477th Advisory Committee on Reactor Safeguards (ACRS) - November 3, 2000

                                                               285
 1                            UNITED STATES
 2                    NUCLEAR REGULATORY COMMISSION
 3                                 ***
 4              ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
 5                                 ***
 6                         477TH ACRS MEETING
 7
 8
 9                         Conference Room 2B3
10                        Two White Flint North
11                        11545 Rockville Pike
12                         Rockville, Maryland
13
14                      Friday, November 3, 2000
15
16              The committee met, pursuant to notice at 8:30 a.m.
17
18    MEMBERS PRESENT:
19              DANA A. POWERS, Chairman
20              GEORGE APOSTOLAKIS, Vice Chairman
21              WILLIAM J. SHACK, ACRS Member
22              GRAHAM M. LEITCH, ACRS Member
23              MARIO V. BONACA, ACRS Member
24              THOMAS S. KRESS, ACRS Member
25              JOHN D. SIEBER, ACRS Member
.                                                               286
 1              GRAHAM B. WALLIS, ACRS Member
 2              ROBERT L. SEALE, ACRS Member
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
.                                                               287
 1    PARTICIPANTS:
 2              JOHN T. LARKINS, Executive Director, ACRS
 3              AMARJIT SINGH, ACRS Staff
 4              CAROL HARRIS, ACRS/ACNW Staff
 5              JAMES E. LYONS, Associate Director for Technical
 6              Support, ACRS
 7              HOWARD J. LARSON, ACRS Staff
 8              THOMAS A. GORMAN, BWR Owners Group, Appendix R
 9              Committee
10              JIM KENNY, BWR Owners Group, Appendix R Committee
11              CHRIS PRAGMAN, BWR Owners Group, Appendix R
12              Committee
13              ERIC WEISS, Office of Nuclear Reactor Regulation
14              LEON WHITNEY, Office of Nuclear Reactor Regulation
15              STEVE DINSMORE, Office of Nuclear Reactor
16              Regulation
17              TONY ULSES, Office of Nuclear Reactor Regulation
18              FRED EMERSON, Nuclear Energy Institute
19              DENIS SHUMAKER, PSEG Nuclear
20              BIJAN NIJAFI, EPRI/SAIC
21              MARK HENRY SALLEY, Office of Nuclear Reactor
22              Regulation
23              PAL A. BOEHNERT, ACRS Staff
24              NOEL F. DUDLEY, ACRS Staff
25              SAM LEE, Office of Nuclear Reactor Regulation
.                                                               288
 1              JERRY DOZIER, Office of Nuclear Reactor Regulation
 2              STEVE, KOENICK, Office of Nuclear Reactor
 3              Regulation
 4              STEVE HOFFMAN, Office of Nuclear Reactor
 5              Regulation
 6              TAMARA BLOOMER, Office of Nuclear Reactor
 7              Regulation
 8              JIM DAVIS, NRR
 9              JIT VORA, NRR
10              BARRY ELLIOT, NRR
11              DOUG WALTERS, Nuclear Energy Institute
12              CHRIS GRIMES, NRR
13              YUNG LIU, Agronne National Laboratory
14              ROBERT LOFARO, Brookhaven National Laboratory
15              ALAN HISER, NRR
16              JUAN PERALTA, NRR
17              CHRIS GRATTON, NRR
18              MARY WEGNER, NRR
19
20
21
22
23
24
25
.                                                               289
 1                        P R O C E E D I N G S
 2                                                     [8:30 a.m.]
 3              DR. POWERS:  The meeting will now come to order. 
 4    This is the second day of the 477th meeting of the Advisory
 5    Committee on Reactor Safeguards.
 6              During today's meeting, the committee will
 7    consider the following; performance-based risk-informed fire
 8    protection standard for LWRs, BWR Owners Group proposed use
 9    of SRV/LPS for post-fire safe shutdown and related issues,
10    the ABB/CE and Siemens digital I&C applications, and the
11    license renewal guidance document.
12              The committee will also consider its research
13    report to the Commission, future ACRS activities, a report
14    of its Planning and Procedures Subcommittee, reconciliation
15    of ACRS comments and recommendations.  We will also work on
16    proposed ACRS reports.
17              The meeting is being conducted in accordance with
18    the provisions of the Federal Advisory Committee Act.  Mr.
19    Howard Larson is the Designated Federal Official for the
20    initial portion of the meeting.
21              We have received no written statements or requests
22    for time to make oral statements from members of the public
23    regarding today's session.
24              A transcript of portions of the meeting is being
25    kept and it is requested that the speakers use one of the
.                                                               290
 1    microphones, identify themselves, and speak with sufficient
 2    clarity and volume so that they can be readily heard.
 3              Before we launch into the scheduled proceedings,
 4    do any of the members have opening comments they would like
 5    to make?
 6              [No response.]
 7              DR. POWERS:  In that regard, I will say that we
 8    have a very intense session this morning, with a lot of
 9    topics being covered.  Then the discussion of the digital
10    I&C programs will be compressed in its time because of the
11    absence of the subcommittee chairman, because of a death in
12    his family, and Jit will try to give us a summary, but
13    otherwise we're going to defer work on digital I&C until the
14    December meeting.
15              With that, let's move to the area of fire
16    protection and, Mr. Sieber, I believe you're going to guide
17    us through several interesting and important topics.
18              MR. SIEBER:  Yes, sir.  Thank you, Mr. Chairman. 
19    Two weeks ago or a little more than two weeks ago, the Fire
20    Protection Subcommittee had a subcommittee meeting which
21    lasted two days, actually, and covered an awful lot of
22    material.  And if we ignore the subcommittee discussion at
23    Davis Besse, it's been almost two years since we've had a
24    full Fire Protection Subcommittee meeting.
25              That's not to say that a lot has not happened and
.                                                               291
 1    it also is not to say that fire protection is not important. 
 2    If you look at the IPEEE reports that utilities have
 3    submitted, you can come to a conclusion that fires as an
 4    initiator for core damage are sort of on a par with just
 5    operating the plant and, of course, that means that we ought
 6    to be paying a lot of attention to risk-informing fire
 7    protection and making fire protection a top-notch thing.
 8              Even though TMI did occur, Brown's Ferry also
 9    occurred and Brown's Ferry was almost as exciting as TMI. 
10    With that, we are going to cover basically just a couple of
11    things today that were among the things we talked about in
12    the Fire Protection Subcommittee.
13              The first of those is a BWR Owners Group
14    initiative, where they would like to use safety relief
15    valves and their low pressure injection system as part of
16    their fire protection shutdown, alternative shutdown.
17              Now, there is an interesting thing.  I re-read a
18    couple of times Appendix R and Branch Technical Position
19    9.5-1 and the associated generic letter, and the inspection
20    guidance, and it seemed to me that it hasn't changed since
21    the early `80s, when I first read it, and one of the things
22    that's in there, in Section 3L2, is that if you are to claim
23    credit for an alternative shutdown mechanism, one of the
24    things that you aren't supposed to do, which is one of the
25    performance goals, is uncover the core in the BWR.
.                                                               292
 1              There is some indication that in some plants, that
 2    uncovery of the core briefly occurs during the use of low
 3    pressure systems to achieve cold shutdown and, therefore,
 4    would be the subject of an exemption.
 5              And I think that we should pay particular
 6    attention to that as we go through this first session.
 7              However, with that, what I would like to do is
 8    introduce Mr. Tom Gorman, from the BWR Owners Group.  By the
 9    way, as Mr. Gorman is getting ready, the information in your
10    books is in Tab 9.
11              DR. POWERS:  I will remind the committee that Mr.
12    Gorman was among our hosts when we were up at Susquehanna.
13              MR. SIEBER:  At Susquehanna, right.
14              MR. GORMAN:  Good morning.  I'm accompanied this
15    morning by Jim Kenny, who is the Chairman of the Boiling
16    Water Owners Group, and Chris Pragman, who is a member of
17    the BWR Owners Group, Appendix R Steering Committee.
18              This is just a check to make sure that we're all
19    at the right place and we're going to be here and we're
20    going to talk about the use of SRVs in low pressure systems,
21    as both redundant and alternative shutdown paths.
22              And the topics that I'm planning on covering this
23    morning are just a brief introduction to bring everybody
24    onto the same page relative to this issue, talk about fire
25    protection defense-in-depth briefly, and then talk about
.                                                               293
 1    what the BWR Owners Group has done and what the BWR Owners
 2    Group position is relative to the use of the SRV and low
 3    pressure systems, and then briefly conclude.
 4              The BWR Owners Group believes that the use of SRVs
 5    in lower pressure systems has always been a part of the way
 6    we have shut our plants down in the event of fires, and we
 7    came into a disagreement relative to this issue in the
 8    recent past relative to some inspections that were being
 9    done at the plants.
10              We took the action to form an Appendix R Committee
11    to address these types of issues in the BWR Owners Group and
12    through our interactions with the NRC, I think we're very
13    close to the resolution of this issue with respect to SRVs
14    and low pressure systems.
15              Fire protection defense-in-depth is a very
16    important concept relative to our power plants in terms of
17    making sure that we do not allow fires to happen; to make
18    sure that, if they do happen, we're able to mitigate the
19    effects of those fires, and the defense-in-depth program for
20    fire protection is really based on three primary
21    considerations.
22              We have trained and qualified personnel.  We have
23    comprehensive procedures that address our behaviors relative
24    to the fire protection issues and plant operation, and then
25    we have some plant-specific features that are designed for
.                                                               294
 1    mitigating the effects of fires and for preventing fires
 2    from spreading.
 3              With respect to the personnel, we all have a safe
 4    fire protection engineer on-site.  A number of units have
 5    additional fire protection --
 6              DR. APOSTOLAKIS:  Excuse me.  You are blocking the
 7    screen.  Could you point to the screen?  That's good.  Thank
 8    you.
 9              MR. GORMAN:  WE have safe fire protection
10    engineers that are assigned to the site that work on a
11    day-to-day basis with the fire protection program, on-site
12    fire brigades, and then with respect to our post-fire safe
13    shutdown capability, we have system engineers, we have
14    electrical engineers that review the circuits, the effects
15    of fire-induced failures on the systems and the equipment
16    that we use for post-fire safe shutdown, and then we have
17    engineers that are assigned to design and assure that the
18    fire barriers that we use to prevent the spread of fire in
19    the plant are adequately addressed.
20              DR. POWERS:  Can you give me an idea on how
21    frequent fires, say reportable fires, are at the BWRs?
22              MR. GORMAN:  I can speak probably for Susquehanna
23    better than I can speak for, say, just BWRs as a whole.
24              DR. POWERS:  Just give me a feel for it.  I won't
25    hold you to the exact number.
.                                                               295
 1              MR. GORMAN:  Periodically, we will have a fire. 
 2    Typically, the fire that will occur at Susquehanna would be
 3    a fire that might occur due to an electrical short in a
 4    panel, electrical panel; occasionally, due to work in
 5    process in the plant during an outage, potentially there
 6    might be weld spatter that would ignite some material in the
 7    vicinity of where the work is being performed.
 8              I know from a plant operations standpoint, any
 9    fire that occurs in the plant is viewed as a concern and any
10    fires that occur in the plant are looked into, they're
11    discouraged in terms of take corrective actions to prevent
12    those types of things from occurring again.
13              I know whenever we do hot work, which would
14    include welding in the power plant, people doing that type
15    of work are required to have a permit before they can go
16    out.  There's a fire watch that is specifically assigned to
17    make sure that if there is any inadvertent ignition of
18    materials, and typically that might be construction
19    materials, those fire watches are there to make sure that
20    things spread.
21              So for the specific numbers, I haven't seen maybe
22    more than one to two per year at our facility.  Now, there
23    have been a couple of fires related to transformers and
24    those are more significant and typically those are also in
25    areas that are external from the power plants.
.                                                               296
 1              MR. SIEBER:  They're outside.
 2              DR. SEALE:  And there's a lot of mitigation for
 3    those kinds of events built into their location and
 4    everything else.
 5              MR. GORMAN:  Right.  The specific hazards, like a
 6    transformer, have specific fire protection features that are
 7    included to make sure that they don't become a problem.
 8              We also have a lot of procedures related to fire
 9    protection.  We have procedures that limit the amount of in
10    situ combustibles that can be placed into the power plant.
11              We have controls over the amount of transient
12    combustibles.  If you're going to take a transient into the
13    plant, those combustibles need to be authorized by people
14    involved in the fire protection program at the sites.
15              As I had spoken a little bit before, we have
16    programs for control of ignition sources, fire watches,
17    permits for hot works and those types of things.  We have
18    inspection requirements for our passive fire protection
19    features.  We inspect our fire barriers on a -- I believe
20    it's an 18-month basis at this point.  That would include
21    the physical walls themselves.  We have daily surveillances
22    on fire doors to make sure that those doors are in the
23    proper position.
24              We have, on a cycle basis, inspections of the
25    raceway fire barriers that are used to protect the redundant
.                                                               297
 1    safe shutdown systems.
 2              We perform testing of the active fire protection
 3    features and make sure that they're functional and that they
 4    will be able to perform their job.  We have training for our
 5    fire brigade personnel and we have training for our
 6    engineering personnel.
 7              With respect to the plant design features, we have
 8    fire detection systems which are in just about all locations
 9    in the power block.  We have fire suppression systems, that
10    includes automatic and manual, the manual systems being our
11    fire extinguishers and our hose stations.
12              We have fire barriers that separate our fire
13    areas.  We have fire barriers to protect our redundant safe
14    shutdown circuits.  We use low combustible materials by
15    design in the power plant, and we've also provided emergency
16    lighting and communications in the event that communications
17    between plant operations and personnel in the power plant
18    are necessary.
19              DR. KRESS:  The fire protection systems, are they
20    smoke detectors or infrared, or both?
21              MR. GORMAN:  At Susquehanna, for example, most are
22    smoke detectors, although we do have some heat sensors at
23    certain locations.
24              So with respect to this defense-in-depth program,
25    we try to prevent a fire from starting.  We try to detect it
.                                                               298
 1    and suppress it if it does start, and we do provide the
 2    passive barriers that we've talked about to prevent the
 3    spread.
 4              In addition to that, we also demonstrate the
 5    ability to achieve and maintain safe shutdown for the event
 6    of a single fire in any plant area.
 7              So these features, the defense-in-depth features
 8    are really designed to prevent fire from starting.  In
 9    addition to that, we also make assumptions, from an
10    analytical perspective, that we do have fire damage, and
11    I'll go into that a little bit more, and with that fire
12    damage, we also make sure that we still have a protected or
13    a hardened safe shutdown path that will allow us to bring
14    the unit to safe shutdown.
15              DR. KRESS:  Do you evacuate personnel from your
16    plant if you have a fire?
17              MR. GORMAN:  I think the procedure is that if you
18    notice a fire, you're to call the control room and then
19    personnel safety would instruct you to leave the area.  Upon
20    notification of the control room, the plant control room
21    dispatches somebody from the Operations Department to
22    investigate it and activates the fire brigade.
23    So most of the fire-fighting is done by trained members of
24    the fire brigade, not the man on the street, but people on
25    the street are instructed and trained through their general
.                                                               299
 1    employee training to notify the control room in the event of
 2    any abnormalities.
 3              So with respect to the safe shutdown capability,
 4    what we're required to do is to identify systems that can
 5    perform the required safe shutdown functions of controlling
 6    reactivity, controlling pressure, providing inventory
 7    makeup, removing the decay heat, and any support systems
 8    that are necessary for those primary functions to be
 9    performed.
10              We then identify all the equipment that's
11    necessary to have those systems perform those functions.  We
12    identify all the cables that are necessary to have that
13    equipment work and that would be to control power, the mode
14    of power for it, and any support systems, any interlocks.
15              We're then required to go out and identify the
16    physical locations of all of those cables, the raceway in
17    the power plant, and then we do an analysis that takes a
18    look at each fire area, postulates a fire within the fire
19    area, and, as a result of that analysis, we assure that
20    we've got one safe shutdown path with the capability to
21    safely control the plant and bring it to safe shutdown.
22              MR. SIEBER:  Ordinarily, since you have two trains
23    in the plant, if the fire isn't in the control room, one of
24    those trains serves as a safe shutdown path, provided you
25    have 20 feet separation.
.                                                               300
 1              Is that the way you interpret that?
 2              MR. GORMAN:  For the fire in the control room?
 3              MR. SIEBER:  No.  For a fire not in the control
 4    room.
 5              MR. GORMAN:  Not in the control room.  Typically,
 6    yes.  You start with your divisionalized paths and then you
 7    select equipment within those paths that can perform the
 8    required functions and you do what is necessary to protect
 9    and make sure that those are hardened against the effects of
10    a fire.
11              MR. SIEBER:  Right.
12              DR. APOSTOLAKIS:  Why do you emphasize one safe
13    shutdown path?
14              MR. GORMAN:  Well, that's what the requirement has
15    us do.
16              DR. POWERS:  I mean, it could have been the same
17    font as the rest.  Is there a message there?
18              MR. GORMAN:  Let me see, George.  No.  I wanted to
19    be able to demonstrate I knew how to use the underline and
20    the bold font.
21              DR. APOSTOLAKIS:  You succeeded.
22              MR. GORMAN:  I guess the emphasis is that it is a
23    difficult and it's an information-intensive analysis and it
24    does direct at assuring that you do have one path that is
25    available.
.                                                               301
 1              And if you had to do more than that, it would be
 2    even more of a significant challenge.  I'm not sure it could
 3    be done, based on the current rules that we apply.
 4              MR. SIEBER:  A question relating to Susquehanna,
 5    since you're most familiar with that.
 6              MR. GORMAN:  That's what I know, yes.
 7              MR. SIEBER:  When you installed the cables, I
 8    presume you used pull tickets and then somebody typed all
 9    that stuff into a computer so you can do the analysis that's
10    required.
11              Is the information at Susquehanna specific to
12    cable trays or just rooms?
13              MR. GORMAN:  Our information is specific to cable
14    trays, conduits and raceways within rooms.  For example --
15              MR. SIEBER:  You know what tray in what room has
16    what wire.
17              MR. GORMAN:  Right.
18              MR. SIEBER:  That's not true for all plants,
19    though, right?
20              MR. GORMAN:  I think by this point, most plants
21    have had to go out and gather that information and that is a
22    -- some of the older plants, I think that was a real
23    difficult task to get to that point.
24              MR. SIEBER:  So you would say, in general, and I'm
25    not holding you to this, but people have that kind of
.                                                               302
 1    information that would allow them to know what tray in what
 2    room a given circuit goes.
 3              MR. GORMAN:  That would be my impression, yes.
 4              MR. SIEBER:  All right.  Thank you.
 5              MR. LEITCH:  Jack, I feel sure that's the case at
 6    Limerick.
 7              MR. SIEBER:  It was for us, too.
 8              MR. LEITCH:  But, of course, Limerick is the same
 9    vintage as Susquehanna.
