and temperatures on the vessel, containment, biological shield, attached piping and appurtenances, and adjacent
equipment and components to demonstrate that operability of the reactor will not be detrimentally affected. This evaluation must include:
(A) Detailed thermal and structural analyses to establish the time and temperature profile of the annealing operation. These analyses must include heatup and cooldown rates, and
must demonstrate that localized temperatures, thermal stress gradients, and subsequent residual stresses will not result in unacceptable dimensional changes or distortions in the
vessel, attached piping and appurtenances, and that the thermal annealing cycle will not result in unacceptable degradation of the fatigue life of these components.
(B) The effects of localized high temperatures on degradation of the concrete adjacent to the vessel and changes in thermal and mechanical properties, if any, of the reactor vessel
insulation, and on detrimental effects, if any, on containment and the biological shield. If the design temperature limitations for the adjacent concrete structure are to be exceeded
during the thermal annealing operation, an acceptable maximum temperature for the concrete must be established for the annealing operation using appropriate test data.
(iii) The methods, including heat source, instrumentation and procedures proposed for performing the thermal annealing. This shall include any special precautions necessary to
minimize occupational exposure, in accordance with the As Low As Reasonably Achievable (ALARA) principle and the provisions of § 20.1206.
(iv) The proposed thermal annealing operating parameters, including bounding conditions for temperatures and times, and heatup and cooldown schedules.
(A) The thermal annealing time and temperature parameters selected must be based on projecting sufficient recovery of fracture toughness, using the procedures of paragraph (e) of
this section, to satisfy the requirements of § 50.60 and § 50.61 for the proposed period of operation addressed in the application.
(B) The time and temperature parameters evaluated as part of the thermal annealing operating plan, and supported by the evaluation results of paragraph (b)(1)(ii) of this section,
represent the bounding times and temperatures for the thermal annealing operation. If these bounding conditions for times and temperatures are violated during the thermal
annealing operation, then the annealing operation is considered not in accordance with the Thermal Annealing Operating Plan, as required by paragraph (c)(1) of this section, and
the licensee must comply with paragraph (c)(2) of this section.
(2) Requalification Inspection and Test Program. The inspection and test program to requalify the annealed reactor vessel must include the detailed monitoring, inspections, and
tests proposed to demonstrate that the limitations on temperatures, times and temperature profiles, and stresses evaluated for the proposed thermal annealing conditions of paragraph
(b)(1)(iv) of this section have not been exceeded, and to determine the thermal annealing time and temperature to be used in quantifying the fracture toughness recovery. The
requalification inspection and test program must demonstrate that the thermal annealing operation has not degraded the reactor vessel, attached piping or appurtenances, or the
adjacent concrete structures to a degree that could affect the safe operation of the reactor.
(3) Fracture Toughness Recovery and Reembrittlement Trend Assurance Program. The percent recovery of RTNDT and Charpy upper-shelf energy due to the thermal annealing
treatment must be determined based on the time and temperature of the actual vessel thermal anneal. The recovery of RTNDT and Charpy upper-shelf energy provide the basis for
establishing the post-anneal RTNDT and Charpy upper-shelf energy for each vessel material. Changes in the RTNDT and Charpy upper-shelf energy with subsequent plant operation
must be determined using the post-anneal values of these parameters in conjunction with the projected reembrittlement trend determined in accordance with paragraph (b)(3)(ii) of
this section. Recovery and reembrittlement evaluations shall include:
(i) Recovery Evaluations. (A) The percent recovery of both RTNDT and Charpy upper-shelf energy must be determined by one of the procedures described in paragraph (e) of this
section, using the proposed lower bound thermal annealing time and temperature conditions described in the operating plan.
(B) If the percent recovery is determined from testing surveillance specimens or from testing materials removed from the reactor vessel, then it shall be demonstrated that the
proposed thermal annealing parameters used in the test program are equal to or bounded by those used in the vessel annealing operation.
(C) If generic computational methods are used, appropriate justification must be submitted as a part of the application.
(ii) Reembrittlement Evaluations. (A) The projected post-anneal reembrittlement of RTNDT must be calculated using the procedures in § 50.61(c), or must be determined using the
same basis as that used for the pre-anneal operating period. The projected change due to post-anneal reembrittlement for Charpy upper-shelf energy must be determined using the
same basis as that used for the pre-anneal operating period.
(B) The post-anneal reembrittlement trend of both RTNDT and Charpy upper-shelf energy must be estimated, and must be monitored using a surveillance program defined in the
Thermal Annealing Report and which conforms to the intent of Appendix H of this part, "Reactor Vessel Material Surveillance Program Requirements."
(4) Identification of Unreviewed Safety Questions and Technical Specification Changes. Any changes to the facility as described in the updated final safety analysis report
constituting unreviewed safety questions, and any changes to the technical specifications, which are necessary to either conduct the thermal annealing or operate the nuclear power
reactor following the annealing, must be identified. The section shall demonstrate that the Commission's requirements continue to be complied with, and that there is reasonable
assurance of adequate protection to the public health and safety following the changes.
(c) Completion or Termination of Thermal Annealing. (1) If the thermal annealing was completed in accordance with the Thermal Annealing Operating Plan and the Requalification
Inspection and Test Program, the licensee shall so confirm in writing to the Director, Office of Nuclear Reactor Regulation. The licensee may restart its reactor after the
requirements of paragraph (f)(2) of this section have been met.
(2) If the thermal annealing was completed but the annealing was not performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and
Test Program, the licensee shall submit a summary of lack of compliance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program and a
justification for subsequent operation to the Director, Office of Nuclear Reactor Regulation. Any changes to the facility as described in the updated final safety analysis report which
are attributable to the noncompliances and constitute unreviewed safety questions, and any changes to the technical specifications which are required as a result of the
noncompliances, shall also be identified.
(i) If no unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor after the requirements of paragraph (f)(2) of this section
have been met.
(ii) If any unreviewed safety questions or changes to technical specifications are identified, the licensee may not restart its reactor until approval is obtained from the Director, Office
of Nuclear Reactor Regulation and the requirements of paragraph (f)(2) of this section have been met.
(3) If the thermal annealing was terminated prior to completion, the licensee shall immediately notify the NRC of the premature termination of the thermal anneal.
(i) If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test
Program, and the licensee does not elect to take credit for any recovery, the licensee need not submit the Thermal Annealing Results Report required by paragraph (d) of this section
but instead shall confirm in writing to the Director, Office of Nuclear Reactor Regulation that the partial annealing was otherwise performed in accordance with the Thermal
Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program. The licensee may restart its reactor after the requirements of paragraph (f)(2) of
this section have been met.
(ii) If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test
Program, and the licensee elects to take full or partial credit for the partial annealing, the licensee shall confirm in writing to the Director, Office of Nuclear Reactor Regulation that
the partial annealing was otherwise performed in compliance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program.
The licensee may restart its reactor after the requirements of paragraph (f)(2) of this section have been met.
(iii) If the partial annealing was not performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program,
the licensee shall submit a summary of lack of compliance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program and a justification for
subsequent operation to the Director, Office of Nuclear Reactor Regulation. Any changes to the facility as described in the updated final safety analysis report which are attributable
to the noncompliances and constitute unreviewed safety questions, and any changes to the technical specifications which are required as a result of the noncompliances, shall also be
identified.
(A) If no unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor after the requirements of paragraph (f)(2) of this section
have been met.
(B) If any unreviewed safety questions or changes to technical specifications are identified, the licensee may not restart its reactor until approval is obtained from the Director,
Office of Nuclear Reactor Regulation and the requirements of paragraph (f)(2) of this section have been met.
(d) Thermal Annealing Results Report. Every licensee that either completes a thermal annealing, or that terminates an annealing but elects to take full or partial credit for the
annealing, shall provide the following information within three months of completing the thermal anneal, unless an extension is authorized by the Director, Office of Nuclear
Reactor Regulation:
(1) The time and temperature profiles of the actual thermal annealing;
(2) The post-anneal RTNDT and Charpy upper-shelf energy values of the reactor vessel materials for use in subsequent reactor operation;
(3) The projected post-anneal reembrittlement trends for both RTNDT and Charpy upper-shelf energy; and
(4) The projected values of RTPTS and Charpy upper-shelf energy at the end of the proposed period of operation addressed in the Thermal Annealing Report.
(e) Procedures for Determining the Recovery of Fracture Toughness. The procedures of this paragraph must be used to determine the percent recovery of RTNDT, Rt, and percent
recovery of Charpy upper-shelf energy, Ru. In all cases, Rt and Ru may not exceed 100.
(1) For those reactors with surveillance programs which have developed credible surveillance data as defined in § 50.61, percent recovery due to thermal annealing (Rt and Ru) must
be evaluated by testing surveillance specimens that have been withdrawn from the surveillance program and that have been annealed under the same time and temperature
conditions as those given the beltline material.
(2) Alternatively, the percent recovery due to thermal annealing (Rt
and Ru) may be determined from the results of a verification
test program employing materials removed from the beltline region of the
reactor vessel6 and that have been annealed
under the same time and temperature conditions as those given the beltline
material.
(3) Generic computational methods may be used to determine recovery if adequate justification is provided.
(f) Public information and participation. (1) Upon receipt of a Thermal Annealing Report, and a minimum of 30 days before the licensee starts thermal annealing, the Commission
shall:
(i) Notify and solicit comments from local and State governments in the vicinity of the site where the thermal annealing will take place and any Indian Nation or other indigenous
people that have treaty or statutory rights that could be affected by the thermal annealing,
(ii) Publish a notice of a public meeting in the FEDERAL REGISTER and in a forum, such as local newspapers, which is readily accessible to individuals in the vicinity of the site, to
solicit comments from the public, and
(iii) Hold a public meeting on the licensee's Thermal Annealing Report.
(2) Within 15 days after the NRC's receipt of the licensee submissions required by paragraphs (c)(1), (c)(2) and (c)(3)(i) through (iii) of this section, the NRC staff shall make
available at the NRC Web site, http://www.nrc.gov, a summary of its inspection of the licensee's thermal annealing, and the Commission shall hold a public meeting:
(i) For the licensee to explain to NRC and the public the results of the reactor pressure vessel annealing,
(ii) for the NRC to discuss its inspection of the reactor vessel annealing, and
(iii) for the NRC to receive public comments on the annealing.
(3) Within 45 days of NRC's receipt of the licensee submissions required by
paragraphs (c)(1), (c)(2) and (c)(3)(i) through (iii) of this section,
the NRC staff shall complete full documentation of its inspection of the
licensee's annealing process and make available this documentation at
the NRC Web site, http://www.nrc.gov.
[60 FR 65472, Dec. 19, 1995, as amended at 64 FR 48952, Sept. 9, 1999;
64 FR 53613, Oct. 4, 1999]
Effective Date Note: See 64 FR 53582, Oct. 4, 1999, for effectiveness
of Sec. 50.66 (b) introductory text, paragraphs (b)(4), (c)(2), and (c)(3)(iii).
6 For those cases where materials are removed
from the beltline of the pressure vessel, the stress limits of the applicable
portions of the ASME Code Section III must be satisfied, including consideration
of fatigue and corrosion, regardless of the Code of record for the vessel
design.
§ 50.67 Accident source term.
(a) Applicability. The requirements of this section apply to all holders of operating licenses issued prior to January 10, 1997, and holders of renewed licenses under part 54 of this
chapter whose initial operating license was issued prior to January 10, 1997, who seek to revise the current accident source term used in their design basis radiological analyses.
(b) Requirements. (1) A licensee who seeks to revise its current accident source term in design basis radiological consequence analyses shall apply for a license amendment under
§ 50.90. The application shall contain an evaluation of the consequences of applicable design basis accidents1 previously analyzed in the safety analysis report.
(2) The NRC may issue the amendment only if the applicant's analysis demonstrates with reasonable assurance that:
(i) An individual located at any point on the boundary of the exclusion area for any 2-hour period following the onset of the postulated fission product release, would not receive a
radiation dose in excess of 0.25 Sv (25 rem)2 total effective dose equivalent (TEDE).
(ii) An individual located at any point on the outer boundary of the low population zone, who is exposed to the radioactive cloud resulting from the postulated fission product release
(during the entire period of its passage), would not receive a radiation dose in excess of 0.25 Sv (25 rem) total effective dose equivalent (TEDE).
(iii) Adequate radiation protection is provided to permit access to and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 0.05 Sv (5 rem) total effective dose equivalent (TEDE) for the duration of the accident.
[64 FR 72001, Dec. 23, 1999]
1 The fission product release assumed for these calculations should be based upon a major accident, hypothesized for purposes of design analyses or postulated from considerations of possible accidental events, that would result in potential hazards not exceeded by those from any accident considered credible. Such accidents have generally been assumed to result in substantial meltdown of the core with subsequent release of appreciable quantities of fission products.
2 The use of 0.25 Sv (25 rem) TEDE is not intended to imply that this value constitutes an acceptable limit for emergency doses to the public under accident conditions. Rather, this 0.25 Sv (25 rem) TEDE value has been stated in this section as a reference value, which can be used in the evaluation of proposed design basis changes with respect to potential reactor accidents of exceedingly low probability of occurrence and low risk of public exposure to radiation.
§ 50.68 Criticality accident requirements.
(a) Each holder of a construction permit or operating license for a nuclear power reactor issued under this part or a
combined license for a nuclear power reactor issued under Part 52 of this chapter, shall comply with either 10 CFR 70.24 of
this chapter or the requirements in paragraph (b) of this section.
(b) Each licensee shall comply with the following requirements in lieu of maintaining a monitoring system capable of
detecting a criticality as described in 10 CFR 70.24:
(1) Plant procedures shall prohibit the handling and storage at any one time of more fuel assemblies than have been
determined to be safely subcritical under the most adverse moderation conditions feasible by unborated water.
(2) The estimated ratio of neutron production to neutron absorption and leakage (k-effective) of the fresh fuel in the fresh
fuel storage racks shall be calculated assuming the racks are loaded with fuel of the maximum fuel assembly reactivity and
flooded with unborated water and must not exceed 0.95, at a 95 percent probability, 95 percent confidence level. This
evaluation need not be performed if administrative controls and/or design features prevent such flooding or if fresh fuel
storage racks are not used.
(3) If optimum moderation of fresh fuel in the fresh fuel storage racks occurs when the racks are assumed to be loaded with
fuel of the maximum fuel assembly reactivity and filled with low-density hydrogenous fluid, the k-effective corresponding
to this optimum moderation must not exceed 0.98, at a 95 percent probability, 95 percent confidence level. This evaluation
need not be performed if administrative controls and/or design features prevent such moderation or if fresh fuel storage
racks are not used.
(4) If no credit for soluble boron is taken, the k-effective of the spent fuel storage racks loaded with fuel of the maximum
fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with
unborated water. If credit is taken for soluble boron, the k-effective of the spent fuel storage racks loaded with fuel of the
maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded
with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 percent
confidence level, if flooded with unborated water.
(5) The quantity of SNM, other than nuclear fuel stored onsite, is less than the quantity necessary for a critical mass.
(6) Radiation monitors are provided in storage and associated handling areas when fuel is present to detect excessive
radiation levels and to initiate appropriate safety actions.
(7) The maximum nominal U-235 enrichment of the fresh fuel assemblies is limited to five (5.0) percent by weight.
(8) The FSAR is amended no later than the next update which § 50.71(e) of this
part requires, indicating that the licensee has chosen to comply with
§ 50.68(b).
(c) While a spent fuel transportation
package approved under Part 71 of this
chapter or spent fuel storage cask
approved under Part 72 of this chapter
is in the spent fuel pool:
(1) The requirements in § 50.68(b) do
not apply to the fuel located within that
package or cask; and
(2) The requirements in Part 71 or 72
of this chapter, as applicable, and the
requirements of the Certificate of
Compliance for that package or cask,
apply to the fuel within that package or
cask.
[63 FR 63130, Nov. 12, 1998; as amended at 71 FR 66648, Nov. 16, 2006]
Inspections, Records, Reports, Notifications
§ 50.69 Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
(a) Definitions.
Risk-Informed Safety Class (RISC)–1 structures, systems, and components (SSCs) means safety-related SSCs that perform safety significant functions.
Risk-Informed Safety Class (RISC)–2 structures, systems and components (SSCs) means nonsafety-related SSCs that perform safety significant functions.
Risk-Informed Safety Class (RISC)–3 structures, systems and components (SSCs) means safety-related SSCs that perform low safety significant functions.
Risk-Informed Safety Class (RISC)–4 structures, systems and components (SSCs) means nonsafety-related SSCs that perform low safety significant functions.
Safety significant function means a function whose degradation or loss could result in a significant adverse effect on defense-in-depth, safety margin, or risk.
(b) Applicability and scope of risk-informed treatment of SSCs and submittal/approval process. (1) A holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder of a renewed LWR license under part 54 of this chapter; an applicant for a construction permit or operating license under this part; or an applicant for a design approval, a combined license, or manufacturing license under part 52 of this chapter; may voluntarily comply with the requirements in this section as an alternative to compliance with the following requirements for RISC–3 and RISC–4 SSCs:
(i) 10 CFR part 21.
(ii) The portion of 10 CFR 50.46a(b) that imposes requirements to conform to Appendix B to 10 CFR part 50.
(iii) 10 CFR 50.49.
(iv) 10 CFR 50.55(e).
(v) The inservice testing requirements in 10 CFR 50.55a(f); the inservice inspection, and repair and replacement (with the exception of fracture toughness), requirements for ASME Class 2 and Class 3 SSCs in 10 CFR 50.55a(g); and the electrical component quality and qualification requirements in Section 4.3 and 4.4 of IEEE 279, and Sections 5.3 and 5.4 of IEEE 603-1991, as incorporated by reference in 10 CFR 50.55a(h).
(vi) 10 CFR 50.65, except for paragraph (a)(4).
(vii) 10 CFR 50.72.
(viii) 10 CFR 50.73.
(ix) Appendix B to 10 CFR part 50.
(x) The Type B and Type C leakage testing requirements in both Options A and B of Appendix J to 10 CFR part 50, for penetrations and valves meeting the following criteria:
(A) Containment penetrations that are either 1-inch nominal size or less, or continuously pressurized.
(B) Containment isolation valves that meet one or more of the following criteria:
(1) The valve is required to be open under accident conditions to prevent or mitigate core damage events;
(2) The valve is normally closed and in a physically closed, water- filled system;
(3) The valve is in a physically closed system whose piping pressure rating exceeds the containment design pressure rating and is not connected to the reactor coolant pressure boundary; or
(4) The valve is 1-inch nominal size or less.
(xi) Appendix A to part 100, Sections VI(a)(1) and VI(a)(2), to the extent that these regulations require qualification testing and specific engineering methods to demonstrate that SSCs are designed to withstand the Safe Shutdown Earthquake and Operating Basis Earthquake.
(2) A licensee voluntarily choosing to implement this section shall submit an application for license amendment under § 50.90 that contains the following information:
(i) A description of the process for categorization of RISC–1, RISC–2, RISC–3 and RISC–4 SSCs.
(ii) A description of the measures taken to assure that the quality and level of detail of the systematic processes that evaluate the plant for internal and external events during normal operation, low power, and shutdown (including the plant-specific probabilistic risk assessment (PRA), margins-type approaches, or other systematic evaluation techniques used to evaluate severe accident vulnerabilities) are adequate for the categorization of SSCs.
(iii) Results of the PRA review process conducted to meet § 50.69(c)(1)(i).
(iv) A description of, and basis for acceptability of, the evaluations to be conducted to satisfy § 50.69(c)(1)(iv). The evaluations must include the effects of common cause interaction susceptibility, and the potential impacts from known degradation mechanisms for both active and passive functions, and address internally and externally initiated events and plant operating modes (e.g., full power and shutdown conditions).
(3) The Commission will approve a licensee's implementation of this section if it determines that the process for categorization of RISC–1, RISC–2, RISC–3, and RISC–4 SSCs satisfies the requirements of § 50.69(c) by issuing a license amendment approving the licensee's use of this section.
(4) An applicant choosing to implement this section shall include the information in § 50.69(b)(2) as part of application. The Commission will approve an applicant's implementation of this section if it determines that the process for categorization of RISC–1, RISC–2, RISC–3, and RISC–4 SSCs satisfies the requirements of § 50.69(c).
(c) SSC Categorization Process. (1) SSCs must be categorized as RISC–1, RISC–2, RISC–3, or RISC–4 SSCs using a categorization process that determines if an SSC performs one or more safety significant functions and identifies those functions. The process must:
(i) Consider results and insights from the plant-specific PRA. This PRA must at a minimum model severe accident scenarios resulting from internal initiating events occurring at full power operation. The PRA must be of sufficient quality and level of detail to support the categorization process, and must be subjected to a peer review process assessed against a standard or set of acceptance criteria that is endorsed by the NRC.
(ii) Determine SSC functional importance using an integrated, systematic process for addressing initiating events (internal and external), SSCs, and plant operating modes, including those not modeled in the plant-specific PRA. The functions to be identified and considered include design bases functions and functions credited for mitigation and prevention of severe accidents. All aspects of the integrated, systematic process used to characterize SSC importance must reasonably reflect the current plant configuration and operating practices, and applicable plant and industry operational experience.
(iii) Maintain defense-in-depth.
(iv) Include evaluations that provide reasonable confidence that for SSCs categorized as RISC–3, sufficient safety margins are maintained and that any potential increases in core damage frequency (CDF) and large early release frequency (LERF) resulting from changes in treatment permitted by implementation of § § 50.69(b)(1) and (d)(2) are small.
(v) Be performed for entire systems and structures, not for selected components within a system or structure.
(2) The SSCs must be categorized by an Integrated Decision-Making Panel (IDP) staffed with expert, plant-knowledgeable members whose expertise includes, at a minimum, PRA, safety analysis, plant operation, design engineering, and system engineering.
(d) Alternative treatment requirements—(1) RISC–1 and RISC 2 SSCs. The licensee or applicant shall ensure that RISC–1 and RISC–2 SSCs perform their functions consistent with the categorization process assumptions by evaluating treatment being applied to these SSCs to ensure that it supports the key assumptions in the categorization process that relate to their assumed performance.
(2) RISC–3 SSCs. The licensee or applicant shall ensure, with reasonable confidence, that RISC–3 SSCs remain capable of performing their safety-related functions under design basis conditions, including seismic conditions and environmental conditions and effects throughout their service life. The treatment of RISC–3 SSCs must be consistent with the categorization process. Inspection and testing, and corrective action shall be provided for RISC–3 SSCs.
(i) Inspection and testing. Periodic inspection and testing activities must be conducted to determine that RISC–3 SSCs will remain capable of performing their safety-related functions under design basis conditions; and
(ii) Corrective action. Conditions that would prevent a RISC–3 SSC from performing its safety-related functions under design basis conditions must be corrected in a timely manner. For significant conditions adverse to quality, measures must be taken to provide reasonable confidence that the cause of the condition is determined and corrective action taken to preclude repetition.
(e) Feedback and process adjustment—(1) RISC–1, RISC–2, RISC–3 and RISC–4 SSCs. The licensee shall review changes to the plant, operational practices, applicable plant and industry operational experience, and, as appropriate, update the PRA and SSC categorization and treatment processes. The licensee shall perform this review in a timely manner but no longer than once every two refueling outages.
(2) RISC–1 and RISC–2 SSCs. The licensee shall monitor the performance of RISC–1 and RISC–2 SSCs. The licensee shall make adjustments as necessary to either the categorization or treatment processes so that the categorization process and results are maintained valid.
(3) RISC–3 SSCs. The licensee shall consider data collected in § 50.69(d)(2)(i) for RISC–3 SSCs to determine if there are any adverse changes in performance such that the SSC unreliability values approach or exceed the values used in the evaluations conducted to satisfy § 50.69(c)(1)(iv). The licensee shall make adjustments as necessary to the categorization or treatment processes so that the categorization process and results are maintained valid.
(f) Program documentation, change control and records. (1) The licensee or applicant shall document the basis for its categorization of any SSC under paragraph (c) of this section before removing any requirements under § 50.69(b)(1) for those SSCs.
(2) Following implementation of this section, licensees and applicants shall update their final safety analysis report (FSAR) to reflect which systems have been categorized, in accordance with § 50.71(e).
(3) When a licensee first implements this section for a SSC, changes to the FSAR for the implementation of the changes in accordance with § 50.69(d) need not include a supporting § 50.59 evaluation of the changes directly related to implementation. Thereafter, changes to the programs and procedures for implementation of § 50.69(d), as described in the FSAR, may be made if the requirements of this section and § 50.59 continue to be met.
(4) When a licensee first implements this section for a SSC, changes to the quality assurance plan for the implementation of the changes in accordance with § 50.69(d) need not include a supporting § 50.54(a) review of the changes directly related to implementation. Thereafter, changes to the programs and procedures for implementation of § 50.69(d), as described in the quality assurance plan may be made if the requirements of this section and § 50.54(a) continue to be met.
(g) Reporting. The licensee shall submit a licensee event report under § 50.73(b) for any event or condition that prevented, or would have prevented, a RISC–1 or RISC–2 SSC from performing a safety significant function.
[69 FR 68047, Nov. 22, 2004]
§ 50.70 Inspections.
(a) Each applicant for or holder of a license, including a construction permit or an early site permit, shall permit inspection, by duly authorized representatives of the Commission, of his records, premises, activities, and of licensed materials in possession or use, related to the license or construction permit or early site permit as may be necessary to effectuate the purposes of the Act, as amended, including Section 105 of the Act, and the Energy Reorganization Act of 1974, as amended.
(b)(1) Each licensee and each holder of a construction permit shall, upon request by the Director, Office of Nuclear Reactor Regulation, provide rent-free office space for the exclusive use of the Commission inspection personnel. Heat, air conditioning, light, electrical outlets, and janitorial services shall be furnished by each licensee and each holder of a construction permit. The office shall be convenient to and have full access to the facility and shall provide the inspector both visual and acoustic privacy.
(2) For a site with a single power reactor or fuel facility licensed under part 50 or part 52 of this chapter, or a facility issued a manufacturing license under part 52, the space provided shall be adequate to accommodate a full-time inspector, a part-time secretary and transient NRC personnel and will be generally commensurate with other office facilities at the site. A space of 250 square feet either within the site’s office complex or in an office trailer or other onsite space is suggested as a guide. For sites containing multiple power reactor units or fuel facilities, additional space may be requested to accommodate additional full-time inspector(s). The office space that is provided shall be subject to the
approval of the Director, Office of Nuclear Reactor Regulation. All furniture, supplies and communication equipment will be furnished by the Commission.
(3) The licensee or construction permit holder shall afford any NRC resident inspector assigned to that site, or other NRC inspectors identified by the Regional Administrator as likely to inspect the facility, immediate unfettered access, equivalent to access provided regular plant employees, following proper identification and compliance with applicable access control measures for security, radiological protection and personal safety.
(4) The licensee or construction permit holder (nuclear power reactor only) shall ensure that the arrival and presence of an NRC inspector, who has been properly authorized facility access as described in paragraph (b)(3) of this section, is not announced or otherwise communicated by its employees or contractors to other persons at the facility unless specifically requested by the NRC inspector.
[21 FR 355, Jan. 19, 1956; 44 FR 47919, Aug. 16, 1979, as amended at 52 FR 31612, Aug. 21, 1987; 53 FR 42942, Oct. 25, 1988; 72 FR 49501, Aug. 28, 2007; 73 FR 5722, Jan. 31, 2008; 75 FR 73944, Nov. 30, 2010; 84 FR 65644, Nov. 29, 2019]
§ 50.71 Maintenance of records, making of reports.
(a) Each licensee, including each holder of a construction permit or early site permit, shall maintain all records and make all reports, in connection with the activity, as may be required by the conditions of the license or permit or by the regulations, and orders of the Commission in effectuating the purposes of the Act, including Section 105 of the Act, and the Energy Reorganization Act of 1974, as amended. Reports must be submitted in accordance with § 50.4 or 10 CFR 52.3, as applicable.
(b) With respect to any production or utilization facility of a type described in § 50.21(b) or 50.22, or a testing facility, each licensee and each holder of a construction permit shall submit its annual financial report, including the certified financial statements, to the Commission, as specified in § 50.4, upon issuance of the report. However, licensees and holders of a construction permit who submit a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission, need not submit the annual financial report or the certified financial statement under this paragraph.
(c) Records that are required by the regulations in this part or part 52 of this chapter, by license condition, or by technical specifications must be retained for the period specified by the appropriate regulation, license condition, or technical specification. If a retention period is not otherwise specified, these records must be retained until the Commission terminates the facility license or, in the
case of an early site permit, until the permit expires.
(d)(1) Records which must be maintained under this part or part 52 of this chapter may be the original or a reproduced copy or microform if the reproduced copy or microform is duly authenticated by authorized personnel and the microform is capable of producing a clear and legible copy after storage for the period specified by Commission regulations. The record may also be stored in electronic media with the capability of producing legible, accurate, and complete records during the required retention period. Records such as letters, drawings, and specifications, must include all pertinent information such as stamps, initials, and signatures. The licensee shall maintain adequate safeguards against tampering with, and loss of records.
(2) If there is a conflict between the Commission's regulations in this part, license condition, or technical specification, or other written Commission approval or authorization pertaining to the retention period for the same type of record, the retention period specified in the regulations in this part for such records shall apply unless the Commission, pursuant to § 50.12 of this part, has granted a specific exemption from the record retention requirements specified in the regulations in this part.
(e) Each person licensed to operate a nuclear power reactor under the provisions of § 50.21 or § 50.22, and each applicant for a combined license under part 52 of this chapter, shall update periodically, as provided in paragraphs (e) (3) and (4) of this section, the final safety analysis report (FSAR) originally submitted as part of the application for the license, to assure that the information included in the report contains the latest information developed. This submittal shall contain all the changes necessary to reflect information and analyses submitted to the Commission by the applicant or
licensee or prepared by the applicant or licensee pursuant to Commission requirement since the submittal of the original FSAR, or as appropriate, the last update to the FSAR under this section. The submittal shall include the effects 1 of all changes made in the facility or procedures as described in the FSAR; all safety analyses and evaluations performed by the applicant or licensee either in support of approved license amendments or in support of conclusions that changes did not require a license amendment in accordance with § 50.59(c)(2) or, in the case of a license that references a certified design, in accordance with § 52.98(c) of this chapter; and all analyses of new safety issues performed by or on behalf of the applicant or licensee at Commission request. The updated information shall be appropriately located within the update to the FSAR.
(1) The licensee shall submit revisions containing updated information to the Commission, as specified in § 50.4, on a replacement-page basis that is accompanied by a list which identifies the current pages of the FSAR following page replacement.
(2) The submittal shall include (i) a certification by a duly authorized officer of the licensee that either the information accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement, or that no such changes were made; and (ii) an identification of changes made under the provisions of § 50.59 but not previously submitted to the Commission.
(3)(i) A revision of the original FSAR containing those original pages that are still applicable plus new replacement pages shall be filed within 24 months of either July 22, 1980, or the date of issuance of the operating license, whichever is later, and shall bring the FSAR up to date as of a maximum of 6 months prior to the date of filing the revision.
(ii) [Reserved]
(iii) During the period from the docketing of an application for a combined license under subpart C of
part 52 of this chapter until the Commission makes the finding under § 52.103(g) of this chapter, the update to the FSAR must be submitted annually.
(4) Subsequent revisions must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months. The revisions must reflect all changes up to a maximum of 6 months prior to the date of filling. For nuclear power reactor facilities that have submitted the certifications required by § 50.82(a)(1), subsequent revisions must be filed every 24 months.
(5) Each replacement page shall include both a change indicator for the area changed, e.g., a bold line vertically drawn in the margin adjacent to the portion actually changed, and a page change identification (date of change or change number or both).
(6) The updated FSAR shall be retained by the licensee until the Commission terminates their license.
(f) Each person licensed to manufacture a nuclear power reactor under subpart F of 10 CFR part 52 shall
update the FSAR originally submitted as part of the application to reflect any modification to the design that is approved by the Commission under § 52.171 of this chapter, and any new analyses of the design performed by or on behalf of the licensee at the NRC's request. This submittal shall contain all the changes necessary to reflect information and analyses submitted to the Commission by the licensee or
prepared by the licensee with respect to the modification approved under § 52.171 of this chapter or the analyses requested by the Commission under § 52.171 of this chapter. The updated information shall be appropriately located within the update to the FSAR.
(g) The provisions of this section apply to nuclear power reactor licensees that have submitted the certification of permanent cessation of operations required under §§ 50.82(a)(1)(i) or 52.110(a)(1) of this chapter. The provisions of paragraphs (a), (c), and (d) of this section also apply to non-power reactor licensees that are no longer authorized to operate.
(h)(1) No later than the scheduled date for initial loading of fuel, each holder of a combined license under subpart C of 10 CFR part 52 shall develop a level 1 and a level 2 probabilistic risk assessment (PRA). The PRA must cover those initiating events and modes for which NRC-endorsed consensus standards on PRA exist one year prior to the scheduled date for initial loading of fuel.
(2) Each holder of a combined license shall maintain and upgrade the PRA required by paragraph (h)(1) of this section. The upgraded PRA must cover initiating events and modes of operation contained in NRC-endorsed consensus standards on PRA in effect one year prior to each required upgrade. The PRA must be upgraded every four years until the permanent cessation of operations under § 52.110(a) of this chapter.
(3) Each holder of a combined license shall, no later than the date on which the licensee submits an application for a renewed license, upgrade the PRA required by paragraph (h)(1) of this section to cover all modes and all initiating events.
1 Effects of changes includes appropriate revisions of descriptions in the FSAR such that the FSAR (as updated) is complete and accurate.
[33 FR 9704, July 4, 1968, as amended at 41 FR 18303, May 3, 1976; 45 FR 30615, May 9, 1980; 51 FR 40310, Nov. 6, 1986; 53 FR 19250, May 27, 1988; 57 FR 39358, Aug. 31, 1992; 61 FR 39301, July 29, 1996; 64 FR 53614, Oct. 4, 1999; 71 FR 29246, May 22, 2006; 72 FR 49501, Aug. 28, 2007; 86 FR 43402, Aug. 9, 2021]
Effective Date Note: See 64 FR 53582, Oct. 4, 1999, for effectiveness of § 50.71(e) introductory text.
§ 50.72 Immediate notification requirements for operating nuclear power reactors.
(a) General requirements.1 (1) Each nuclear power reactor licensee licensed under §§ 50.21(b) or 50.22 holding an operating license under this part or a combined license under part 52 of this chapter after the Commission makes the finding under § 52.103(g), shall notify the NRC Operations Center via the Emergency Notification System of:
(i) The declaration of any of the Emergency Classes specified in the licensee's approved Emergency Plan; 2 or
(ii) Those non-emergency events specified in paragraph (b) of this section that occurred within three years of the date of discovery.
(2) If the Emergency Notification System is inoperative, the licensee shall make the required notifications via commercial telephone service, other dedicated telephone system, or any other method which will ensure that a
report is made as soon as practical to the NRC Headquarters Operations Center at the numbers specified in appendix A to part 73 of this chapter.
(3) The licensee shall notify the NRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of
the Emergency Classes.
(4) The licensee shall activate the Emergency Response Data System (ERDS) 3 as soon as possible but not later than one hour after declaring an Emergency Class of alert, site area emergency, or general emergency. The ERDS may also be activated by the licensee during emergency drills or exercises if the licensee's computer system has the capability to transmit the exercise data.
(5) When making a report under paragraph (a)(1) of this section, the licensee shall identify:
(i) The Emergency Class declared; or
(ii) Paragraph (b)(1), “One-hour reports,” paragraph (b)(2), “Four-hour reports,” or paragraph (b)(3), “Eight-hour reports,” as the paragraph of this section requiring notification of the non-emergency event.
(b) Non-emergency events--(1) One-hour reports. If not reported as a declaration of an Emergency Class under paragraph (a) of this section, the licensee shall notify the NRC as soon as practical and in all cases within one hour of the occurrence of any deviation from the plant's Technical Specifications authorized pursuant to Sec. 50.54(x) of this part.
(2) Four-hour reports. If not reported under paragraphs (a) or (b)(1) of this section, the licensee shall notify the NRC as soon as practical and in all cases, within four hours of the occurrence of any of the following:
(i) The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.
(ii)-(iii) [Reserved]
(iv)(A) Any event that results or should have resulted in emergency core cooling system (ECCS) discharge into the reactor coolant system as a result of a valid signal except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.
(B) Any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.
(v)-(x) [Reserved]
(xi) Any event or situation, related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made. Such an event may include an onsite fatality or inadvertent release of radioactively contaminated materials.
(3) Eight-hour reports. If not reported under paragraphs (a), (b)(1) or (b)(2) of this section, the licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any of the following:
(i) [Reserved]
(ii) Any event or condition that results in:
(A) The condition of the nuclear power plant, including its principal safety barriers, being seriously degraded; or
(B) The nuclear power plant being in an unanalyzed condition that significantly degrades plant safety.
(iii) [Reserved]
(iv)(A) Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B) of this section, except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.
(B) The systems to which the requirements of paragraph (b)(3)(iv)(A) of this section apply are:
(1) Reactor protection system (RPS) including: Reactor scram and reactor trip. 4
(2) General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).
(3) Emergency core cooling systems (ECCS) for pressurized water reactors (PWRs) including: High-head, intermediate-head, and low-head injection systems and the low pressure injection function of residual (decay) heat removal systems.
(4) ECCS for boiling water reactors (BWRs) including: High-pressure and low-pressure core spray systems; high-pressure coolant injection system; low pressure injection function of the residual heat removal system.
(5) BWR reactor core isolation cooling system; isolation condenser system; and feedwater coolant injection system.
(6) PWR auxiliary or emergency feedwater system.
(7) Containment heat removal and depressurization systems, including containment spray and fan cooler systems.
(8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs); hydroelectric facilities used in lieu of EDGs at the Oconee Station; and BWR dedicated Division 3 EDGs.
(v) Any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to:
(A) Shut down the reactor and maintain it in a safe shutdown condition;
(B) Remove residual heat;
(C) Control the release of radioactive material; or
(D) Mitigate the consequences of an accident.
(vi) Events covered in paragraph (b)(3)(v) of this section may include one or more procedural errors, equipment failures, and/or discovery of design, analysis, fabrication, construction, and/or procedural inadequacies. However, individual component failures need not be reported pursuant to paragraph (b)(3)(v) of this section if redundant equipment in the same system was operable and available to perform the required safety function.
(vii)-(xi) [Reserved]
(xii) Any event requiring the transport of a radioactively contaminated person to an offsite medical facility for treatment.
(xiii) Any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).
(c) Followup notification. With respect to the telephone notifications made under paragraphs (a) and (b) of this section, in addition to making the required initial notification, each licensee, shall during the course of the event:
(1) Immediately report (i) any further degradation in the level of safety of the plant or other worsening plant conditions, including those that require the declaration of any of the Emergency Classes, if such a declaration has not been previously made, or (ii) any change from one Emergency Class to another, or (iii) a termination of the Emergency Class.
(2) Immediately report (i) the results of ensuing evaluations or assessments of plant conditions, (ii) the effectiveness of response or protective measures taken, and (iii) information related to plant behavior that is not understood.
(3) Maintain an open, continuous communication channel with the NRC Operations Center upon request by the NRC.
1. Other requirements for immediate notification of the NRC by licensed operating nuclear power reactors are contained elsewhere in this chapter, in particular Secs. 20.1906, 20.2202, 50.36, 72.74, 72.75, and 73.1200.
2. These Emergency Classes are addressed in Appendix E of this part.
3. Requirements for ERDS are addressed in Appendix E, Section VI.
4. Actuation of the RPS when the reactor is critical is reportable under paragraph (b)(2)(iv)(B) of this section.
[48 FR 39046, Aug. 29, 1983; 48 FR 40882, Sept. 12, 1983; 55 FR 29194, July 18, 1990, as amended at 56 FR 944, Jan. 10, 1991; 56 FR 23473, May 21, 1991; 56 FR 40184, Aug. 13, 1991; 57 FR 41381, Sept. 10, 1992; 58 FR 67661, Dec. 22, 1993; 59 FR 14087, Mar. 25, 1994; 65 FR 63786, Oct. 25, 2000; 72 FR 49502, Aug. 28, 2007; 85 FR 65662, Oct. 16, 2020; 87 FR 20697, Apr. 8, 2022; 88 FR 15880, Mar. 14, 2023]
§ 50.73 Licensee event report system.
(a) Reportable events. (1) The holder of an operating license
under this part or a combined license
under part 52 of this chapter (after the
Commission has made the finding under § 52.103(g) of this chapter) for a nuclear
power plant (licensee) shall submit a
Licensee Event Report (LER) for any
event of the type described in this
paragraph within 60 days after the
discovery of the event. In the case of an
invalid actuation reported under § 50.73(a)(2)(iv), other than actuation of
the reactor protection system (RPS)
when the reactor is critical, the licensee
may, at its option, provide a telephone
notification to the NRC Operations
Center within 60 days after discovery of
the event instead of submitting a written
LER. Unless otherwise specified in this
section, the licensee shall report an
event if it occurred within 3 years of the
date of discovery regardless of the plant
mode or power level, and regardless of
the significance of the structure, system,
or component that initiated the event.
(2) The licensee shall report:
(i)(A) The completion of any nuclear plant shutdown required by the plant's Technical Specifications.
(B) Any operation or condition which was prohibited by the plant's Technical Specifications except when:
(1) The Technical Specification is administrative in nature;
(2) The event consisted solely of a case of a late surveillance test where the oversight was corrected, the test was performed, and the equipment was found to be capable of
performing its specified safety functions; or
(3) The Technical Specification was revised prior to discovery of the event such that the operation or condition was no longer prohibited at the time of discovery of the event.
(C) Any deviation from the plant's Technical Specifications authorized pursuant to Sec. 50.54(x) of this part.
(ii) Any event or condition that resulted in:
(A) The condition of the nuclear power plant, including its principal safety barriers, being seriously degraded; or
(B) The nuclear power plant being in an unanalyzed condition that significantly degraded plant safety.
(iii) Any natural phenomenon or other external condition that posed an actual threat to the safety of the nuclear power plant or significantly hampered site personnel in the
performance of duties necessary for the safe operation of the nuclear power plant.
(iv)(A) Any event or condition that resulted in manual or automatic actuation of any of the systems listed in paragraph (a)(2)(iv)(B) of this section, except when:
(1) The actuation resulted from and was part of a pre-planned sequence during testing or reactor operation; or
(2) The actuation was invalid and;
(i) Occurred while the system was properly removed from service; or
(ii) Occurred after the safety function had been already completed.
(B) The systems to which the requirements of paragraph (a)(2)(iv)(A) of this section apply are:
(1) Reactor protection system (RPS) including: reactor scram or reactor trip.
(2) General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs).
(3) Emergency core cooling systems (ECCS) for pressurized water reactors (PWRs) including: high-head, intermediate-head, and low-head injection systems and the low pressure
injection function of residual (decay) heat removal systems.
(4) ECCS for boiling water reactors (BWRs) including: high-pressure and low-pressure core spray systems; high-pressure coolant injection system; low pressure injection function
of the residual heat removal system.
(5) BWR reactor core isolation cooling system; isolation condenser system; and feedwater coolant injection system.
(6) PWR auxiliary or emergency feedwater system.
(7) Containment heat removal and depressurization systems, including containment spray and fan cooler systems.
(8) Emergency ac electrical power systems, including: emergency diesel generators (EDGs); hydroelectric facilities used in lieu of EDGs at the Oconee Station; and BWR dedicated
Division 3 EDGs.
(9) Emergency service water systems that do not normally run and that serve as ultimate heat sinks.
(v) Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to:
(A) Shut down the reactor and maintain it in a safe shutdown condition;
(B) Remove residual heat;
(C) Control the release of radioactive material; or
(D) Mitigate the consequences of an accident.
(vi) Events covered in paragraph (a)(2)(v) of this section may include one or more procedural errors, equipment failures, and/or discovery of design, analysis, fabrication,
construction, and/or procedural inadequacies. However, individual component failures need not be reported pursuant to paragraph (a)(2)(v) of this section if redundant equipment in
the same system was operable and available to perform the required safety function.
(vii) Any event where a single cause or condition caused at least one independent train or channel to become inoperable in multiple systems or two independent trains or channels to
become inoperable in a single system designed to:
(A) Shut down the reactor and maintain it in a safe shutdown condition;
(B) Remove residual heat;
(C) Control the release of radioactive material; or
(D) Mitigate the consequences of an accident.
(viii)(A) Any airborne radioactive release that, when averaged over a time period of 1 hour, resulted in airborne radionuclide concentrations in an unrestricted area that exceeded 20
times the applicable concentration limits specified in appendix B to part 20, table 2, column 1.
(B) Any liquid effluent release that, when averaged over a time period of 1 hour, exceeds 20 times the applicable concentrations specified in appendix B to part 20, table 2, column
2, at the point of entry into the receiving waters (i.e., unrestricted area) for all radionuclides except tritium and dissolved noble gases.
(ix)(A) Any event or condition that as a result of a single cause could have prevented the fulfillment of a safety function for two or more trains or channels in different systems that
are needed to:
(1) Shut down the reactor and maintain it in a safe shutdown condition;
(2) Remove residual heat;
(3) Control the release of radioactive material; or
(4) Mitigate the consequences of an accident.
(B) Events covered in paragraph (a)(2)(ix)(A) of this section may include cases of procedural error, equipment failure, and/or discovery of a design, analysis, fabrication,
construction, and/or procedural inadequacy. However, licensees are not required to report an event pursuant to paragraph (a)(2)(ix)(A) of this section if the event results from:
(1) A shared dependency among trains or channels that is a natural or expected consequence of the approved plant design; or
(2) Normal and expected wear or degradation.
(x) Any event that posed an actual threat to the safety of the nuclear power plant or significantly hampered site personnel in the performance of duties necessary for the safe
operation of the nuclear power plant including fires, toxic gas releases, or radioactive releases.
(b) Contents. The Licensee Event Report shall contain:
(1) A brief abstract describing the major occurrences during the event, including all component or system failures that contributed to the event and significant corrective action taken
or planned to prevent recurrence.
(2)(i) A clear, specific, narrative description of what occurred so that knowledgeable readers conversant with the design of commercial nuclear power plants, but not familiar with
the details of a particular plant, can understand the complete event.
(ii) The narrative description must include the following specific information as appropriate for the particular event:
(A) Plant operating conditions before the event.
(B) Status of structures, components, or systems that were inoperable at the start of the event and that contributed to the event.
(C) Dates and approximate times of occurrences.
(D) The cause of each component or system failure or personnel error, if known.
(E) The failure mode, mechanism, and effect of each failed component, if known.
(F) The Energy Industry Identification System component function identifier and system name of each component or system referred to in the LER.
(1) The Energy Industry Identification System is defined in: IEEE Std 803-1983 (May 16, 1983) Recommended Practice for Unique Identification in Power Plants and Related
Facilities--Principles and Definitions.
(2) IEEE Std 803-1983 has been approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.
(3) A notice of any changes made to the material incorporated by reference
will be published in the Federal Register. Copies may be obtained from
the Institute of Electrical and Electronics Engineers, 445 Hoes Lane,
P.O. Box 1331, Piscataway, NJ 08855-1331. IEEE Std 803-1983
is available for inspection at the NRC's Technical Library, which is located
in the Two White Flint North Building, 11545 Rockville Pike, Rockville,
Maryland 20852-2738; or at the National Archives and Records Administration
(NARA). For information on the availability of this material at NARA,
call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(G) For failures of components with multiple functions, include a list of systems or secondary functions that were also affected.
(H) For failure that rendered a train of a safety system inoperable, an estimate of the elapsed time from the discovery of the failure until the train was returned to service.
(I) The method of discovery of each component or system failure or procedural error.
(J) For each human performance related root cause, the licensee shall discuss the cause(s) and circumstances.
(K) Automatically and manually initiated safety system responses.
(L) The manufacturer and model number (or other identification) of each component that failed during the event.
(3) An assessment of the safety consequences and implications of the event. This assessment must include:
(i) The availability of systems or components that could have performed the same function as the components and systems that failed during the event, and
(ii) For events that occurred when the reactor was shutdown, the availability of systems or components that are needed to shutdown the reactor and maintain safe shutdown
conditions, remove residual heat, control the release of radioactive material, or mitigate the consequences of an accident.
(4) A description of any corrective actions planned as a result of the event, including those to reduce the probability of similar events occurring in the future.
(5) Reference to any previous similar events at the same plant that are known to the licensee.
(6) The name and telephone number of a person within the licensee's organization who is knowledgeable about the event and can provide additional information concerning the
event and the plant's characteristics.
(c) Supplemental information. The Commission may require the licensee to submit specific additional information beyond that required by paragraph (b) of this section if the
Commission finds that supplemental material is necessary for complete understanding of an unusually complex or significant event. These requests for supplemental information
will be made in writing and the licensee shall submit, as specified in § 50.4, the requested information as a supplement to the initial LER.
(d) Submission of reports. Licensee Event Reports must be prepared
on Form NRC 366 and submitted to the U.S. Nuclear Regulatory Commission,
as specified in § 50.4.
(e) Report legibility. The reports and copies that licensees are required to submit to the Commission under the provisions of this section must be of sufficient quality to permit
legible reproduction and micrographic processing.
(f) [Reserved]
(g) Reportable occurrences. The requirements contained in this
section replace all existing requirements for licensees to report "Reportable
Occurrences" as defined in individual plant Technical Specifications.
[48 FR 33858, July 26, 1983, as amended at 49 FR 47824, Dec. 7, 1984;
51 FR 40310, Nov. 6, 1986; 56 FR 23473, May 21, 1991; 56 FR 61352, Dec.
3, 1991; 57 FR 41381, Sept. 10, 1992; 58 FR 67661, Dec. 22, 1993; 59 FR
50689, Oct. 5, 1994; 63 FR 50480, Sept. 22, 1998; 65 FR 63787, Oct. 25,
2000; 69 FR 18803, Apr. 9, 2004; 72 FR 49502, Aug. 28, 2007]
§ 50.74 Notification of change in operator or senior operator status.
Each licensee shall notify the appropriate NRC contact, as described in § 55.5 of this chapter, within 30 days of the following in regard to a licensed operator or senior operator:
(a) Permanent reassignment from the position for which the licensee has certified the need for a licensed operator or senior
operator under § 55.31(a)(3) of this chapter;
(b) Termination of any operator or senior operator;
(c) Permanent disability or illness as described in § 55.25 of this chapter.
[52 FR 9469, Mar. 25, 1987, as amended at 60 FR 13616, Mar. 14, 1995;
68 FR 58809, Oct. 10, 2003; 86 FR 67842, Nov. 30, 2021]
§ 50.75 Reporting and recordkeeping for decommissioning planning.