10              MR. SIEBER:  Right.
11              MR. LEITCH:  So that's not surprising, perhaps.
12              MR. PRAGMAN:  Peach Bottom is a slightly older
13    plant and we have maybe 5,000 safe shutdown cables we have
14    to keep track of, and we can tell by looking at a drawing
15    where our cable trays are, but we can't tell by looking at a
16    drawing where our conduits are.
17              So every cable that's in conduit has to be walked
18    down practically hand-over-hand to verify what rooms it's in
19    and what rooms it isn't in.
20              MR. SIEBER:  Yes.  I guess if you review the
21    associated circuit analysis done by Sandia and published
22    about six months ago, the failure effects treatment for
23    cables in conduit is different than it is for cables in
24    cable trays, as far as hot shorts versus browning out
25    against the conduit.
.                                                               303
 1              DR. SEALE:  When you say you have to go through
 2    and walk these down, is that on an as-needed basis or is
 3    that something that you're trying to systematically remedy?
 4              MR. PRAGMAN:  That's something we had to do to
 5    meet Appendix R originally in the `80s.  So anytime we add a
 6    cable to the plant now, if that cable is going to be a safe
 7    shutdown cable, because it's involved in a safe shutdown
 8    circuit, then we have to capture that information as part of
 9    the installation process.
10              DR. SEALE:  And what about catching up?
11              MR. PRAGMAN:  For all the Appendix R cables, it
12    was done --
13              DR. SEALE:  You've done that now.
14              MR. PRAGMAN:  It was done originally.
15              DR. SEALE:  But the non-Appendix R cables are
16    still --
17              MR. SIEBER:  Wherever you find them.
18              MR. PRAGMAN:  Right.  The other 50,000 cables --
19              MR. SIEBER:  Running loose.
20              MR. PRAGMAN:  -- that aren't safe shutdown --
21              MR. SIEBER:  They're running loose.
22              MR. PRAGMAN:  If they're in conduit, I'm going to
23    have a hard time telling you where it's at.
24              MR. SIEBER:  Yes.
25              DR. SEALE:  Usually, if something fails, you don't
.                                                               304
 1    replace it.  You just put another circuit in.
 2              MR. PRAGMAN:  Sure.
 3              MR. GORMAN:  Okay.  With respect to the fire
 4    protection program, we have the defense-in-depth measures
 5    that we described.  We really view these defense-in-depth
 6    measures as the means that we expect to use to prevent fires
 7    from damaging plant equipment and if we do damage plant
 8    equipment, we consider that to be a failure.
 9              In addition to that, we do this safe shutdown
10    analysis that we've talked about and within the safe
11    shutdown analysis, there are currently a number of things
12    that we consider to be conservatisms.
13              DR. APOSTOLAKIS:  Can you explain a little bit
14    what unprotected equipment and unexamined equipment are?
15              MR. GORMAN:  Yes.  Can I do large fire area first?
16              DR. APOSTOLAKIS:  It's up to you.
17              MR. GORMAN:  Let me do large fire areas first. 
18    These are just the backup slides that I think everybody has
19    a copy of.  People that accompanied Dana up to Susquehanna
20    I'm sure are familiar with this.  This is just a site plan
21    and I just wanted to give you an overview of the site.  You
22    can see the cooling towers, the large spray pond, and there
23    are a couple of buildings that are bolded, reactor building,
24    control structure, the diesel bays, and our emergency
25    service water pump house out by the spray pond.
.                                                               305
 1              Those are the areas where we have essentially our
 2    equipment that is used for post-fire safe shutdown.
 3              Then this just kind of gives you a little bit of a
 4    blow-up on the two reactor buildings, which are
 5    side-by-side, the four primary diesel generators, and the
 6    control structure.  The big circles in the middle are the
 7    primary containments.
 8              There's a view of the primary containment, which
 9    essentially separates --
10              DR. WALLIS:  It will focus better, I think.
11              MR. GORMAN:  Better focus?
12              DR. WALLIS:  It's not in focus in the middle.
13              MR. GORMAN:  There we go.  Now we lost the bottom
14    one.  So this is a big essentially 88-foot diameter
15    reinforced concrete structure that's inerted during primary
16    -- during operations that separates the north and south
17    sides of the reactor building.
18              And then this particular view is a view through
19    the two reactor buildings that based on where the view was
20    taken, you don't see that primary containment structure.
21              And the heavy lines -- the heavy lines outline the
22    fire areas that we have at Susquehanna and the significance
23    of a fire area is that with respect to our analysis, we
24    assume that a single fire will damage anything within the
25    fire area.
.                                                               306
 1              So if you had a fire down on elevation 645, we
 2    would assume there is a potential for equipment damage all
 3    the way up to elevation 779.  We would make that kind of
 4    assumption.  So we have large fire areas, and I think this
 5    is typical of other plants, also.
 6              So there are large fire areas and there are
 7    conservative assumptions made relative to fire damage within
 8    those fire areas.
 9              DR. APOSTOLAKIS:  But you don't always assume that
10    all the equipment and cables are damaged, do you?
11              MR. GORMAN:  Yes, that's the assumption.  We go
12    off, we identify systems that can perform the functions, the
13    equipment necessary for those systems to operate.  We then
14    find the cabling that's necessary for the equipment to
15    operate, locate the cables either by -- if you're fortunate
16    enough to have information available to you, use that
17    information, or if you're like Chris, at Peach Bottom, you
18    go out and chase it down in the power plant.
19              And then having identified where the raceway and
20    where the circuits are, you would postulate a fire in a
21    given fire area and you would say any of those circuits that
22    are in that fire area could be damaged, and you would not --
23              DR. APOSTOLAKIS:  That's different than saying all
24    of them will be damaged.  You say any could.  That's
25    different from all will.
.                                                               307
 1              MR. GORMAN:  You assume that they are damaged.
 2              DR. APOSTOLAKIS:  You assume that they're damaged.
 3              MR. GORMAN:  You assume that they're damaged,
 4    unless you can demonstrate that they are not damaged.
 5              DR. APOSTOLAKIS:  Unless?
 6              MR. GORMAN:  Unless you do something extra to
 7    demonstrate that they will not be damaged.
 8              DR. APOSTOLAKIS:  But let's look back at your
 9    figure.
10              MR. GORMAN:  Okay.
11              DR. APOSTOLAKIS:  So you said that on the left, if
12    there is a fire down there, everything in that large area
13    has the potential for being damaged, but you don't
14    necessarily assume immediately that everything is damaged.
15              MR. GORMAN:  That's the initial assumption, is
16    that anything within that boundary is damaged and it's not
17    available.
18              DR. APOSTOLAKIS:  But if you get into real
19    trouble, then you relax that, don't you?
20              MR. GORMAN:  If you get into real trouble, then
21    what you have to do is a specific analysis that demonstrates
22    that you have --S
23              DR. APOSTOLAKIS:  So sort of a screening approach.
24              MR. GORMAN:  Yes.
25              DR. APOSTOLAKIS:  Okay.
.                                                               308
 1              MR. SIEBER:  Well, you may have to take additional
 2    steps, like suppression, detection and suppression or
 3    shielding or fire barriers or something like that.
 4              MR. GORMAN:  Right.
 5              MR. SIEBER:  On the other hand, if you actually
 6    had a fire, whatever operates operates and you would use it.
 7              MR. GORMAN:  Right.
 8              DR. SHACK:  Are Unit 1 and Unit 2 truly asymmetric
 9    here or is that just an error in the diagram?
10              MR. GORMAN:  Unit 1 is kind of a -- if you took
11    Unit 1 and you slid it over to the left --
12              DR. SHACK:  I just meant some of the fire areas
13    don't seem to be the same.  I've got dark outlines around
14    some areas that look to be --
15              MR. GORMAN:  There is a little bit of asymmetry,
16    yes.
17              MR. LEITCH:  They're mirror images, aren't they?
18              MR. GORMAN:  No.
19              DR. APOSTOLAKIS:  Not quite.  Not quite.
20              MR. GORMAN:  Unit 1 is a slide-over of Unit 2, so
21    it's not a mirror image.
22              DR. APOSTOLAKIS:  So where is the reactor?
23              MR. GORMAN:  It's on this center line and on the
24    other center line over on the Unit 1 side.
25              MR. LEITCH:  Now, the area heavied up in bold, is
.                                                               309
 1    that the -- where is the fuel, the spent fuel pool?  That
 2    area heavied up there, is that the reactor --
 3              MR. GORMAN:  The spent fuel pool is up on the
 4    refueling floor, up here.
 5              MR. LEITCH:  In the center there, is it?
 6              MR. GORMAN:  Yes, it would be in this area here. 
 7    Cask storage pit and spent fuel pool on the other side of
 8    that.
 9              MR. LEITCH:  It's a common fuel for both units?
10              MR. GORMAN:  No.  There's a fuel pool for each
11    unit, with a cask storage pit that's between them with
12    removable gates that allows you to communicate.
13              MR. LEITCH:  But you don't consider that a large
14    fire area.
15              MR. GORMAN:  Actually, the upper elevations are
16    really included to be part of both of the fire areas, down
17    below.  Most of the equipment that is required to safely
18    shut down the plant is below this elevation.  There is not
19    much up above it.
20              Also, the areas up above it are big, large areas
21    that don't really have any physical separation in them.  So
22    those are kind of looked at as a top hat on top of the
23    individual fire areas and you could say damage is assumed to
24    occur up there, also, but when you end up chasing down all
25    your cables, you find out that you really don't have any up
.                                                               310
 1    there anyway.
 2              DR. SEALE:  I don't see any isolation between the
 3    two and the upper level.  So does that mean that I've got
 4    problems with both units if I have a fire?
 5              MR. GORMAN:  Potentially, for us, we look at that. 
 6    What we do is if we have a fire on Unit 2, we protect the
 7    way to shut down Unit 1 and Unit 2.
 8              DR. SEALE:  And you assume that you have damage in
 9    the upper regions there on Unit 1 if you have a problem in
10    Unit 2.
11              MR. GORMAN:  Right.  And as I said before, there
12    really isn't much of anything above elevation 779, but you
13    look at certain systems.
14              So our philosophy is I'm only looking at certain
15    systems.  I don't know that there isn't a cable that somehow
16    got over here that could affect Unit 1 and would cause it to
17    shut down, so I assume that I have a problem on Unit 1 when
18    my fire is on Unit 2 and I make sure I can shut both of
19    those units down.
20              DR. SEALE:  If you've got a problem on two, one is
21    not in the bank.
22              MR. GORMAN:  Right.  So that's the large fire
23    areas.  The unprotected equipment and cables within the fire
24    area are assumed to be damaged.  So if you noticed, and I
25    don't know if we did, each one of these fire areas has
.                                                               311
 1    little Roman numerals with a circle around it.  That's the
 2    path that we would be using for safe shutdown in that area.
 3              So the assumption right off of the bat is the
 4    other path is lost.  If there were any equipment from the
 5    other path in there, we would just say it's damaged, we
 6    wouldn't even look to use it, unless we were to do, again,
 7    an additional analysis that looked at additional
 8    considerations relative to physical locations, fire spreads,
 9    fire protection features and those types of things.
10              The next item is unexamined equipment and cables
11    are not credited for mitigating the effects of the fire.  At
12    Susquehanna, we've got about roughly 2,000 safe shutdown
13    components and we've got roughly 25,000 components.
14              So we have examined the 2,000 components relative
15    to the function or relationship between the circuits, the
16    components and the systems.  The other 23,000 have not been
17    treated with that same degree of rigor and, therefore, those
18    23,000 are assumed to be damaged by the fire.
19              Again, that's kind of like what we do with Unit 1
20    for our Unit 2 fire.  You don't know everything about Unit
21    1, so you assume it's impacted.  With respect to those
22    23,000 components, we don't know everything about them, so
23    we assume that they are impacted.
24              And then we often make assumptions about damage to
25    equipment that -- on one hand, we'd be making an assumption
.                                                               312
 1    that it was damaged; on the other hand, if it benefited us,
 2    we would not make that same assumption, and maybe an example
 3    of that was -- didn't have a very good one at the last
 4    meeting, but let me try this one.
 5              For example, the MSIVs, we would assume that the
 6    MSIVs would be closed because all we really do is make sure
 7    that we protect the capability to isolate the MSIVs.  So we
 8    would make the assumption that they were driven closed by
 9    some kind of a fire-induced damage, except in the event if
10    we were using an alternate shutdown cooling mode, where you
11    would flood up the vessel, flood the main steam lines, then
12    we would not make that assumption that those MSIVs were
13    closed, because they could then present a flow diversion for
14    the shutdown system.
15              So these are basically the conservatisms that are
16    built into the analysis and, again, this is an analysis
17    that's predicated on the concept of defense-in-depth, where
18    we don't want a fire to start, we don't want to damage plant
19    equipment.  If anything does happen, we want to mitigate
20    those effects quickly and, in addition to that, we protect
21    one hardened path and we make sure we can achieve safe
22    shutdown with that path.
23              So I think when you take the perspective and you
24    look at the defense-in-depth aspects of it, you look at
25    these large fire areas, these types of assumptions, the
.                                                               313
 1    protective features that we have, our basic position is that
 2    although fires are not necessarily infrequent, the type of a
 3    fire that would get us to the point where we would end up
 4    using, testing our analyzed safe shutdown systems, we
 5    believe, would be a quite infrequent fire.
 6              MR. LEITCH:  I'm still just a little confused by
 7    the meaning of the heavy lines.  For example, over on the
 8    right, I guess that's Unit 1, there's a vertical line that's
 9    -- or vertical wall there that's not heavied in.  It seems
10    to be heavied in on the other side.
11              MR. GORMAN:  Right.  That's the main steam tunnel
12    and on Unit 2, we needed to make that a fire area boundary,
13    whereas on Unit 1, it wasn't necessary to do that.
14              DR. APOSTOLAKIS:  And the necessity was dictated
15    by what?
16              MR. GORMAN:  Typically, cable routing.  You look
17    at these more current power plants and when you look at
18    them, they are generally very well separated from an
19    equipment perspective.  You've got a room for RHR Division 1
20    equipment, room for RHR Division 2, core spray has got its
21    own room, HPCI and RCSI, they have their own rooms.
22    You've got separate fire areas, separate rooms for your four
23    KV switch gear and everything looks generally to be pretty
24    well separated, until you start doing all the cable chasing
25    and the raceway chasing and then you find out that the
.                                                               314
 1    configuration of the plant dictates where the individuals
 2    that put the raceways in and put the cables in were forced
 3    to route those things and typically, for us, those become
 4    the challenges.
 5              So you really have to chase down all these cables
 6    and find out where they go and you're often surprised at
 7    what you find.
 8              DR. WALLIS:  So the cables weren't located by
 9    design to be in optimum position for fire prevention.
10              MR. SIEBER:  Sometimes not.
11              DR. WALLIS:  You just have to find out where they
12    happen to be.
13              MR. GORMAN:  The design for optimum fire
14    protection was kind of evolving, at least for a plant like
15    Susquehanna.  Originally, we routed cables in the power
16    plant under an electrical separation criteria that said
17    three foot, five foot separation on redundant trains, one to
18    two feet on your cable trays and your raceways.
19              That was the original thought process that was
20    used to design these things.  And then after most of the
21    raceway was installed in the plant, most of the cables were
22    installed into the plant, things evolved from the Brown's
23    Ferry event hat got us more into essentially divisional
24    separation and there were certain features at Susquehanna
25    that really dictated that the north side of Unit 2 and the
.                                                               315
 1    south side of Unit 1 are the bad places to be.
 2              And those are the ones that essentially
 3    communicate with the control structure.
 4              MR. LEITCH:  There's also some issues, too, that
 5    the primary containments are symmetric.  At Limerick, at
 6    least, though, I believe it's the same thing at Susquehanna,
 7    but the reactor buildings are mirror images.
 8              So, for example, although the reactors are
 9    identical, HPCI, for example, is outboard on each unit.  So
10    that gives you some different cable raceway configurations.
11              MR. GORMAN:  Yes.  Like for Susquehanna, if you
12    took a -- if you go through the center line on each reactor
13    building, you have your divisional separation, so you've
14    got, I think it's Division 1 is primarily located on this
15    side, Division 2 is on this side.  Since the plants are
16    slide-over, you've got most of your Division 1 equipment on
17    Unit 2 here and your Division 2 equipment over on the other
18    side.
19    Now, those reactor buildings each have the emergency switch
20    gear rooms in them, whereas the control structure has the
21    125-volt DC distribution system in it.  So there's a lot of
22    communication between control structure and the switch gear
23    rooms.
24              Another thing you find for Susquehanna is our main
25    steam tunnels on both units are right here.
.                                                               316
 1              So when you came in from the control structure, on
 2    most elevations, you couldn't go this direction without
 3    going through 11 feet of concrete and a high radiation area. 
 4    So most of the routings went through this area.
 5    So what we find is that those two paths of each reactor
 6    building are in the area where we have the most props from
 7    the cable routing perspective, and then you're trying to
 8    match both of those up with a control structure that's
 9    divisionally -- for us, it's divisionally split about a
10    horizontal plane.
11              So you find out, on Unit 1, where you've got
12    primarily Division 2 protected equipment that you're trying
13    to protect, it's going down to the lower elevation of the
14    control structure, which is the Division 2 area, and as a
15    result, the lower elevations of Unit 1 have problems.  The
16    higher elevations, which are going up to the higher
17    locations in the control structure have the Division 1
18    problems.
19              Those are the types of things that we figured out
20    in the last couple of years and the people that were
21    building the plant and routing the cables and the raceways
22    were never made privy to that information.
23              So given all of that, we have come to what is an
24    acceptable way to safely shut down the plant in the event of
25    a fire, given the defense-in-depth programs, given the
.                                                               317
 1    conservatisms we used in the analysis and given the fact
 2    that the likelihood of getting to the point where this is
 3    all that is available and remains available to you is very
 4    low.
 5              And the BWR Owners Group has proposed that it is
 6    acceptable to use the SRVs in our low pressure systems, and
 7    we have a position on that and I will give you that in a
 8    little bit of a discussion, and then I'll tell you a little
 9    bit about how we drew that conclusion.
10              MR. LEITCH:  When you say SRVs, are you
11    differentiating between ADS SRVs and other SRVs?
12              MR. GORMAN:  No.  It could really be either.  It
13    could be your ADS SRVs or it could be your normal SRVs, and
14    for our plant, we have 16 safety relief valves.  They all
15    have an individual ability to be opened.
16              Six of them are ADS SRVs and there are additional
17    solenoid valves from Division 1 and Division 2 that provide
18    power to open those SRVs.
19              So there is an automatic function associated with
20    opening those six SRVs.  There's a manual capability built
21    into opening those SRVs.  It's a part of the automatic
22    initiation logic and then there's also key lock switches in
23    both our upper and our lower relay rooms, where a separate
24    control can be used to open any one of those six SRVs.
25              MR. LEITCH:  But you don't have any manual means
.                                                               318
 1    to open the non-ADS SRVs.
 2              MR. GORMAN:  You do, yes.
 3              MR. LEITCH:  You do?
 4              MR. GORMAN:  Yes.  They all have individual
 5    solenoids and key locks or switches in the control room that
 6    you can use to open them.  That's not necessarily true of
 7    everybody, but that is the Susquehanna design.
 8              So the position that the BWR Owners Group has put
 9    forth is that the use of the SRVs in low pressure systems is
10    an acceptable methodology for achieving redundant and/or
11    alternative safe shutdown in accordance with the
12    requirements of Appendix R.
13              We also believe that the use of these systems, we
14    don't consider it to be a change.  We believe it's something
15    that we had been doing all along.  We believed it was okay
16    to be doing it all along and we just got to the point where
17    there was a difference of opinion relative to that.
18              So we don't view this as --
19              MR. SIEBER:  I'd like to ask a question about
20    that.  Not only does 3G1, 2 and 3 talk about and set
21    requirements for safe shutdown, but so does Section L and L2
22    and 3.
23              And beyond that Generic Letter 81-12 is the
24    implementation guidance for interpreting what the 3G and 3L
25    say.  By adopting this position, you're basically saying to
.                                                               319
 1    me that you don't want to -- you want to re-interpret what
 2    Generic Letter 81-12 says.  Is that true?
 3              MR. GORMAN:  No.
 4              MR. SIEBER:  Do you understand where I'm going?
 5              MR. GORMAN:  Yes.
 6              MR. SIEBER:  This has to do with uncovering the
 7    core.
 8              MR. GORMAN:  Yes.  3G1 essentially says that you
 9    have to have systems free of fire damage that are capable of
10    achieving hot shutdown and that you need to be able to make
11    repairs within 72 hours to get to cold shutdown.  So that's
12    the guidance in 3G1.
13              Then 3G2 says for the circuits that are necessary
14    to do that, you need to do -- if they're affected by the
15    fire, you could do three things.  You can protect them with
16    a one-hour fire barrier, as long as you have suppression and
17    detection.
18              You can protect them with a three-hour fire
19    barrier if you don't have suppression and detection, or if
20    you've got 20-foot separation, no intervening combustibles
21    and suppression and detection, then that's okay.
22              So with respect to 3G1 and 3G2, that's all the
23    guidance that we have.  And if we had done that, which is
24    what we have done with our SRVs and low pressure systems,
25    the way we've used them, we believe we have met those two
.                                                               320
 1    requirements.
 2              MR. SIEBER:  Generic Letter 81-12 gives you
 3    performance criteria as to what plant parameters, how far
 4    they're allowed to go in the process of shutting down using
 5    the equipment trains that you selected.
 6              MR. GORMAN:  Right.  Now, what happens is if you
 7    can't meet the separation requirements of 3G2, then you end
 8    up in 3G3 and 3G3 says if you can't do one of those three
 9    things, then you need to provide an alternative or a
10    dedicated shutdown system and the alternative and dedicated
11    shutdown systems need to be independent of the fire area.
12              So you've got to have something that's totally
13    independent of the fire area and that's where you get tied
14    into 3L.
15              MR. SIEBER:  But you're always forced into that,
16    are you not?  Because everything in --
17              MR. GORMAN:  Into what?
18              MR. SIEBER:  G3.
19              MR. GORMAN:  No.
20              MR. SIEBER:  Because everything ends up in the
21    control room.
22              MR. GORMAN:  In the control room, that is the area
23    where we do --
24              MR. SIEBER:  That forces you into L.
25              MR. GORMAN:  That's primarily the area, control
.                                                               321
 1    room and, in some cases --
 2              MR. SIEBER:  Cable spreading rooms.
 3              MR. GORMAN:  -- cable spreading rooms, right.  But
 4    for the balance of the plant, typically --
 5              MR. SIEBER:  Everything else you can probably
 6    engineer right out of it.
 7              MR. GORMAN:  Right.
 8              MR. SIEBER:  But for those two areas, you can't. 
 9    So that forces you into G3 and L.
10              MR. GORMAN:  For those two areas, right.  Now, for
11    the rest of the plant, w say it's primarily 3G1 and 3G2 and
12    in our defining the term so that we can communicate on this
13    issue, we said let's call 3G1 and 3G2 shutdown, let's call
14    that redundant and if we can't do redundant, then let's --
15    the other one would be either alternative or dedicated, if
16    you go to 3G3.
17              MR. SIEBER:  And the other thing that it appears
18    you have done is you have philosophically said I don't want
19    to use different methods depending on which section of the
20    regulation I'm in.  Is that correct?  If you're in G1/G2,
21    you want to have the same shutdown methodology that you
22    would if you were in G3 or L.
23              MR. GORMAN:  No, it would be different.  Again,
24    I'll talk about Susquehanna, but for Susquehanna, for the
25    fire in the control room, what we have is a remote shutdown
.                                                               322
 1    panel.
 2              MR. SIEBER:  Right.
 3              MR. GORMAN:  So the fire is in the control room. 
 4    We leave the control room.  It's a common control room for
 5    both units, and go to each unit's --
 6              MR. SIEBER:  But it's still a low pressure
 7    shutdown, right?
 8              MR. GORMAN:  No, it's a high pressure shutdown. 
 9    So what we're primarily -- the discussion we've been
10    primarily having with the NRC is related to 3G1 and 3G2
11    shutdown, redundant shutdown and the use of the SRVs in the
12    lower pressure systems in regard to that.
13              MR. SIEBER:  Okay.  I can follow you from here
14    then.  Go ahead.
15              MR. GORMAN:  Jit doesn't like it when we talk all
16    the 3G.1's.
17              DR. APOSTOLAKIS:  The last bullet confuses me a
18    little bit.  It's not a change, but rather an endorsement of
19    what has consistently been done.  By whom?
20              MR. GORMAN:  The BWRs.
21              DR. APOSTOLAKIS:  And it has not been endorsed by
22    the NRC?  I don't understand what it means, has been done.
23              MR. GORMAN:  Our position was we've used it as a
24    shutdown method for 3G.1 and 3G.2.  We believe it's been
25    approved by the NRC to be used for 3G1 and 3G2.  So we're
.                                                               323
 1    just coming back in and we're trying to put together our
 2    story that demonstrates those points.
 3              DR. APOSTOLAKIS:  But obviously it has not been
 4    approved.
 5              MR. GORMAN:  It has.
 6              DR. APOSTOLAKIS:  It has?
 7              MR. GORMAN:  Yes.  We've provided licensing
 8    citations for specific units, where the units --
 9              DR. APOSTOLAKIS:  So if it has been approved, why
10    do you need an endorsement?  Am I missing something?
11              MR. SIEBER:  I think that you're assuming that
12    it's been approved, because you've had Appendix R
13    inspections and nobody said anything, right?
14              MR. GORMAN:  No.  We've been able to cite specific
15    licensees, where they have been told it's okay to use this
16    shutdown methodology.
17              DR. POWERS:  Have they been told that by exemption
18    or specifically?
19              MR. GORMAN:  Specific SERs without an exemption.
20              DR. SEALE:  Okay.  Fine.  But --
21              DR. APOSTOLAKIS:  What's fine?
22              DR. SEALE:  But who blew the whistle?  I mean,
23    clearly --
24              MR. GORMAN:  Why are we here today?
25              DR. SEALE:  Someone -- yes.
.                                                               324
 1              DR. APOSTOLAKIS:  Yes.  I don't understand why --
 2              DR. SEALE:  Someone said hold on.  Now, is this an
 3    overzealous inspector or what?
 4              MR. GORMAN:  Most of the issues came up during
 5    inspections and I would say based on the amount of work that
 6    we've had to go through to convince everybody on both sides
 7    of the table that it has been improved, it is acceptable, it
 8    is okay, that it's reasonable that an inspector may not have
 9    seen it, is obviously approved.
10              So what we're trying to do is we --
11              DR. SEALE:  Well, there's difference of opinion as
12    to what the implications of those prior SERs really meant
13    when they were issued.
14              DR. APOSTOLAKIS:  But it's not an issue of
15    inspectors anymore.  Now it's the headquarters people who
16    have to be convinced.
17              DR. SEALE:  The remedy is to get a headquarters
18    endorsement, which essentially sets aside all of these other
19    problems.
20              DR. APOSTOLAKIS:  But then if that's the case, it
21    is a change.
22              DR. SEALE:  Only in the minds of some people.
23              MR. LEITCH:  I'm a little confused, though.  Isn't
24    the --
25              DR. APOSTOLAKIS:  There is no 1.174 for the minds.
.                                                               325
 1              MR. LEITCH:  The classical way you take a BWR to
 2    shutdown in a small break LOCA with HPCI unavailable is you
 3    ADS and then go with your low pressure injection systems.
 4              MR. GORMAN:  Right.
 5              MR. LEITCH:  And in that sequence, the core is
 6    momentarily uncovered.  I mean, that's new information to
 7    me.  I never particularly understood that to be the case.
 8              MR. SIEBER:  It can be.
 9              MR. GORMAN:  It depends on when the blow-down
10    occurs.  It depends on -- and from an elevation perspective,
11    it depends on the number of SRVs that you're using to blow
12    down.
13              MR. LEITCH:  But that's an accepted approach.
14              MR. GORMAN:  That's an accepted way.
15              MR. LEITCH:  To shutting down a BWR.  Now, the
16    fire doesn't make it any different, does it?
17              MR. GORMAN:  Exactly.
18              MR. SIEBER:  But it really also depends on the
19    plant, because it's a matter of capacity, right?  How much
20    water you have.
21              MR. GORMAN:  It depends on what your shutdown
22    approach is and how many SRVs you have, how many you have
23    protected, what their sizes are, what your procedures tell
24    the operators to do.
25              MR. LEITCH:  At Susquehanna, for example, the core
.                                                               326
 1    can be momentarily -- in other words, the level can be below
 2    the top of active fuel momentarily.
 3              MR. GORMAN:  Not by our calculations.  What we've
 4    done is we've -- we follow our EOPs.  We'll below down when
 5    level reaches the top of active fuel and the core -- the
 6    downcomer level, the indicated water level will drop below
 7    the top of active fuel, but the core is always covered.
 8              MR. SIEBER:  But what do you do if you get to that
 9    point where you say it's now time to quit doing that and the
10    pressure is still too high?
11              MR. GORMAN:  If what?
12              MR. SIEBER:  And the pressure is still too high to
13    inject.
14              MR. GORMAN:  Well, ADS will take pressure down.
15              MR. SIEBER:  Okay.
16              MR. GORMAN:  We have another slide that tries to
17    depict that a little bit.  It's an excerpt from the report
18    we submitted to the NRC on this issue that shows the
19    behavior of the --
20              DR. SEALE:  Four years ago.
21              MR. SIEBER:  Let me ask one further question, then
22    we can charge ahead.
23              For Susquehanna, the core doesn't become uncovered
24    even though you're -- if you were looking at the collapsed
25    volume, it may be.  Is that true?
.                                                               327
 1              MR. GORMAN:  I think if you took a collapsed
 2    volume, you would show a lower level, yes.
 3              MR. SIEBER:  Now, does any BWR using this system
 4    to shut down, cool down, have an uncollapsed volume that's
 5    below the top of the core?
 6              MR. GORMAN:  There may be some, because some
 7    people, I think, might use fewer than six SRVs and I think
 8    the information that NRC provided on the 17th showed that, I
 9    think, for as few as three SRVs, fuel temperatures are still
10    well within the acceptable range.
11              DR. SEALE:  As I recall, wasn't -- didn't
12    Susquehanna take a contrarian position to the overall BWR
13    Owners Group position on how far down you would let the
14    water level go in this maneuver?  In fact, you said you
15    would not uncover with the uncollapsed water level, whereas
16    the overall Owners Group position, and maybe that's changed
17    now, I don't know, but at that time, the overall Owners
18    position was that there could, in fact, be some dropping f
19    the water level below the top of the core.
20              MR. GORMAN:  I think that issue was related to the
21    ATWS and I think it related to should you tell the operator
22    to blow down at a certain point because of your suppression
23    pool temperature, your heat capacity temperature limit, and
24    I believe our people believed that you shouldn't let the
25    heat capacity temperature limit drive you to do the
.                                                               328
 1    blow-down.  And it wasn't really -- it was just don't blow
 2    down because the heat capacity temperature limit, because we
 3    don't really think that that's going to give us a problem
 4    relative to failing the containment.
 5              But if we're in an ATWS condition and we blow down
 6    the core, we're pretty sure we're going to have a problem
 7    with the core.
 8              So we said let's protect the core rather than
 9    worrying about the containment and we think that there is
10    sufficient margin in that protection for the containment,
11    that this is the smart thing to do, and I think that got
12    resolved.
13              DR. SEALE:  I remember there was a difference in
14    the position, though.
15              MR. SIEBER:  Now,. Just in summary, so we can take
16    a great leap forward here, since we're behind time.  As far
17    as Susquehanna is concerned, using ADS and LPSI comply with
18    Section 3G, 3L and 81-12.
19              MR. GORMAN:  With respect to Susquehanna, what we
20    do is we believe we comply with 3G.1 and 3G.2.  Like many
21    others in this area, we're not 100 percent clear on what all
22    of the requirements were relative to Appendix R back in the
23    middle `80s.  We processed a deviation, which is another
24    legal term.  It's like an exemption for a plant that's not
25    required to meet the law, back in 1989, that said our
.                                                               329
 1    process variables could be worse than for a loss of normal
 2    AC power and we processed that to the NRC.
 3              But the position of the Owners --
 4              MR. SIEBER:  And that was accepted, right?
 5              MR. GORMAN:  Yes.
 6              MR. SIEBER:  Okay.
 7              MR. GORMAN:  The position of the Owners Group --
 8              MR. SIEBER:  That's understandable.
 9              MR. GORMAN:  The position of the Owners Group is
10    that the critical criteria relative to 3G.1 and 3G.2 is that
11    you don't damage the fuel, you don't damage the primary
12    coolant boundary, and you don't damage the containment.
13              MR. SIEBER:  But that's different than what it
14    says.
15              MR. GORMAN:  It's different than what 3G.3 and 3L
16    say, but 3G.3 and 3L, our position is, do not apply to the
17    redundant shutdown.
18              MR. SIEBER:  I shouldn't have taken engineering. 
19    I should have been a lawyer.  Let's charge right ahead here
20    now, so that we can have a little time for 805.
21              MR. GORMAN:  So with respect to an actual plant
22    fire, we would not expect that they would interrupt power
23    operation and the ones that we have have not.
24              If we did have an event that affected our plant
25    equipment, we would expect the operators to use any
.                                                               330
 1    available plant systems.  The defense-in-depth concepts that
 2    we apply for the fire protection program, we believe, really
 3    minimize the challenges to any of the plant equipment.
 4              But if there is something that challenges plant
 5    equipment, the operators are trained and the operators are
 6    expected to use what is available and we, as the fire
 7    designers, do not want to tell them to do anything any
 8    different than that.
 9              If the response to the fire requires an entry into
10    the EOPs, we expect the operator to enter those EOPs.  The
11    operators are trained to enter those EOPs and we expect them
12    to perform in accordance with those EOPs.  And the protected
13    safe shutdown path that we provided is really a hardened
14    fire path relative to the design concepts that we've applied
15    for fire protection and plant safe shutdown.
16              DR. POWERS:  Do the operators enter into the EOPs
17    for expected events, like, say, for instance, a loss of
18    off-site power?
19              MR. GORMAN:  Loss of off-site power would give you
20    an entry into the EOPs, yes.  The MSIVs would go closed,
21    you'd have a level pressure transient.  Those would be entry
22    conditions into the EOP.  So you would be in your EOPs and
23    once you're in your EOPs, you'll stay there until you have
24    stable control of the unit and are able to exit through
25    those procedures.
.                                                               331
 1              DR. POWERS:  It seems to me that what you're
 2    proposing here is that I've got a bunch of events that I can
 3    imagine will happen to a plant -- it won't happen everyday,
 4    but in the lifetime of the plant, I might have several of
 5    these, and I want my operators to respond to them in sort of
 6    a consistent fashion.
 7              MR. GORMAN:  Yes.
 8              DR. POWERS:  That is that one of these events, be
 9    it a loss of off-site power or a fire of some magnitude,
10    they kind of do the same thing.  They're not expected to
11    say, oh, I go this bookshelf or this bookshelf, I go to the
12    same bookshelf all the time.
13              MR. GORMAN:  Right.  And that's critical, because
14    we don't want the operator in the control room trying to
15    figure out what's going on in the power plant on his own. 
16    We want him to work within the bounds of the symptom-based
17    procedures and there's a lot of uncertainty relative to
18    fires.
19              As we said, most of the fires are not fires that
20    are going to challenge anything.  If the fire response says
21    use this shutdown methodology, well, I don't think they're
22    going to do it.  We'd have a hard task to get them to accept
23    anything like that, from an operating perspective.
24              But what we try to do is we try to give them a
25    hardened path and we try to give them a heads up as to, in
.                                                               332
 1    the particular areas of the plant, what it is that may
 2    happen relative to fires, with the expectation that they
 3    will follow their procedures, use the available positions,
 4    and if they're in the EOPs, they follow the EOPs.
 5              MR. SIEBER:  Now, a fire is not a design basis
 6    event, correct?
 7              MR. GORMAN:  It's not one of the design basis
 8    accidents, that's correct.
 9              MR. SIEBER:  So you don't need pedigreed equipment
10    to respond to it.  That's one of the things that allows you
11    take this methodology.
12              MR. GORMAN:  Well, this is equipment that we would
13    use for design basis accidents and typically you end up
14    relying on that type of equipment, because --
15              MR. SIEBER:  Sometimes you -- it depends on the
16    plant.
17              MR. GORMAN:  Right.  If you can justify the
18    availability of others, you can use it.
19              MR. SIEBER:  Well, we installed stuff that was not
20    1A in order to take care of all -- I'm from PWR, so all our
21    aux feed pumps were in one room.  You can't get separation
22    like that.  So we built a whole new system.  To give us
23    separation.
24              MR. GORMAN:  So the approach we used to draw our
25    conclusion is that we reviewed the regulations and the
.                                                               333
 1    regulatory guidance and a lot of the documents that you're
 2    referencing, Jack, and we determined that what we're doing
 3    is consistent with those regulatory requirements.
 4              We assured that the approach did not present an
 5    unsafe condition and the basic starting point from that is
 6    that these are safety systems that are designed to control
 7    the power plant, they're accepted as original design basis
 8    systems within the power plant.