(a) This section establishes requirements for indicating to NRC how a licensee will provide reasonable assurance that funds will be available for the decommissioning process. For power reactor licensees (except a holder of a manufacturing license under part 52 of this chapter), reasonable assurance consists of a series of steps as provided in paragraphs (b), (c), (e), and (f) of this section. Funding for the decommissioning of power reactors may also be subject to the regulation of Federal or State Government agencies (e.g., Federal Energy Regulatory Commission (FERC) and State Public Utility Commissions) that have jurisdiction over rate regulation. The requirements of this section, in particular paragraph (c) of this section, are in addition to, and not substitution for, other requirements, and are not intended to be used by themselves or by other agencies to establish rates.
(b) Each power reactor applicant for or holder of an operating license, and each applicant for a combined license under subpart C of 10 CFR part 52 for a production or utilization facility of the type and power level specified in paragraph (c) of this section shall submit a decommissioning report, as required by § 50.33(k).
(1) For an applicant for or holder of an operating license under part 50, the report must contain a certification that financial assurance for decommissioning will be (for a license applicant), or has been (for a license holder), provided in an amount which may be more, but not less, than the amount stated in the table in paragraph (c)(1) of this section adjusted using a rate at least equal to that stated in paragraph (c)(2) of this section. For an applicant for a combined license under subpart C of 10 CFR part 52, the report must contain a certification that financial assurance for decommissioning will be provided no later than 30 days after the Commission publishes notice in the Federal Register under § 52.103(a) in an amount which may be more, but not less, than the amount stated in the table in paragraph (c)(1) of this section, adjusted using a rate at least equal to that stated in paragraph (c)(2) of this section.
(2) The amount to be provided must be adjusted annually using a rate at least equal to that stated in paragraph (c)(2) of this section.
(3) The amount must be covered by one or more of the methods described in paragraph (e) of this section as acceptable to the NRC.
(4) The amount stated in the applicant's or licensee's certification may be based on a cost estimate for decommissioning the facility. As part of the certification, a copy of the financial instrument obtained to satisfy the requirements of paragraph (e) of this section must be submitted to NRC; provided, however, that an applicant for or holder of a combined license need not obtain such financial instrument or submit a copy to the Commission except as provided in paragraph (e)(3) of this section.
(c) Table of minimum amounts (January 1986 dollars) required to demonstrate reasonable assurance of funds for decommissioning by reactor type and power level, P (in MWt); adjustment factor.1
|
Millions |
(1)(i) For a PWR: |
greater than or equal to 3400 MWt |
$105 |
between 1200 Mwt and 3400 Mwt (For a PWR of less than 1200 Mwt, use P=1200 Mwt) |
$(75+0.0088P) |
(ii) For a BWR: |
greater than or equal to 3400 MWt |
$135 |
between 1200 Mwt and 3400 Mwt (For a BWR of less than 1200 Mwt, use P=1200 MWt) |
$(104+0.009P) |
(2) An adjustment factor at least equal to 0.65 L + 0.13 E + 0.22 B is to be used where L and E are escalation factors for labor and energy, respectively, and are to be taken from regional data of U.S. Department of Labor Bureau of Labor Statistics and B is an escalation factor for waste burial and is to be taken from NRC report NUREG-1307, "Report on Waste Burial Charges."
(d)(1) Each non-power reactor applicant for or holder of an operating license for a production or utilization facility shall submit a decommissioning report as required by § 50.33(k) of this part.
(2) The report must:
(i) Contain a cost estimate for decommissioning the facility;
(ii) Indicate which method or methods described in paragraph (e) of this section as acceptable to the NRC will be used to provide funds for decommissioning; and
(iii) Provide a description of the means of adjusting the cost estimate and associated funding level periodically over the life of the facility.
(e)(1) Financial assurance is to be provided by the following methods.
(i) Prepayment. Prepayment is the deposit made preceding the start of operation or the transfer of a license under § 50.80 into an account segregated from licensee assets and outside the administrative control of the licensee and its subsidiaries or affiliates of cash or liquid assets such that the amount of funds would be sufficient to pay decommissioning costs at the time permanent termination of operations is expected. Prepayment may be in the form of a trust, escrow account, or Government fund with payment by, certificate of deposit, deposit of government or other securities or other method acceptable to the NRC. This trust, escrow account, Government fund, or other type of agreement shall be established in writing and maintained at all times in the United States with an entity that is an appropriate State or Federal government agency, or an entity whose operations in which the prepayment deposit is managed are regulated and examined by a Federal or State agency. A licensee that has prepaid funds based on a site-specific estimate under § 50.75(b)(1) of this section may take credit for projected earnings on the prepaid decommissioning trust funds, using up to a 2 percent annual real rate of return from the time of future funds' collection through the projected decommissioning period, provided that the site-specific estimate is based on a period of safe storage that is specifically described in the estimate. This includes the periods of safe storage, final dismantlement, and license termination. A licensee that has prepaid funds based on the formulas in § 50.75(c) of this section may take credit for projected earnings on the prepaid decommissioning funds using up to a 2 percent annual real rate of return up to the time of permanent termination of operations. A licensee may use a credit of greater than 2 percent if the licensee's rate-setting authority has specifically authorized a higher rate. However, licensees certifying only to the formula amounts (i.e., not a site-specific estimate) can take a pro-rata credit during the immediate dismantlement period (i.e., recognizing both cash expenditures and earnings the first 7 years after shutdown). Actual earnings on existing funds may be used to calculate future fund needs.
(ii) External sinking fund. An external sinking fund is a fund established and maintained by setting funds aside periodically in an account segregated from licensee assets and outside the administrative control of the licensee and its subsidiaries or affiliates in which the total amount of funds would be sufficient to pay decommissioning costs at the time permanent termination of operations is expected. An external sinking fund may be in the form of a trust, escrow account, or Government fund, with payment by certificate of deposit, deposit of Government or other securities, or other method acceptable to the NRC. This trust, escrow account, Government fund, or other type of agreement shall be established in writing and maintained at all times in the United States with an entity that is an appropriate State or Federal government agency, or an entity whose operations in which the external linking fund is managed are regulated and examined by a Federal or State agency. A licensee that has collected funds based on a site-specific estimate under § 50.75(b)(1) of this section may take credit for projected earnings on the external sinking funds using up to a 2 percent annual real rate of return from the time of future funds' collection through the decommissioning period, provided that the site-specific estimate is based on a period of safe storage that is specifically described in the estimate. This includes the periods of safe storage, final dismantlement, and license termination. A licensee that has collected funds based on the formulas in § 50.75(c) of this section may take credit for collected earnings on the decommissioning funds using up to a 2 percent annual real rate of return up to the time of permanent termination of operations. A licensee may use a credit of greater than 2 percent if the licensee's rate-setting authority has specifically authorized a higher rate. However, licensees certifying only to the formula amounts (i.e., not a site-specific estimate) can take a pro-rata credit during the dismantlement period (i.e., recognizing both cash expenditures and earnings the first 7 years after shutdown). Actual earnings on existing funds may be used to calculate future fund needs. A licensee, whose rates for decommissioning costs cover only a portion of these costs, may make use of this method only for the portion of these costs that are collected in one of the manners described in this paragraph, (e)(1)(ii). This method may be used as the exclusive mechanism relied upon for providing financial assurance for decommissioning in the following circumstances:
(A) By a licensee that recovers, either directly or indirectly, the estimated total cost of decommissioning through rates established by "cost of service" or similar ratemaking regulation. Public utility districts, municipalities, rural electric cooperatives, and State and Federal agencies, including associations of any of the foregoing, that establish their own rates and are able to recover their cost of service allocable to decommissioning, are assumed to meet this condition.
(B) By a licensee whose source of revenues for its external sinking fund is a "non-bypassable charge," the total amount of which will provide funds estimated to be needed for decommissioning pursuant to §§ 50.75(c), 50.75(f), or 50.82 of this part.
(iii) A surety method, insurance, or other guarantee method:
(A) These methods guarantee that decommissioning costs will be paid. A surety method may be in the form of a surety bond, or letter of credit. Any surety method or insurance used to provide financial assurance for decommissioning must contain the following conditions:
(1) The surety method or insurance must be open-ended, or, if written for a specified term, such as 5 years, must be renewed automatically, unless 90 days or more prior to the renewal day the issuer notifies the NRC, the beneficiary, and the licensee of its intention not to renew. The surety or insurance must
also provide that the full face amount be paid to the beneficiary automatically prior to the expiration without proof of forfeiture if the licensee fails to provide a replacement acceptable to the NRC within 30 days after receipt of notification of cancellation.
(2) The surety or insurance must be payable to a trust established for decommissioning costs. The trustee and trust must be acceptable to the NRC. An acceptable trustee includes an appropriate State or Federal government agency or an entity that has the authority to act as a trustee and whose trust operations are regulated and examined by a Federal or State agency.
(B) A parent company guarantee of funds for decommissioning costs based on a financial test may be used if the guarantee and test are as contained in appendix A to 10 CFR part 30.
(C) For commercial companies that issue bonds, a guarantee of funds by the applicant or licensee for decommissioning costs based on a financial test may be used if the guarantee and test are as contained in appendix C to 10 CFR part 30. For commercial companies that do not issue bonds, a guarantee of funds by the applicant or licensee for decommissioning costs may be used if the guarantee and test are as contained in appendix D to 10 CFR part 30. For non-profit entities, such as colleges, universities, and non-profit hospitals, a guarantee of funds by the applicant or licensee may be used if the guarantee and test are as contained in appendix E to 10 CFR part 30. A guarantee by the applicant or licensee may not be used in any situation in which the applicant or licensee has a parent company holding majority control of voting stock of the company.
(iv) For a power reactor licensee that is a Federal licensee, or for a non-power reactor licensee that is a Federal, State, or local government licensee, a statement of intent containing a cost estimate for decommissioning, and indicating that funds for decommissioning will be obtained when necessary.
(v) Contractual obligation(s) on the part of a licensee's customer(s), the total amount of which over the duration of the contract(s) will provide the licensee's total share of uncollected funds estimated to be needed for decommissioning pursuant to Secs. 50.75(c), 50.75(f), or § 50.82. To be acceptable to the NRC as a method of decommissioning funding assurance, the terms of the contract(s) shall include provisions that the electricity buyer(s) will pay for the decommissioning obligations specified in the contract(s), notwithstanding the operational status either of the licensed power reactor to which the contract(s) pertains or force majeure provisions. All proceeds from the contract(s) for decommissioning funding will be deposited to the external sinking fund. The NRC reserves the right to evaluate the terms of any contract(s) and the financial qualifications of the contracting entity or entities offered as assurance for decommissioning funding.
(vi) Any other mechanism, or combination of mechanisms, that provides, as determined by the NRC upon its evaluation of the specific circumstances of each licensee submittal, assurance of decommissioning funding equivalent to that provided by the mechanisms specified in paragraphs (e)(1)(i) through (v) of this section. Licensees who do not have sources of funding described in paragraph (e)(1)(ii) of this section may use an external sinking fund in combination with a guarantee mechanism, as specified in paragraph (e)(1)(iii) of this section, provided that the total amount of funds estimated to be necessary for decommissioning is assured.
(2) The NRC reserves the right to take the following steps in order to ensure a licensee's adequate accumulation of decommissioning funds: review, as needed, the rate of accumulation of decommissioning funds; and, either independently or in cooperation with the FERC and the licensee's State PUC, take additional actions as appropriate on a case- by-case basis, including modification of a licensee's schedule for the accumulation of decommissioning funds.
(3) Each holder of a combined license under subpart C of 10 CFR part 52 shall, 2 years before and 1 year before the scheduled date for initial loading of fuel, consistent with the schedule required by § 52.99(a), submit a report to the NRC containing a certification updating the information described under paragraph (b)(1) of this section, including a copy of the financial instrument to be used. No later than 30 days after the Commission publishes notice in the Federal Register under 10 CFR 52.103(a), the licensee shall submit a report containing a certification that financial assurance for decommissioning is being provided in an amount specified in the licensee's most recent updated certification, including a copy of the financial instrument obtained to satisfy the requirements of paragraph (e) of this section.
(f)(1) Each power reactor licensee shall report, on a calendar-year basis, to the NRC by March 31, 1999, and at least once every 2 years thereafter on the
status of its decommissioning funding for each reactor or part of a reactor that it owns. However, each holder of a combined license under part 52 of this
chapter need not begin reporting until the date that the Commission has made the finding under § 52.103(g) of this chapter. The information in this report
must include, at a minimum, the amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c); the amount of decommissioning funds accumulated to the end of the calendar year preceding the date of the report; a schedule of the annual amounts remaining to be collected; the assumptions used
regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections; any contracts upon which the licensee is relying pursuant to paragraph (e)(1)(v) of this section; any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report; and any material changes to trust agreements. If any of the preceding items is not applicable, the licensee should so state in its report. Any licensee for a plant that is within 5 years of the projected end of its operation, or where conditions have changed such that it will close within 5 years (before the end of its licensed life), or that has already closed (before the end of its licensed life), or that is involved in a merger or an acquisition shall submit this report annually.
(2) Each power reactor licensee shall report, on a calendar-year basis, to the NRC by March 31, 1999, and at least once every 2 years thereafter on the status of its decommissioning funding for each reactor or part of a reactor that it owns. The information in this report must include, at a minimum, the amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c); the amount of decommissioning funds accumulated to the end of the calendar year preceding the date of the report; a schedule of the annual amounts remaining to be collected; the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections; any contracts upon which the licensee is relying pursuant to paragraph (e)(1)(v) of this section; any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report; and any material changes to trust agreements. If any of the preceding items is not applicable, the licensee should so state in its report. Any licensee for a plant that is within 5 years of the projected end of its operation, or where conditions have changed such that it will close within 5 years (before the end of its licensed life), or that has already closed (before the end of its licensed life), or that is involved in a merger or an acquisition shall submit this report annually.
(3) Each power reactor licensee shall at or about 5 years prior to the projected end of operations submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission.
(4) Each non-power reactor licensee shall at or about 2 years prior to the projected end of operations submit a preliminary decommissioning plan containing a cost estimate for decommissioning and an up-to-date assessment of the major factors that could affect planning for decommissioning. Factors to be considered in submitting this preliminary plan information include—
(i) The decommissioning alternative anticipated to be used. The requirements of § 50.82(b)(4)(i) must be considered at this time;
(ii) Major technical actions necessary to carry out decommissioning safely;
(iii) The current situation with regard to disposal of high-level and low-level radioactive waste;
(iv) Residual radioactivity criteria;
(v) Other site specific factors which could affect decommissioning planning and cost.
(5) If necessary, the cost estimate, for power and non-power reactors, shall also include plans for adjusting levels of funds assured for decommissioning to demonstrate that a reasonable level of assurance will be provided that funds will be available when needed to cover the cost of decommissioning.
(g) Each licensee shall keep records of information important to the safe and effective decommissioning of the facility in an identified location until the license is terminated by the Commission. If records of relevant information are kept for other purposes, reference to these records and their locations may be used. Information the Commission considers important to decommissioning consists of—
(1) Records of spills or other unusual occurrences involving the spread of contamination in and around the facility, equipment, or site. These records may be limited to instances when significant contamination remains after any cleanup procedures or when there is reasonable likelihood that contaminants may have spread to inaccessible areas as in the case of possible seepage into porous materials such as concrete. These records must include any known information on identification of involved nuclides, quantities, forms, and concentrations.
(2) As-built drawings and modifications of structures and equipment in restricted areas where radioactive materials are used and/or stored and of locations of possible inaccessible contamination such as buried pipes which may be subject to contamination. If required drawings are referenced, each relevant document need not be indexed individually. If drawings are not available, the licensee shall substitute appropriate records of available information concerning these areas and locations.
(3) Records of the cost estimate performed for the decommissioning funding plan or of the amount certified for decommissioning, and records of the funding method used for assuring funds if either a funding plan or certification is used.
(4) Records of:
(i) The licensed site area, as originally licensed, which must include a site map and any acquisition or use of property outside the originally licensed site area for the purpose of receiving, possessing, or using licensed materials;
(ii) The licensed activities carried out on the acquired or used property; and
(iii) The release and final disposition of any property recorded in paragraph (g)(4)(i) of this section, the historical site assessment performed for the release, radiation surveys performed to support release of the property, submittals to the NRC made in accordance with § 50.83, and the methods employed to ensure that the property met the radiological criteria of 10 CFR Part 20, Subpart E, at the time the property was released.
(h)(1) Licensees that are not "electric utilities" as defined in § 50.2 that use prepayment or an external sinking fund to provide financial assurance shall provide in the terms of the arrangements governing the trust, escrow account, or Government fund, used to segregate and manage the funds that—
(i) The trustee, manager, investment advisor, or other person directing investment of the funds:
(A) Is prohibited from investing the funds in securities or other obligations of the licensee or any other owner or operator of any nuclear power reactor or their affiliates, subsidiaries, successors or assigns, or in a mutual fund in which at least 50 percent of the fund is invested in the securities of a licensee or parent company whose subsidiary is an owner or operator of a foreign or domestic nuclear power plant. However, the funds may be invested in securities tied to market indices or other non-nuclear sector collective, commingled, or mutual funds, provided that this subsection shall not operate in such a way as to require the sale or transfer either in whole or in part, or other disposition of any such prohibited investment that was made before the publication date of this rule, and provided further that no more than 10 percent of trust assets may be indirectly invested in securities of any entity owning or operating one or more nuclear power plants.
(B) Is obligated at all times to adhere to a standard of care set forth in the trust, which either shall be the standard of care, whether in investing or otherwise, required by State or Federal law or one or more State or Federal regulatory agencies with jurisdiction over the trust funds, or, in the absence of any such standard of care, whether in investing or otherwise, that a prudent investor would use in the same circumstances. The term "prudent investor," shall have the same meaning as set forth in the Federal Energy Regulatory Commission's "Regulations Governing Nuclear Plant Decommissioning Trust Funds" at 18 CFR 35.32(a)(3), or any successor regulation.
(ii) The licensee, its affiliates, and its subsidiaries are prohibited from being engaged as investment manager for the funds or from giving day-to-day management direction of the funds' investments or direction on individual investments by the funds, except in the case of passive fund management of trust funds where management is limited to investments tracking market indices.
(iii) The trust, escrow account, Government fund, or other account used to segregate and manage the funds may not be amended in any material respect without written notification to the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, at least 30 working days before the proposed effective date of the
amendment. The licensee shall provide the text of the proposed amendment and a statement of the reason for the proposed amendment. The trust, escrow account, Government fund, or other account may not be amended if the person responsible for managing the trust, escrow account, Government fund, or other account receives written notice of objection from the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, within the notice period; and
(iv) Except for withdrawals being made under § 50.82(a)(8) or for payments of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, no disbursement or payment may be made from the trust, escrow account, Government fund, or other account used to segregate and manage the funds until written notice of the intention to make a disbursement or payment has been given to the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, at least 30 working days before the date of the intended disbursement or payment. The disbursement or payment from the trust, escrow account, Government fund or other account may be made following the 30-working day notice period if the person responsible for managing the trust, escrow account, Government fund, or other account does not receive written notice of objection from the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, within the notice period. Disbursements or payments from the trust, escrow account, Government fund, or other account used to segregate and manage the funds, other than for payment of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, are restricted to decommissioning expenses or transfer to another financial assurance method acceptable under paragraph (e) of this section until final decommissioning has been completed. After decommissioning has begun and withdrawals from the decommissioning fund are made under § 50.82(a)(8), no further notification need be made to the NRC.
(2) Licensees that are "electric utilities" under § 50.2 that use prepayment or an external sinking fund to provide financial assurance shall include a provision in the terms of the trust, escrow account, Government fund, or other account used to segregate and manage funds that except for withdrawals being made under § 50.82(a)(8) or for payments of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, no disbursement or payment may be made from the trust, escrow account, Government fund, or other account used to segregate and manage the funds until written notice of the intention to make a disbursement or payment has been given the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, at least 30 working days before the date of the intended disbursement or payment. The disbursement or payment from the trust, escrow account, Government fund or other account may be made following the 30-working day notice period if the person responsible for managing the trust, escrow account, Government fund, or other account does not receive written notice of objection from the Director, Office of Nuclear Reactor Regulation, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, within the notice period. Disbursements or payments from the trust, escrow account, Government fund, or other account used to segregate and manage the funds, other than for payment of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, are restricted to decommissioning expenses or transfer to another financial assurance method acceptable under paragraph (e) of this section until final decommissioning has been completed. After decommissioning has begun and withdrawals from the decommissioning fund are made under § 50.82(a)(8), no further notification need be made to the NRC.
(3) A licensee that is not an "electric utility" under § 50.2 and using a surety method, insurance, or other guarantee method to provide financial assurance shall provide that the trust established for decommissioning costs to which the surety or insurance is payable contains in its terms the requirements in paragraphs (h)(1)(i), (ii), (iii), and (iv) of this section.
(4) Unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility that does no more than delete specific license conditions relating to the terms and conditions of decommissioning trust agreements involves "no significant hazards consideration."
(5) The provisions of paragraphs (h)(1) through (h)(3) of this section do not apply to any licensee that as of December 24, 2003, has existing license conditions relating to decommissioning trust agreements, so long as the licensee does not elect to amend those license conditions. If a licensee with existing license conditions relating to decommissioning trust agreements elects to amend those conditions, the license amendment shall be in accordance with the provisions of paragraph (h) of this section.
1 Amounts are based on activities related to the definition of "Decommission" in § 50.2 of this part and do not include the cost of removal and disposal of spent fuel or of nonradioactive structures and materials beyond that necessary to terminate the license.
[53 FR 24049, June 27, 1988, as amended at 58 FR 68731, Dec. 29, 1993; 59 FR 1618, Jan. 12, 1994; 61 FR 39301, July 29, 1996; 63 FR 50480, Sept. 22, 1998; 63 FR 57236, Oct. 27, 1998; 67 FR 78350, Dec. 24, 2002; 68 FR 12571, Mar. 17, 2003; 68 FR 19727, Apr. 22, 2003; 68 FR 65388, Nov. 20, 2003; 72 FR 49502, Aug. 28, 2007; 73 FR 5722, Jan. 31, 2008; 76 FR 35571 Jun. 17, 2011; 83 FR 30288, Jun. 28, 2018; 84 FR 65644, Nov. 29, 2019; 87 FR 68031, Nov. 14, 2022]
§ 50.76. Licensee's change of status; financial qualifications.
An electric utility licensee holding an operating license (including
a renewed license) for a nuclear power reactor, no later than seventy-five
(75) days prior to ceasing to be an electric utility in any manner not
involving a license transfer under § 50.80, shall provide the NRC
with the financial qualifications information that would be required for
obtaining an initial operating license as specified in § 50.33(f)(2).
The financial qualifications information must address the first full five
years of operation after the date the licensee ceases to be an electric
utility.
[69 FR 4448, Jan. 30, 2004]
US/IAEA Safeguards Agreement
§ 50.78 Facility information and verification.
(a) In response to a written request by the Commission, each applicant for a construction permit or license and each recipient of a construction permit or a license shall submit facility information, as described in § 75.10 of this chapter, on IAEA Design Information Questionnaire forms and site information on DOC/NRC Form AP–A and associated forms;
(b) As required by the Additional Protocol, shall submit location information described in § 75.11 of this chapter on DOC/NRC Form AP–1 and associated forms; and
(c) Shall permit verification thereof by the International Atomic Energy Agency (IAEA) and take other action as necessary to implement the US/IAEA Safeguards Agreement, as described in Part 75 of this chapter.
[49 FR 19627, May 9, 1984; 72 FR 49503, Aug. 28, 2007; 73 FR 78605, Dec. 23, 2008; 85 FR 65663, Oct. 16, 2020]
Transfers of Licenses--Creditors' Rights--Surrender of Licenses
§ 50.80 Transfer of licenses.
(a) No license for a production or utilization facility (including, but not limited to, permits under this part and part 52 of this chapter, and licenses under parts 50 and 52 of this chapter), or any right thereunder, shall be transferred, assigned, or in any manner disposed of, either voluntarily or
involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission gives its consent in writing.
(b)(1) An application for transfer of a license shall include:
(i) For a construction permit or operating license under this part, as much of the information described in §§ 50.33 and 50.34 of this part with respect to the identity and technical and
financial qualifications of the proposed transferee as would be required by those sections if the application were for an initial license. The Commission may require additional information such as data respecting proposed safeguards against hazards from radioactive materials and the applicant's qualifications to protect against such hazards.
(ii) For an early site permit under part 52 of this chapter, as much of the information described in §§ 52.16 and 52.17 of this chapter with respect to the identity and technical qualifications of
the proposed transferee as would be required by those sections if the application were for an initial license.
(iii) For a combined license under part 52 of this chapter, as much of the information described in §§ 52.77 and 52.79 of this chapter with respect to the identity and technical and financial
qualifications of the proposed transferee as would be required by those sections if the application were for an initial license. The Commission may require additional information such as data respecting proposed safeguards against hazards from radioactive materials and the applicant's qualifications to protect against such hazards.
(iv) For a manufacturing license under part 52 of this chapter, as much of the information described in §§ 52.156 and 52.157 of this chapter with respect to the identity and technical qualifications
of the proposed transferee as would be required by those sections if the application were for an initial license.
(2) The application shall include also a statement of the purposes for which the transfer of the license is requested, the nature of the transaction necessitating or making desirable the transfer of the license, and an agreement to limit access to Restricted Data pursuant to § 50.37. The Commission may require any person who submits an application for license pursuant to the provisions of this section to file a
written consent from the existing licensee or a certified copy of an order or judgment of a court of competent jurisdiction attesting to the person's right (subject to the licensing requirements of the Act and these regulations) to possession of the facility or site involved.