 9              We did a review of that just to demonstrate that
10    and then we did a qualitative examination of the relative
11    risks associated with this option versus other available
12    options under the Appendix R scenarios.
13              DR. KRESS:  Are you going to tell us what those
14    relative risks were?  Do you have the numbers?
15              MR. GORMAN:  It's qualitative.  It's difficult to
16    do a quantitative one for fires, because you need about 17
17    billion more pieces of information than we generally have
18    available to us.
19              DR. KRESS:  We understand.
20              DR. APOSTOLAKIS:  Careful now.
21              MR. GORMAN:  Sixteen billion.
22              DR. SEALE:  16.9.
23              DR. APOSTOLAKIS:  Be careful.
24              MR. GORMAN:  I'll put this one up real quick.
25              DR. APOSTOLAKIS:  What is that?
.                                                               334
 1              DR. KRESS:  That was quick.
 2              MR. SIEBER:  I thought it was just fine.
 3              MR. GORMAN:  And our overall conclusion is that
 4    these shutdown systems and this shutdown methodology, they
 5    represent an accepted shutdown methodology in the original
 6    design basis for the GE BWR.  They're a technically
 7    acceptable means of shutting down the plant, they're a safe
 8    means, and they're a means that are consistent with the
 9    current procedures and the operator training.
10              In addition to that, they satisfy the safe
11    shutdown goals for post-fire safe shutdown and they can
12    accomplish all the required safe shutdown functions.
13              DR. SHACK:  If this is not approved, what will you
14    have to do?
15              MR. GORMAN:  For me, I'll have to go look for
16    another safe shutdown path.  We've got -- at one point in
17    time, the discussion was this is an acceptable methodology
18    from an alternative shutdown perspective, which is the
19    3G.3/3L stuff we were kicking around before.
20              The way we've used the shutdown methodology,
21    though, we've used it by protecting it in accordance with
22    the one-hour wrap, the three-hour wrap, or the 20-foot
23    separation.  So I don't have independence.
24              So if I can't call it a redundant of 3G.2 or 3G.1
25    shutdown methodology, I don't have it independent of the
.                                                               335
 1    area, so I can't call it alternative, so I don't have a
 2    shutdown path.
 3              So then I would be going back and I would be
 4    taking my HPCI systems, my RCSI systems, all of the cables
 5    for those, all the equipment for those.  In Chris' case,
 6    down at Peach Bottom, he'd be going out and walking down a
 7    whole bunch more conduits to find out where things are in a
 8    particular location for those paths and then we'd go into
 9    the process, not unlike what we just finished up with, the
10    Thermo-Lag issue of providing fire rated barriers or
11    whatever we needed to protect those particular circuits.
12              So we've estimated maybe ten to 20 --
13              MR. LEITCH:  The problem is there's only one HPCI. 
14    So once you postulate the fire in the HPCI room, then you're
15    kind of between a rock and a hard place.
16              MR. GORMAN:  Then you've got to have your RCSI
17    system, so then you --
18              MR. LEITCH:  And I'm not sure that RCSI has the
19    capacity to -- well, I guess --
20              MR. GORMAN:  Well, for this event, you don't need
21    a lot of capacity.
22              MR. LEITCH:  Right.  This would be okay, yes.  You
23    could perhaps do it with RCSI.
24              MR. GORMAN:  Yes.  RCSI is another way that it
25    could be done, yes.
.                                                               336
 1              MR. LEITCH:  But those rooms are pretty close to
 2    one another, they're usually adjacent to one another.
 3              MR. GORMAN:  They're right next to each other, for
 4    us.
 5              MR. LEITCH:  Right.  But if this is not an
 6    acceptable method of shutting down in a fire, it's not an
 7    acceptable method of shutting down otherwise, right?  I just
 8    don't see what the fire has to do with it.  This is the way
 9    you shut down a BWR within a small break LOCA with HPCI
10    unavailable.
11              DR. APOSTOLAKIS:  So where does that leave us?  I
12    don't understand.
13              MR. SIEBER:  We're at the point in the agenda
14    where we --
15              DR. APOSTOLAKIS:  I'm not talking about the
16    agenda.  I think that was a very important comment.  Let's
17    say the staff does not endorse this.  What does that do to
18    other regulations?
19              DR. POWERS:  What I see here, if I can find these
20    things, when I look at these things, I see sentences that go
21    something like this; based on the above, for those licensees
22    who propose the use of ADS and LPSI for alternative shutdown
23    in the event of fire, we consider their proposal as a
24    request for an exemption to the requirements to Section 3L
25    of Appendix R and intend to grant such exemptions.
.                                                               337
 1              MR. SIEBER:  So that you will end up okay
 2    regardless.
 3              DR. POWERS:  Right.  It seems -- I mean, this
 4    particular phrase was written by the staff in 1982, that
 5    they have granted it as an exemption from Appendix R, and
 6    seemingly, in a blanket fashion.
 7              MR. SIEBER:  I don't know that, but it would
 8    appear to be that way.
 9              DR. POWERS:  The issue that comes to my mind is
10    something like this; that fires happen.  Frequency, one to a
11    half a year.  Most fires are not very bad fires.  So do you
12    want a process that stresses the safety systems for
13    responding to those fires?  And it seems to me that going
14    into this low pressure -- into a low pressure environment
15    puts some stress on the safety systems.
16              Do you want to do that routinely?
17              MR. WEISS:  This is Eric Weiss.  I'm Chief of the
18    Fire Protection Section.
19              I think I can add a little perspective to the
20    comment that was made.  What we're talking about here is a
21    fire that has been sufficiently challenging, that it has
22    affected all non-safety and all safety systems and all we
23    have left is this one protected path.
24              As Dr. Powers has said, not all fires rise to that
25    level of significance.  So if the operators were confronted
.                                                               338
 1    with a small fire or a fire, you imagine whatever you want,
 2    a fire in a trash can, a fire in a remote corner of a room,
 3    you wouldn't expect operators to immediately go to ADS low
 4    pressure system.  They would shut down normally.  They would
 5    use their turbine and their bypass valves and they would
 6    shut down in a normal fashion.
 7              Now, in the case of this postulated fire that the
 8    regulations contemplate, where we assume everything that's
 9    not protected is engulfed, everything, that includes all
10    non-safety and all safety systems, and all we have left are
11    those systems that are explicitly protected to the
12    requirements of Appendix R, then you would be using ADS/LPS. 
13    I don't think it's fair to say that every little fire will
14    result in the use of ADS/LPS, is the point I'm getting at.
15              DR. SHACK:  But then is it safe to say that you do
16    plan to continue granting the exemptions?
17              MR. WEISS:  I have a presentation on that, but to
18    make a long story short, the language that was referenced
19    earlier regarding exemptions was concerning 3L.  That was
20    the specific topic under discussion under 3G.3.
21              And the issue on the table for us right now is a
22    proposal by the BWR Owners Group to consider this
23    generically, as appropriate, as a redundant means, meaning
24    3G.2.
25              On the advice of our Office of General Counsel,
.                                                               339
 1    the acceptance criteria under 3L, which is 3G.3, do not
 2    apply to 3G.2.  As an engineer, I think the issue is, is the
 3    core safe, is the reactor safe, is the public health
 4    protected.
 5              As a regulator, the issue is, are the regulations
 6    met, is it acceptable and is it consistent with what we've
 7    accepted in the past.
 8              And I guess I'm jumping ahead to my presentation. 
 9    I will attempt to show you the context in which this
10    appears, some background information, the safety issues that
11    we considered in examining this, if you wish.
12              We had planned to do that a little bit later.  We
13    have a lot of things on the agenda.  But I hope to bring
14    some perspective to it.
15              MR. SIEBER:  Well, it seems to me that's the most
16    important question we have to ask at this point in time. 
17    Maybe it would be okay if we would go ahead with NRC's
18    presentation right now, so that we have some continuity. 
19    Then we can go back to the NFPA-805 after that.
20              DR. POWERS:  I guess what I'm interested in is the
21    salient discrepancy or difference between 3G.1, 2 and 3L,
22    the core uncovery question.
23              DR. SEALE:  The what?
24              DR. POWERS:  The core uncovery question, is that
25    the really significant difference between the two?
.                                                               340
 1              MR. WEISS:  From a regulation point of view, I
 2    think there is a difference.  That's what the Office of
 3    General Counsel tells us.  But I would also like to add the
 4    perspective that Appendix R is a design requirement.  It
 5    says, in effect, the features of the plant, in order to be
 6    licensed, have to have these design characteristics.
 7              Having said that, there are EOPs and EPGs and they
 8    tell licensees how to operate plants and they're a little
 9    bit different.
10              As was alluded to earlier, we have one set of EOPs
11    that are symptom-based and we wouldn't want to tailor a set
12    of guidelines for fires that were different than the other
13    things that got you into this.  You have one set of EOPs and
14    the operators follow them and the licensees are required to
15    do an analysis that shows that those EOPs are acceptable in
16    terms of their implications for the core and public health
17    and safety.
18              But as Mr. Gorman made reference to, whether you
19    uncover the core or not depends upon the assumptions that
20    you put into your analysis when you use the system, how many
21    SRVs there are that are used.  We have with us today, we
22    have Dr. Ulses, from the Reactor Systems Branch, who can
23    discuss the core thermal hydraulics perspective on this that
24    we considered in developing a safety evaluation that is
25    presently in concurrence.
.                                                               341
 1              MR. GORMAN:  That's kind of a key point.  Use of
 2    the system does not necessarily result in core uncovery. 
 3    You could get to the point where you uncover the core when
 4    you use the system in conjunction with your emergency
 5    operating procedures, because they instruct the operators to
 6    wait until you depressurize.
 7              Now, one of the things we had looked at at
 8    Susquehanna in terms of satisfying what appeared to be a
 9    legal concern relative to that was, well, we can tell the
10    operator to blow down at minus 91 inches and then the core
11    -- the level in the core, as well as the indicated water
12    level, would always be above the top of active fuel.
13              And if we were to do that, then what we would be
14    doing is we would be telling the operator to do something
15    different in the event of a fire than what he's instructed
16    to do for everything else that he does.
17              DR. POWERS:  And that just gives me real pause to
18    do that, because the more "if then" statements that you have
19    in EOPs, the more chance there is for a mistake, because
20    it's not clear the operators has perfect information coming
21    in here to make -- to go through these "if then" statements.
22              Similarly, if the issue is -- if the telling
23    discrepancy that we're worrying about is a momentary
24    uncovering of the core, we have to understand that it's
25    relative to the collapsed level, it's not a loss of cooling
.                                                               342
 1    to that core.
 2              MR. GORMAN:  Right.
 3              DR. POWERS:  And we need to be a little bit
 4    risk-informed here.  This may be a highly deterministic
 5    regulation, but we can't ignore risk.
 6              On the other hand, I'm also thinking of a grander
 7    scheme of risk.  I don't want to put unnecessary stress on
 8    safety systems for events that are very frequent.
 9              So I'm coming from a totally risk perspective on a
10    deterministic rule, which is always going to get me in
11    trouble.
12              MR. SIEBER:  Well, it would seem to me that this
13    method is seldom used.
14              DR. SEALE:  Yes.  Our experience --
15              MR. SIEBER:  If at all.
16              DR. SEALE:  Our experience -- this is one case
17    where the experience base is large enough to be predictive
18    of a relatively low level of having to resort to this
19    procedure.  You don't do that very often and there is enough
20    experience to confirm that.
21              DR. POWERS:  Is there, within our thinking on
22    this, any reason to believe that that frequency with which
23    we do these things is going to change?  We might well think
24    that, for instance, if we were pressurized -- I know, the
25    pressurized reactors, that you guys go like this -- that we
.                                                               343
 1    could anticipate that steam generator tube ruptures might
 2    actually go up as an event that you have to handle.
 3              DR. SEALE:  Yes, but not on BWRs.
 4              DR. POWERS:  I was using that as --
 5              DR. SEALE:  I understand.  Is there a generic
 6    problem like -- of similar import that could suddenly impose
 7    a high frequency of this kind of thing.
 8              DR. POWERS:  I mean, nothing comes to mind.
 9              MR. SIEBER:  Would it be satisfactory if I changed
10    the order of the agenda to hear from the NRC on this matter
11    at this time?
12              DR. POWERS:  I think we ought to get it all in one
13    package, if we can.  We've got a little time, because the
14    topic that's going to follow you has been truncated
15    substantially and we can shift it later, if we need to. 
16    It's fairly important to get this all lined out, because
17    this has some significant -- this has potential significant
18    impacts on paperwork, if not some poor fellow having to walk
19    down trays at Peach Bottom, which I wouldn't want to do for
20    love nor money.
21              MR. SIEBER:  I'd like to get it right the first
22    time.
23              DR. BONACA:  Can I ask just one more question? 
24    I'm intrigued by it.  Was this issue created by the
25    implementation of the EPGs?
.                                                               344
 1              MR. PRAGMAN:  No.
 2              DR. BONACA:  So it wasn't the fact that the EPGs
 3    drive most scenarios in a certain way and, therefore, you
 4    must also address the Appendix R.
 5              MR. PRAGMAN:  If I could use Peach Bottom as an
 6    example, the EPGs were available just as we were developing
 7    our original Appendix R submittals and designs in the `80s
 8    and when we looked to the EPGs, we said let's find different
 9    ways of shutting the plant down that are a subset of the
10    EPGs and get all the locations with cables and equipment for
11    those.
12              So when it came to a way of shutting the plant
13    down with low pressure systems, we asked GE how many SRVs
14    are we going to need to protect to make this work.  So it
15    was kind of reverse engineering, figuring out, run different
16    cases until they say, well, two is not enough, three is just
17    right, four is more than you need, that's how many I have to
18    protect, just three.  So that was all worked into the design
19    originally.
20              DR. BONACA:  Okay.  Thank you.
21              DR. SEALE:  That was a very helpful presentation,
22    by the way.  Just at the right level.  Very clear and you're
23    very knowledgeable, so we appreciate that.
24              MR. HANNON:  While Eric is taking the microphone,
25    this is John Hannon, Plant Systems Branch Chief.  There was
.                                                               345
 1    a question posed that I don't think we fully answered about
 2    the exemption process, and I wanted just to revisit that.
 3              Were we to have an application for an exemption
 4    under 3L, yes, we would process and grant it.  But what
 5    we're talking about now is a different case.
 6              MR. WEISS:  As the slide says, I'm Eric Weiss. 
 7    I'm Chief of the Fire Protection and Special Projects
 8    Section in the Plant Systems Branch.  What we have in front
 9    of us is a BWR Owners Group submittal that was submitted I
10    September of 1999 to use safety relief valves in low
11    pressure systems as a means of redundant post-fire safe
12    shutdown.
13              This is distinct from alternatives, so we're
14    talking 3G.1 and 2.
15              And was already said by the Owners Group, the
16    reason this came up was that on certain inspections, it was
17    not clear what this was acceptable or not.
18              The Owners Group position as that this was
19    approved and it was part of their licensing basis and we
20    were asked to go back and clear the record, so that there
21    wouldn't be these issues during inspection.
22              Now, in considering this, there were certain
23    regulatory background that we took into perspective.  I
24    mean, as a regulator, one of the things you want to do is
25    you want to ask yourself is this consistent with what we've
.                                                               346
 1    done in the past, is this consistent with what we accept now
 2    in other arenas, what is the regulatory background.
 3              And as I'm sure the committee knows, SRV and low
 4    pressure systems is part of the design basis of all boiling
 5    water reactors.  It's used for loss of coolant accidents. 
 6    So it's a fully safety grade system, very high quality
 7    components.
 8              It turns out that SRVs in low pressure systems
 9    have also been accepted as part of the licensing basis for
10    all boiling water reactors in order to meet the single
11    failure criteria of GDC-34.
12              The NRC has an SE that accepts it for those
13    plants, you know, if you have a failure in a single drop
14    line, you're required by GDC 34 to have another means of
15    reaching shutdown and it's been accepted for that purpose.
16              Also, SRV in low pressure systems have already
17    been accepted by the staff widely as an alternative means;
18    that is, it's a 3G.3 means.  Now, the issue is will we
19    accept it as a 3G.2 means.
20              DR. POWERS:  And this is where they've been
21    accepted by --the statement I have here -- as an exemption.
22              MR. WEISS:  In some cases, that's the case, yes. 
23    The staff did a regulatory and core thermal hydraulic
24    analysis and said that this was an acceptable way of
25    achieving safe shutdown as a redundant means to meet 3G.2. 
.                                                               347
 1    That was an internal memorandum from our Reactor Systems
 2    Branch to us.
 3              And as I alluded to earlier, we have Tony Ulses
 4    with us, who can go into greater detail about the thermal
 5    hydraulics.
 6              On 4-25 of this year, the staff met with the
 7    Owners Group to provide technical, regulatory, risk and
 8    legal feedback.  We looked at seven major sub-issues during
 9    our review.  The existence of plant-specific licensing bases
10    on which the staff has approved SRV/LPS as a redundant means
11    of post-fire safe shutdown, the Owners Group identified five
12    plants.  They said look at these SEs, and we did, we
13    consulted with our Office of General counsel, we had our
14    engineers look at it, and, indeed, we had approved for those
15    plants the use of SRV/LPS as a redundant means of achieving
16    safe shutdown.
17              I must say that in some cases, it took a little
18    bit of effort, but we reached that conclusion, and it's
19    because of that effort that it's unfair to expect an
20    inspector to pour through pages of an SE and say, aha, I see
21    the light, I see what you're talking about.  And to be
22    frank, in some cases, it was just too obscure for us to
23    reconstruct all of the different pieces many years later as
24    to exactly what was in the mind of the reviewer and what he
25    thought he was approving and under what conditions.
.                                                               348
 1              So anyway, we found five cases where we're quite
 2    confident we've already approved it.
 3              DR. SEALE:  And there may be more.
 4              MR. WEISS:  And there may be more.  I mean, it's
 5    certainly arguable.
 6              MR. WHITNEY:  Excuse me.  This is Leon Whitney,
 7    from the Plant Systems Branch.  It's interesting to note
 8    that if it was truly redundant, there would be no submittal
 9    required by the licensee.  So the question initially going
10    into that review was why is there being a discussion of this
11    at all, wouldn't this be in response to an alternative
12    shutdown request, which did require submittal in accordance
13    with 50.48.
14              But even after that pause, thinking about that,
15    when you read the words, you could come to the conclusion
16    that it was approved redundantly.
17              MR. WEISS:  Whether SRV hot shutdown procedure
18    existed was one of the issues we looked at and the Owners
19    Group produced EGP-4, which, as we alluded to, is a generic
20    procedure, and we also looked at the likely
21    depressurization, top of active fuel, the hot shutdown
22    maintenance capability.
23              It turns out, as I'm sure the committee knows,
24    that shutdown for a boiler is defined as above 200 degrees
25    and that means that plants certainly have the design
.                                                               349
 1    capability and they have the operational capability, if they
 2    wish, to remain at hot shutdown for some length of time.
 3              Latent heat or vaporization of water means it's
 4    not hard to stay above 200, particularly when you've got
 5    decay heat in the core.
 6              We looked at the non-applicability of Appendix R
 7    3L.  That we got some assistance on from our Office of
 8    General Counsel.  The non-applicability of the single
 9    failure criterion and the potential increase and risk from
10    what we hypothesized in some cases could be the abandonment
11    of the suppression and detection features that are required
12    by 3L.
13              In other words, if you convert something from an
14    alternative to a redundant system, and, to be frank, what we
15    constructed was a deterministic SE, but we did look at the
16    risk issue and we have with us Steve Dinsmore, of our PRA
17    branch, to talk to that.
18              But the bottom line on it is it's in kind of a
19    gray area.  It doesn't preclude what we want to do and it
20    doesn't shout for us to do it, either, but it's the way the
21    risk analysis came out.
22              The number of protected SRVs for core thermal
23    hydraulic safety during depressurization was another issue
24    we looked at based on --
25              DR. POWERS:  Let me come back to the previous
.                                                               350
 1    slide on the risk analysis.  You said it was in a gray area. 
 2    Can you give me some feeling for what the importance
 3    measures were from the risk analysis?
 4              MR. WEISS:  I'm going to defer the risk argument
 5    to Mr. Dinsmore and let him speak to that.
 6              MR. DINSMORE:  This is Steve Dinsmore.  I did the
 7    risk analysis part of this.  It was relatively difficult,
 8    because it was a generic analysis on something that's very
 9    situation-specific, and I have some slides, but I could also
10    answer the questions directly.
11              There wasn't an importance measure, per se.  What
12    we did is we looked at the equipment that would be in a
13    room, if this thing was called alternative, and the
14    equipment which would be in the room if this path was called
15    redundant, and tried to figure out the difference in risk
16    from those two situations.
17              DR. POWERS:  And could you give me a feeling for
18    what the difference in risks were?
19              MR. DINSMORE:  Yes.  For specific rooms, we
20    figured the risk could go up by a factor of ten if you
21    labeled this thing redundant instead of alternative.  In
22    other rooms, the risk could go down by a factor of two if
23    you labeled this path redundant instead of alternative.
24              DR. POWERS:  Now, factors of ten and two get me
25    excited if I'm working from ten-to-the-minus-four to
.                                                               351
 1    ten-to-the-minus-three.  They don't get me too excited if
 2    I'm working ten-to-the-minus-eleven or
 3    ten-to-the-minus-twelve.
 4              MR. DINSMORE:  Yes.  Well, the absolute level of
 5    risk has got more uncertainty in it.  That's why I was kind
 6    of avoiding that.  But if you take some kind of generic
 7    assumptions on area ratios and severity factors and that
 8    kind of -- and fire initiation frequencies, it looked like
 9    most of the rooms, when you called this thing alternative,
10    would be less than ten-to-the-minus-six, quite a bit less.
11              So if you change it to redundant, you pick that up
12    by a factor of ten.  You're still kind of down in the
13    ten-to-the-minus-six change.
14              DR. APOSTOLAKIS:  For what?
15              MR. DINSMORE:  Core damage frequency.  There were
16    some rooms that maybe, if you call this alternative, would
17    be around ten-to-the-minus-six.  So that when you call it
18    redundant and you take out the fire detection and
19    suppression equipment, it would bounce up to
20    ten-to-the-minus-five or so.
21              And that's what Eric was meaning, that there's no
22    real yes or on.  We expected most things to be
23    risk-insignificant.  There might be some areas, these kind
24    of outlier rooms -- it depends on what is in the room that
25    you could get a risk increase of around
.                                                               352
 1    ten-to-the-minus-five and there might be other areas, again,
 2    where you'd get this little decrease, and we didn't really
 3    try to sum it up, because it depends on how many of these
 4    different types of rooms are in the plants and stuff like
 5    that.
 6              DR. POWERS:  But you've given me a feel for the
 7    numbers.  Thank you.
 8              DR. APOSTOLAKIS:  And how many billions of
 9    information did you need?
10              MR. SIEBER:  Seventeen.
11              MR. DINSMORE:  I think I used about eight, but I
12    wouldn't take this to court.
13              DR. APOSTOLAKIS:  Eight billion.
14              MR. WEISS:  Getting back to the issues that we
15    looked at, we looked at the number of protected SRVs for a
16    core thermal hydraulic safety during depressurization.  We
17    looked at some vessel material concerns related to the
18    cool-down rate.
19              After looking at these issues, we decided that we
20    could write an SE and we have one in concurrence --
21              DR. SHACK:  Excuse me.  Did anybody look at the
22    frequency at which you would expect this to be used?
23              MR. WEISS:  Well, obviously, the risk people did,
24    but consider how many times in the -- how many hundreds of
25    years of reactor operation we had this, how may fires have
.                                                               353
 1    produced this, you might be able to argue Brown's Ferry, but
 2    Brown's Ferry didn't have this system protected, according
 3    to this.
 4              I guess the long and short of it is that if you
 5    use -- if the issue is the materials concern, there are
 6    separate caps on the materials issue.  In other words, one
 7    would use up the vessel if one used this too much and that
 8    would be handled in a separate arena.
 9              Does that address your concern?
10              DR. SHACK:  Right.
11              DR. APOSTOLAKIS:  It confuses me, but that's okay. 
12    Dr. Shack is helped.
13              DR. SEALE:  But so far there's only one fire that
14    would potentially -- if this system -- if this alternative
15    were available and was a protective system, there's only one
16    fire so far that might have brought this challenge into
17    play.
18              MR. WEISS:  First, I'd say that this system has
19    been in the plants for a long period of time.  We've
20    approved it already, without dispute, on a number of them.
21              The issue now is are we going to accept it
22    generically across the board, no argument, this is a
23    redundant system.
24              So yes, this system has been in place and we're
25    not expecting to see every fire result in the use of this
.                                                               354
 1    system.  This is for the stylized fire that destroys all the
 2    non-safety systems, gets rid of the turbine and the bypass
 3    valves and the way you shut down ordinarily, gets rid of
 4    HPCI, gets rid of RCSI.
 5              It's just terrible, it destroys everything, but
 6    the only thing left is SRV/LPS, and then the licensee's
 7    operators would enter the same EOP that they enter for a
 8    host of other events and shut down the same way with
 9    confidence that they had a protected system.
10
11              MR. WHITNEY:  Let's take it to its logical
12    extreme.  The -- never mind.  Thank you.  It will just
13    confuse things unendingly.  I'll get myself in a hole. 
14    Never mind.
15              DR. SEALE:  A wise man.
16              MR. WHITNEY:  I was about to get legalistic with
17    you, but we don't want to do that today.
18              DR. APOSTOLAKIS:  So you expect to concur, is that
19    --
20              MR. WEISS:  Yes.  We have an SE in concurrence now
21    and barring some other tech review organization or OGC
22    non-concurring in a way that would preclude us from
23    processing the SE, I would expect it would be out --
24    DR. POWERS:  Am I wrong in looking at this and saying that
25    all you're doing is reconfirming what has been done since
.                                                               355
 1    apparently 1982?
 2              MR. WEISS:  We're trying to clear the air is what
 3    we're trying to do and I must say if you go back and look at
 4    SEs that were written 20 years ago and that were amended and
 5    you have all of these different plants out there with
 6    different reviewers, with different amendments and
 7    exemptions and so forth, it's not an easy thing to
 8    construct.
 9              And so it's really unfair for everyone.  It's
10    unfair for the licensee and it's unfair for the inspector to
11    put the burden on them to say, now, you go back and sort out
12    this mess.
13              So the Owners Group came in with a proposal that
14    asked us to clear the air, as you put it, and we think we
15    have a regulatory context.  We think we have a safety basis
16    and we think we have a legal, a regulatory basis upon which
17    to accept this, and our SE is in concurrence.
18              MR. SIEBER:  When do you expect to issue the
19    safety evaluation?
20              MR. WEISS:  As I say, it's in concurrence.  I
21    could lose a lot of money by betting on the day that it
22    comes out.  I am asked to do that as part of my job for a
23    number of things and I usually build in some contingency,
24    because invariably it gets to some branch and somebody has a
25    question.  It's not just signing off on it, but they want to
.                                                               356
 1    have a meeting, they want to talk about it.
 2              But I would think --
 3              MR. SIEBER:  I can withdraw my question, if you'd
 4    like.
 5              MR. WEISS:  I would think it would be a few weeks.
 6              DR. BONACA:  I'd like to ask just a question about
 7    how many BWRs do you expect to use SRVs and LPSI for safe
 8    shutdown, all of them?
 9              MR. SIEBER:  All of them.
10              DR. BONACA:  Then the question I have is, I mean,
11    you have a rule that says you have to use a HPCI in one
12    method, the other one is RCSI and --
13              MR. WHITNEY:  The smart thing for us to do would
14    be to defer to the BWR Owners Group representatives to
15    answer that kind of a question.  However, if you look at the
16    expense involved in reanalyzing your plant, and I must have
17    heard ten times in my career from senior licensee officials
18    that they just aren't going to reanalyze for the hell of it,
19    because it costs real money.
20              I would expect that plants that already have the
21    SRV/LPS redundantly in place, of course, will leave it. 
22    Plants that have it alternatively in place will leave it,
23    and a very small number -- now let's hear from the BWR
24    Owners Group.
25              MR. GORMAN:  This is Tom Gorman with the BWR
.                                                               357
 1    Owners Group.  We did a survey to check the number of BWRs
 2    that actually used the shutdown methodology and I think it
 3    was on the order of about ten or 12 out of the 20 or so
 4    plants.
 5              Some plants use it in selected areas on a selected
 6    basis and others use it very widely as a shutdown
 7    methodology.  We talked a little bit the contrast against
 8    HPCI and I think when I look at all the available paths out
 9    there for safely shutting down the plant, I think if you get
10    to the point where you're using any of them, it's going to
11    be a challenge for you for this kind of an event.
12              DR. BONACA:  I wasn't questioning that.  I thought
13    that the number would be larger.  In that case, I would have
14    a problem in having a rule that says you have to have this
15    and that and then there is an exception that seems to be the
16    rule.  But that's not the case.
17              MR. WHITNEY:  The exception has always existed for
18    alternative, as a planned exemption, based on submittal. 
19    The question here is whether or not the redundancy is
20    inherent within the rule.  I think that's what we're trying
21    to answer.
22              The BWR Owners Group position was that it was and
23    is and the SER that's currently in concurrence agrees that
24    it's inherent within the structure of 3G.2 and 3G.1.
25              DR. BONACA:  Okay.
.                                                               358
 1              MR. SIEBER:  Any additional questions?  I think
 2    this whole matter is complicated to understand, and so I
 3    appreciate all the information that you've provided to me,
 4    because I think I do now understand it.  I hope there's no
 5    written test, however.
 6              MR. WHITNEY:  I could pass it, having worked in
 7    the area every day.  That's about it.
 8              MR. SIEBER:  Well, as long as you give the same
 9    answers every day.
10              What I would like to do now, Mr. Chairman, if you
11    don't mind, is move on to the NEI presentation on --
12              DR. POWERS:  I wonder if it would be appropriate
13    to take a break at this point.  So why don't we come back at
14    25 after the hour, and it allow us to at least clutch and
15    then we can shift gears.
16              [Recess.]
17              DR. POWERS:  Let's come back into session.  We're
18    going to be discussing a new and different issue.
19              MR. SIEBER:  More complicated, I hope.
20              MR. SHUMAKER:  We can make it that way.
21              MR. SIEBER:  No, no.
22              DR. POWERS:  Don't feel any obligations.
23              MR. SIEBER:  Well, I respect the fact that you
24    waited for us and allowed us to rearrange the agenda to help
25    us pursue to some conclusion on our first topic, but what I
.                                                               359
 1    would like you to do now, Mr. Emerson, is introduce your
 2    fellow speakers and give us your presentation on NFPA-805.
 3              MR. EMERSON:  Thank you.  As usual, it's a
 4    pleasure to be here.  The purpose of my presentation is
 5    basically to introduce Denis Shumaker's presentation, since
 6    his Salem plant was the subject of the pilot evaluation
 7    which is nearing completion on NFPA-805, and he is supported
 8    by Bijan Nijafi of SAIC.
 9              DR. APOSTOLAKIS:  It confuses me a little bit why
10    NEI is introducing the NFPA standard.
11              DR. POWERS:  Because we asked them to.
12              DR. APOSTOLAKIS:  Is that the reason?
13              MR. EMERSON:  I'm sorry.  Because we are
14    producing?  I didn't understand your question.
15              DR. APOSTOLAKIS:  Why are you introducing the NFPA
16    standard?  That's a society, isn't it?  They should have --
17    why is it -- what role is NEI playing in this?
18              MR. EMERSON:  NEI has been supporting the
19    standard, from an industry standpoint.  We asked EPRI to
20    fund the pilot evaluation for it and we have basically just
21    a central point for all of the industry activities.
22              And rather than have the same speakers that we had
23    two and a half weeks ago, I'm just planning to summarize
24    what many of them said and introduce Denis.  That's why.
25              MR. SIEBER:  You also have a companion NEI
.                                                               360
 1    document.  I guess it's not truly a companion, but it's an
 2    implementation guide.
 3              MR. EMERSON:  Yes.  We will be doing one.  We
 4    don't have it yet.
 5              MR. SIEBER:  You have pieces of it.
 6              MR. EMERSON:  We have one guide that's under
 7    development for circuit failures, which is not at issue
 8    here, and once the standard has been approved and is out,
 9    then we will be writing an implementation guide in
10    furtherance of the NRC's rulemaking to adopt it.
11              MR. SIEBER:  Thank you.
12              MR. EMERSON:  I'm going to go through this
13    presentation fairly quickly, because as I say, the real meat
14    of the discussion comes in what happened during the pilot
15    evaluation at Salem.
16              The NRC direction for working on the standard came
17    from several documents, the most recent of which was the SRM
18    for SECY-98-058.  This slide provides an indication of the
19    Commission's direction to the staff and supporting the
20    development of 805, and both industry and staff personnel
21    for the last several years have provided extensive support
22    for this standard.
23              In terms of process, there's been a lot of process
24    that's -- a lot of water that's gone under the bridge up
25    until now.  This slide represents what remains ahead of us.
.                                                               361
 1              On November 15, in a couple of weeks, the NFPA
 2    membership will vote for whether to adopt the standard or
 3    not, based on its current format.  The options that the
 4    committee has, that the membership has is to either accept
 5    it as is, to accept it based on four amendments that are
 6    offered at the time of the meeting, or return a portion or
 7    portions of the standard to the committee for additional
 8    work, or return the entire standard to the committee for
 9    additional work.
10              Those are the options that lie ahead of the NFPA
11    membership.
12              If it's approved, the NFPA Standards Council will
13    issue it in January and it will be published in March and
14    April.
15              MR. SIEBER:  At this point, though, it is not a
16    mandatory requirement, it will be something that licensees
17    can accept.
18              MR. EMERSON:  The necessary is probably better
19    equipped to deal with this than I am, but the process by
20    which it becomes a requirement is the rulemaking process
21    that the staff has currently begun.
22              DR. POWERS:  Well, there are a lot of things to be
23    done, need to be done.  A rule could become an acceptable
24    way of meeting the existing requirements.
25              MR. SIEBER:  Like a reg guide.
.                                                               362
 1              DR. POWERS:  Yes.
 2              MR. EMERSON:  The document is organized into six
 3    chapters and six appendices.  The NFPA style requirements
 4    provide that the body of the standard is enforceable; in
 5    other words, if the rulemaking adopts it as a requirement,
 6    then what appears in the chapters is enforceable.
 7              The appendix material is for information or
 8    guidance only.  It's just an acceptable way of addressing
 9    the requirements that appear in the basic chapters.  And
10    this document applies to existing light water nuclear
11    reactors.
12              I will spend a couple of slides just giving an
13    overview of what is in the various chapters.
14              The first chapter provides goals, performance
15    objectives, and performance criteria to lay the groundwork
16    for the application of the rest of the standard.  It
17    addresses nuclear safety, radioactive release, life safety,
18    and plant damage, and business interruption has been at
19    various times in the standard, but it's been deleted from
20    the final revision.
21              Chapter 2 is based on the goals, objectives and
22    criteria established in Chapter 1 and it provides for either
23    performance-based or deterministic options for addressing
24    the issues.
25              Chapter 3 provides a fundamental set of program
.                                                               363
 1    elements for the standard that are, for anyone adopting this
 2    in its entirety, each -- the licensee would have to fulfill
 3    these requirements.
 4              These requirements are things that are deemed
 5    necessary for any plant using the standard that they have to
 6    do.  There are options for other program elements beyond
 7    these that are performance-based, but Chapter 3 consistently
 8    throughout the standards development has been deemed to be
 9    prescriptive and that was deemed to be the way that these
10    fundamental elements would be implemented.
11    Chapter 3 addresses such things as the fire protection
12    program and administrative controls and procedures, the fire
13    brigade activities and content and the organization and the
14    fire protection systems and components.
15              Chapter 4 is where you get into the determination
16    of fire protection systems and features.  It requires one
17    success path to remain free of fire damage and it permits
18    the use of either performance-based or deterministic
19    approaches.  It references back to the methodology that was
20    established in Chapter 2 for these things.
21              Chapter 5 addresses fire protection during
22    decommissioning and plant shutdown, which is basically a
23    deterministic approach.  And Chapter 6 is just a summary of
24    NFPA references.
25              DR. SEALE:  Recently, we have been infatuated with
.                                                               364
 1    the problem of spent fuel storage fires and this is, in
 2    part, in connection with decommissioned or shut down plants.
 3              Are spent fuel fires included specifically in your
 4    Chapter 5 or is that another issue?
 5              MR. EMERSON:  Denis tells me that they're
 6    addressed in there.
 7              MR. SHUMAKER:  Right.
 8              DR. SEALE:  It is included.
 9              MR. SHUMAKER:  That's correct.
10              MR. EMERSON:  The appendices, Appendix A provides
11    explanatory material for information in the rest of the
12    standard itself.  It expands on specific points, provides
13    additional guidance, et cetera, for specific requirements
14    that are laid out in the body of the standard.
15              Appendix B provides an acceptable method for
16    demonstrating that cable and equipment damage for those
17    types of things, that sufficient equipment remains available
18    to address the nuclear safety performance criteria which
19    were laid out, and, again, those criteria are in the areas
20    of reactivity control, inventory and pressure control, decay
21    heat removal, vital auxiliaries which support those
22    functions, and the process monitoring which supports those
23    functions.
24              Appendix C provides for the fire modeling and it
25    indicates methods and considerations for doing that.