(c) After appropriate notice to interested persons, including the existing licensee, and observance of such procedures as may be required by the Act or regulations or orders of the Commission, the Commission will approve an application for the transfer of a license, if the Commission determines:
(1) That the proposed transferee is qualified to be the holder of the license; and
(2) That transfer of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.
[26 FR 9546, Oct. 10, 1961, as amended at 35 FR 19661, Dec. 29, 1970; 38 FR 3956, Feb. 9, 1973; 65 FR 44660, July 19, 2000; 70 FR 61888, Oct. 27, 2005; 72 FR 49503, Aug. 28, 2007]
§ 50.81 Creditor regulations.
(a) Pursuant to section 184 of the Act, the Commission consents, without individual application, to the creation of any mortgage, pledge, or other lien upon any production or utilization facility not owned by the United States which is the subject of a license or upon any leasehold or other interest in such facility: Provided:
(1) That the rights of any creditor so secured may be exercised only in compliance with and subject to the same requirements and restrictions as would apply to the licensee pursuant to the provisions of the license, the Atomic Energy Act of 1954, as amended, and regulations issued by the Commission pursuant to said Act; and
(2) That no creditor so secured may take possession of the facility pursuant to the provisions of this section prior to either the issuance of a license from the Commission authorizing such possession or the transfer of the license.
(b) Any creditor so secured may apply for transfer of the license covering such facility by filing an application for transfer of the license pursuant to § 50.80(b). The Commission will act upon such application pursuant to § 50.80 (c).
(c) Nothing contained in this regulation shall be deemed to affect the means of acquiring, or the priority of, any tax lien or other lien provided by law.
(d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be issued by the Commission with regard to a facility;
(2) "Creditor" includes, without implied limitation, the trustee under any mortgage, pledge or lien on a facility made to secure any creditor, any trustee or receiver of the facility appointed by a court of competent jurisdiction in any action brought for the benefit of any creditor secured by such mortgage, pledge or lien, any purchaser of such facility at the sale thereof upon foreclosure of such mortgage, pledge, or lien or upon exercise of any power of sale contained therein, or any assignee of any such purchaser.
(3) Facility includes but is not limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter, and a reactor manufactured under a manufacturing
license under subpart F of part 52 of this chapter.
[26 FR 9546, Oct. 10, 1961, as amended at 32 FR 2562, Feb. 7, 1967; 72 FR 49504, Aug. 28, 2007]
§ 50.82 Termination of license.
For power reactor licensees who, before the effective date of this rule, either submitted a decommissioning plan for approval or possess an approved decommissioning plan, the plan is considered to be the PSDAR submittal required under paragraph (a)(4) of this section and the provisions of this section apply accordingly. For power reactor licensees whose decommissioning plan approval activities have been relegated to notice of opportunity for a hearing under subpart G of 10 CFR part 2, the public meeting convened and 90-day delay of major decommissioning activities required in paragraphs (a)(4)(ii) and (a)(5) of this section shall not apply, and any orders arising from proceedings under subpart G of 10 CFR part 2 shall continue and remain in effect absent any orders from the Commission.
(a) For power reactor licensees—
(1) (i) When a licensee has determined
to permanently cease operations the licensee shall, within 30 days, submit a
written certification to the NRC,
consistent with the requirements of
§ 50.4(b)(8);
(ii) Once fuel has been permanently
removed from the reactor vessel, the
licensee shall submit a written
certification to the NRC that meets the
requirements of § 50.4(b)(9); and
(iii) For licensees whose licenses have
been permanently modified to allow
possession but not operation of the
facility, before August 28, 1996, the
certifications required in paragraphs
(a)(1)(i) through (ii) of this section shall
be deemed to have been submitted.
(2) Upon docketing of the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel, or when a final legally effective order to permanently cease operations has come into effect, the 10 CFR part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel.
(3) Decommissioning will be completed within 60 years of permanent cessation of operations. Completion of decommissioning beyond 60 years will be approved by the Commission only when necessary to protect public health and safety. Factors that will be considered by the Commission in evaluating an alternative that provides for completion of decommissioning beyond 60 years of permanent cessation of operations include unavailability of waste disposal capacity and other site-specific factors affecting the licensee's capability to carry out decommissioning, including presence of other nuclear facilities at the site.
(4) (i) Prior to or within 2 years following permanent cessation of operations, the licensee shall submit a post-shutdown decommissioning activities report (PSDAR) to the NRC, and a copy to the affected State(s). The PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific DCE, including the projected cost of managing irradiated fuel.
(ii) The NRC shall notice receipt of the PSDAR and make the PSDAR available for public comment. The NRC shall also schedule a public meeting in the vicinity of the licensee's facility upon receipt of the PSDAR. The NRC shall publish a notice in the Federal Register and in a forum, such as local newspapers, that is readily accessible to individuals in the vicinity of the site, announcing the date, time and location of the meeting, along with a brief description of the purpose of the meeting.
(5) Licensees shall not perform any major decommissioning activities, as defined in § 50.2, until 90 days after the NRC has received the licensee's PSDAR submittal and until certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel, as required under § 50.82(a)(1), have been submitted.
(6) Licensees shall not perform any
decommissioning activities that—
(i) Foreclose release of the site for
possible unrestricted use;
(ii) Result in significant
environmental impacts not previously
reviewed; or
(iii) Result in there no longer being
reasonable assurance that adequate
funds will be available for
decommissioning.
(7) In taking actions permitted under § 50.59 following submittal of the PSDAR, the licensee shall notify the NRC, in writing and send a copy to the affected State(s), before performing any decommissioning activity inconsistent with, or making any significant schedule change from, those actions and schedules described in the PSDAR, including changes that
significantly increase the decommissioning cost.
(8)(i) Decommissioning trust funds may be used by licensees if—
(A) The withdrawals are for expenses
for legitimate decommissioning
activities consistent with the definition
of decommissioning in § 50.2;
(B) The expenditure would not reduce
the value of the decommissioning trust
below an amount necessary to place and
maintain the reactor in a safe storage
condition if unforeseen conditions or
expenses arise; and
(C) The withdrawals would not
inhibit the ability of the licensee to
complete funding of any shortfalls in
the decommissioning trust needed to
ensure the availability of funds to
ultimately release the site and terminate
the license.
(ii) Initially, 3 percent of the generic amount specified in § 50.75 may be used for decommissioning planning. For licensees that have submitted the certifications required under § 50.82(a)(1) and commencing 90 days after the NRC has received the PSDAR, an additional 20 percent may be used. A site-specific decommissioning cost estimate must be submitted to the
NRC prior to the licensee using any funding in excess of these amounts.
(iii) Within 2 years following permanent cessation of operations, if not already submitted, the licensee shall submit a site-specific decommissioning cost estimate.
(iv) For decommissioning activities that delay completion of decommissioning by including a period of storage or surveillance, the licensee shall provide a means of adjusting cost estimates and associated funding levels over the storage or surveillance period.
(v) After submitting its site-specific DCE required by paragraph (a)(4)(i) of this section, and until the licensee has completed its final radiation survey and demonstrated that residual radioactivity has been reduced to a level that permits termination of its license, the licensee must annually submit to the NRC, by March 31, a financial assurance status report. The report must include the following information, current through the end of the previous calendar year:
(A) The amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon;
(B) An estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based;
(C) Any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report; and
(D) Any material changes to trust agreements or financial assurance contracts.
(vi) If the sum of the balance of any remaining decommissioning funds, plus earnings on such funds calculated at not greater than a 2 percent real rate of return, together with the amount provided by other financial assurance methods being relied upon, does not cover the estimated cost to complete the decommissioning, the financial assurance status report must include additional financial assurance to cover the estimated cost of completion.
(vii) After submitting its site-specific DCE required by paragraph (a)(4)(i) of this section, the licensee must annually submit to the NRC, by March 31, a report on the status of its funding for managing irradiated fuel. The report must include the following information, current through the end of the previous calendar year:
(A) The amount of funds accumulated to cover the cost of managing the irradiated fuel;
(B) The projected cost of managing irradiated fuel until title to the fuel and possession of the fuel is transferred to the Secretary of Energy; and
(C) If the funds accumulated do not cover the projected cost, a plan to obtain additional funds to cover the cost.
(9) All power reactor licensees must submit an application for termination of license. The application for termination of license must be accompanied or preceded by a license termination plan to be submitted for NRC approval.
(i) The license termination plan must be a supplement to the FSAR or equivalent and must be submitted at least 2 years before termination of the license date.
(ii) The license termination plan must include—
(A) A site characterization;
(B) Identification of remaining dismantlement activities;
(C) Plans for site remediation;
(D) Detailed plans for the final radiation survey;
(E) A description of the end use of the site, if restricted;
(F) An updated site-specific estimate of remaining decommissioning costs;
(G) A supplement to the environmental report, pursuant to § 51.53, describing any new information or significant environmental change associated with the licensee's proposed termination activities; and
(H) Identification of parts, if any, of the facility or site that were released for use before approval of the license termination plan.
(iii) The NRC shall notice receipt of the license termination plan and make the license termination plan available for public comment. The NRC shall also schedule a public meeting in the vicinity of the licensee's facility upon receipt of the license termination plan. The NRC shall publish a notice in the Federal Register and in a forum, such as local newspapers, which is
readily accessible to individuals in the vicinity of the site, announcing the date, time and location of the meeting, along with a brief description of the purpose of the meeting.
(10) If the license termination plan demonstrates that the remainder of decommissioning activities will be performed in accordance with the regulations in this chapter, will not be inimical to the common defense and security or to the health and safety of the public, and will not have a significant effect on the quality of the environment and after notice to interested
persons, the Commission shall approve the plan, by license amendment, subject to such conditions and limitations as it deems appropriate and necessary and authorize implementation of the license termination plan.
(11) The Commission shall terminate the license if it determines that—
(i) The remaining dismantlement has been performed in accordance with the approved license termination plan, and
(ii) The final radiation survey and associated documentation, including an assessment of dose contributions associated with parts released for use before approval of the license termination plan, demonstrate that the facility and site have met the criteria for decommissioning in 10 CFR part 20, subpart E.
(b) For non-power reactor licensees—
(1) A licensee that permanently ceases operations must make application for license termination within 2 years following permanent cessation of operations, and in no case later than 1 year prior to expiration of the operating license. Each application for termination of a license must be accompanied or preceded by a proposed decommissioning plan. The contents of the decommissioning plan are specified in paragraph (b)(4) of this section.
(2) For decommissioning plans in which the major dismantlement activities are delayed by first placing the facility in storage, planning for these delayed activities may be less detailed. Updated detailed plans must be submitted and approved prior to the start of these activities.
(3) For decommissioning plans that delay completion of decommissioning by including a period of storage or surveillance, the licensee shall provide that—
(i) Funds needed to complete decommissioning be placed into an account segregated from the licensee's assets and outside the licensee's administrative control during the storage or surveillance period, or a surety method or fund statement of intent be maintained in accordance with the criteria of § 50.75(e); and
(ii) Means be included for adjusting cost estimates and associated funding levels over the storage or surveillance period.
(4) The proposed decommissioning plan must include—
(i) The choice of the alternative for decommissioning with a description of activities involved. An alternative is acceptable if it provides for completion of decommissioning without significant delay. Consideration will be given to an alternative which provides for delayed completion of decommissioning only when necessary to protect the public health and safety. Factors to be considered in evaluating an alternative which provides for delayed completion of decommissioning include unavailability of waste disposal capacity and other site-specific factors affecting the licensee's capability to carry out decommissioning, including the presence of other nuclear facilities at the site.
(ii) A description of the controls and limits on procedures and equipment to protect occupational and public health and safety;
(iii) A description of the planned final radiation survey;
(iv) An updated cost estimate for the chosen alternative for decommissioning, comparison of that estimate with present funds set aside for decommissioning, and plan for assuring the availability of adequate funds for completion of decommissioning; and
(v) A description of technical specifications, quality assurance provisions and physical security plan provisions in place during decommissioning.
(5) If the decommissioning plan demonstrates that the decommissioning will be performed in accordance with the regulations in this chapter and will not be inimical to the common defense and security or to the health and safety of the public, and after notice to interested persons, the Commission will approve, by amendment, the plan subject to such conditions and limitations as it deems appropriate and necessary. The approved decommissioning plan will be a supplement to the Safety Analysis report or equivalent.
(6) The Commission will terminate the license if it determines that—
(i) The decommissioning has been performed in accordance with the approved decommissioning plan, and
(ii) The terminal radiation survey and associated documentation demonstrate that the facility and site are suitable for release in accordance with the criteria for decommissioning in 10 CFR part 20, subpart E.
(c) For a facility that has permanently ceased operation before the expiration of its license, the collection period for any shortfall of funds will be determined, upon application by the licensee, on a case-by-case basis taking into account the specific financial situation of each licensee.
[61 FR 39301, July 29, 1996, as amended at 62 FR 39091, July 21, 1997; 68 FR 19727, Apr. 22, 2003; 76 FR 35571 Jun. 17, 2011; 79 FR 66603, Nov. 10, 2014; 89 FR 57720, Jul. 16, 2024]
§ 50.83 Release of part of a power reactor facility or site for unrestricted
use.
(a) Prior written NRC approval is required to release part of a facility
or site for unrestricted use at any time before receiving approval of
a license termination plan. Section 50.75 specifies recordkeeping requirements
associated with partial release. Nuclear power reactor licensees seeking
NRC approval shall--
(1) Evaluate the effect of releasing the property to ensure that--
(i) The dose to individual members of the public does not exceed the
limits and standards of 10 CFR Part 20, Subpart D;
(ii) There is no reduction in the effectiveness of emergency planning
or physical security;
(iii) Effluent releases remain within license conditions;
(iv) The environmental monitoring program and offsite dose calculation
manual are revised to account for the changes;
(v) The siting criteria of 10 CFR Part 100 continue to be met; and
(vi) All other applicable statutory and regulatory requirements continue
to be met.
(2) Perform a historical site assessment of the part of the facility
or site to be released; and
(3) Perform surveys adequate to demonstrate compliance with the radiological
criteria for unrestricted use specified in 10 CFR 20.1402 for impacted
areas.
(b) For release of non-impacted areas, the licensee may submit a written
request for NRC approval of the release if a license amendment is not
otherwise required. The request submittal must include--
(1) The results of the evaluations performed in accordance with paragraphs
(a)(1) and (a)(2) of this section;
(2) A description of the part of the facility or site to be released;
(3) The schedule for release of the property;
(4) The results of the evaluations performed in accordance with §
50.59; and
(5) A discussion that provides the reasons for concluding that the environmental
impacts associated with the licensee's proposed release of the property
will be bounded by appropriate previously issued environmental impact
statements.
(c) After receiving an approval request from the licensee for the release
of a non-impacted area, the NRC shall--
(1) Determine whether the licensee has adequately evaluated the effect
of releasing the property as required by paragraph (a)(1) of this section;
(2) Determine whether the licensee's classification of any release areas
as non-impacted is adequately justified; and
(3) Upon determining that the licensee's submittal is adequate, inform
the licensee in writing that the release is approved.
(d) For release of impacted areas, the licensee shall submit an application
for amendment of its license for the release of the property. The application
must include--
(1) The information specified in paragraphs (b)(1) through (b)(3) of
this section;
(2) The methods used for and results obtained from the radiation surveys
required to demonstrate compliance with the radiological criteria for
unrestricted use specified in 10 CFR 20.1402; and
(3) A supplement to the environmental report, under § 51.53, describing
any new information or significant environmental change associated with
the licensee's proposed release of the property.
(e) After receiving a license amendment application from the licensee
for the release of an impacted area, the NRC shall--
(1) Determine whether the licensee has adequately evaluated the effect
of releasing the property as required by paragraph (a)(1) of this section;
(2) Determine whether the licensee's classification of any release areas
as non-impacted is adequately justified;
(3) Determine whether the licensee's radiation survey for an impacted
area is adequate; and
(4) Upon determining that the licensee's submittal is adequate, approve
the licensee's amendment application.
(f) The NRC shall notice receipt of the release approval request or license
amendment application and make the approval request or license amendment
application available for public comment. Before acting on an approval
request or license amendment application submitted in accordance with
this section, the NRC shall conduct a public meeting in the vicinity of
the licensee's facility for the purpose of obtaining public comments on
the proposed release of part of the facility or site. The NRC shall publish
a document in the Federal Register and in a forum, such as local newspapers,
which is readily accessible to individuals in the vicinity of the site,
announcing the date, time, and location of the meeting, along with a brief
description of the purpose of the meeting.
[68 FR 19727, Apr. 22, 2003]
Amendment of License or Construction Permit at Request of Holder
§ 50.90 Application for amendment of license, construction permit, or early site permit.
Whenever a holder of a license,
including a construction permit and
operating license under this part, and an
early site permit, combined license, and
manufacturing license under part 52 of
this chapter, desires to amend the
license or permit, application for an
amendment must be filed with the
Commission, as specified in §§ 50.4 or
52.3 of this chapter, as applicable, fully
describing the changes desired, and
following as far as applicable, the form
prescribed for original applications.
[64 FR 53614, Oct. 4, 1999; 72 FR 49504, Aug. 28, 2007]
§ 50.91 Notice for public comment; State consultation.
The Commission will use the
following procedures for an application
requesting an amendment to an
operating license under this part or a
combined license under part 52 of this
chapter for a facility licensed under §§ 50.21(b) or 50.22, or for a testing
facility, except for amendments subject
to hearings governed by 10 CFR part 2,
subpart L. For amendments subject to 10
CFR part 2, subpart L, the following
procedures will apply only to the extent
specifically referenced in § 2.309(b) of
this chapter, except that notice of
opportunity for hearing must be
published in the Federal Register at
least 30 days before the requested
amendment is issued by the
Commission:
(a) Notice for public comment. (1) At the time a licensee requests an amendment, it must provide to the Commission, in
accordance with the distribution requirements specified in § 50.4, its analysis about the issue of no significant hazards
consideration using the standards in § 50.92.
(2)(i) The Commission may publish in the Federal Register under § 2.105 an individual notice of proposed action for an
amendment for which it makes a proposed determination that no significant hazards consideration is involved, or, at least
once every 30 days, publish a periodic Federal Register notice of proposed actions which identifies each amendment issued
and each amendment proposed to be issued since the last such periodic notice, or it may publish both such notices.
(ii) For each amendment proposed to be issued, the notice will (A) contain the staff's proposed determination, under the
standards in § 50.92, (B) provide a brief description of the amendment and of the facility involved, (C) solicit public
comments on the proposed determination, and (D) provide for a 30-day comment period.
(iii) The comment period will begin on the day after the date of the publication of the first notice, and, normally, the
amendment will not be granted until after this comment period expires.
(3) The Commission may inform the public about the final disposition of an amendment request for which it has made a
proposed determination of no significant hazards consideration either by issuing an individual notice of issuance under
§ 2.106 of this chapter or by publishing such a notice in its periodic system of Federal Register notices. In either event, it
will not make and will not publish a final determination on no significant hazards consideration, unless it receives a request
for a hearing on that amendment request.
(4) Where the Commission makes a final determination that no
significant hazards consideration is involved and that the amendment
should be issued, the amendment will be effective on issuance, even if
adverse public comments have been received and even if an interested
person meeting the provisions for intervention called for in §
2.309 of this chapter has filed a request for a hearing. The Commission
need hold any required hearing only after it issues an amendment,
unless it determines that a significant hazards consideration is
involved, in which case the Commission will provide an opportunity for
a prior hearing.
(5) Where the Commission finds that an emergency situation exists, in that failure to act in a timely way would result in
derating or shutdown of a nuclear power plant, or in prevention of either resumption of operation or of increase in power
output up to the plant's licensed power level, it may issue a license amendment involving no significant hazards
consideration without prior notice and opportunity for a hearing or for public comment. In such a situation, the
Commission will not publish a notice of proposed determination on no significant hazards consideration, but will publish a
notice of issuance under § 2.106 of this chapter, providing for opportunity for a hearing and for public comment after
issuance. The Commission expects its licensees to apply for license amendments in timely fashion. It will decline to
dispense with notice and comment on the determination of no significant hazards consideration if it determines that the
licensee has abused the emergency provision by failing to make timely application for the amendment and thus itself
creating the emergency. Whenever an emergency situation exists, a licensee requesting an amendment must explain why
this emergency situation occurred and why it could not avoid this situation, and the Commission will assess the licensee's
reasons for failing to file an application sufficiently in advance of that event.
(6) Where the Commission finds that exigent circumstances exist, in that a licensee and the Commission must act quickly
and that time does not permit the Commission to publish a Federal Register notice allowing 30 days for prior public
comment, and it also determines that the amendment involves no significant hazards considerations, it:
(i)(A) Will either issue a Federal Register notice providing notice of an opportunity for hearing and allowing at least two
weeks from the date of the notice for prior public comment; or
(B) Will use local media to provide reasonable notice to the public in the area surrounding a licensee's facility of the
licensee's amendment and of its proposed determination as described in paragraph (a)(2) of this section, consulting with the
licensee on the proposed media release and on the geographical area of its coverage;
(ii) Will provide for a reasonable opportunity for the public to comment, using its best efforts to make available to the
public whatever means of communication it can for the public to respond quickly, and, in the case of telephone comments,
have these comments recorded or transcribed, as necessary and appropriate;
(iii) When it has issued a local media release, may inform the licensee of the public's comments, as necessary and
appropriate;
(iv) Will publish a notice of issuance under § 2.106;
(v) Will provide a hearing after issuance, if one has been
requested by a person who satisfies the provisions for intervention
specified in § 2.309 of this chapter;
(vi) Will require the licensee to explain the exigency and why the licensee cannot avoid it, and use its normal public notice
and comment procedures in paragraph (a)(2) of this section if it determines that the licensee has failed to use its best efforts
to make a timely application for the amendment in order to create the exigency and to take advantage of this procedure.
(7) Where the Commission finds that significant hazards considerations are involved, it will issue a Federal Register notice
providing an opportunity for a prior hearing even in an emergency situation, unless it finds an imminent danger to the
health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.
(b) State consultation. (1) At the time a licensee requests an amendment, it must notify the State in which its facility is
located of its request by providing that State with a copy of its application and its reasoned analysis about no significant
hazards considerations and indicate on the application that it has done so. (The Commission will make available to the
licensee the name of the appropriate State official designated to receive such amendments.)
(2) The Commission will advise the State of its proposed determination about no significant hazards consideration
normally by sending it a copy of the Federal Register notice.
(3) The Commission will make available to the State official designated to consult with it about its proposed determination
the names of the Project Manager or other NRC personnel it designated to consult with the State. The Commission will
consider any comments of that State official. If it does not hear from the State in a timely manner, it will consider that the
State has no interest in its determination; nonetheless, to ensure that the State is aware of the application, before it issues
the amendment, it will make a good faith effort to telephone that official. (Inability to consult with a responsible State
official following good faith attempts will not prevent the Commission from making effective a license amendment
involving no significant hazards consideration.)
(4) The Commission will make a good faith attempt to consult with the State before it issues a license amendment
involving no significant hazards consideration. If, however, it does not have time to use its normal consultation procedures
because of an emergency situation, it will attempt to telephone the appropriate State official. (Inability to consult with a
responsible State official following good faith attempts will not prevent the Commission from making effective a license
amendment involving no significant hazards consideration, if the Commission deems it necessary in an emergency
situation.)
(5) After the Commission issues the requested amendment, it will send a copy of its determination to the State.
(c) Caveats about State consultation. (1) The State consultation procedures in paragraph (b) of this section do not give the
State a right:
(i) To veto the Commission's proposed or final determination;
(ii) To a hearing on the determination before the amendment becomes effective; or
(iii) To insist upon a postponement of the determination or upon issuance of the amendment.
(2) These procedures do not alter present provisions of law that reserve to the Commission exclusive responsibility for
setting and enforcing radiological health and safety requirements for nuclear power plants.
[51 FR 7765, Mar. 6, 1986, as amended at 51 FR 40310, Nov. 6, 1986; 61
FR 39303, July 29, 1996; 69 FR 2276, Jan. 14, 2004; 72 FR 49504, Aug. 28, 2007]
§ 50.92 Issuance of amendment
(a) In determining whether an amendment to a license, construction permit, or early site permit will be issued to the applicant, the Commission will be guided by the considerations which govern the issuance of initial licenses, construction permits, or early site permits to the extent applicable and appropriate. If the application involves
the material alteration of a licensed facility, a construction permit will be issued before the issuance of the
amendment to the license, provided however, that if the application involves a material alteration to a nuclear power reactor manufactured under part 52 of this chapter before its installation at a site, or a combined license before the date that the Commission makes the finding under § 52.103(g) of this chapter, no application for a
construction permit is required. If the amendment involves a significant hazards consideration, the Commission
will give notice of its proposed action:
(1) Under § 2.105 of this chapter before acting thereon; and
(2) As soon as practicable after the application has been docketed.
(b) The Commission will be particularly sensitive to a license amendment request that involves irreversible consequences (such as one that permits a significant increase in the amount of effluents or radiation emitted by a nuclear power plant).
(c) The Commission may make a final determination, under the procedures in § 50.91, that a proposed amendment to an operating license or a combined license for a facility or reactor licensed under §§ 50.21(b) or 50.22, or for a testing facility involves no significant hazards consideration, if operation of the facility in accordance with the proposed amendment would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
(2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or
(3) Involve a significant reduction in a margin of safety.
[51 FR 7767, Mar. 6, 1986; 72 FR 49504, Aug. 28, 2007]
Revocation, Suspension, Modification, Amendment of Licenses and Construction Permits, Emergency Operations by the Commission
§ 50.100 Revocation, suspension, modification of licenses, permits, and approvals for cause.
A license, permit, or standard design approval under parts 50 or 52 of this chapter may be revoked, suspended, or modified, in whole or in part, for any material false statement in the application or in the supplemental or other statement of fact required of the applicant; or because of conditions revealed by the application or statement of fact of any report, record, inspection, or other means which would warrant
the Commission to refuse to grant a license, permit, or approval on an original application (other than those relating to §§ 50.51, 50.42, and 50.43(b)); or for failure to manufacture a reactor, or construct or operate a facility in accordance with the terms of the permit or license, provided, however, that failure to make timely completion of the proposed construction or alteration of a facility under a construction permit under part 50 of this chapter or a combined license under part 52 of this chapter shall be governed by the provisions of § 50.55(b); or for violation of, or failure to observe, any of the terms and provisions of the act, regulations, license, permit, approval, or order of the Commission.
[; 72 FR 49504, Aug. 28, 2007; 89 FR 57720, Jul. 16, 2024]
§ 50.101 Retaking possession of special nuclear material.
Upon revocation of a license, the Commission may immediately cause the retaking of possession of all special nuclear
material held by the licensee.
[21 FR 355, Jan. 19, 1956, as amended at 40 FR 8790, Mar. 3, 1975]
§ 50.102 Commission order for operation after revocation.
Whenever the Commission finds that the public convenience and necessity, or the Department finds that the production
program of the Department requires continued operation of a production or utilization facility, the license for which has
been revoked, the Commission may, after consultation with the appropriate federal or state regulatory agency having
jurisdiction, order that possession be taken of such facility and that it be operated for a period of time as, in the judgment of
the Commission, the public convenience and necessity or the production program of the Department may require, or until a
license for operation of the facility shall become effective. Just compensation shall be paid for the use of the facility.
[40 FR 8790, Mar. 3, 1975]
§ 50.103 Suspension and operation in war or national emergency.
(a) Whenever Congress declares that a state of war or national emergency exists, the Commission, if it finds it necessary to
the common defense and security, may,
(1) Suspend any license it has issued.
(2) Cause the recapture of special nuclear material.
(3) Order the operation of any licensed facility.
(4) Order entry into any plant or facility in order to recapture special nuclear material or to operate the facility.
(b) Just compensation shall be paid for any damages caused by recapture of special nuclear material or by operation of any
facility, pursuant to this section.
[21 FR 355, Jan. 19, 1956, as amended at 35 FR 11416, July 17, 1970; 40 FR 8790, Mar. 3, 1975]
Backfitting
§ 50.109 Backfitting.
(a)(1) Backfitting is defined as the modification of or addition to systems, structures, components, or design of a facility; or the design approval or manufacturing license for a facility; or the procedures or organization required to design, construct or operate a facility; any of which may result from a new or
amended provision in the Commission's regulations or the imposition of a regulatory staff position interpreting the Commission's regulations that is either new or different from a previously applicable staff position after:
(i) The date of issuance of the construction permit for the facility for facilities having construction permits issued after October 21, 1985;
(ii) Six (6) months before the date of docketing of the operating license application for the facility for facilities having construction permits issued before October 21, 1985;
(iii) The date of issuance of the operating license for the facility for facilities having operating licenses;
(iv) The date of issuance of the design approval under subpart E of part 52 of this chapter;
(v) The date of issuance of a manufacturing license under subpart F of part 52 of this chapter;
(vi) The date of issuance of the first construction permit issued for a duplicate design under appendix N of this part; or
(vii) The date of issuance of a combined license under subpart C of part 52 of this chapter, provided that if the combined license references an early site permit, the provisions in § 52.39 of this chapter apply with respect to the site characteristics, design parameters, and terms and conditions specified in the early site permit. If the combined license references a standard design certification rule under subpart B of 10 CFR part 52, the provisions in § 52.63 of this chapter apply with respect to the design matters resolved in the standard design certification rule, provided however, that if any specific backfitting limitations are included in a referenced design certification rule, those
limitations shall govern. If the combined license references a standard design approval under subpart E of 10 CFR part 52, the provisions in § 52.145 of this chapter apply with respect to the design
matters resolved in the standard design approval. If the combined license uses a reactor manufactured under a manufacturing license under subpart F of 10 CFR part 52, the provisions of § 52.171 of this chapter apply with respect to matters resolved in the manufacturing license proceeding.
(2) Except as provided in paragraph (a)(4) of this section, the Commission shall require a systematic and documented analysis pursuant to paragraph (c) of this section for backfits which it seeks to impose.
(3) Except as provided in paragraph (a)(4) of this section, the Commission shall require the backfitting of a facility only when it determines, based on the analysis described in paragraph (c) of this section, that there is a substantial increase in the overall protection of the public health and safety or the common defense and security to be derived from the backfit and that the direct and indirect costs of implementation for that facility are justified in view of this increased protection.
(4) The provisions of paragraphs (a)(2) and (a)(3) of this section are inapplicable and, therefore, backfit analysis is not required and the standards in paragraph (a)(3) of this section do not apply where the Commission or staff, as appropriate, finds and declares, with appropriate documented evaluation for its finding, either:
(i) That a modification is necessary to bring a facility into compliance with a license or the rules or orders of the Commission, or into conformance with written commitments by the licensee; or
(ii) That regulatory action is necessary to ensure that the facility provides adequate protection to the health and safety of the public and is in accord with the common defense and security; or
(iii) That the regulatory action involves defining or redefining what level of protection to the public health and safety or common defense and security should be regarded as adequate.
(5) The Commission shall always require the backfitting of a facility if it determines that such regulatory action is necessary to ensure that the facility provides adequate protection to the health and safety of the public and is in accord with the common defense and security.
(6) The documented evaluation required by paragraph (a)(4) of this section shall include a statement of the objectives of and reasons for the modification and the basis for invoking the exception. If immediately effective regulatory action is required, then the documented evaluation may follow rather than precede the regulatory action.
(7) If there are two or more ways to achieve compliance with a license or the rules or orders of the Commission, or with written licensee commitments, or there are two or more ways to reach a level of protection which is adequate, then ordinarily the applicant or licensee is free to choose the way which best suits its purposes. However, should it be necessary or appropriate for the Commission to prescribe a specific way to comply with its requirements or to achieve adequate protection, then cost may be a factor in selecting the way, provided that the objective of compliance or adequate protection is met.
(b) Paragraph (a)(3) of this section shall not apply to backfits imposed prior to October 21, 1985.
(c) In reaching the determination required by paragraph (a)(3) of this section, the Commission will consider how the backfit should be scheduled in light of other ongoing regulatory activities at the facility and, in addition, will consider information available concerning any of the following factors as may be appropriate and any other information relevant and material to the proposed backfit:
(1) Statement of the specific objectives that the proposed backfit is designed to achieve;
(2) General description of the activity that would be required by the licensee or applicant in order to complete the backfit;
(3) Potential change in the risk to the public from the accidental off-site release of radioactive material;
(4) Potential impact on radiological exposure of facility employees;
(5) Installation and continuing costs associated with the backfit, including the cost of facility downtime or the cost of construction delay;
(6) The potential safety impact of changes in plant or operational complexity, including the relationship to proposed and existing regulatory requirements;
(7) The estimated resource burden on the NRC associated with the proposed backfit and the availability of such resources;
(8) The potential impact of differences in facility type, design or age on the relevancy and practicality of the proposed backfit;
(9) Whether the proposed backfit is interim or final and, if interim, the justification for imposing the proposed backfit on an interim basis.
(d) No licensing action will be withheld during the pendency of backfit analyses required by the Commission's rules.
(e) The Executive Director for Operations shall be responsible for implementation of this section, and all analyses required by this section shall be approved by the Executive Director for Operations or his designee.
[53 FR 20610, June 6, 1988, as amended at 54 FR 15398, Apr. 18, 1989; 72 FR 49504, Aug. 28, 2007; 89 FR 57720, Jul. 16,2024]
Enforcement
§ 50.110 Violations.
(a) The Commission may obtain an injunction or other court order to prevent a violation of the provisions of--
(1) The Atomic Energy Act of 1954, as amended;
(2) Title II of the Energy Reorganization Act of 1974, as amended; or
(3) A regulation or order issued pursuant to those Acts.
(b) The Commission may obtain a court order for the payment of a civil penalty imposed under Section 234 of the Atomic
Energy Act:
(1) For violations of--
(i) Sections 53, 57, 62, 63, 81, 82, 101, 103, 104, 107, or 109 of the Atomic Energy Act of 1954, as amended;
(ii) Section 206 of the Energy Reorganization Act;
(iii) Any rule, regulation, or order issued pursuant to the sections specified in paragraph (b)(1)(i) of this section;
(iv) Any term, condition, or limitation of any license issued under the sections specified in paragraph (b)(1)(i) of this
section.
(2) For any violation for which a license may be revoked under section 186 of the Atomic Energy Act of 1954, as amended.
[57 FR 55075, Nov. 24, 1992]
§ 50.111 Criminal penalties.
(a) Section 223 of the Atomic Energy Act of 1954, as amended, provides for criminal sanctions for willful violation of,
attempted violation of, or conspiracy to violate, any regulation issued under sections 161b, 161i, or 161o of the Act. For
purposes of section 223, all the regulations in part 50 are issued under one or more of sections 161b, 161i, or 161o, except
for the sections listed in paragraph (b) of this section.
(b) The regulations in 10 CFR Part 50 that are not issued under sections 161b, 161i, or 161o for the purposes of section 223
are as follows: §§ 50.1, 50.2, 50.3, 50.4, 50.8, 50.11, 50.12, 50.13, 50.20, 50.21, 50.22, 50.23, 50.30, 50.31, 50.32, 50.33,
50.34a, 50.35, 50.36b, 50.37, 50.38, 50.39, 50.40, 50.41, 50.42, 50.43, 50.45, 50.50, 50.51, 50.52, 50.53, 50.56, 50.57,
50.58, 50.81, 50.90, 50.91, 50.92, 50.100, 50.101, 50.102, 50.103, 50.109, 50.110, 50.111.
[57 FR 55075, Nov. 24, 1992, as amended at 61 FR 39303, July 29, 1996]
Additional Standards for Licenses, Certifications, and Regulatory Approvals
§ 50.120 Training and qualification of nuclear power plant personnel.
(a) Applicability. The requirements of this section apply to each applicant for and each holder of an operating license issued under this part and each holder of a combined license issued under part
52 of this chapter for a nuclear power plant of the type specified in § 50.21(b) or § 50.22.
(b) Requirements. (1)(i) Each nuclear power plant operating license applicant, by 18 months prior to fuel load, and each holder of an operating license shall establish, implement, and maintain a
training program that meets the requirements of paragraphs (b)(2) and (b)(3) of this section.
(ii) Each holder of a combined license shall establish, implement, and maintain the training program that meets the requirements of paragraphs (b)(2) and (b)(3) of this section, as described in the final safety analysis report no later than 18 months before the scheduled date for initial loading of fuel.
(2) The training program must be derived from a systems approach to training as defined in 10 CFR 55.4, and must provide for the training and qualification of the following categories of nuclear power plant personnel:
(i) Non-licensed operator.
(ii) Shift supervisor.
(iii) Shift technical advisor.
(iv) Instrument and control technician.
(v) Electrical maintenance personnel.
(vi) Mechanical maintenance personnel.
(vii) Radiological protection technician.
(viii) Chemistry technician.
(ix) Engineering support personnel.
(3) The training program must incorporate the instructional requirements necessary to provide qualified personnel to operate and maintain the facility in a safe manner in all modes of operation. The training
program must be developed to be in compliance with the facility license, including all technical specifications and applicable regulations. The training program must be periodically evaluated and revised as appropriate to reflect industry experience as well as changes to the facility, procedures, regulations,
and quality assurance requirements. The training program must be periodically reviewed by licensee management for effectiveness. Sufficient records must be maintained by the licensee to maintain program integrity and kept available for NRC inspection to verify the adequacy of the program.
[58 FR 21912, Apr. 26, 1993; 58 FR 39092, July 21, 1993; 72 FR 49505, Aug. 28, 2007; 74 FR 28146, Jun. 12, 2009]
§ 50.150 Aircraft impact assessment.
(a) Assessment requirements. (1) Assessment. Each applicant listed in paragraph (a)(3) shall perform a design-specific assessment of the effects on the facility of the impact of a large, commercial aircraft. Using realistic analyses, the applicant shall identify and incorporate into the design those design features and functional capabilities to show that, with reduced use of operator actions:
(i) The reactor core remains cooled, or the containment remains intact; and
(ii) Spent fuel cooling or spent fuel pool integrity is maintained.
(2) Aircraft impact characteristics.1 The assessment must be based on the beyond-design-basis impact of a large, commercial aircraft used for long distance flights in the United States, with aviation fuel loading typically used in such flights, and an impact speed and angle of impact considering the ability of both experienced and inexperienced pilots to control large, commercial aircraft at the low altitude representative of a nuclear power plant’s low profile.
(3) Applicability. The requirements of paragraphs (a)(1) and (a)(2) of this section apply to applicants for:
(i) Construction permits for nuclear power reactors issued under this part after July 13, 2009;
(ii) Operating licenses for nuclear power reactors issued under this part for which a construction permit was issued after July 13, 2009;
(iii)(A) Standard design certifications issued under part 52 of this chapter after July 13, 2009;
(B) Renewal of standard design certifications in effect on July 13, 2009 which have not been amended to comply with the requirements of this section by the time of application for renewal;
(iv) Standard design approvals issued under part 52 of this chapter after July 13, 2009;
(v) Combined licenses issued under part 52 of this chapter that:
(A) Do not reference a standard design certification, standard design approval, or manufactured reactor; or
(B) Reference a standard design certification issued before July 13, 2009 which has not been amended to address the requirements of this section; and
(vi) Manufacturing licenses issued under part 52 of this chapter that:
(A) Do not reference a standard design certification or standard design approval; or
(B) Reference a standard design certification issued before July 13, 2009 which has not been amended to address the requirements of this section.
(b) Content of application. For applicants identified in paragraph (a)(3) of this section, the preliminary or final
safety analysis report, as applicable, must include a description of:
(1) The design features and functional capabilities identified in paragraph (a)(1) of this section; and
(2) How the design features and functional capabilities identified in paragraph (a)(1) of this section meet the assessment requirements in paragraph (a)(1) of this section.
(c) Control of changes. (1) For construction permits which are subject to paragraph (a) of this section, if the permit holder changes the information required by 10 CFR 50.34(a)(13) to be included in the preliminary safety analysis report, then the permit holder shall consider the effect of the changed feature or capability on the original assessment required by 10 CFR 50.150(a) and amend the information required by 10 CFR 50.34(a)(13) to be included in the preliminary safety analysis report to describe how the modified design features and functional capabilities continue to meet the assessment requirements in paragraph (a)(1) of this section.
(2) For operating licenses which are subject to paragraph (a) of this section, if the licensee changes the information required by 10 CFR 50.34(b)(12) to be included in the final safety analysis report, then the licensee shall consider the effect of the changed feature or capability on the original assessment required by 10 CFR 50.150(a) and amend the information required by 10 CFR 50.34(b)(12) to be included in the final safety analysis report to describe how the modified design features and functional capabilities continue to meet the assessment requirements in paragraph (a)(1) of this section.
(3) For standard design certifications which are subject to paragraph (a) of this section, generic changes to the information required by 10 CFR 52.47(a)(28) to be included in the final safety analysis report are governed by the applicable requirements of 10 CFR 52.63.
(4)(i) For combined licenses which are subject to paragraph (a) of this section, if the licensee changes the information required by 10 CFR 52.79(a)(47) to be included in the final safety analysis report, then the licensee shall consider the effect of the changed feature or capability on the original assessment required by 10 CFR 50.150(a) and amend the information required by 10 CFR 52.79(a)(47) to be included in the final safety analysis report to describe how the modified design features and functional capabilities continue to meet the assessment requirements in paragraph (a)(1) of this section.
(ii) For combined licenses which are not subject to paragraph (a) of this section but reference a standard design certification which is subject to paragraph (a) of this section, proposed departures from the information required by 10 CFR 52.47(a)(28) to be
included in the final safety analysis report for the referenced standard design certification are governed by the change control requirements in the applicable design certification rule.
(iii) For combined licenses which are not subject to paragraph (a) of this section but reference a manufactured reactor which is subject to paragraph (a) of this section, proposed departures from the information required by 10 CFR 52.157(f)(32) to be included in the final safety analysis report for the manufacturing license are governed by the applicable requirements in 10 CFR 52.171(b)(2).
(5)(i) For manufacturing licenses which are subject to paragraph (a) of this section, generic changes to the information required by 10 CFR 52.157(f)(32) to be included in the final safety analysis report are governed by the applicable requirements of 10 CFR 52.171.
(ii) For manufacturing licenses which are not subject to paragraph (a) of this section but reference a standard design certification which is subject to paragraph (a) of this section, proposed departures from the information required by 10 CFR 52.47(a)(28) to be included in the final safety analysis report for the referenced standard design certification are governed by the change control requirements in the applicable design certification rule.
[74 FR 28146, Jun. 12, 2009]
1 Changes to the detailed parameters on aircraft impact characteristics set forth in guidance shall be approved by the Commission.
§ 50.155 Mitigation of beyond-design-basis events.
(a) Applicability. (1) Each holder of an operating license for a nuclear power reactor under this part and each holder of a combined license under part 52 of this chapter for which the Commission
has made the finding under § 52.103(g) of this chapter shall comply with the requirements of this section until submittal of the license holder's certifications described in § 50.82(a)(1)
or § 52.110(a) of this chapter.
(2)(i) Once the certifications described in § 50.82(a)(1) or § 52.110(a) of this chapter have been submitted by a licensee subject to the requirements of this section, that licensee need only comply with the requirements of paragraphs (b) through (d) and (f) of this section associated with spent fuel pool cooling capabilities.
(ii) Holders of operating licenses or combined licenses for which the certifications described in § 50.82(a)(1) or § 52.110(a) of this chapter have been submitted need not meet the
requirements of this section except for the requirements of paragraph (b)(2) of this section associated with spent fuel pool cooling capabilities once the decay heat of the fuel in the spent fuel pool can be removed solely by heating and boiling of water within the spent fuel pool and the boil-off period provides sufficient time for the licensee to obtain off-site resources to sustain the spent fuel pool cooling function indefinitely, as demonstrated by an analysis performed and retained by the licensee.
(iii) The holder of the license for Millstone Power Station, Unit 1, is not subject to the requirements of this section.
(iv) Holders of operating licenses or combined licenses for which the certifications described in § 50.82(a)(1) or § 52.110(a) of this chapter have been submitted need not meet the
requirements of this section once all irradiated fuel has been permanently removed from the spent fuel pool(s).
(b) Strategies and guidelines. Each applicant or licensee shall develop, implement, and maintain:
(1) Mitigation strategies for beyond-design basis external events—Strategies and guidelines to mitigate beyond-design-basis external events from natural phenomena that are developed
assuming a loss of all ac power concurrent with either a loss of normal access to the ultimate heat sink or, for passive reactor designs, a loss of normal access to the normal heat sink. These
strategies and guidelines must be capable of being implemented site-wide and must include the following:
(i) Maintaining or restoring core cooling, containment, and spent fuel pool cooling capabilities; and
(ii) The acquisition and use of offsite assistance and resources to support the functions required by paragraph (b)(1)(i) of this section indefinitely, or until sufficient site functional capabilities can be maintained without the need for the mitigation strategies.
(2) Extensive damage mitigation guidelines—Strategies and guidelines to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant impacted by the event, due to explosions or fire, to include strategies and guidelines in the following areas:
(i) Firefighting;
(ii) Operations to mitigate fuel damage; and
(iii) Actions to minimize radiological release.
(c) Equipment. (1) The equipment relied on for the mitigation strategies and guidelines required by paragraph (b)(1) of this section must have sufficient capacity and capability to perform the functions required by paragraph (b)(1) of this section.
(2) The equipment relied on for the mitigation strategies and guidelines required by paragraph (b)(1) of this section must be reasonably protected from the effects of natural phenomena that are equivalent in magnitude to the phenomena assumed for developing the design basis of the facility.
(d) Training requirements. Each licensee shall provide for the training of personnel that perform activities in accordance with the capabilities required by paragraphs (b)(1) and (2) of this section.
(e) Spent fuel pool monitoring. In order to support effective prioritization of event mitigation and recovery actions, each licensee shall provide reliable means to remotely monitor wide-range water level for each spent fuel pool at its site until 5 years have elapsed since all of the fuel within that spent fuel pool was last used in a reactor vessel for power generation. This provision does not apply to General Electric Mark III upper containment pools.
(f) Documentation of changes. (1) A licensee may make changes in the implementation of the requirements in this section without NRC approval, provided that before implementing each such change, the licensee demonstrates that the provisions of this section continue to be met and maintains documentation of changes until the requirements of this section no longer apply.
(2) Changes in the implementation of requirements in this section subject to change control processes in addition to paragraph (f) of this section must be processed via their respective change
control processes, unless the changes being evaluated impact only the implementation of the requirements of this section.
(g) Implementation. Each holder of an operating license for a nuclear power reactor under this part on September 9, 2019, and each holder of a combined license under part 52 of this chapter for
which the Commission made the finding specified in 10 CFR 52.103(g) as of September 9, 2019, shall continue to comply with the provisions of paragraph (b)(2) of this section, and shall comply with all other provisions of this section no later than September 9, 2022, for licensees that received NRC Order EA–13–109 or September 9, 2021, for all other applicable licensees.
(h) Withdrawal of orders and removal of license conditions. (1) On September 9, 2022, Order EA–12–049, "Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA–12–051, "Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation," are withdrawn for each licensee or construction permit holder that was issued those Orders.
(2) On September 9, 2019, Enrico Fermi Nuclear Plant Unit 3, License No. NPF–95, license conditions 2.D(12)(h), "Reliable Spent Fuel Pool/Buffer Pool Level Instrumentation," 2.D(12)(i), "Emergency Planning Actions," and 2.D(12)(g), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(g)1, are deemed removed from that license.
(3) On September 9, 2019, William States Lee III Nuclear Station, Unit 1, License No. NPF–101, license conditions 2.D(12)(d)11 regarding reliable spent fuel pool instrumentation, 2.D(12)(g), "Emergency Planning Actions," and 2.D(12)(j), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(j)1, and William States Lee III Nuclear Station, Unit 2, License No. NPF–102, license conditions 2.D(12)(d)11 regarding reliable spent fuel pool instrumentation, 2.D(12)(g), "Emergency Planning Actions," and 2.D(12)(j), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(j)1, are deemed removed from those licenses.
(4) On September 9, 2019, North Anna Unit 3, License No. NPF–103, license conditions 2.D(12)(g), "Reliable Spent Fuel Pool/Buffer Pool Level Instrumentation," 2.D(12)(h), "Emergency Planning Actions," and 2.D(12)(f), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(f)1, are deemed removed from the license.
(5) On September 9, 2019, Turkey Point, Unit 6, License No. NPF–104, license conditions 2.D(12)(e)11 regarding reliable spent fuel pool instrumentation, 2.D(12)(g), "Emergency Planning Actions," and 2.D(12)(h), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(h)1, and Turkey Point, Unit 7, License No. NPF–105, license conditions 2.D(12)(e)11 regarding reliable spent fuel pool instrumentation, 2.D(12)(g), "Emergency Planning Actions," and 2.D(12)(h), "Mitigation Strategies for Beyond-Design-Basis External Events," except for 2.D(12)(h)1, are deemed removed from those licenses.
[84 FR 39718, Aug. 9, 2019]
Small Modular Reactors, Non-Light-
Water Reactors, and Non-Power
Production or Utilization Facilities.
§ 50.160 Emergency preparedness for
small modular reactors, non-light-water
reactors, and non-power production or
utilization facilities.
(a) Definitions. For the purpose of this
section:
(1) Site boundary means site
boundary as defined in § 20.1003 of this
chapter.
(2) [Reserved]
(b) Requirements. The emergency
plan shall contain information needed
to demonstrate compliance with the
elements set forth in this paragraph. The
applicable requirements of § 50.47(a)(1)
apply to applications submitted under
this section.
(1) Performance-based framework.
Demonstrate effective response in drills
and exercises for emergency and
accident conditions.
(i) Maintenance of performance.
Maintain in effect preparedness to
respond to emergency and accident
conditions and describe in an
emergency plan the provisions to be
employed to maintain preparedness.
(ii) Performance objectives. (A) By the
beginning of each calendar quarter,
develop and maintain a complete list of
performance objectives for that calendar
quarter; and
(B) Maintain records showing the
implemented performance objectives
and associated metrics during each
calendar quarter for the previous eight
calendar quarters.
(iii) Emergency response performance.
The emergency response team must
have sufficient capability to
demonstrate the following emergency
response functions using drills or
exercises:
(A) Event classification and
mitigation. Assess, classify, monitor,
and repair facility malfunctions in
accordance with the emergency plan to
return the facility to safe conditions.
(B) Protective actions. Implement and
maintain protective actions for onsite
personnel for emergency conditions,
and recommend protective actions to
offsite authorities as conditions warrant.
(C) Communications. Establish and
maintain effective communications with
the emergency response organization,
and make notifications to response
personnel and organizations who may
have responsibilities for responding
during emergencies.
(D) Command and control. Establish
and maintain effective command and
control for emergencies by using a
supporting organizational structure with
defined roles, responsibilities, and
authorities for directing and performing
emergency response functions as
described in paragraph (b) of this
section.