.                                                               365
 1              Appendix D describes the use of fire PSA methods
 2    in the standard, which support the change analysis process,
 3    which is embodied, I think, in Chapter 4, if I'm correct.
 4              Appendix E provides, again, more guidance on the
 5    deterministic approach for addressing fire damage and
 6    business interruption.  And F, again, is publications which
 7    support Chapter 6.
 8              As I indicated, the NFPA Technical Committee on
 9    Nuclear Facilities has been working on this standard for
10    several years now.  This process started without a model of
11    an effective performance-based fire protection standard to
12    work from, since the NFPA is in the process on several
13    fronts of establishing such types of standards.
14              So basically the committee started from scratch
15    and had a lot of work to do to develop an effective
16    performance-based standard, when the only guidance that we
17    had available was the prescriptive methods that existed in
18    the existing regulation.
19              So I would say having observed this process for
20    the last two years, that the committee has made considerable
21    progress in the right direction toward achieving a true
22    risk-informed performance-based standard.
23              The process, the NFPA process will permit revision
24    of the document if new information comes to light.
25              An overview of the use of PSA within the standard. 
.                                                               366
 1    The fire risk evaluations include an analysis of core damage
 2    frequency and LERF.  The criteria for whether these are
 3    acceptable are determined by the AHJ or the authority having
 4    jurisdiction, which, in most cases, is the Nuclear
 5    Regulation Commission.  These evaluations, similarly to Reg
 6    Guide 1.174, have to consider defense-in-depth and safety
 7    margins and you can't come to a conclusion based on risk
 8    alone.  Those other factors have to be weighed in.
 9              Uncertainty has to be evaluated and all
10    potentially fire risk-significant scenarios have to be
11    considered.
12              The methods that have to be used have to be
13    acceptable to the AHJ and Appendix D provides acceptable
14    methods that can be used.
15              The risk-informed approach requires PSA
16    evaluations for all changes that use a performance-based
17    approach.  These PSA evaluations can include qualitative or
18    quantitative evaluations of the modes of operation.
19              It requires monitoring, availability, reliability
20    and performance in order to validate the assumptions that
21    were made in the PSA analysis, and, obviously, supporting
22    documentation, as well.
23              One of the discussions that took place during the
24    development of the standard was whether it should require a
25    full risk evaluation for the use of the standard. 
.                                                               367
 1    Initially, we started out that way, but after a while, it
 2    became apparent that that might be an unnecessary burden. 
 3    So we revised it to include a change method that required a
 4    PSA evaluation to support changes rather than being
 5    necessary for the standard as a whole, since a deterministic
 6    approach is also allowed.
 7              In the area of fire modeling, it's a
 8    performance-based approach.  The performance criteria are
 9    established in the area of identifying equipment and
10    targets, damage thresholds, fire scenarios and determining
11    the protection required for equipment and targets, and the
12    risk evaluation and change analysis provide for the
13    likelihood and extent of fire damage.
14              For completing the standard, I indicated earlier
15    what the steps were ahead of the NFPA for doing that.  From
16    the industry standpoint, the potential benefits of having
17    the standard in place are it provides an alternative
18    performance-based risk-informed licensing basis as an
19    alternative to the existing basis.
20              Not a mandatory one, but an alternative that a
21    licensee can choose to adopt within the context of the
22    rulemaking that's underway.
23              It provides, also, if a plant does not choose to
24    change its entire licensing basis in line with the standard
25    for a -- provides a context for the use of risk-informed
.                                                               368
 1    tools to support exemptions and deviations within the
 2    current basis.
 3              As we discussed somewhat during the subcommittee
 4    meeting several weeks ago, these tools do exist, but the
 5    standard provides a framework and a established guidance for
 6    using them in the regulatory arena.
 7              Now, we support completing and implementing the
 8    standard.  We have been supporting it for the last two
 9    years.  We think it is going to provide useful tools, and I
10    think Denis will give some indication of what is usefulness
11    is in his talk.
12              But there are issues that still need to be
13    addressed, and I will spend a few minutes going through what
14    those issues are.
15              The principal industry issues are, first, on this
16    slide, with Chapter 3.  As I indicated earlier, Chapter 3
17    provides for the fundamental elements that will apply to any
18    fire protection program for a licensee who chooses to adopt
19    this standard.
20              We have no difficulty with the concept of
21    fundamental elements that apply across the board, but we
22    feel that a risk-informed performance-based standard ought
23    to allow more flexibility for the way that you achieve these
24    fundamental elements than the current standard does.
25              DR. POWERS:  This is the 256 foot fire hydrant
.                                                               369
 1    issue here?
 2              MR. EMERSON:  That's one example.
 3              DR. POWERS:  That's an example of where the
 4    prescription has been retained in a less than flexible
 5    manner, because you can't ascertain why 256 and not 257 or
 6    255 or something like that.
 7              MR. SIEBER:  It's how long the hoses are.
 8              MR. EMERSON:  We believe that there are ways that
 9    don't degrade the importance of the fundamental element and
10    then there are alternative approaches that can be taken, and
11    it would be a benefit to the licensees who will be asked to
12    consider adopting this or who may consider adopting this to
13    have more flexibility and equal validity in the methods that
14    they might consider.
15              The other factor is that it adds new requirements
16    that aren't addressed in current licensing bases, which, by
17    itself, is not necessarily bad, but if the licensee has no
18    flexibility in how he does it, then he might be forced to
19    spend a significant amount of money, what we would feel
20    unnecessarily, to achieve the goal of the fundamental
21    elements.
22              DR. POWERS:  That's the step that perplexes me a
23    little bit and presumably we've gathered together an array
24    of people that have expertise in fire.  They came down and
25    they said, okay, you need this fundamental element.  Now,
.                                                               370
 1    that fundamental element didn't happen to appear in Appendix
 2    R or any other kinds of regulations.
 3              But I don't know that anyone ever claimed that the
 4    people that authored Appendix R were all knowledgeable and
 5    all saying.  Why shouldn't we just accept the fact that the
 6    fire protection community now believes this is really
 7    honestly required, to have an adequate fire protection?
 8              MR. EMERSON:  Again, it may be required, and,
 9    again, it's not necessarily -- that's a fact that we have a
10    requirement to do something that hasn't been addressed
11    previously.  It's the way in which it's specified that it
12    has to be done.  We don't necessarily argue that this
13    requirement should exist in the standard.  It's just that if
14    you allow no flexibility in how it's done, then the licensee
15    is --
16              DR. POWERS:  If it was part of your first bullet,
17    I'd say fair enough.
18              MR. EMERSON:  The two are interactive.
19              DR. POWERS:  If that was the concern alone, but it
20    seems like it's just that it's in addition to a requirement. 
21    The world has moved on.  They know more now than they did
22    when they wrote Appendix R.
23              MR. EMERSON:  Have I answered your question?
24              DR. POWERS:  I'll sit here and say it's all part
25    of the first bullet.
.                                                               371
 1              MR. EMERSON:  It's closely tied to the first
 2    bullet.
 3              MR. SHUMAKER:  I'll talk about it more.
 4              MR. EMERSON:  Yes.  Denis will elaborate on it a
 5    little bit later.  I don't want to steal Denis' thunder
 6    here.
 7              DR. POWERS:  Sure.
 8              MR. EMERSON:  Okay.  The other issue is the
 9    circuit analysis provisions in Appendix B.  In NEI, we've
10    spent a lot of effort over the last couple of years, in
11    cooperation with a number of industry groups, to develop a
12    risk-informed method for dealing with circuit analysis and
13    the Appendix B, the way it's currently configured, is
14    basically a prescriptive method for how to do it, with the
15    exception that it allows for the use of other risk-informed
16    methods that are with the authority having jurisdiction.
17              We believe the appendix needs to go farther in B
18    an adopt the same sort of risk-informed approach that the
19    process that we're developing will have.  That process isn't
20    done yet, but we've provided a lot of information on how
21    it's supposed to work.
22              But we feel the standard would be better served if
23    the guidance that's in place matches up much better than it
24    currently does with the prescriptive nature of the circuit
25    analysis guidance that's in there now.
.                                                               372
 1              MR. SIEBER:  On the other hand, if the standard is
 2    adopted, it's voted out by the membership, then what's in
 3    there now becomes the fact of the standard, is that not
 4    correct?
 5              MR. EMERSON:  That's correct.
 6              MR. SIEBER:  So it would require a future revision
 7    to modify that, except to the extent that it's in an
 8    appendix, which means it's not enforceable.
 9              MR. EMERSON:  If the standard is adopted and the
10    appendix stays the way it is, then the provision in the
11    appendix that allows the use of other methods would still
12    allow the use of the method that we're developing.
13              DR. SEALE:  That's probably what your people would
14    invoke.
15              MR. EMERSON:  I expect that would be the case,
16    yes.  We would like to see it not be an exception to the
17    rule, but the guidance that exists overall.
18              MR. SIEBER:  Let me ask a couple more questions
19    about associated circuits.  It seems to me that this has
20    been an issue for a long time and part of that issue stems
21    from the fact that not everybody interpreted what an
22    associated circuit was and how it's to be analyzed and what
23    the definitions are, the same way through the years, which
24    has caused some confusion.  Is that correct or not correct?
25              MR. EMERSON:  There have been differences between
.                                                               373
 1    the staff and the industry in how the regulatory guidance
 2    that's supported the regulation was interpreted, and
 3    primarily Generic Letter 86-10 yes.
 4              MR. SIEBER:  Now, when I look at the NUREG that is
 5    basically the staff's inspection plan for fire protection,
 6    which is 7111.05, the latest edition of that, which came out
 7    in September of this year, has a caveat in it regarding
 8    inspection of associated circuits, which basically tells the
 9    inspector he doesn't have to inspect specifically for
10    associated circuits, that if he runs across one in the
11    course of some other aspect of the fire protection
12    inspection, that he should note it as an unresolved item.
13              And this is sort of an exemption that's pending
14    work that NEI and the industry are doing to further define
15    what the expectations are for the analysis of associated
16    circuits.
17              Could you describe two things, one of them, what
18    is that you're doing, for the benefit of the full committee,
19    and what do you hope to achieve and when do you think you
20    will be in a position to have achieved it?
21              MR. EMERSON:  What we're doing, to respond to your
22    question, about two years ago, when we had spent some
23    non-productive meetings just arguing the issue with the
24    staff, we had the staff put on a workshop where we proposed
25    the use of a risk -- development of a risk-informed method
.                                                               374
 1    for -- rather than continuing to argue on a strictly
 2    licensing basis, to determine the safety significance of
 3    these failures that we had been discussing.
 4              We formed a committee, a task force to do that. 
 5    The task force is developing a document, designated as
 6    NEI-00-01, that provides a combination of deterministic
 7    circuit analysis practices based, in large part, on what the
 8    BWR Owners Group has developed, but extended to PWRs as
 9    well.
10              And it will have two risk-informed methods.  One
11    is a preliminary screen for the use of the method and one is
12    a tail-end safety significance evaluation method as one
13    means of mitigating the potential circuit failure if the
14    analyst has determined it to be a potential issue.
15              So what we hope to gain from it is to determine
16    whether, on a plant specific basis, whether circuit failures
17    that are of concern to either the staff or the licensee to
18    determine if they are -- how -- what level of risk
19    significance they pose.
20              I won't speak for the staff and what they hope to
21    gain from it, but that's what we hope to gain from it. 
22    Remove it from the issue of you should have done this versus
23    you should have done this and come up with a more objective
24    means to measure the significance of actual failures, rather
25    than generalize about the significance of potential ones.
.                                                               375
 1              And as far as when it will be done, we will -- one
 2    of the key elements that will be supporting this activity is
 3    a series of tests which we expect at this point to be
 4    conducted in about a month from now.  After that point, we
 5    will finalize our document. We will conduct an expert panel
 6    to develop probabilities from the results of the testing and
 7    earlier testing that's been done in support of this.
 8              We will conduct pilot evaluations at several
 9    nuclear plants and we expect to submit it to the staff late
10    in the first calendar quarter of 2001.
11              MR. SIEBER:  I presume you're familiar with the
12    June 13 document, which is the letter report from Sandia
13    National Laboratory, circuit failure mode and likelihood
14    analysis.
15              MR. EMERSON:  Yes.
16              MR. SIEBER:  Are your methods in general agreement
17    with the findings that Sandia found in that report?
18              MR. EMERSON:  We had some initial concerns about
19    the Sandia report, which we -- we've had a number of
20    discussions with them about it.  The principal concern had
21    to do with the direct association of a hot short with a
22    spurious actuation, whereas in reality, there's a lot of
23    things that have to happen before a hot short becomes a
24    spurious actuation.
25              Sandia spent a lot of time and effort going
.                                                               376
 1    through existing test reports, some of which is work they
 2    had done and some of which is work that outside groups had
 3    done, and I thought did a very good job of summarizing the
 4    results.
 5              MR. SIEBER:  That was basically their approach.
 6              MR. EMERSON:  Yes.  Now, I think we're a little
 7    bit concerned about the high value that they place on the
 8    potential for hot shorts and we would like to --
 9              MR. SIEBER:  Like .7?
10              MR. EMERSON:  Something like that, yes.
11              MR. SIEBER:  Yes.  That was interesting.
12              MR. EMERSON:  And while our testing is designed
13    not specifically to address the Sandia number, it's intended
14    to broaden the evaluation so that we can assess the impact
15    of a number of different parameters on what does influence
16    the likelihood of spurious actuations.
17              We would hope that the number ends up being
18    somewhat smaller than that.
19              MR. EMERSON:  Well, I think the .7 number was a
20    number that said that if I have a group of cables in a cable
21    tray of a certain -- I think they were referring to 14
22    American wire gauge and poly insulation, that the likelihood
23    of getting a hot short was .7, but they did not go beyond
24    that, as I recall, to say that that hot short that you got
25    would result in a spurious actuation of a critical piece of
.                                                               377
 1    equipment.
 2              I think that that's the area where risk
 3    information becomes important.
 4              MR. EMERSON:  They've clearly distinguished since
 5    then the difference between the two in discussions that
 6    we've had.
 7              MR. SIEBER:  So you don't see yourself in basic
 8    conflict with the circuit analysis methods that they used.
 9              MR. EMERSON:  I don't see a conflict.  I'd say
10    we'd like to -- they have reviewed a lot of testing which
11    was the applicability of the testing to the conclusions and
12    issues that we're trying to deal with are somewhat
13    questionable.  They've tried to look for everything that
14    could possibly bear on the determination of probability and
15    they've done a good job of looking at all that information.
16              What we would like to do is to expand on the
17    knowledge that we have in that and to come to more pointed
18    conclusions as to the likelihood of these things.
19              MR. SIEBER:  But the amount of tests that you
20    would conduct would not be statistically important enough to
21    say that you're establishing a new database, I would
22    presume.
23              MR. EMERSON:  That's correct.  We aren't going to
24    be doing hundreds of tests to address that.  Since our
25    subcommittee meeting, we have taken your suggestion and had
.                                                               378
 1    it reviewed by the University of Maryland, our proposal, and
 2    they have provided some additional suggestions, which we
 3    have incorporated and they indicated that generally we were
 4    pretty much on the right track for the type of information
 5    we would be able to glean from this round of testing and
 6    addressing the parameters that were important.
 7              MR. SIEBER:  I'm sure this committee would like to
 8    hear the results and your progress in this area as it
 9    unfolds.
10              MR. EMERSON:  We'll be happy to provide that
11    information.
12              MR. SIEBER:  I have one final question.  You had a
13    slide that was entitled NFPA-805 Process, which was the
14    calendar of future events.  It was right in the beginning,
15    the fourth slide.  Prior to November 15, however, the
16    committee itself had to vote out NFPA-805 in order to get it
17    to the full membership vote.
18              MR. EMERSON:  Right.
19              MR. SIEBER:  And I understand that vote was not
20    unanimous.
21              MR. EMERSON:  I don't know that I can do justice
22    to the methods that accompanied the vote and what the exact
23    conclusions were.
24              MR. SIEBER:  I'm not trying to drag out who voted
25    what way.  On the other hand, perhaps you could give us an
.                                                               379
 1    indication of those who did not vote in the affirmative,
 2    what their concerns were, in general.
 3              MR. EMERSON:  Well, there were a variety of issues
 4    that were being voted on and it wasn't all a -- some parties
 5    who voted negatively on things were concerned about some
 6    issues.  Other parties were concerned about other issues.
 7              So it wasn't -- we weren't just lining up for the
 8    -- you know, the NRC may have been -- representatives may
 9    have been concerned about certain things, industry
10    representatives may have been concerned about other things.
11              So not all the negative votes pertained to the
12    same issue.
13              MR. SIEBER:  Does anybody else have questions?
14              DR. APOSTOLAKIS:  Yes, I do.  I'm sorry, go ahead.
15              MR. LEITCH:  I just had a follow-up on Dr. Seale's
16    question of a few minutes ago regarding whether the spent
17    fuel issue was discussed in Chapter 5.
18              Somebody, I think, answered affirmatively, that it
19    was.  But it looks to me, though, that Chapter 5, in the
20    intent, is referring specifically to ISFSI facilities, and I
21    really think Dr. Seale's question was getting at the window
22    where a decommissioned plant still has spent fuel stored in
23    the spent fuel pool rather than the ISFSI.
24              And I guess I'm wondering, is that -- I don't see
25    where that's covered in Chapter 5.  Maybe it's implied, but
.                                                               380
 1    Chapter 5 seems to be speaking more to --
 2              DR. SEALE:  It's conceivable that the position
 3    would be that the same rules apply for the spent fuel pool
 4    during operation.
 5              MR. LEITCH:  During operation, yes.
 6              DR. SEALE:  That would still apply in -- you pass
 7    that window.  Now, I don't know, that might be the position
 8    you take.
 9              MR. LEITCH:  It's just not quite clear here.
10              MR. SHUMAKER:  I'm Denis Shumaker.  I guess what I
11    would submit to you is that to get into NFPA-805, there's a
12    number of elements that you need to look at.  One of them is
13    radioactive release and within that element, you do need to
14    look at those parameters.
15              I would also suggest that that would be a
16    component, as well, of Chapter 5.  It's a requirement of the
17    standard itself to look at radioactive release in general.
18              DR. SEALE:  Well, there's some real hairy physics
19    and chemistry right along in there.
20              MR. LEITCH:  I understand.
21              DR. SEALE:  That we haven't been able to get all
22    the answers we would like to have, and that's not something
23    that's going to happen anytime soon on the kind of period
24    you're talking here.
25              MR. SIEBER:  It's probably unlikely to happen in
.                                                               381
 1    805.
 2              DR. SEALE:  Yes.
 3              DR. APOSTOLAKIS:  I guess we're not reviewing the
 4    standard itself today.  We'll have a presentation on the
 5    pilot.