(E) Staffing and operations. Establish
staffing for the facility necessary to
implement the roles and responsibilities
in paragraph (b)(1)(iii) of this section.
(F) Radiological assessment. Assess
radiological conditions in and around
the facility during emergencies,
including:
(1) Radiological conditions. Assess,
monitor, and report radiological
conditions to the applicable response
personnel using installed or portable
equipment.
(2) Protective equipment. Issue and
use protective equipment necessary to
continue and expand mitigation and
protective action strategies.
(3) Core or vessel damage. Assess,
monitor, and report to the applicable
response personnel the extent and
magnitude of damage to the core or
other vessel containing irradiated
special nuclear material, such as fuel or
targets, as applicable.
(4) Releases. Assess, monitor, and
report to the applicable response
personnel the extent and magnitude of
all radiological releases, including
releases of hazardous chemicals
produced from licensed material.
(G) Reentry. Develop and implement
reentry plans for accessing the facility
after emergencies.
(H) Critique and corrective actions.
Critique emergency response functions
and implement corrective actions after
drills and exercises, and after
emergencies, if they occur.
(iv) Planning activities. (A) Maintain
the capability to:
(1) Prepare and issue public
information during emergencies.
(2) Implement the NRC-approved
emergency response plan in conjunction
with the licensee’s Safeguards
Contingency Plan.
(3) Establish voice and data
communications with the NRC for
emergencies.
(4) Establish an emergency facility or
facilities from which effective direction
can be given and effective control can be
exercised during an emergency, with
capabilities to support the emergency
response functions as described in
paragraph (b)(1)(iii) of this section.
(5) Provide site familiarization
training for any offsite organization that
may respond to the site in the event of
an emergency.
(6) Establish methods for maintaining
the emergency plan, contacts and
arrangements, procedures, and
evacuation time estimate up to date,
including periodic reviews by the onsite
and offsite organizations.
(B) For a plume exposure pathway
EPZ that extends beyond the site
boundary, the emergency plan must
describe:
(1) The contacts and arrangements
made and documented with Federal,
State, local, and Tribal governmental
agencies, as applicable, with
responsibilities for coping with
emergencies, including the
identification of the principal
coordinating agencies, and the
coordinated reviews of changes in
offsite and onsite planning and
preparation;
(2) Offsite organizations responsible
for coping with emergencies and the
means of notifying, in the event of an
emergency, persons assigned to the
emergency organizations, including the
means of validating notifications, the
time period by which notifications must
be completed, and primary and
secondary methods to complete
notification;
(3) The protective measures to be
taken within the EPZ to protect the
health and safety of the public in the
event of an emergency, including the
procedures by which the protective
measures are implemented, maintained,
and discontinued;
(4) An evacuation time estimate of the
areas within the EPZ;
(5) The offsite facility and any backup
facilities to coordinate the onsite
response with the offsite response;
(6) The means of making offsite dose
projections and the means of
communicating the offsite dose
projections to the offsite response
coordinating agencies;
(7) The means by which public
information is provided to the members
of the public concerning emergency
planning information, public alert
notification system, and any prompt
actions that need to be taken by the
public;
(8) The general plans and methods to
allow reentry into the EPZ during and
after an emergency; and
(9) The drill and exercise program
that tests and implements major
portions of planning, preparations, and
the coordinated response by the onsite
response organization with the offsite
response organizations within the EPZ
without mandatory public participation.
(2) Hazard analysis. Conduct a hazard
analysis of any contiguous or nearby
facility, such as industrial, military, and
transportation facilities, and include
any credible hazard into the licensee’s
emergency preparedness program that
would adversely impact the
implementation of emergency plans.
(3) Emergency planning zone. For an
applicant whose analysis required by
§ 50.33(g)(2) meets the criteria in
§ 50.33(g)(2)(i), determine and describe
the boundary and physical
characteristics of the EPZ in the
emergency plan.
(4) Ingestion response planning.
Describe or reference in the emergency
plan the capabilities that provide
actions to prevent contaminated food
and water from entering into the
ingestion pathway.
(c) Implementation. (1) An applicant
for an operating license issued under
this part after December 18, 2023 must
establish, implement, and maintain an
emergency preparedness program that
meets the requirements of paragraph (b)
of this section, as described in the
emergency plan and license, and
conduct an initial exercise to
demonstrate this compliance within 2
years before the issuance of an operating
license for the facility described in the
license application.
(2) A holder of a combined license
issued under part 52 of this chapter
before the Commission has made the
finding under § 52.103(g) of this
chapter, must establish, implement, and
maintain an emergency preparedness
program that meets the requirements of
paragraph (b) of this section, as
described in the approved emergency
plan and license, and conduct an initial
exercise to demonstrate this compliance
within 2 years before the scheduled date
for initial loading of fuel.
[88 FR 80074, Nov. 16, 2023]
Appendix A to Part 50—General Design Criteria for Nuclear Power Plants
Table of Contents
CRITERIA
|
Number |
I. Overall Requirements: |
Quality Standards and Records |
1 |
Design Bases for Protection Against Natural Phenomena |
2 |
Fire Protection |
3 |
Environmental and Dynamic Effects Design Bases |
4 |
Sharing of Structures, Systems, and Components |
5 |
II. Protection by Multiple Fission
Product Barriers: |
Reactor Design |
10 |
Reactor inherent Protection |
11 |
Suppression of Reactor Power Oscillations |
12 |
Instrumentation and Control |
13 |
Reactor Coolant Pressure Boundary |
14 |
Reactor Coolant System Design |
15 |
Containment Design |
16 |
Electric Power Systems |
17 |
Inspection and Testing of Electric Power Systems |
18 |
Control Room |
19 |
III. Protection and Reactivity Control
Systems: |
Protection System Functions |
20 |
Protection System Reliability and Testability |
21 |
Protection System Independence |
22 |
Protection System Failure Modes |
23 |
Separation of Protection and Control Systems |
24 |
Protection System Requirements for Reactivity Control Malfunctions |
25 |
Reactivity Control System Redundancy and Capability |
26 |
Combined Reactivity Control Systems Capability |
27 |
Reactivity Limits |
28 |
Protection Against Anticipated Operational Occurrences |
29 |
IV. Fluid Systems: |
Quality of Reactor Coolant Pressure Boundary |
30 |
Fracture Prevention of Reactor Coolant Pressure Boundary |
31 |
Inspection of Reactor Coolant Pressure Boundary |
32 |
Reactor Coolant Makeup |
33 |
Residual Heat Removal |
34 |
Emergency Core Cooling |
35 |
Inspection of Emergency Core Cooling System |
36 |
Testing of Emergency Core Cooling System |
37 |
Containment Heat Removal |
38 |
Inspection of Containment Heat Removal System |
39 |
Testing of Containment Heat Removal System |
40 |
Containment Atmosphere Cleanup |
41 |
Inspection of Containment Atmosphere Cleanup Systems |
42 |
Testing of Containment Atmosphere Cleanup Systems |
43 |
Cooling Water |
44 |
Inspection of Cooling Water System |
45 |
Testing of Cooling Water System |
46 |
V. Reactor Containment: |
Containment Design Basis |
50 |
Fracture Prevention of Containment Pressure Boundary |
51 |
Capability for Containment Leakage Rate Testing |
52 |
Provisions for Containment Testing and Inspection |
53 |
Systems Penetrating Containment |
54 |
Reactor Coolant Pressure Boundary Penetrating Containment |
55 |
Primary Containment Isolation |
56 |
Closed Systems Isolation Valves |
57 |
VI. Fuel and Radioactivity Control: |
Control of Releases of Radioactive Materials to the Environment |
60 |
Fuel Storage and Handling and Radioactivity Control |
61 |
Prevention of Criticality in Fuel Storage and Handling |
62 |
Monitoring Fuel and Waste Storage |
63 |
Monitoring Radioactivity Releases |
64 |
Introduction
Under the provisions of § 50.34, an application for a construction permit must include the principal design criteria for a proposed facility. Under the provisions of 10 CFR 52.47, 52.79, 52.137, and 52.157, an application for a design certification, combined license, design approval, or manufacturing license, respectively, must include the principal design criteria for a proposed facility. The principal design criteria establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety; that is, structures, systems, and components that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public.
These General Design Criteria establish minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have been issued by the Commission. The General Design Criteria are also considered to be generally applicable to other types of nuclear power units and are intended to provide guidance in establishing the principal design criteria for such other units.
The development of these General Design Criteria is not yet complete. For example, some of the definitions need further amplification. Also, some of the specific design requirements for structures, systems, and components important to safety have not as yet been suitably defined. Their omission does not relieve any applicant from considering these matters in the design of a specific facility and satisfying the necessary safety requirements. These matters include:
(1) Consideration of the need to design against single failures of passive components in fluid systems important to safety. (See Definition of Single Failure.)
(2) Consideration of redundancy and diversity requirements for fluid systems important to safety. A "system" could consist of a number of subsystems each of which is separately capable of performing the specified system safety function. The minimum acceptable redundancy and diversity of subsystems and components within a subsystem, and the required interconnection and independence of the subsystems have not yet been developed or defined. (See Criteria 34, 35, 38, 41, and 44.)
(3) Consideration of the type, size, and orientation of possible breaks in components of the reactor coolant pressure boundary in determining design requirements to suitably protect against postulated loss-of-coolant accidents. (See Definition of Loss of Coolant Accidents.)
(4) Consideration of the possibility of systematic, nonrandom, concurrent failures of redundant elements in the design of protection systems and reactivity control systems. (See Criteria 22, 24, 26, and 29.)
It is expected that the criteria will be augmented and changed from time to time as important new requirements for these and other features are developed.
There will be some water-cooled nuclear power plants for which the General Design Criteria are not sufficient and for which additional criteria must be identified and satisfied in the interest of public safety. In particular, it is expected that additional or different criteria will be needed to take into account unusual sites and environmental conditions, and for water-cooled nuclear power units of advanced design. Also, there may be water-cooled nuclear power units for which fulfillment of some of the General Design Criteria may not be necessary or appropriate. For plants such as these, departures from the General Design Criteria must be identified and justified.
Definitions and Explanations
Nuclear power unit. A nuclear power unit means a nuclear power reactor and associated equipment necessary for electric power generation and includes those structures, systems, and components required to provide reasonable assurance the facility can be operated without undue risk to the health and safety of the public.
Loss of coolant accidents. Loss of coolant accidents mean those postulated accidents that result from the loss of reactor coolant at a rate in excess of the capability of the reactor coolant makeup system from breaks in the reactor coolant pressure boundary, up to and including a break equivalent in size to the double-ended rupture of the largest pipe of the reactor coolant system.1
Single failure. A single failure means an occurrence which results in the loss of capability of a component to perform its intended safety functions. Multiple failures resulting from a single occurrence are considered to be a single failure. Fluid and electric systems are considered to be designed against an assumed single failure if neither (1) a single failure of any active component (assuming passive components function properly) nor (2) a single failure of a passive component (assuming active components function properly), results in a loss of the capability of the system to perform its safety functions.2
Anticipated operational occurrences. Anticipated operational occurrences mean those conditions of normal operation which are expected to occur one or more times during the life of the nuclear power unit and include but are not limited to loss of power to all recirculation pumps,
tripping of the turbine generator set, isolation of the main condenser, and loss of all offsite power.
Criteria
I. Overall Requirements
Criterion 1—Quality standards and records. Structures, systems, and components important to safety shall be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety functions to be performed. Where generally recognized codes and standards are used, they shall be identified and evaluated to determine their applicability, adequacy, and sufficiency and shall be supplemented or modified as necessary to assure a quality product in keeping with the required safety function. A quality assurance program shall be established and implemented in order to provide adequate assurance that these structures, systems, and components will satisfactorily perform their safety functions. Appropriate records of the design, fabrication, erection, and testing of structures, systems, and components important to safety shall be maintained by or under the control of the nuclear power unit licensee throughout the life of the unit.
Criterion 2—Design bases for protection against natural phenomena. Structures, systems, and components important to safety shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions. The design bases for these structures, systems, and components shall reflect: (1) Appropriate consideration of the most severe of the natural phenomena that have been historically reported
for the site and surrounding area, with sufficient margin for the limited accuracy, quantity, and period of time in which the historical data have been accumulated, (2) appropriate combinations of the effects of normal and accident conditions with the effects of the natural phenomena and (3) the importance of the safety functions to be performed.
Criterion 3—Fire protection. Structures, systems, and components important to safety shall be designed and located to minimize, consistent with other safety requirements, the probability and effect of fires and explosions. Noncombustible and heat resistant materials shall be used wherever practical throughout the unit, particularly in locations such as the containment and control room. Fire detection and fighting systems of appropriate capacity and capability shall be provided and designed to minimize the adverse effects of fires on structures, systems, and components important to safety. Firefighting systems shall be designed to assure that their rupture or inadvertent operation does not significantly impair
the safety capability of these structures, systems, and components.
Criterion 4—Environmental and dynamic effects design bases. Structures, systems, and components important to safety shall be designed to accommodate the effects of and to be compatible with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents, including loss-of-coolant accidents. These structures, systems, and components shall be appropriately protected against dynamic effects, including the effects of missiles, pipe whipping, and discharging fluids, that may result from equipment failures and from events and conditions outside the nuclear power unit. However, dynamic effects associated with postulated pipe ruptures in nuclear power units may be excluded from the design basis when analyses reviewed and approved by the Commission demonstrate that the probability of fluid system piping rupture is extremely low under conditions consistent with the design basis for the piping.
Criterion 5—Sharing of structures, systems, and components. Structures, systems, and components important to safety shall not be shared among nuclear power units unless it can be shown that such sharing will not significantly impair their ability to perform their safety functions, including, in the event of an accident in one unit, an orderly shutdown and cooldown of the remaining units.
II. Protection by Multiple Fission Product Barriers
Criterion 10—Reactor design. The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
Criterion 11—Reactor inherent protection. The reactor core and associated coolant systems shall be designed so that in the power operating range the net effect of the prompt inherent nuclear feedback characteristics tends to compensate for a rapid increase in reactivity.
Criterion 12—Suppression of reactor power oscillations. The reactor core and associated coolant, control, and protection systems shall be designed to assure that power oscillations which can result in conditions exceeding specified acceptable fuel design limits are not possible or can be reliably and readily detected and suppressed.
Criterion 13—Instrumentation and control. Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems. Appropriate controls shall
be provided to maintain these variables and systems within prescribed operating ranges.
Criterion 14—Reactor coolant pressure boundary. The reactor coolant pressure boundary shall be designed, fabricated, erected, and tested so as to have an extremely low probability of abnormal leakage,
of rapidly propagating failure, and of gross rupture.
Criterion 15—Reactor coolant system design. The reactor coolant system and associated auxiliary, control, and protection systems shall be designed with sufficient margin to assure that the design conditions of the reactor coolant pressure boundary are not exceeded during any condition of normal operation, including anticipated operational occurrences.
Criterion 16—Containment design. Reactor containment and associated systems shall be provided to establish an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment and to assure that the containment design conditions important to safety are not exceeded for as long as postulated accident conditions require.
Criterion 17—Electric power systems. An onsite electric power system and an offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.
Electric power from the transmission network to the onsite electric distribution system shall be supplied by two physically independent circuits (not necessarily on separate rights of way) designed and located so as to minimize to the extent practical the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. A switchyard common to both circuits is acceptable. Each of these circuits shall be designed to be available in sufficient time following a loss of all onsite alternating current power supplies and the other offsite electric power circuit, to assure that specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded. One of these circuits shall be designed to be available within a few seconds following a loss-of-coolant accident to assure that core cooling, containment integrity, and other vital safety functions are maintained.
Provisions shall be included to minimize the probability of losing electric power from any of the remaining supplies as a result of, or coincident with, the loss of power generated by the nuclear power unit, the loss of power from the transmission network, or the loss of power from the onsite electric power supplies.
Criterion 18—Inspection and testing of electric power systems. Electric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the offsite power system, and the onsite power system.
Criterion 19—Control room. A control room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition under accident conditions, including loss-of-coolant accidents. Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident. Equipment at appropriate locations outside the control room shall be provided (1) with a design capability for prompt hot shutdown of the reactor, including necessary instrumentation and controls to maintain the unit in a safe condition during hot shutdown, and (2) with a potential capability for subsequent cold shutdown of the reactor through the use of suitable procedures.
Applicants for and holders of construction permits and operating licenses under this part who apply on or after January 10, 1997, applicants for design approvals or certifications under part 52 of this chapter who apply on or after January 10, 1997, applicants for and holders of combined licenses or manufacturing licenses under part 52 of this chapter who do not reference a standard design approval or certification, or
holders of operating licenses using an alternative source term under § 50.67, shall meet the requirements of this criterion, except that with regard to control room access and occupancy, adequate radiation protection shall be provided to ensure that radiation exposures shall not exceed 0.05 Sv (5 rem) total effective dose equivalent (TEDE) as defined in § 50.2 for the duration of the accident.
III. Protection and Reactivity Control Systems
Criterion 20—Protection system functions. The protection system shall be designed (1) to initiate automatically the operation of appropriate systems including the reactivity control systems, to assure that specified acceptable fuel design limits are not exceeded as a result of anticipated operational occurrences and (2) to sense accident conditions and to initiate the operation of systems and components important to safety.
Criterion 21—Protection system reliability and testability. The protection system shall be designed for high functional reliability and inservice testability commensurate with the safety functions to be performed. Redundancy and independence designed into the protection system shall be sufficient to assure that (1) no single failure results in loss of the protection function and (2) removal from service of any component or channel does not result in loss of the required minimum redundancy unless the acceptable reliability of operation of the protection system can be otherwise demonstrated. The protection system shall be designed to permit periodic testing of its functioning when the reactor is in operation, including a capability to test channels independently to determine failures and losses of redundancy that may have occurred.
Criterion 22—Protection system independence. The protection system shall be designed to assure that the effects of natural phenomena, and of normal operating, maintenance, testing, and postulated accident conditions on redundant channels do not result in loss of the protection function, or shall be demonstrated to be acceptable on some other defined basis. Design techniques, such as functional diversity or diversity in component design and principles of operation, shall be used to the extent practical to prevent loss of the protection function.
Criterion 23—Protection system failure modes. The protection system shall be designed to fail into a safe state or into a state demonstrated to be acceptable on some other defined basis if conditions such as disconnection of the system, loss of energy (e.g., electric power, instrument air), or postulated adverse environments (e.g., extreme heat or cold, fire, pressure, steam, water, and radiation) are experienced.
Criterion 24—Separation of protection and control systems. The protection system shall be separated from control systems to the extent that failure of any single control system component or channel, or failure or removal from service of any single protection system component or channel which is common to the control and protection systems leaves intact a system satisfying all reliability, redundancy, and independence requirements of the protection system. Interconnection of the protection and control systems shall be limited so as to assure that safety is not significantly impaired.
Criterion 25—Protection system requirements for reactivity control malfunctions. The protection system shall be designed to assure that specified acceptable fuel design limits are not exceeded for any single malfunction of the reactivity control systems, such as accidental withdrawal
(not ejection or dropout) of control rods.
Criterion 26—Reactivity control system redundancy and capability. Two independent reactivity control systems of different design principles shall be provided. One of the systems shall use control rods, preferably including a positive means for inserting the rods, and shall be capable of reliably controlling reactivity changes to assure that under conditions of normal operation, including anticipated operational occurrences, and with appropriate margin for malfunctions such as stuck rods, specified acceptable fuel design limits are not exceeded. The second reactivity control system shall be capable of reliably controlling the rate of reactivity changes resulting from planned, normal power changes (including xenon burnout) to assure acceptable fuel design limits are not exceeded. One of the systems shall be capable of holding the reactor core subcritical under cold conditions.
Criterion 27—Combined reactivity control systems capability. The reactivity control systems shall be designed to have a combined capability, in conjunction with poison addition by the emergency core cooling system, of reliably controlling reactivity changes to assure that under postulated accident conditions and with appropriate margin for stuck rods the capability to cool the core is maintained.
Criterion 28—Reactivity limits. The reactivity control systems shall be designed with appropriate limits on the potential amount and rate of reactivity increase to assure that the effects of postulated reactivity accidents can neither (1) result in damage to the reactor coolant pressure boundary greater than limited local yielding nor (2) sufficiently disturb the core, its support structures or other reactor pressure vessel internals to impair significantly the capability to cool the core. These postulated reactivity accidents shall include consideration of rod ejection (unless prevented by positive means), rod dropout, steam line rupture, changes in reactor coolant temperature and pressure, and cold water addition.
Criterion 29—Protection against anticipated operational occurrences. The protection and reactivity control systems shall be designed to assure an extremely high probability of accomplishing their safety functions in the event of anticipated operational occurrences.
IV. Fluid Systems
Criterion 30—Quality of reactor coolant pressure boundary. Components which are part of the reactor coolant pressure boundary shall be designed, fabricated, erected, and tested to the highest quality standards practical. Means shall be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage.
Criterion 31—Fracture prevention of reactor coolant pressure boundary. The reactor coolant pressure boundary shall be designed with sufficient margin to assure that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the boundary behaves in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized. The design shall reflect consideration of service temperatures and other conditions of the boundary material under operating, maintenance, testing, and postulated accident conditions and the uncertainties in determining
(1) material properties, (2) the effects of irradiation on material properties, (3) residual, steady state and transient stresses, and (4) size of flaws.
Criterion 32—Inspection of reactor coolant pressure boundary. Components which are part of the reactor coolant pressure boundary shall be designed to permit (1) periodic inspection and testing of important areas and features to assess their structural and leaktight integrity, and (2) an appropriate material surveillance program for the reactor pressure vessel.
Criterion 33—Reactor coolant makeup. A system to supply reactor coolant makeup for protection against small breaks in the reactor coolant pressure boundary shall be provided. The system safety function shall be to assure that specified acceptable fuel design limits are not exceeded as a result of reactor coolant loss due to leakage from the reactor coolant pressure boundary and rupture of small piping or other small components which are part of the boundary. The system shall be designed to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation (assuming onsite power is not available) the system safety function can be accomplished using the piping, pumps, and valves used to maintain coolant inventory during normal reactor operation.
Criterion 34—Residual heat removal. A system to remove residual heat shall be provided. The system safety function shall be to transfer fission product decay heat and other residual heat from the reactor core at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary are not exceeded.
Suitable redundancy in components and features, and suitable interconnections, leak detection, and isolation capabilities shall be provided to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation (assuming
onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Criterion 35—Emergency core cooling. A system to provide abundant emergency core cooling shall be provided. The system safety function shall be to transfer heat from the reactor core following any loss of reactor coolant at a rate such that (1) fuel and clad damage that could interfere with continued effective core cooling is prevented and (2) clad metal-water reaction is limited to negligible amounts.
Suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities shall be provided to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation
(assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Criterion 36—Inspection of emergency core cooling system. The emergency core cooling system shall be designed to permit appropriate periodic inspection of important components, such as spray rings in the reactor pressure vessel, water injection nozzles, and piping, to assure the integrity and capability of the system.
Criterion 37—Testing of emergency core cooling system. The emergency core cooling system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and performance of the active components of the system, and (3) the operability of the system as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the system into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources, and the operation of the associated cooling water system.
Criterion 38—Containment heat removal. A system to remove heat from the reactor containment shall be provided. The system safety function shall be to reduce rapidly, consistent with the functioning of other associated systems, the containment pressure and temperature following any loss-of-coolant accident and maintain them at acceptably low levels.
Suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities shall be provided to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation
(assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Criterion 39—Inspection of containment heat removal system. The containment heat removal system shall be designed to permit appropriate periodic inspection of important components, such as the torus, sumps, spray nozzles, and piping to assure the integrity and capability of the system.
Criterion 40—Testing of containment heat removal system. The containment heat removal system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and performance of the active components of the system, and (3) the operability of the system as a whole, and under conditions as close to the design as practical the performance of the full operational sequence that brings the system into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources, and the operation of the associated cooling water system.
Criterion 41—Containment atmosphere cleanup. Systems to control fission products, hydrogen, oxygen, and other substances which may be released into the reactor containment shall be provided as necessary to reduce, consistent with the functioning of other associated systems, the concentration and quality of fission products released to the environment following postulated accidents, and to control the concentration of hydrogen or oxygen and other substances in the containment atmosphere following postulated accidents to assure that containment integrity is maintained.
Each system shall have suitable redundancy in components and features, and suitable interconnections, leak detection, isolation, and containment capabilities to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation (assuming onsite power is not available) its safety function can be accomplished, assuming a single failure.
Criterion 42—Inspection of containment atmosphere cleanup systems. The containment atmosphere cleanup systems shall be designed to permit appropriate periodic inspection of important components, such as filter frames, ducts, and piping to assure the integrity and capability of the systems.
Criterion 43—Testing of containment atmosphere cleanup systems. The containment atmosphere cleanup systems shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and performance of the active components of the systems such as fans, filters, dampers, pumps, and valves and (3) the operability of the systems as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the systems into operation, including operation of applicable portions of the protection system, the transfer between normal and emergency power sources, and the operation of associated systems.
Criterion 44—Cooling water. A system to transfer heat from structures, systems, and components important to safety, to an ultimate heat sink shall be provided. The system safety function shall be to transfer the combined heat load of these structures, systems, and components under normal operating and accident conditions.
Suitable redundancy in components and features, and suitable interconnections, leak detection, and isolation capabilities shall be provided to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Criterion 45—Inspection of cooling water system. The cooling water system shall be designed to permit appropriate periodic inspection of important components, such as heat exchangers and piping, to assure the integrity and capability of the system.
Criterion 46—Testing of cooling water system. The cooling water system shall be designed to permit appropriate periodic pressure and functional testing to assure (1) the structural and leaktight integrity of its components, (2) the operability and the performance of the active components of the system, and (3) the operability of the system as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the system into operation for reactor shutdown and for loss-of-coolant accidents, including operation of applicable portions of the protection system and the transfer between normal and emergency power sources.
V. Reactor Containment
Criterion 50—Containment design basis. The reactor containment structure, including access openings, penetrations, and the containment heat removal system shall be designed so that the containment structure and its internal compartments can accommodate, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions resulting from any loss-of-coolant accident. This margin shall reflect consideration of (1) the effects of potential energy sources which have not been included in the determination of the peak conditions, such as energy in steam generators and as required by § 50.44 energy from metal-water and other chemical reactions that may result from degradation but not total failure of emergency core cooling functioning, (2) the limited experience and experimental data available for defining accident phenomena and containment responses, and (3) the conservatism of the calculational model and input parameters.
Criterion 51—Fracture prevention of containment pressure boundary. The reactor containment boundary shall be designed with sufficient margin to assure that under operating, maintenance, testing, and postulated accident conditions (1) its ferritic materials behave in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized. The design shall reflect consideration of service temperatures and other conditions of the containment boundary material during operation, maintenance, testing, and postulated accident conditions, and the uncertainties in determining (1) material properties, (2) residual, steady state, and transient stresses, and (3) size of flaws.
Criterion 52—Capability for containment leakage rate testing. The reactor containment and other equipment which may be subjected to containment test conditions shall be designed so that periodic integrated leakage rate testing can be conducted at containment design pressure.
Criterion 53—Provisions for containment testing and inspection. The reactor containment shall be designed to permit (1) appropriate periodic inspection of all important areas, such as penetrations, (2) an appropriate surveillance program, and (3) periodic testing at containment design pressure of the leaktightness of penetrations which have resilient seals and expansion bellows.
Criterion 54—Piping systems penetrating containment. Piping systems penetrating primary reactor containment shall be provided with leak detection, isolation, and containment capabilities having redundancy, reliability, and performance capabilities which reflect the importance to safety of isolating these piping systems. Such piping systems shall be designed with a capability to test periodically the operability of the isolation valves and associated apparatus and to determine if valve leakage is within acceptable limits.
Criterion 55—Reactor coolant pressure boundary penetrating containment. Each line that is part of the reactor coolant pressure boundary and that penetrates primary reactor containment shall be provided with containment isolation valves as follows, unless it can be demonstrated that the containment isolation provisions for a specific class of lines, such as instrument lines, are acceptable on some other defined basis:
(1) One locked closed isolation valve inside and one locked closed isolation valve outside containment; or
(2) One automatic isolation valve inside and one locked closed isolation valve outside containment; or
(3) One locked closed isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment; or
(4) One automatic isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment.
Isolation valves outside containment shall be located as close to containment as practical and upon loss of actuating power, automatic isolation valves shall be designed to take the position that provides greater safety.
Other appropriate requirements to minimize the probability or consequences of an accidental rupture of these lines or of lines connected to them shall be provided as necessary to assure adequate safety. Determination of the appropriateness of these requirements, such as higher quality in design, fabrication, and testing, additional provisions for inservice inspection, protection against more severe natural phenomena, and additional isolation valves and containment, shall include consideration of the population density, use characteristics, and physical characteristics of the site environs.
Criterion 56—Primary containment isolation. Each line that connects directly to the containment atmosphere and penetrates primary reactor containment shall be provided with containment isolation valves as follows, unless it can be demonstrated that the containment isolation provisions for a specific class of lines, such as instrument lines, are acceptable on some other defined basis:
(1) One locked closed isolation valve inside and one locked closed isolation valve outside containment; or
(2) One automatic isolation valve inside and one locked closed isolation valve outside containment; or
(3) One locked closed isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment; or
(4) One automatic isolation valve inside and one automatic isolation valve outside containment. A simple check valve may not be used as the automatic isolation valve outside containment.
Isolation valves outside containment shall be located as close to the containment as practical and upon loss of actuating power, automatic isolation valves shall be designed to take the position that provides greater safety.
Criterion 57—Closed system isolation valves. Each line that penetrates primary reactor containment and is neither part of the reactor coolant pressure boundary nor connected directly to the containment atmosphere shall have at least one containment isolation valve which shall be either automatic, or locked closed, or capable of remote manual operation. This valve shall be outside containment and located as close to the containment as practical. A simple check valve may not be used as the automatic isolation valve.
VI. Fuel and Radioactivity Control
Criterion 60—Control of releases of radioactive materials to the
environment. The nuclear power unit design shall include means to control suitably the release of radioactive materials in gaseous and liquid effluents and to handle radioactive solid wastes produced during normal reactor operation, including anticipated operational occurrences. Sufficient holdup capacity shall be provided for retention of gaseous and liquid effluents containing radioactive materials, particularly where unfavorable site environmental conditions can be expected to impose unusual operational
limitations upon the release of such effluents to the environment.
Criterion 61—Fuel storage and handling and radioactivity control. The fuel storage and handling, radioactive waste, and other systems which may contain radioactivity shall be designed to assure adequate safety under normal and postulated accident conditions. These systems shall be designed (1) with a capability to permit appropriate periodic inspection and testing of components important to safety, (2) with suitable shielding for radiation protection, (3) with appropriate containment, confinement, and filtering systems, (4) with a residual heat removal capability having reliability and testability that reflects the importance to safety of decay heat and other residual heat removal, and (5) to prevent significant reduction in fuel storage coolant inventory under accident conditions.
Criterion 62—Prevention of criticality in fuel storage and handling. Criticality in the fuel storage and handling system shall be prevented by physical systems or processes, preferably by use of geometrically safe configurations.
Criterion 63—Monitoring fuel and waste storage. Appropriate systems shall be provided in fuel storage and radioactive waste systems and associated handling areas (1) to detect conditions that may result in loss of residual heat removal capability and excessive radiation levels and (2) to initiate appropriate safety actions.
Criterion 64—Monitoring radioactivity releases. Means shall be provided for monitoring the reactor containment atmosphere, spaces containing components for recirculation of loss-of-coolant accident fluids, effluent discharge paths, and the plant environs for radioactivity that may be released from normal operations, including anticipated operational occurrences, and from postulated accidents.
1 Further details relating to the type, size, and orientation of postulated breaks in specific components of the reactor coolant pressure boundary are under development.
2 Single failures of passive components in electric systems should be assumed in designing against a single failure. The conditions under which a single failure of a passive component in a fluid system should be considered in designing the system against a single failure are under development.
[36 FR 3256, Feb. 20, 1971, as amended at 36 FR 12733, July 7, 1971; 41 FR 6258, Feb. 12, 1976; 43 FR 50163, Oct. 27, 1978; 51 FR 12505, Apr. 11, 1986; 52 FR 41294, Oct. 27, 1987; 64 FR 72002, Dec. 23, 1999; 72 FR 49505, Aug. 28, 2007]
Appendix B to Part 50—Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
Introduction. Every applicant for a construction permit is required by the provisions of § 50.34 to include in its preliminary safety analysis report a description of the quality assurance program to be applied to the design, fabrication, construction, and testing of the structures, systems, and components of the facility. Every applicant for an operating license is required to include, in its final safety analysis report, information pertaining to the managerial and administrative controls to be used to assure safe operation. Every applicant for a combined license under part 52 of this chapter is required by the provisions of § 52.79 of this chapter to include in its final safety analysis report a description of the quality assurance applied to the design, and to be applied to the fabrication, construction, and testing of the structures, systems, and components of the facility and to the managerial and administrative controls to be used to assure safe operation. For applications submitted after September 27, 2007, every applicant for an early site permit under part 52 of this chapter is required by the provisions of § 52.17 of this chapter to include in its site safety analysis report a description of the quality assurance program applied to site activities related to the design, fabrication, construction, and testing of the structures, systems, and components of a facility or facilities that may be constructed on the site. Every applicant for a design approval or design certification under part 52 of this chapter is required by the provisions of 10 CFR 52.137 and 52.47, respectively, to include in its final safety analysis report a description of the quality assurance program applied to the design of the structures, systems, and components of the facility. Every applicant for a manufacturing license under part 52 of this chapter is required by the provisions of 10 CFR 52.157 to include in its final safety analysis report a description of the quality assurance program applied to the design, and to be applied to the manufacture of, the structures, systems, and components of the reactor. Nuclear power plants and fuel reprocessing plants include structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. This appendix establishes quality assurance requirements for the design, manufacture, construction, and operation of those structures, systems, and components. The pertinent requirements of this appendix apply to all activities affecting the safety-related functions of those structures, systems, and components; these activities include designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, operating, maintaining, repairing, refueling, and modifying.
As used in this appendix, "quality assurance" comprises all those planned and systematic actions necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service. Quality assurance includes quality control, which comprises those quality assurance actions related to the physical characteristics of a material, structure, component, or system which provide a means to control the quality of the material, structure, component, or system to predetermined requirements.
I. Organization
The applicant 1 shall be responsible for the establishment and execution of the quality assurance program. The applicant may delegate to others, such as contractors, agents, or consultants, the work of establishing and executing the quality assurance program, or any part thereof, but shall retain responsibility for the quality assurance program. The authority and duties of persons and organizations performing activities affecting the safety-related functions of structures, systems, and components shall be clearly established and delineated in writing. These activities include both the performing functions of attaining quality objectives and the quality assurance functions. The quality assurance functions are those of (1) assuring that an appropriate quality assurance program is established and effectively executed; and (2) verifying, such as by checking, auditing, and inspecting, that activities affecting the safety-related functions have been correctly performed. The persons and organizations performing quality assurance functions shall have sufficient authority and organizational freedom to identify quality problems; to initiate, recommend, or provide solutions; and to verify implementation of solutions. The persons and organizations performing quality assurance functions shall report to a management level so that the required authority and organizational freedom, including sufficient independence from cost and schedule when opposed to safety
considerations, are provided. Because of the many variables involved, such as the number of personnel, the type of activity being performed, and the location or locations where activities are performed, the organizational structure for executing the quality assurance program may take various forms, provided that the persons and organizations assigned the quality assurance functions have the required authority and organizational freedom. Irrespective of the organizational structure, the individual(s) assigned the responsibility for assuring effective execution of any portion of the quality assurance program at any location where activities subject to this appendix are being performed, shall have direct access to the levels of management necessary to perform this function.
II. Quality Assurance Program
The applicant shall establish at the earliest practicable time, consistent with the schedule for accomplishing the activities, a quality assurance program which complies with the requirements of this appendix. This program shall be documented by written policies, procedures, or instructions and shall be carried out throughout plant life in accordance with those policies, procedures, or instructions. The applicant shall identify the structures, systems, and components to be covered by the quality assurance program and the major organizations participating in the program, together with the designated functions of these organizations. The quality assurance program shall provide control over activities affecting the quality of the identified structures, systems, and components, to an extent consistent with their importance to safety. Activities affecting quality shall be accomplished under suitably controlled conditions. Controlled conditions include the use of appropriate equipment; suitable environmental conditions for accomplishing the activity, such as adequate cleanness; and assurance that all prerequisites for the given activity have been satisfied. The program shall take into account the need for special controls, processes, test equipment, tools, and skills to attain the required quality, and the need for verification of quality by inspection and test. The program shall provide for indoctrination and training of personnel performing activities affecting quality as necessary to assure that suitable proficiency is achieved and maintained. The applicant shall regularly review the status and adequacy of the quality assurance program. Management of other organizations participating in the quality assurance program shall regularly review the status and adequacy of that part of the quality assurance program which they are executing.
III. Design Control
Measures shall be established to assure that applicable regulatory requirements and the design basis, as defined in § 50.2 and as specified in the license application, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions. These measures shall include provisions to assure that appropriate quality standards are specified and included in design documents and that deviations from such standards are controlled. Measures shall also be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems and components.
Measures shall be established for the identification and control of design interfaces and for coordination among participating design organizations. These measures shall include the establishment of procedures among participating design organizations for the review, approval, release, distribution, and revision of documents involving design interfaces.
The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. The verifying or checking process shall be performed by individuals or groups other than those who performed the original design, but who may be from the same organization. Where a test program is used to verify the adequacy of a specific design feature in lieu of other verifying or checking processes, it shall include suitable qualifications testing of a prototype unit under the most adverse design conditions. Design control measures shall be applied to items such as the following: reactor physics, stress, thermal, hydraulic, and accident analyses; compatibility of materials; accessibility for inservice inspection, maintenance, and repair; and delineation of acceptance criteria for inspections and tests.
Design changes, including field changes, shall be subject to design control measures commensurate with those applied to the original design and be approved by the organization that performed the original design unless the applicant designates another responsible organization.
IV. Procurement Document Control
Measures shall be established to assure that applicable regulatory requirements, design bases, and other requirements which are necessary to assure adequate quality are suitably included or referenced in the documents for procurement of material, equipment, and services, whether purchased by the applicant or by its contractors or subcontractors. To the extent necessary, procurement documents shall require contractors or subcontractors to provide a quality assurance program consistent with the pertinent provisions of this appendix.
V. Instructions, Procedures, and Drawings
Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.
VI. Document Control
Measures shall be established to control the issuance of documents, such as instructions, procedures, and drawings, including changes thereto, which prescribe all activities affecting quality. These measures shall assure that documents, including changes, are reviewed for adequacy and approved for release by authorized personnel and are distributed to and used at the location where the prescribed activity is performed. Changes to documents shall be reviewed and approved by the same organizations that performed the original review and approval unless the applicant designates another responsible organization.
VII. Control of Purchased Material, Equipment, and Services
Measures shall be established to assure that purchased material, equipment, and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents. These measures shall include provisions, as appropriate, for source evaluation and selection, objective evidence of quality furnished by the contractor or subcontractor, inspection at the contractor or subcontractor source, and examination of products upon delivery. Documentary evidence that material and equipment conform to the procurement requirements shall be available at the nuclear powerplant or fuel reprocessing plant site prior to installation or use of such material and equipment. This documentary evidence shall be retained at the nuclear powerplant or fuel reprocessing plant site and shall be sufficient to identify the specific requirements, such as codes, standards, or specifications, met by the purchased material and equipment. The effectiveness of the control of quality by contractors and subcontractors shall be assessed by the applicant or designee at intervals consistent with the importance, complexity, and quantity of the product or services.
VIII. Identification and Control of Materials, Parts, and Components
Measures shall be established for the identification and control of materials, parts, and components, including partially fabricated assemblies. These measures shall assure that identification of the item is maintained by heat number, part number, serial number, or other appropriate means, either on the item or on records traceable to the item, as required throughout fabrication, erection, installation, and use of the item. These identification and control measures shall be designed to prevent the use of incorrect or defective material, parts, and components.
IX. Control of Special Processes
Measures shall be established to assure that special processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements.
X. Inspection
A program for inspection of activities affecting quality shall be established and executed by or for the organization performing the activity to verify conformance with the documented instructions, procedures, and drawings for accomplishing the activity. Such inspection shall be performed by individuals other than those who performed the activity being inspected. Examinations, measurements, or tests of material or products processed shall be performed for each work operation where necessary to assure quality. If inspection of processed material or products is impossible or disadvantageous, indirect control by monitoring processing methods, equipment, and personnel shall be provided. Both inspection and process monitoring shall be provided when control is inadequate without both. If mandatory inspection hold points, which require witnessing or inspecting by the applicant's designated representative and beyond which work shall not proceed without the consent of its designated representative are required, the specific hold points shall be indicated in appropriate documents.
XI. Test Control
A test program shall be established to assure that all testing required to demonstrate that structures, systems, and components will perform satisfactorily in service is identified and performed in accordance with written test procedures which incorporate the requirements and acceptance limits contained in applicable design documents. The test program shall include, as appropriate, proof tests prior to installation, preoperational tests, and operational tests during nuclear power plant or fuel reprocessing plant operation, of structures, systems, and components. Test procedures shall include provisions for assuring that all prerequisites for the given test have been met, that adequate test instrumentation is available and used, and that the test is performed under suitable environmental conditions. Test results shall be documented and evaluated to assure that test requirements have been satisfied.
XII. Control of Measuring and Test Equipment
Measures shall be established to assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within necessary limits.
XIII. Handling, Storage and Shipping
Measures shall be established to control the handling, storage, shipping, cleaning and preservation of material and equipment in accordance with work and inspection instructions to prevent damage or deterioration. When necessary for particular products, special protective environments, such as inert gas atmosphere, specific moisture content levels, and temperature levels, shall be specified and provided.
XIV. Inspection, Test, and Operating Status
Measures shall be established to indicate, by the use of markings such as stamps, tags, labels, routing cards, or other suitable means, the status of inspections and tests performed upon individual items of the nuclear power plant or fuel reprocessing plant. These measures shall provide for the identification of items which have satisfactorily passed required inspections and tests, where necessary to preclude inadvertent bypassing of such inspections and tests. Measures shall also be established for indicating the operating status of structures, systems, and components of the nuclear power plant or fuel reprocessing plant, such as by tagging valves and switches, to prevent inadvertent operation.
XV. Nonconforming Materials, Parts, or Components
Measures shall be established to control materials, parts, or components which do not conform to requirements in order to prevent their inadvertent use or installation. These measures shall include, as appropriate, procedures for identification, documentation, segregation, disposition, and notification to affected organizations. Nonconforming items shall be reviewed and accepted, rejected, repaired or reworked in accordance with documented procedures.
XVI. Corrective Action
Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action taken shall be documented and reported to appropriate levels of management.
XVII. Quality Assurance Records
Sufficient records shall be maintained to furnish evidence of activities affecting quality. The records shall include at least the following: Operating logs and the results of reviews, inspections, tests, audits, monitoring of work performance, and materials analyses. The records shall also include closely-related data such as qualifications of personnel, procedures, and equipment. Inspection and test records shall, as a minimum, identify the inspector or data recorder, the type of observation, the results, the acceptability, and the action taken in connection with any deficiencies noted. Records shall be identifiable and retrievable. Consistent with applicable regulatory requirements, the applicant shall establish requirements concerning record retention, such as duration, location, and assigned responsibility.
XVIII. Audits
A comprehensive system of planned and periodic audits shall be carried out to verify compliance with all aspects of the quality assurance program and to determine the effectiveness of the program. The audits shall be performed in accordance with the written procedures or check lists by appropriately trained personnel not having direct responsibilities in the areas being audited. Audit results shall be documented and reviewed by management having responsibility in the area audited. Followup action, including reaudit of deficient areas, shall be taken where indicated.
1 While the term "applicant" is used in these criteria, the requirements are, of course, applicable after such a person has received a license to construct and operate a nuclear power plant or a fuel reprocessing plant or has received an early site permit, design approval, design certification, or manufacturing license, as applicable. These criteria will also be used for guidance in evaluating the adequacy of quality assurance programs in use by holders of construction permits, operating licenses, early site permits, design approvals, combined licenses, and manufacturing licenses.
[35 FR 10499, June 27, 1970, as amended at 36 FR 18301, Sept. 11, 1971; 40 FR 3210D, Jan. 20, 1975; 72 FR 49505, Aug. 28, 2007; 84 FR 63568, Nov. 18, 2019]
Appendix C to Part 50—A Guide for the Financial Data and Related Information Required To Establish Financial Qualifications for Construction Permits and Combined Licenses
General Information
This appendix is intended to appraise applicants for construction permits and combined licenses for production or utilization facilities of the types described in § 50.21(b) or § 50.22, or testing facilities, of the general kinds of financial data and other related information that will demonstrate the
financial qualification of the applicant to carry out the activities for which the permit or license is sought. The kind and depth of information described in this guide is not intended to be a rigid and absolute requirement. In some instances, additional pertinent material may be needed. In any case, the applicant should include information other than that specified, if the information is pertinent to establishing the applicant’s financial ability to carry out the activities for which the permit or license is sought.
It is important to observe also that both § 50.33(f) and this appendix distinguish between applicants which are established organizations and those which are newly-formed entities organized primarily for the purpose of engaging in the activity for which the permit is sought. Those in the former category will normally have a history of operating experience and be able to submit financial statements reflecting the financial results of past operations. With respect, however, to the applicant which is a newly formed company established primarily for the purpose of carrying out the licensed activity, with little or no prior operating history, somewhat more detailed data and supporting documentation will generally be necessary. For this reason, the appendix describes separately the scope of information to be included in applications by each of these two classes of applicants.
In determining an applicant's financial qualification, the Commission will require the minimum amount of information necessary for that purpose. No special forms are prescribed for submitting the information. In many cases, the financial information usually contained in current annual financial reports, including summary data of prior years, will be sufficient for the Commission's needs. The Commission reserves the right, however, to require additional financial information at the construction permit stage, particularly in cases in which the proposed power generating facility will be commonly owned by two or more existing companies or in which financing depends upon long-term arrangements for sharing of the power from the facility by two or more electrical generating companies.
Applicants are encouraged to consult with the Commission with respect to any questions they may have relating to the requirements of the Commission's regulations or the information set forth in this appendix.
I. Applicants Which Are Established Organizations
A. Applications for Construction Permits or Combined Licenses
1. Estimate of construction costs. For electric utilities, each applicant's estimate of the total cost of the proposed facility should be broken down as follows and be accompanied by a statement describing the bases from which the estimate is derived:
(a) Total nuclear production plant costs ............................ |
$.......... |
(b) Transmission, distribution, and general plant costs ..... |
$.......... |
(c) Nuclear fuel inventory cost for first core1 .................... |
$.......... |
Total estimated cost ........................................................... |
$.......... |
1Section 2.390 of 10 CFR Part 2 and § 9.5 of 10 CFR Part 9 indicate the circumstances under which information submitted by applicants may be withheld from public disclosure.
If the fuel is to be acquired by lease or other arrangement than purchase, the application should so state. The items to be included in these categories should be the same as those defined in the applicable electric plant and nuclear fuel inventory accounts prescribed by the Federal Energy Regulatory Commission or an explanation given as to any departure therefrom.
Since the composition of construction cost estimates for production and utilization facilities other than nuclear power reactors will vary according to the type of facility, no particular format is suggested for submitting such estimates. The estimate should, however, be itemized by categories of cost in sufficient detail to permit an evaluation of its reasonableness.
2. Source of construction funds. The application should include a brief statement of the applicant's general financial plan for financing the cost of the facility, identifying the source or sources upon which the applicant relies for the necessary construction funds, e.g., internal sources such as undistributed earnings and depreciation accruals, or external sources such as borrowings.
3. Applicant's financial statements. The application should also include the applicant's latest published annual financial report, together with any current interim financial statements that are pertinent. If an annual financial report is not published, the balance sheet and operating statement covering the latest complete accounting year together with all pertinent notes thereto and certification by a public accountant should be furnished.
II. Applicants Which Are Newly Formed Entities
A. Applications for Construction Permits or Combined Licenses
1. Estimate of construction costs. The information that will normally be required of applicants which are newly formed entities will not differ in scope from that required of established organizations. Accordingly, applicants should submit estimates as described above for established organizations.
2. Source of construction funds. The application should specifically identify the source or sources upon which the applicant relies for the funds necessary to pay the cost of constructing the facility, and the amount to be obtained from each. With respect to each source, the application should describe in detail the applicant's legal and financial relationships with its stockholders, corporate affiliates, or others (such as financial institutions) upon which the applicant is relying for financial
assistance. If the sources of funds relied upon include parent companies or other corporate affiliates, information to support the financial capability of each such company or affiliate to meet its commitments to the applicant should be set forth in the application. This information should be of the same kind and scope as would be required if the parent companies or affiliates were in fact the applicant. Ordinarily, it will be necessary that copies of agreements or contracts among the companies be submitted.
As noted earlier in this appendix, an applicant which is a newly formed entity will normally not be in a position to submit the usual types of balance sheets and income statements reflecting the results of prior operations. The applicant should, however, include in its application a statement of its assets, liabilities, and capital structure as of the date of the application.
III. Annual Financial Statement
Each holder of a construction permit for a production or utilization facility of a type described in § 50.21(b) or § 50.22 or a testing facility, and each holder of a combined license issued under part 52 of this chapter, is required by § 50.71(b) to file its annual financial report with the Commission at the time of issuance. This requirement does not apply to licensees or holders of construction permits for medical and research reactors.
IV. Additional Information
The Commission may, from time to time, request the applicant, whether an established organization or newly formed entity, to submit additional or more detailed information respecting its financial arrangements and status of funds if such information is deemed necessary to enable the Commission to determine an applicant's financial qualifications for the license.
[49 FR 35753, Sept. 12, 1984, as amended at 50 FR 18853, May 3, 1985; 72 FR 49506, Aug. 28, 2007; 81 FR 86909, Dec. 2, 2016; 88 FR 80949, Nov. 21, 2023]
Appendix D to Part 50--[Reserved]
Appendix E to Part 50—Emergency Planning and Preparedness for Production and Utilization Facilities
Table of Contents
- Introduction
- The Preliminary Safety Analysis Report
- The Final Safety Analysis Report
- Content of Emergency Plans
- Implementing Procedures
- Emergency Response Data System
I. Introduction
1. Each applicant for a construction permit is required by § 50.34(a) to include in the preliminary safety analysis report a discussion of preliminary plans for coping with emergencies. Each applicant for an operating license is required by § 50.34(b) to include in the final safety analysis report plans for coping with emergencies. Each applicant for a combined license under subpart C of part 52 of this chapter is required by § 52.79 of this chapter to include in the application plans for coping with emergencies. Each applicant for an early site permit under subpart A of part 52 of this chapter may submit plans for coping with emergencies under § 52.17 of this chapter.