 6              MR. SIEBER:  Well, it's not approved yet, so I
 7    think this is just a briefing to bring us up-to-date.
 8              DR. APOSTOLAKIS:  I must say I'm having a problem,
 9    the same problem that I had with the ASME standard.  I don't
10    know that if I pick up this standard, I will know what to
11    do.  In particular, if I went to Appendix D, which has a
12    title Use of Fire PSA Methods in NFPA-805, and basically
13    tells me that I have to consult nine references which are
14    reports in order to see how I could actually do it.
15              If the purpose of a standard is to facilitate
16    review from the NRC staff, this doesn't do it.
17              DR. POWERS:  I think that's the point that emerged
18    most clearly concerning 805 in the subcommittee meeting, is
19    that with respect to the risk-informed portion, it is not a
20    how-to on the risk analysis.  And, in fact, they look to
21    some other people establishing the standards on how to do
22    the risk analysis.
23              MR. NIJAFI:  This is Bijan Nijafi.  I'm sitting in
24    for EPRI.  In fact, Appendix D, that's how the initial draft
25    of it started and then later on in the process, it was
.                                                               382
 1    recognized it's not the presence of a standard, to write a
 2    guide, to write a guide even as part of its appendix.
 3              So it was concluded the best thing is to raise
 4    basically the level of instruction, provide basically what
 5    you need to cover when you do a risk analysis, but to get to
 6    the how-to in a guide, sort of in order to preclude future
 7    evolvement of the techniques and methods and even then fact
 8    that there are more than one acceptable methods, there is
 9    not only one.
10              Just leave that to the supporting documentation as
11    long as they meet certain attributes.  So we decided to
12    basically talk more of attributes in the Appendix D as
13    opposed to a guide or a how-to.
14              DR. APOSTOLAKIS:  I still don't know how
15    supporting these references are, because I see reports from
16    all over the place, some dated back to 1983, and I think you
17    would be better off just deleting all of them.
18              I mean, if I view this as a set of minimum
19    requirements, high level requirements, maybe then it's okay. 
20    But other than that --
21              MR. NIJAFI:  I would call it more an attribute of
22    what is required of you when you're going to do that, I
23    mean, things you -- minimum requirement may be one word, but
24    --
25              DR. APOSTOLAKIS:  It's obscure.  It's obscure. 
.                                                               383
 1    For somebody who hasn't done it, to be hit with a sentence,
 2    if the analysis partitions and empirical fire frequency is
 3    the partitioning method, should reflect the physical
 4    characteristics.  That doesn't mean anything to people who
 5    have not done a fire analysis.  Unless I've done the
 6    analysis, partitioning empirical fire frequencies means
 7    nothing to me.
 8              So I don't know how helpful this is.
 9              DR. POWERS:  Well, I guess the question really is,
10    is it the objective of the standard to train people and I
11    think what you're telling us is that no, it really isn't. 
12    That an untrained person would never be reading that
13    appendix or should not be reading that appendix.  They
14    should be reading something else first.
15              MR. NIJAFI:  And you can -- I'm sorry -- you can
16    say the same thing about what is in the fundamentals in
17    Chapter 3, not a fire protection -- somebody who is not a
18    cognizant fire protection engineer would not recognize a lot
19    of the words that's in Chapter 3 or the rest of it, or pick
20    up NFPA-101, you won't understand probably two-thirds of it
21    if you're not a fire protection engineer.
22              DR. APOSTOLAKIS:  Well, where I'm coming from is
23    I've heard a lot of discussions that with the ASME and ANS
24    and NFPA standards, the whole process of risk-informing the
25    regulations will be accelerated.  And what I'm saying is
.                                                               384
 1    that it will not.  It was a misplaced hope.
 2              Now, I may have misunderstood the purpose of these
 3    standards, but I don't think that the staff can do much with
 4    this.
 5              MR. NIJAFI:  Appendix D is not intended to
 6    risk-inform, in and of itself, anything.  It just says that
 7    if you know what you're doing in your process, the main body
 8    describes the process.  So if you know what you're doing
 9    there --
10              DR. APOSTOLAKIS:  That's my problem.  There is my
11    problem.  If you know what you're doing, you don't need
12    this.  And if you publish it because you expect the NRC
13    staff to nod its head and say yes, they're not going to do
14    that, because they have to look at the detail.  So the big
15    question, in my mind, is why publish it.
16              But then, again, other people feel other ways, so. 
17    I mean, if the staff has to review the details of your
18    analysis and I have to have an expert to read this to
19    understand it, I really don't understand what the purpose of
20    the standard is, but maybe I have the same problem with all
21    standards.
22              Now, you say here some things that I see that have
23    value, like the analysis should include consideration of
24    seismically induced fire scenarios.  I mean, that's
25    specific, that tells me I have to do that.  Now, how to do
.                                                               385
 1    it is a different story.  But the rest of the stuff is --
 2    anyway, that's one man's view.
 3              MR. NIJAFI:  Well, that's been the challenge of
 4    the whole process.  We have about 60 people --
 5              DR. APOSTOLAKIS:  I'm sure you were challenged.
 6              MR. NIJAFI:  -- the consensus that, I mean, you
 7    get 60 opinions.
 8              DR. APOSTOLAKIS:  I guess we'll have to have a
 9    regulatory guide someplace.
10              DR. POWERS:  I think I'd like to challenge, it's
11    emerging, is that the risk assessment community has to hone
12    in on the approaches and methods and ways of doing things in
13    a consensus and not ask the fire protection community to do
14    that.
15              DR. APOSTOLAKIS:  Well, if I want to be a little
16    negative here, all these things have been put on hold
17    because the NFPA has been developing the standard.  So, I
18    mean, if a society with the prestige of this particular
19    society says we're going to develop a standard, I don't
20    think anybody else would be willing to spend money doing
21    that, but evidently now, after the standard, they will have
22    to do it.
23              MR. EMERSON:  I think the purpose of the NFPA was
24    to develop a standard for fire protection programs rather
25    than a standard for fire PSAs.
.                                                               386
 1              DR. APOSTOLAKIS:  But if the PSA is part of it --
 2    I think I made my view clear.  Do you want me to repeat it?
 3              MR. SIEBER:  Okay.  Are there any further
 4    questions?  If not, what I would like to do is invite Denis
 5    Shumaker to give his presentation based on the experiences
 6    of the pilot plant at Oak Creek?  Salem.
 7              MR. SHUMAKER:  Salem.  Salem.
 8              MR. SIEBER:  Close.
 9              MR. SHUMAKER:  Thanks, John.  As John said, I'm
10    here to discuss today the EPRI pilot of NFPA-805, and Bijan
11    Nijafi, who spoke previously, is on my left.  He is the
12    project manager basically for the project and a significant
13    contributor.  So he is here, as well.
14              First of all, I'd like to thank you for the
15    opportunity.  We've done a lot of work on this and we
16    appreciate the opportunity and the interest on the part of
17    ACRS to listen a little bit and ask how the pilot went.
18              AS you will notice, we say in the first slide that
19    the pilot is a -- this is preliminary results and while I
20    would suggest that most of the learnings, we believe, have
21    been identified, the pilot is, in fact, a work in progress
22    and it will complete in the next presumably by the end of
23    the year, I think is our current target.
24              I am going to talk briefly about what the benefits
25    are and I'm going to take the opportunity to reiterate my
.                                                               387
 1    support of risk-informed performance-based standards, why a
 2    pilot, why we as the industry decided we wanted to do a
 3    pilot of the standard, why Salem, why did Salem put their
 4    hand up and volunteer to be the pilot.
 5              Then we'll talk about some of the results and
 6    conclusions of the pilot.
 7              First of all, and, again, I know this is somewhat
 8    reiterative, but use of risk-informed performance-based
 9    strategies gives us the ability to better understand and
10    manage our risk, and in this arena, our fire risk.  We were
11    also one of the pilots for the SDP functional inspection
12    process and I think the learnings we've had through a couple
13    evolutions, that and the opportunity to be part of the
14    pilot, we're already starting to implement some of the
15    insights that we've gained from that opportunity.
16              We did have the opportunity during the IPEEE to
17    have some similar -- to understand those benefits, as well. 
18    We're going into a more refined mode at this point.
19              Use of these in the NFPA standard or the guides
20    provided in NFPA, and I will basically allude back to what
21    George said, this isn't really a bunch of new tools and new
22    stuff.  There is some new things in it, but, in general,
23    we're just consolidating and we're pulling together the
24    existing tools we've had in the industry, the existing
25    documentation, kind of standardizing it and putting together
.                                                               388
 1    a package.
 2              So this provides us with a basis for reviewing
 3    fire protection attributes by, first of all, assessing the
 4    current plant configuration and better understanding fire
 5    risk in that environment; understanding fire protection
 6    issues that arise, that would be impairments or problems
 7    that come up in the plant, and understanding and relating
 8    those to fire risk and using that for things like how
 9    quickly do we need or should we respond to those issues.
10              And it also gives us an opportunity to look at
11    different modifications that we do.  Often, when a plant is
12    going to perform a modification, they have a couple avenues
13    to do it and by having a good tool, you can actually look at
14    the various options and understand which modification option
15    gives you the most risk benefit.
16              So we are looking at those and the bottom line
17    there is it allows us to spend our dollars where we can get
18    the most risk gain and most risk benefit within the plant.
19              Why pilot?  We wanted to test the standard.  We
20    wanted to determine whether it was complete, whether it was
21    practical, whether it was cost-effective, and whether
22    anybody would use it, and whether it was useable either in
23    whole, that would be as a substitute for your current fire
24    protection program, Appendix R, if you will, or useable in
25    part, maybe to substantiate exemptions, deviations and the
.                                                               389
 1    like.
 2              How did Salem get involved?  We have an issue with
 3    fire wrap at Salem.  We're looking at some of the areas.  I
 4    looked at the hazards in the room, the room geometry, the
 5    defense-in-depth features and risk-informed
 6    performance-based strategies seemed to make a lot of sense.
 7              So we did a feasibility study of a number of
 8    areas, I guess 18 fire areas in the plant that had wrap and
 9    we concluded that several of them had a very high success
10    potential and, again, you don't really need the tools to see
11    it.
12              You go into these rooms, there's basically no
13    combustible loads, there's suppression.  Cable trays are
14    very high in the room and they have the fire -- some fire
15    resistant barrier applied to them already.
16              So we volunteered to participate in the pilot and
17    are looking at risk-informed performance-based strategies
18    for some of the resolution.
19              I'd like to go into and talk a little bit about
20    the pilot.  First of all, NFPA-805 has a number of
21    performance criterias contained with it.  The first one, the
22    one we think about most, I think, is the nuclear safety
23    component.  There's also the radioactive release component,
24    the life safety component, and then the property damage and
25    business interruption component.   We've piloted actually
.                                                               390
 1    the nuclear safety component and radioactive release
 2    component and have not piloted life safety or property
 3    damage and business interruption during the pilot.
 4              Now, the elements that we exercised in the pilot
 5    include the fundamentals that Fred talked to you about
 6    previously in Chapter 3.  Fire modeling, change analysis,
 7    other modes of operation, radioactive release, and the
 8    programmatic issues that are contained within the standard
 9    itself.
10              I'll start by talking briefly about the
11    fundamentals section and the results of that.  AS mentioned
12    previously, these are considered -- the attributes of
13    Chapter 3 are considered to be a basic element of a fire
14    protection program and the standard requires that you meet
15    those elements.
16              It does provide some allowance for items that were
17    previously reviewed and approved by the NRC as being
18    exemptions or having precedence.  But basically, this is the
19    foundation type documents for a fire protection program.
20              And I think one of the significant issues to
21    consider here and one of the things the pilot looked at a
22    lot was that there are a number of different pieces of
23    Chapter 3 and some of those pieces are things like control
24    of transient combustibles and control of ignition sources
25    and things like that, which are important and difficult
.                                                               391
 1    maybe in some respects to performance-base.  There's other
 2    attributes, as well, and some of those come out of existing
 3    NRC guidance.
 4              But one thing to consider now is as and if we move
 5    805 into a rule, basically it no longer becomes a guidance
 6    document, which has some flexibility in the part of the
 7    staff and the utilities for options, but it now becomes a
 8    regulation which becomes more of a legalistic attribute as
 9    far as reviewing and working within those standards.
10              From a results standpoint, the pilot plant
11    complied with most of the elements or we had an alternate
12    strategy in place that had been previously reviewed and
13    accepted by the NRC.
14              There are attributes of Chapter 3 that are not
15    performance-based and possibly could, and I provided a
16    couple examples.  One of them is metal trays and conduits
17    for electrical raceways, and that's pervious guidance and it
18    makes good sense, but we do have cases, for instance, where
19    we've used core duct sleeves embedded in concrete or other
20    types of raceways in the plant.
21              Another one would be separation of fire pumps with
22    fire barriers.  Again, previously, we required separation
23    between fire pumps with a fire barrier, the 805 talks about
24    separation of the fire pumps from the building with
25    barriers, and it's actually more prescriptive and more
.                                                               392
 1    restrictive than Appendix R, which would allow you to use
 2    spatial separation and things like that as part of your
 3    requirements.
 4              DR. POWERS:  Do we understand why the authors of
 5    805 took the more restrictive point of view?
 6              MR. SHUMAKER:  I wasn't a participant in enough of
 7    those meetings to know how all that transpired.
 8              MR. SIEBER:  Fred?
 9              MR. EMERSON:  As to how it got that way, it was
10    introduced by -- each of the sections of the standard had a
11    writing committee to develop them, in which there were
12    various participants, some were industry, some were NRC. 
13    And the result of the committee development of Chapter 3 was
14    this.
15              The committee negotiated and ended up in this
16    particular boat.
17              And as the speaker who addressed the subcommittee
18    on Chapter 3 indicated, there was a number of votes relative
19    to Chapter 3 during the process of developing the standard
20    and consistently the committee supported the prescriptive
21    approach.
22              The details fluctuated somewhat from vote to vote,
23    but generally the prescriptive approach was upheld by the
24    committee.
25              DR. POWERS:  What I'm coming back to is -- I mean,
.                                                               393
 1    here is a requirement that's more restrictive than what you
 2    would have under Appendix R and we have all these luminaries
 3    of the fire protection field have gathered and come to the
 4    conclusion that you need something more than what's in
 5    Appendix R.
 6              Knowing something about how these things get
 7    written, it could be an accident, somebody wrote it down and
 8    nobody ever looked at it to see if it really was more
 9    prescriptive, that there was some rationale for it, or to be
10    some conscious decision on the writing group that said, no,
11    what's in Appendix R is just not adequate, that we have to
12    have a more stringent approach here.
13              I'm trying to understand how they --
14              MR. EMERSON:  I'm sure it was a conscious decision
15    and I'm sure it was debated back and forth before, first,
16    the writing committee and then the full committee decided
17    that that was the appropriate way to characterize it, but I
18    doubt if it was an accident.
19              MR. SIEBER:  I would imagine, though, and just
20    picking up on your point, Dana, that there ought to be a
21    technical basis when you make something more prescriptive.
22              For example, the 20-foot separation criteria that
23    you have for alternate safe shutdown is there because of
24    some analysis of what a fire does in a room in a certain
25    location with regard to the plume and heat and so forth. 
.                                                               394
 1    The same thing that occurs with fire pumps, for example,
 2    there is a certain inventory of combustibles, which is
 3    basically the lubricating oil or a diesel, a fuel tank or
 4    day tank, that can create a certain size fire that will last
 5    a certain length of time in a certain geometry that says
 6    either I put a fire barrier up or I move the next one far
 7    enough away that it's not affected, and somebody had to do
 8    that, I would imagine, in order to come up with a rule like
 9    this.
10              DR. APOSTOLAKIS:  Well, Jack, we've been told many
11    times that a lot of the regulations that we have in place
12    were developed without any such technical analysis and why
13    should they be any different from us.
14              MR. SIEBER:  But that was supposed to be the
15    method of the past and now we're supposed to be enlightened
16    and risk-informed.
17              DR. APOSTOLAKIS:  No.  It took us 25 years to get
18    to be risk-informed and for those guys, it's still new.
19              MR. SIEBER:  What I'm saying is that perhaps we
20    need further advancement or further scrutiny for some of
21    these or at least some flexibility so that you can make a
22    technical judgment on your own.
23              DR. APOSTOLAKIS:  I think it's a cultural issue. 
24    They're used to a very prescriptive approach.
25              DR. POWERS:  It's not the prescriptive or
.                                                               395
 1    non-prescriptiveness that I'm interested in here.  We've
 2    accepted prescriptiveness.  Here, it's the question of why
 3    should it be more stringent than what's in Appendix R. 
 4    That's where the conscious decision must have come about
 5    somehow.
 6              MR. SHUMAKER:  And I guess I would suggest that
 7    some of these are somewhat subtle until you sit down and
 8    start piloting the standard and one of the things I will
 9    mention is that we -- the EPRI pilot did meet with NFPA at
10    one of their -- at basically their last meeting before they
11    voted on the comments and revisions to the standard and
12    because of the time in the process, they were able to
13    incorporate some of those.  They were not able to
14    incorporate some of those thoughts, but I think when you
15    actually start applying the standard to a real plant and
16    start looking at it in a real life situation.
17              And I will give you an example.  Salem and Hope
18    Creek have their own fire water system, which are tied
19    together with a -- which are tied together.  So basically we
20    have two sets of fire water pumps that are five or six
21    hundred yards apart.  They are not separated by fire
22    barriers because they're five or six hundred yards apart.
23              So we don't prescriptively meet maybe this
24    requirement, although we do have fire water pumps that are
25    separated.
.                                                               396
 1              So I guess what I'm saying is there are some
 2    subtleties here that really start to, I think, come out when
 3    you start applying it to real case issues, and that was the
 4    intent of the pilot.  That's why we piloted the standard.
 5              MR. SIEBER:  Thank you.
 6              MR. SHUMAKER:  Okay.  Then the other two examples
 7    I used, I used Dana's 250-foot fire hydrant issue and also
 8    --
 9              DR. POWERS:  I don't own this one.
10              MR. SHUMAKER:  What's that?
11              DR. POWERS:  I don't own this.  This is just my
12    favorite example of prescriptiveness gone mad.
13              MR. SHUMAKER:  Also, there's a ceiling of conduits
14    with fire seals with some guidance with respect to this and
15    over the years, there's been a number of fire tests which
16    demonstrate that for small conduits with lots of distance
17    runs from barriers, you probably don't need seals and a
18    number of plants have implemented that kind of philosophy
19    and Chapter 3 does, in fact, require the sealing of these
20    conduits.
21              Those would be some examples of basically cases
22    that could be more performance-based.
23              DR. APOSTOLAKIS:  This is not the only example of
24    prescriptiveness.