2. This appendix establishes minimum requirements for emergency plans for use in attaining an acceptable state of emergency preparedness. These plans shall be described generally in the preliminary safety analysis report for a construction permit and submitted as part of the final safety analysis report for an operating license. These plans, or major features thereof, may be submitted as part of the site safety analysis report for an early site permit.
3.
The potential radiological hazards
to the public associated with the
operation of non-power production or
utilization facilities licensed under this
part and fuel facilities licensed under 10
CFR part 70 involve considerations
different than those associated with
nuclear power reactors. Consequently,
the size of Emergency Planning Zones 1 (EPZs) for facilities other than power
reactors and the degree to which
compliance with the requirements of
this section and sections II, III, IV, and
V of this appendix is necessary, will be
determined on a case-by-case basis.2
4. Notwithstanding the above paragraphs, in the case of an operating license authorizing only fuel loading and/or low power operations up to 5 percent of rated power, no NRC or FEMA review, findings, or determinations concerning the state of offsite emergency preparedness or the adequacy of and the capability to implement State and local offsite emergency plans, as defined in this Appendix, are required prior to the issuance of such a license.
5. Each applicant for a combined license or early site permit under part 52 of this chapter whose application is docketed before December 23, 2011 may defer compliance with any change to emergency preparedness regulations under the final rule issued November 23, 2011. If that applicant chooses to defer compliance, it shall subsequently request to amend the combined license or early site permit to comply with those changes no later than December 31, 2013. An applicant that does not receive a combined license or early site permit before December 31, 2013, shall revise its combined license or early site permit application to comply with those changes no later than December 31, 2013. Notwithstanding any Commission finding under 10 CFR 52.103(g) regarding the combined license holder's facility, the combined license holder may not operate the facility until the NRC has approved the license amendment demonstrating compliance with the final rule.
6. The Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 2, holding a construction permit under the provisions of part 50 of this chapter, shall meet the requirements of the final rule issued November 23, 2011 as applicable to operating nuclear power reactor licensees.
II. The Preliminary Safety Analysis Report
The Preliminary Safety Analysis Report shall contain sufficient information to ensure the compatibility of proposed emergency plans for both onsite areas and the EPZs, with facility design features, site layout, and site location with respect to such considerations as access routes, surrounding population distributions, land use, and local jurisdictional boundaries for the EPZs in the case of nuclear power reactors as well as the means by which the standards of § 50.47(b) will be met.
As a minimum, the following items shall be described:
A. Onsite and offsite organizations for coping with emergencies and the means for notification, in the event of an emergency, of persons assigned to the emergency organizations.
B. Contacts and arrangements made and documented with local, State, and Federal governmental agencies with responsibility for coping with emergencies, including identification of the principal agencies.
C. Protective measures to be taken within the site boundary and within each EPZ to protect health and safety in the event of an accident; procedures by which these measures are to be carried out (e.g., in the case of an evacuation, who authorizes the evacuation, how the public is to be notified and instructed, how the evacuation is to be carried out); and the expected response of offsite agencies in the event of an emergency.
D. Features of the facility to be provided for onsite emergency first aid and decontamination and for emergency transportation of onsite individuals to offsite treatment facilities.
E. Provisions to be made for emergency treatment at offsite facilities of individuals injured as a result of licensed activities.
F. Provisions for a training program for employees of the licensee, including those who are assigned specific authority and responsibility in the event of an emergency, and for other persons who are not employees of the licensee but whose assistance may be needed in the event of a radiological emergency.
G. A preliminary analysis that projects the time and means to be employed in the notification of State and local governments and the public in the event of an emergency. A nuclear power plant applicant shall perform a preliminary analysis of the time required to evacuate various sectors and distances within the plume exposure pathway EPZ for transient and permanent populations, noting major impediments to the evacuation or taking of protective actions.
H. A preliminary analysis reflecting the need to include facilities, systems, and methods for identifying the degree of seriousness and potential scope of radiological consequences of emergency situations within and outside the site boundary, including capabilities for dose projection using real-time meteorological information and for dispatch of radiological monitoring teams within the EPZs; and a preliminary analysis reflecting the role of the onsite technical support center and the emergency operations facility in assessing information, recommending protective action, and disseminating information to the public.
III. The Final Safety Analysis Report; Site Safety Analysis Report
The final safety analysis report or the site safety analysis report for an early site permit that includes complete and integrated emergency plans under § 52.17(b)(2)(ii) of this chapter shall contain the plans for coping with emergencies. The plans shall be an expression of the overall concept of operation; they shall describe the essential elements of advance planning that have been considered and the provisions that have been made to cope with emergency situations. The plans shall incorporate information about the emergency response roles of supporting organizations and offsite agencies. That information shall be sufficient to provide assurance of coordination among the supporting groups and with the licensee. The site safety analysis report for an early site permit which proposes major features must address the relevant provisions of 10 CFR 50.47 and 10 CFR part 50, appendix E, within the scope of emergency preparedness matters addressed in the major features.
The plans submitted must include a description of the elements set out in Section IV for the emergency planning zones (EPZs) to an extent sufficient to demonstrate that the plans provide reasonable assurance that adequate protective measures can and will be taken in the event of an emergency.
IV. Content of Emergency Plans
1. The applicant's emergency plans shall contain, but not necessarily be limited to, information needed to demonstrate compliance with the elements set forth below, i.e., organization for coping with radiological emergencies, assessment actions, activation of emergency organization, notification procedures, emergency facilities and equipment, training, maintaining emergency preparedness, recovery, and onsite protective actions during hostile action. In addition, the emergency response plans submitted by an applicant for a nuclear power reactor operating license under this part, or for an early site permit (as applicable) or combined license under 10 CFR part 52, shall contain information needed to demonstrate compliance with the standards described in § 50.47(b), and they will be evaluated against those standards.
2. This nuclear power reactor license applicant shall also provide an analysis of the time required to evacuate various sectors and distances within the plume exposure pathway EPZ for transient and permanent populations, using the most recent U.S. Census Bureau data as of the date the applicant submits its application to the NRC.
3. Nuclear power reactor licensees shall use NRC approved evacuation time estimates (ETEs) and updates to the ETEs in the formulation of protective action recommendations and shall provide the ETEs and ETE updates to State and local governmental authorities for use in developing offsite protective action strategies.
4. Within 365 days of the later of the date of the availability of the most recent decennial census data from the U.S. Census Bureau or December 23, 2011, nuclear power reactor licensees shall develop an ETE analysis using this decennial data and submit it under § 50.4 to the NRC. These licensees shall submit this ETE analysis to the NRC at least 180 days before using it to form protective action recommendations and providing it to State and local governmental authorities for use in developing offsite protective action strategies.
5. During the years between decennial censuses, nuclear power reactor licensees shall estimate EPZ permanent resident population changes once a year, but no later than 365 days from the date of the previous estimate, using the most recent U.S. Census Bureau annual resident population estimate and State/local government population data, if available. These licensees shall maintain these estimates so that they are available for NRC inspection during the period between decennial censuses and shall submit these estimates to the NRC with any updated ETE analysis.
6. If at any time during the decennial period, the EPZ permanent resident population increases such that it causes the longest ETE value for the 2-mile zone or 5-mile zone, including all affected Emergency Response Planning Areas, or for the entire 10-mile EPZ to increase by 25 percent or 30 minutes, whichever is less, from the nuclear power reactor licensee's currently NRC approved or updated ETE, the licensee shall update the ETE analysis to reflect the impact of that population increase. The licensee shall submit the updated ETE analysis to the NRC under § 50.4 no later than 365 days after the licensee's determination that the criteria for updating the ETE have been met and at least 180 days before using it to form protective action recommendations and providing it to State and local governmental authorities for use in developing offsite protective action strategies.
7. After an applicant for a combined license under part 52 of this chapter receives its license, the licensee shall conduct at least one review of any changes in the population of its EPZ at least 365 days prior to its
scheduled fuel load. The licensee shall estimate EPZ permanent resident population changes using the most recent U.S. Census Bureau annual resident population estimate and State/local government population data, if available. If the EPZ permanent resident population increases such that it causes the longest ETE value for the 2-mile zone or 5-mile zone, including all affected Emergency Response Planning Areas, or for the entire 10-mile EPZ, to increase by 25 percent or 30 minutes, whichever is less, from the licensee's currently approved ETE, the licensee shall update the ETE analysis to reflect the impact of that population increase. The licensee shall submit the updated ETE analysis to the NRC for review under § 50.4 of this chapter no later than 365 days before the licensee's scheduled fuel load.
A. Organization
The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency. Specifically, the following shall be included:
1. A description of the normal plant operating organization.
2. A description of the onsite emergency response organization (ERO) with a detailed discussion of:
a. Authorities, responsibilities, and duties of the individual(s) who will take charge during an emergency;
b. Plant staff emergency assignments;
c. Authorities, responsibilities, and duties of an onsite emergency coordinator who shall be in charge of the exchange of information with offsite authorities responsible for coordinating and implementing offsite emergency measures.
3. A description, by position and function to be performed, of the licensee's headquarters personnel who will be sent to the plant site to augment the onsite emergency organization.
4. Identification, by position and function to be performed, of persons within the licensee organization who will be responsible for making offsite dose projections, and a description of how these projections will be made and the results transmitted to State and local authorities, NRC, and other appropriate governmental entities.
5. Identification, by position and function to be performed, of other employees of the licensee with special qualifications for coping with emergency conditions that may arise. Other persons with special qualifications, such as consultants, who are not employees of the licensee and who may be called upon for assistance for emergencies shall also be identified. The special qualifications of these persons shall be described.
6. A description of the local offsite services to be provided in support of the licensee's emergency organization.
7. By June 23, 2014, identification of, and a description of the assistance expected from, appropriate State, local, and Federal agencies with responsibilities for coping with emergencies, including hostile action at the site. For purposes of this appendix, "hostile action" is defined as an act directed toward a nuclear power plant or its personnel that includes the use of violent force to destroy equipment, take hostages, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, projectiles, vehicles, or other devices used to deliver destructive force.
8. Identification of the State and/or local officials responsible for planning for, ordering, and controlling appropriate protective actions, including evacuations when necessary.
9. By December 24, 2012, for nuclear power reactor licensees, a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan.
B. Assessment Actions
1. The means to be used for determining the magnitude of, and for continually assessing the impact of, the release of radioactive materials shall be described, including emergency action levels that are to be used as criteria for determining the need for notification and participation of local and State agencies, the Commission, and other Federal agencies, and the emergency action levels that are to be used for determining when and what type of protective measures should be considered within and outside the site boundary to protect health and safety. The emergency action levels shall be based on in-plant conditions and instrumentation in addition to onsite and offsite monitoring. By June 20, 2012, for nuclear power reactor licensees, these action levels must include hostile action that may adversely affect the nuclear power plant. The initial emergency action levels shall be discussed and agreed on by the applicant or licensee and state and local governmental authorities, and approved by the NRC. Thereafter, emergency action levels shall be reviewed with the State and local governmental authorities on an annual basis.
2. A licensee desiring to change its entire emergency action level scheme shall submit an application for an amendment to its license and receive NRC approval before implementing the change. Licensees shall follow the change process in § 50.54(q) for all other emergency action level changes.
C. Activation of Emergency Organization
1. The entire spectrum of emergency conditions that involve the alerting or activating of progressively larger segments of the total emergency organization shall be described. The communication steps to be taken to alert or activate emergency personnel under each class of emergency shall be described. Emergency action levels (based not only on onsite and offsite radiation monitoring information but also on readings from a number of sensors that indicate a potential emergency, such as the pressure in containment and the response of the Emergency Core Cooling System) for notification of offsite agencies shall be described. The existence, but not the details, of a message authentication scheme shall be noted for such agencies. The emergency classes defined shall include: (1) Notification of unusual events, (2) alert, (3) site area emergency, and (4) general emergency. These classes are further discussed in NUREG–0654/FEMA–REP–1.
2. By June 20, 2012, nuclear power reactor licensees shall establish and maintain the capability to assess, classify, and declare an emergency condition within 15 minutes after the availability of indications to plant
operators that an emergency action level has been exceeded and shall promptly declare the emergency condition as soon as possible following identification of the appropriate emergency classification level. Licensees shall not construe these criteria as a grace period to attempt to restore plant conditions to avoid declaring an emergency action due to an emergency action level that has been exceeded. Licensees shall not construe these criteria as preventing implementation of response actions deemed by the licensee to be necessary to protect public health and safety provided that any delay in declaration does not deny the State and local authorities the opportunity to implement measures necessary to protect the public health and safety.
D. Notification Procedures
1. Administrative and physical means for notifying local, State, and Federal officials and agencies and agreements reached with these officials and agencies for the prompt notification of the public and for public evacuation or other protective measures, should they become necessary, shall be described. This description shall include identification of the appropriate officials, by title and agency, of the State and local government agencies within the EPZs.
2. Provisions shall be described for yearly dissemination to the public within the plume exposure pathway EPZ of basic emergency planning information, such as the methods and times required for public notification and the protective actions planned if an accident occurs, general information as to the nature and effects of radiation, and a listing of local broadcast stations that will be used for dissemination of information during an emergency. Signs or other measures shall also be used to disseminate to any transient population within the plume exposure pathway EPZ appropriate information that would be helpful if an accident occurs.
3. A licensee shall have the capability to notify responsible State and local governmental agencies within 15 minutes after declaring an emergency. The licensee shall demonstrate that the appropriate governmental authorities have the capability to make a public alerting and notification decision promptly on being informed by the licensee of an emergency condition. Prior to initial operation greater than 5 percent of rated thermal power of the first reactor at a site, each nuclear power reactor licensee shall demonstrate that administrative and physical means have been established for alerting and providing prompt instructions to the public within the plume exposure pathway EPZ. The design objective of the prompt public alert and notification system shall be to have the capability to essentially complete the initial alerting and initiate notification of the public within the plume exposure pathway EPZ within about 15 minutes. The use of this alerting and notification capability will range from immediate alerting and notification of the public (within 15 minutes of the time that State and local officials are notified that a situation exists requiring urgent action) to the more likely events where there is substantial time available for the appropriate governmental authorities to make a judgment whether or not to activate the public alert and notification system. The alerting and notification capability shall additionally include administrative and physical means for a backup method of public alerting and notification capable of being used in the event the primary method of alerting and notification is unavailable during an emergency to alert or notify all or portions of the plume exposure pathway EPZ population. The backup method shall have the capability to alert and notify the public within the plume exposure pathway EPZ, but does not need to meet the 15-minute design objective for the primary prompt public alert and notification system. When there is a decision to activate the alert and notification system, the appropriate governmental authorities will determine whether to activate the entire alert and notification system simultaneously or in a graduated or staged manner. The responsibility for activating such a public alert and notification system shall remain with the appropriate governmental authorities.
E. Emergency Facilities and Equipment
Adequate provisions shall be made and described for emergency facilities and equipment, including:
1. Equipment at the site for personnel monitoring;
2. Equipment for determining the magnitude of and for continuously assessing the impact of the release of radioactive materials to the environment;
3. Facilities and supplies at the site for decontamination of onsite individuals;
4. Facilities and medical supplies at the site for appropriate emergency first aid treatment;
5. Arrangements for medical service providers qualified to handle radiological emergencies onsite;
6. Arrangements for transportation of contaminated injured individuals from the site to specifically identified treatment facilities outside the site boundary;
7. Arrangements for treatment of individuals injured in support of licensed activities on the site at treatment facilities outside the site boundary;
8.a. (i) A licensee onsite technical support center and an emergency operations facility from which effective direction can be given and effective control can be exercised during an emergency;
(ii) For nuclear power reactor licensees, a licensee onsite operational support center;
b. For a nuclear power reactor licensee's emergency operations facility required by paragraph 8.a of this section, either a facility located between 10 miles and 25 miles of the nuclear power reactor site(s), or a primary facility located less than 10 miles from the nuclear power reactor site(s) and a backup facility located between 10 miles and 25 miles of the nuclear power reactor site(s). An emergency operations facility may serve more than one nuclear power reactor site. A licensee desiring to locate an emergency operations facility more than 25 miles from a nuclear power reactor site shall request prior Commission approval by submitting an application for an amendment to its license. For an emergency operations facility located more than 25 miles from a nuclear power reactor site, provisions must be made for locating NRC and offsite responders closer to the nuclear power reactor site so that NRC and offsite responders can interact face-to-face with emergency response personnel entering and leaving the nuclear power reactor site. Provisions for locating NRC and offsite responders closer to a nuclear power reactor site that is more than 25 miles from the emergency operations facility must include the following:
(1) Space for members of an NRC site team and Federal, State, and local responders;
(2) Additional space for conducting briefings with emergency response personnel;
(3) Communication with other licensee and offsite emergency response facilities;
(4) Access to plant data and radiological information; and
(5) Access to copying equipment and office supplies;
c. By June 20, 2012, for a nuclear power reactor licensee's emergency operations facility required by paragraph 8.a of this section, a facility having the following capabilities:
(1) The capability for obtaining and displaying plant data and radiological information for each reactor at a nuclear power reactor site and for each nuclear power reactor site that the facility serves;
(2) The capability to analyze plant technical information and provide technical briefings on event conditions and prognosis to licensee and offsite response organizations for each reactor at a nuclear power reactor site and for each nuclear power reactor site that the facility serves; and
(3) The capability to support response to events occurring simultaneously at more than one nuclear power reactor site if the emergency operations facility serves more than one site; and
d. For nuclear power reactor licensees, an alternative facility (or facilities) that would be accessible even if the site is under threat of or experiencing hostile action, to function as a staging area for augmentation of emergency response staff and collectively having the following characteristics: the capability for communication with the emergency operations facility, control room, and plant security; the capability to perform offsite notifications; and the capability for engineering assessment activities, including damage control team planning and preparation, for use when onsite emergency facilities cannot be safely accessed during hostile action. The requirements in this paragraph 8.d must be implemented no later than December 23, 2014, with the exception of the capability for staging emergency response organization personnel at the alternative facility (or facilities) and the capability for communications with the emergency operations facility, control room, and plant security, which must be implemented no later than June 20, 2012.
e. A licensee shall not be subject to the requirements of paragraph 8.b of this section for an existing emergency operations facility approved as of December 23, 2011;
9. At least one onsite and one offsite communications system; each system shall have a backup power source. All communication plans shall have arrangements for emergencies, including titles and alternates for those in charge at both ends of the communication links and the primary and backup means of communication. Where consistent with the function of the governmental agency, these arrangements will include:
a. Provision for communications with contiguous State/local governments within the plume exposure pathway EPZ. Such communications shall be tested monthly.
b. Provision for communications with Federal emergency response organizations. Such communications systems shall be tested annually.
c. Provision for communications among the nuclear power reactor control room, the onsite technical support center, and the emergency operations facility; and among the nuclear facility, the principal State and local emergency operations centers, and the field assessment teams. Such communications systems shall be tested annually.
d. Provisions for communications by the licensee with NRC Headquarters and the appropriate NRC Regional Office Operations Center from the nuclear power reactor control room, the onsite technical support center, and the emergency operations facility. Such communications shall be tested monthly.
F. Training
1. The program to provide for: (a) The training of employees and exercising, by periodic drills, of emergency plans to ensure that employees of the licensee are familiar with their specific emergency response duties, and (b) The participation in the training and drills by other persons whose assistance may be needed in the event of a radiological emergency shall be described. This shall include a description of specialized initial training and periodic retraining programs to be provided to each of the following categories of emergency personnel:
i. Directors and/or coordinators of the plant emergency organization;
ii. Personnel responsible for accident assessment, including control room shift personnel;
iii Radiological monitoring teams;
iv. Fire control teams (fire brigades);
v. Repair and damage control teams;
vi. First aid and rescue teams;
vii. Medical support personnel;
viii. Licensee's headquarters support personnel;
ix. Security personnel.
In addition, a radiological orientation training program shall be made available to local services personnel; e.g., local emergency services/Civil Defense, local law enforcement personnel, local news media persons.
2. The plan shall describe provisions for the conduct of emergency preparedness exercises as follows: Exercises shall test the adequacy of timing and content of implementing procedures and methods, test emergency equipment and communications networks, test the public alert and notification system, and ensure that emergency organization personnel are familiar with their duties.3
a. A full participation 4 exercise which tests as much of the licensee, State, and local emergency plans as is reasonably achievable without mandatory public participation shall be conducted for each site at which a power reactor is located. Nuclear power reactor licensees shall submit exercise scenarios under § 50.4 at least 60 days before use in a full participation exercise required by this paragraph 2.a.
(i) For an operating license issued under this part, this exercise must be conducted within 2 years before the issuance of the first operating license for full power (one authorizing operation above 5 percent of rated thermal power) of the first reactor and shall include participation by each State and local government within the plume exposure pathway EPZ and each state within the ingestion exposure pathway EPZ. If the full participation exercise is conducted more than 1 year prior to issuance of an operating licensee for full power, an exercise which tests the licensee's onsite emergency plans must be conducted within one year before issuance of an operating license for full power. This exercise need not have State or local government participation.
(ii) For a combined license issued under part 52 of this chapter, this exercise must be conducted within two years of the scheduled date for initial loading of fuel. If the first full participation exercise is conducted more than one year before the scheduled date for initial loading of fuel, an exercise which tests the licensee's onsite emergency plans must be conducted within one year before the scheduled date for initial loading of fuel. This exercise need not have State or local government participation. If FEMA identifies one or more deficiencies in the state of offsite emergency preparedness as the result of the first full participation exercise, or if the Commission finds that the state of emergency preparedness does not provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency, the provisions of § 50.54(gg) apply.
(iii) For a combined license issued under part 52 of this chapter, if the applicant currently has an operating reactor at the site, an exercise, either full or partial participation,5 shall be conducted for each subsequent reactor constructed on the site. This exercise may be incorporated in the exercise requirements of Sections IV.F.2.b. and c. in this appendix. If FEMA identifies one or more deficiencies in the state of offsite emergency preparedness as the result of this exercise for the new reactor, or if the Commission finds that the state of emergency preparedness does not provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency, the provisions of § 50.54(gg) apply.
b. Each licensee at each site shall conduct a subsequent exercise of its onsite emergency plan every 2 years. Nuclear power reactor licensees shall submit exercise scenarios under § 50.4 at least 60 days before use in an exercise required by this paragraph 2.b. The exercise may be included in the full participation biennial exercise required by paragraph 2.c. of this section. In addition, the licensee shall take actions necessary to ensure that adequate emergency response capabilities are maintained during the interval between biennial exercises by conducting drills, including at least one drill involving a combination of some of the principal functional areas of the licensee's onsite emergency response capabilities. The principal functional areas of emergency response include activities such as management and coordination of emergency response, accident assessment, event classification, notification of offsite authorities, assessment of the onsite and offsite impact of radiological releases, protective action recommendation development, protective action decision making, plant system repair and mitigative action implementation. During these drills, activation of all of the licensee's emergency response facilities (Technical Support Center (TSC), Operations Support Center (OSC), and the Emergency Operations Facility (EOF)) would not be necessary, licensees would have the opportunity to consider accident management strategies, supervised instruction would be permitted, operating staff in all participating facilities would have the opportunity to resolve problems (success paths) rather than have controllers intervene, and the drills may focus on the onsite exercise training objectives.
c. Offsite plans for each site shall be exercised biennially with full participation by each offsite authority having a role under the radiological response plan. Where the offsite authority has a role under a radiological response plan for more than one site, it shall fully participate in one exercise every two years and shall, at least, partially participate in other offsite plan exercises in this period. If two different licensees each have licensed facilities located either on the same site or on adjacent, contiguous sites, and share most of the elements defining co-located licensees,6 then each licensee shall:
(1) Conduct an exercise biennially of its onsite emergency plan;
(2) Participate quadrennially in an offsite biennial full or partial participation exercise;
(3) Conduct emergency preparedness activities and interactions in the years between its participation in the offsite full or partial participation exercise with offsite authorities, to test and maintain interface among the affected State and local authorities and the licensee. Co-located licensees shall also participate in emergency preparedness activities and interaction with offsite authorities for the period between exercises;
(4) Conduct a hostile action exercise of its onsite emergency plan in each exercise cycle; and
(5) Participate in an offsite biennial full or partial participation hostile action exercise in alternating exercise cycles.
d. Each State with responsibility for nuclear power reactor emergency preparedness should fully participate in the ingestion pathway portion of exercises at least once every exercise cycle. In States with more than one nuclear power reactor plume exposure pathway EPZ, the State should rotate this participation from site to site. Each State with responsibility for nuclear power reactor emergency preparedness should fully participate in a hostile action exercise at least once every cycle and should fully participate in one hostile action exercise by December 31, 2015. States with more than one nuclear power reactor plume exposure pathway EPZ should rotate this participation from site to site.
e. Licensees shall enable any State or local government located within the plume exposure pathway EPZ to participate in the licensee's drills when requested by such State or local government.
f. Remedial exercises will be required if the emergency plan is not satisfactorily tested during the biennial exercise, such that NRC, in consultation with FEMA, cannot (1) find reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency or (2) determine that the Emergency Response Organization (ERO) has maintained key skills specific to emergency response. The extent of State and local participation in remedial exercises must be sufficient to show that appropriate corrective measures have been taken regarding the elements of the plan not properly tested in the previous exercises.
g. All exercises, drills, and training that provide performance opportunities to develop, maintain, or demonstrate key skills must provide for formal critiques in order to identify weak or deficient areas that need correction. Any weaknesses or deficiencies that are identified in a critique of exercises, drills, or training must be corrected.
h. The participation of State and local govern