25              MR. SHUMAKER:  No, these are examples.
.                                                               397
 1              DR. APOSTOLAKIS:  I mean, in other areas, similar
 2    things have been done.
 3              MR. SHUMAKER:  Right.
 4              DR. APOSTOLAKIS:  Not just fires.
 5              MR. NIJAFI:  One other thing to point out is that
 6    the composition of this committee, it also includes people
 7    with heavy NFPA background.  So some of these concepts of
 8    what we're talking about could have sort of come into it
 9    even though it's outside of Appendix R, because it is, in
10    the fire protection community, a good practice thing to do,
11    whether it's a nuclear power plant or a movie theater, is
12    that some of these -- I mean, it's not -- that's it.
13              MR. SHUMAKER:  Okay.  I'll continue on.  There's
14    another set of elements, as well, that were not previously
15    required prior to 805, at least not for the early plants,
16    and some of those examples I have identified here, as well. 
17    One is a requirement for, and I apologize for the
18    typographical error there, but it should say requirement for
19    interior finishes, which are required to meet NFPA-101,
20    Class A for walls and ceilings and Class 1 for floors.
21              And while there has been like control room floors,
22    we try to maintain those types of materials, that would
23    essentially be a new requirement.  And because it is a new
24    requirement, the plant license would not -- would be silent
25    with respect to any kind of approval on this issue, even if
.                                                               398
 1    it had been looked at or considered.
 2              It just would not have been something that would
 3    have shown up in any of the licensing paper.
 4              Other examples include a requirement for using
 5    plenum rated cable above ceilings.  As many of you know,
 6    we've used typically IEEE-383 cable throughout the plants
 7    and where we have suspended ceilings, we -- and older plants
 8    typically do not have plenum rated cable.  And another one
 9    would be the requirement for seismic category one, class 1E
10    electric fire pumps, particularly when diesels are available
11    as backups.
12              So I guess in conclusion, while it would seem
13    maybe that the review of Chapter 3 should be more of a
14    verification process, with the exception of maybe some what
15    I would call, if there were any new issues that you would
16    consider safety significant, this would be a good time to
17    put them in.
18              It was not a verification process going through
19    it.
20              I'll go on and talk a little bit about our results
21    from fire modeling and basically the standard requires that
22    we select an appropriate fire model and we modeled two
23    scenarios.  One is a model based on the worst case plant
24    configuration.  I say worst case because there are
25    transients that move around and things like that that need
.                                                               399
 1    to be considered in worst case that aren't typically or
 2    generally in the plant.
 3              And then also modeling that model, changing the
 4    parameters in a means or an effort to violate the
 5    performance criteria, and basically that's used to define
 6    what the margin is.  We call the first one maximum expected
 7    fire scenario, and the second the limiting fire scenario.
 8              The pilot project has reviewed three fire models
 9    or is in the process of reviewing three fire models.  They
10    are CFAST, MAGIC, which is from France, and, also, the FIVE,
11    and they have plans to review COMPBRN-3E, as well.  And as
12    most of you know, that was the -- the industry does have
13    significant experience with COMPBRN and so we kind of
14    focused on the other three initially.
15              DR. APOSTOLAKIS:  So I guess the industry hasn't
16    learned how to spell it yet.
17              MR. SHUMAKER:  I'm sorry?
18              DR. APOSTOLAKIS:  There is no U, Denis, in
19    COMPBRN.  Don't let Nathan see it.
20              MR. SHUMAKER:  Okay.  Results. First of all, we've
21    determined that simple zone models are acceptable for --
22              DR. APOSTOLAKIS:  Can you tell us a little bit
23    about what your preliminary conclusion is regarding CFAST,
24    MAGIC and FIVE?  Leave FIVE out.  I don't want you to say
25    anything about FIVE.  MAGIC and CFAST.
.                                                               400
 1              MR. NIJAFI:  One point to make throughout, I guess
 2    we didn't say it at the beginning, is that this pilot
 3    exercise was primarily in order to demonstrate proof of
 4    principal and learn.  So we really did not go exercise these
 5    models as much as the other parts of the standard to the
 6    depth.
 7              The intent of these was to -- whether we feel
 8    that, again, the same bullets, as far as the modeling is
 9    concerned, whether the standard is complete, provides enough
10    instructions, is it practical, can it be used with the
11    existing tools, is it useable.
12              So within that context, what have we learned that
13    basically generally is simple scenarios.  If we -- with
14    acceptable margin, they are adequate tools, which we knew
15    before, these can deal with it.
16              DR. APOSTOLAKIS:  Do CFAST and MAGIC estimate the
17    time from the beginning of the fire until some cables are
18    damaged?
19              MR. NIJAFI:  Yes.
20              DR. APOSTOLAKIS:  They do.
21              MR. NIJAFI:  They do provide you the time to
22    damage, time to detector actuation.  Those are actually
23    further scenarios that we selected.  That's what we -- yes.
24              DR. APOSTOLAKIS:  Because there was a time when
25    they did not.
.                                                               401
 1              MR. NIJAFI:  Yes.  They are -- and, in fact, part
 2    of that is -- I mean, admittedly, we put in variable heat
 3    release rates, slow growth, rapid growth fires and different
 4    kinds of fires.
 5              DR. APOSTOLAKIS:  Okay.  WASH-1400 type of
 6    dependence here.
 7              MR. NIJAFI:  And we're trying to basically find
 8    out whether -- I mean, this standard requires going out
 9    there and developing a completely new model, because it -- I
10    mean, those kinds of things.
11              That was completeness, usability, effectiveness,
12    and the conclusion is basically that the fire modeling part
13    is not going to be a prohibitive thing.
14              DR. APOSTOLAKIS:  It never was, but it always had
15    the reputation for being the prohibitive thing now, which is
16    a mystery to me.
17              MR. NIJAFI:  Well, part of the fact is that, I
18    think, in my opinion, contributes to the fact that the fire
19    modeling is something that directly and indirectly has been
20    used in the fire protection practice more than other
21    elements of the standard, let alone the fundamentals and
22    whatever have you.
23              But the fire modeling has been used since the days
24    of NFPA or SFPE or whatever, goes back decades that the
25    people have used these things and exercised them.
.                                                               402
 1              DR. APOSTOLAKIS:  Not estimating times.
 2              MR. NIJAFI:  Well, one way or another, they have
 3    used different --
 4              DR. APOSTOLAKIS:  In the last 20 years, no.  We
 5    looked when we developed --
 6              MR. NIJAFI:  But I'm talking even outside of the
 7    nuclear community.  I'm not talking -
 8              DR. APOSTOLAKIS:  Yes, but they were not
 9    estimating time to damage.  They were estimating other
10    things.  The time to damage really came from the --
11              MR. SHUMAKER:  But CFAST does it, MAGIC does it.
12              DR. APOSTOLAKIS:  Now.
13              MR. SHUMAKER:  Now, right; in the past, did not.
14              MR. SIEBER:  I would like to ask a question that
15    may display my ignorance, but does the fire model that
16    you're talking about here work with or does it replace the
17    old fire hazards analysis that used to be required?
18              MR. NIJAFI:  Fire hazards analysis basically it
19    has a wide -- let's just limit only the part of the fire
20    hazard analysis that deals with the fire and its effect,
21    where does it start, how big does it get, and what does it
22    do.
23              That part of it, in a way, it does these kinds,
24    could replace what the FHA does for that purpose.
25              MR. SIEBER:  For that area.
.                                                               403
 1              MR. NIJAFI:  For that area, for that piece of the
 2    equation.  Like when we defined, going into a room, the
 3    standard defines the scenarios, these fire scenarios will
 4    become your design basis fire scenarios for that particular
 5    fire area.
 6              In the past, FHAs have used very simplified
 7    assumptions or you can call it models to determine that
 8    damage.  It's either in the form of everything in the room
 9    is damaged or in the form of the crude 20,000 BTUs per
10    square foot is a fire that lasts one hour or something like
11    that.
12              But that is sort of a simplified concept of fire
13    dynamics.  I mean, as simple as you can get.
14              DR. APOSTOLAKIS:  I think these models, Jack, they
15    attempt to various degrees of approximation to describe the
16    thermal environment in a room or in a compartment.
17              MR. SIEBER:  So from that, you can determine what
18    kind of duration your fire barrier may need --
19              DR. APOSTOLAKIS:  That's exactly --
20              MR. NIJAFI:  That's exactly right.
21              MR. SIEBER:  So when it used to say have a
22    three-hour barrier, you may find it it's an hour and a half.
23              DR. APOSTOLAKIS:  Exactly.  Not only that, but the
24    detection and suppression time depend on this.
25              MR. SIEBER:  That's right.
.                                                               404
 1              MR. NIJAFI:  In a way, in the past, since your
 2    fire growth estimates were so crude, you tried to come at it
 3    backward and say this is the kind of protection I need,
 4    therefore, that's what I do.  You didn't deal with actual
 5    hazard in the room.
 6              Now we're trying to predict the actual hazard as
 7    opposed to say this is the hazard, go deal with it.  We're
 8    just saying, okay, what is the actual hazard and the point
 9    about the simplicity that I wanted to make is that -- which
10    may be, again, common sense confirmed, that if you're
11    willing to accept certain level of -- I mean, robustness,
12    you can use back-of-the-envelope calculation and find your
13    exposure all the way to the detailed model, if you want to
14    really analyze to that time to damage with high level of
15    confidence as the configuration changes.
16              MR. SIEBER:  But these issues become important
17    when you think about things like internal flooding from an
18    overly designed suppression system and if you put enough
19    water in there, you fill the room.
20              MR. NIJAFI:  And I will -- I agree, even to use
21    somebody's word, that a little bit of a protection in a lot
22    of places at times is better than a lot of protection in
23    fewer places.
24              So this is the kind of thing that if you can
25    demonstrate -- I mean, like, there are examples that, I
.                                                               405
 1    mean, if you were supposed to have a three-hour protection
 2    in one area of the room and you had something else here that
 3    you could have credited, but you didn't, because you assumed
 4    all engulfing.
 5              But now if you can say this is only an hour and a
 6    half, one hour, but your analysis shows that this -- so you
 7    have actually two for an hour instead of only having one for
 8    three hours.
 9              So that may be then a better thing in the scheme
10    of things for fire safety than it is --
11              MR. SIEBER:  Okay.  Thank you very much.
12              MR. SHUMAKER:  Okay.  So we'll go back and discuss
13    some of the results from the fire model.  We've kind of gone
14    over those, but as we alluded to, we had determined that
15    simple zone models are found to be acceptable for most
16    cases.
17              For the maximum expected fire scenarios, there's
18    adequate guidance provided within NFPA-805, but with respect
19    to the limiting fire scenario, additional guidance would be
20    recommended, would be something that we would possibly put
21    into an implementation guide.
22              Because in some cases, it's physically impossible
23    to create a fire big enough to actually cause damage.  And
24    in some cases, it's not always the size of the fire that's
25    really the critical parameter, but maybe some geometric type
.                                                               406
 1    things, the other issues.
 2              So those were basically some of the results.
 3              DR. APOSTOLAKIS:  Denis, maybe you said it and I
 4    missed it, but the pilot is testing all aspects of the
 5    standard, every single chapter?
 6              MR. SHUMAKER:  No.
 7              DR. APOSTOLAKIS:  Or selected?  For example, what
 8    I'm particularly interested in is what is called, in Figure
 9    2-2, the deterministic approach.  Are you testing that or
10    are you doing a PSA risk-informed type of test?
11              MR. NIJAFI:  I'll come to -- okay.  If you want to
12    talk about that.  Basically, we are testing that in the
13    sense that the example problem that we selected within the
14    room, part of the room, it does meet the requirements, let's
15    say, the three-hour barrier, and we're not -- I mean, we're
16    looking at the combined room.  And I'll come back, actually
17    --
18              DR. APOSTOLAKIS:  That's fine.  Now, the question
19    is, when you talk about fire models, CFAST and so on, are
20    these to be used exclusively on the performance-based
21    risk-informed approach or also the deterministic approach?
22              MR. NIJAFI:  It could be used on both sides.
23              DR. APOSTOLAKIS:  It could be used on both sides.
24              MR. NIJAFI:  The way you use it in the
25    performance-based side is two ways, either --
.                                                               407
 1              DR. APOSTOLAKIS:  I understand.  But we are not
 2    going to get from the pilot some sort of evaluation of
 3    whether it is better to go the left branch or the right
 4    branch on Figure 2-2.  You will not do that.
 5              MR. NIJAFI:  No.  But the intent of the pilot is
 6    to provide any lessons learned from how -- what are the
 7    questions that may come up in implementing the standard.  Is
 8    it clear enough to whether go to the left or to the right,
 9    those are the kinds of things.
10              DR. APOSTOLAKIS:  That's, by the way, for my
11    colleagues, handwritten page 54.
12              MR. NIJAFI:  And I've written -- by the way, that
13    question has come up even before, so I wrote some notes that
14    I --
15              DR. APOSTOLAKIS:  I'm sorry for not being
16    original.
17              MR. NIJAFI:  That's fine, no.  I'm just --
18              DR. POWERS:  We really need to move this along.
19              MR. SHUMAKER:  Okay.  I'll try to do that.  I'll
20    go on to the change analysis, which was the next element
21    that we piloted, and we reviewed basically the core damage
22    frequency and LERF, which is large and early radioactive
23    release.
24              DR. APOSTOLAKIS:  This is a fundamental question I
25    have here.  When I read the standard, I don't recall the
.                                                               408
 1    standard saying anywhere you have to do this, and yet they
 2    talk about the change.
 3              So you concluded that you actually had to do a
 4    baseline evaluation.  Is that a correct statement?  I don't
 5    recall anywhere in the standard -- I mean, the figure,
 6    again, says evaluate change, without really specifying what
 7    that change is.  So you concluded that in order -- it says
 8    standard requires.  Does the standard require that you do a
 9    CDF and LERF?
10              MR. NIJAFI:  Yes, it does.
11              DR. APOSTOLAKIS:  Maybe you can point me to where,
12    but not now, though.
13              MR. NIJAFI:  I can point you there.
14              MR. SHUMAKER:  It doesn't require that you do a
15    change, though, you just do a fire PSA.
16              MR. SIEBER:  You do a before and after.
17              MR. NIJAFI:  Right.
18              MR. SIEBER:  Go ahead.
19              MR. SHUMAKER:  So what we did is we did a
20    quantitative estimate for the CDF and it was based on the
21    maximum expected fire scenario and then we did a qualitative
22    estimate for LERF.
23              Again, we didn't exercise the standards all the
24    way through.  In some cases, we just did a -- and that was
25    the case with LERF.  We did basically a walk-through
.                                                               409
 1    quantitative assessment as to how it would be done and what
 2    kind of results we would expect.
 3              With respect to the results from the change
 4    analysis, the first result, Salem, like many plants, when
 5    they did the IPEEE, they did it as a shot in time type
 6    document and they did not maintain it.  So the first step is
 7    to update the IPEEE to reflect the current plant
 8    configuration and, also, to identify or update some of the
 9    technical issues and quality issues that are associated with
10    it.
11              So that was one of the results.
12              The second one we spent a considerable amount of
13    time on was the determination of baseline risk.  As you
14    know, when you look at it back from a compliance standard,
15    in Appendix R, you basically have three options in 3G.2 for
16    compliance, the three-hour fire barrier, one-hour fire
17    barrier with suppression and detection, and automatic
18    suppression and detection, and also 20 feet of spatial
19    separation.
20              And 3G.3 also gives you a baseline strategy, if
21    you will, for alternate shutdown and many plants, like
22    Salem, also have an exemption strategy, as well.  So those
23    would be your regulatory, if you will, compliance
24    strategies.
25              And the plants are dynamic.  On a day to day
.                                                               410
 1    basis, cables are added, things are taken away, things
 2    change.  So you actually have somewhat of a dynamic plant
 3    and trying to decide what is, in fact, the baseline that
 4    you're going to use, is it the DCPs that are going to be
 5    done tomorrow that are already generated, not installed, is
 6    it where you were in 1981 when you implemented the original
 7    program.
 8              So that became a discussion point within the pilot
 9    and it's a more significant issue than it would appear at
10    first, when you first go through it, because each of those
11    compliance strategies will give different kind of baseline
12    risks.
13              DR. APOSTOLAKIS:  But hopefully not with dramatic
14    differences.
15              MR. SHUMAKER:  Well, hopefully, none of them would
16    be unacceptable risks.
17              DR. APOSTOLAKIS:  No, no. Dramatic.
18              MR. SHUMAKER:  Yes.  You wouldn't have --
19              DR. APOSTOLAKIS:  You're not going to jump --
20              MR. SHUMAKER:  You're correct.  You're correct. 
21    You're correct.  But they would be different.  They would be
22    different.
23              DR. APOSTOLAKIS:  Sure.
24              MR. SHUMAKER:  And how you model it up front has
25    an impact on the maintenance requirements down the road, as
.                                                               411
 1    well.  So you need to be real cognizant of that when you
 2    prepare your model.
 3              The determination of risk acceptance criteria
 4    which the standard doesn't -- it currently remains undefined
 5    in the standard and there's been some discussions about that
 6    being an implementation guide issue.  There's been
 7    discussions about how this relates to Reg Guide 1.174, but
 8    basically I will just identify that the acceptance criteria
 9    is currently undefined in the NFPA-805 standard, as it now
10    sits.
11              And then the evaluation of spurious equipment
12    actuations, which we talked about earlier, which is really
13    an issue because it's an industry issue that we're resolving
14    in another area.
15              MR. SIEBER:  What I would like to do is to get
16    quickly to the bottom line.  Could you go to slide 19 and go
17    through the programmatic part and then to the conclusions? 
18    Then we can leave some time for the staff to provide their
19    comments.
20              MR. SHUMAKER:  I can do that.
21              MR. SIEBER:  The things we're skipping is
22    radiation area, which I think is pretty straightforward.
23              MR. SHUMAKER:  Right.  Well, there was -- the
24    other issue you're skipping, just so you know, is the
25    bundling issue we talked about in the subcommittee meeting.
.                                                               412
 1              MR. SIEBER:  Right.  How many can you put together
 2    to come out even.
 3              MR. SHUMAKER:  And as long as you recognize you're
 4    skipping that, that's fine with me.
 5              DR. APOSTOLAKIS:  When will you have a report on
 6    this?
 7              MR. SHUMAKER:  It should be done by the end of the
 8    year.  So the final element we piloted was a programmatic
 9    issue and, of course, being a nuclear plant, we do maintain
10    configuration control, we do maintain procedures and the
11    like.
12              So generally, the standard requires that you do
13    that sort of thing.  And basically, the result was, with the
14    exception of the PSA, which is really, for our purposes, the
15    IPEEE, the attributes are currently addressed, with the
16    exception of some of the items that were credited in the
17    IPEEE.
18              They may not be well defined in the design
19    drawings.  So there were some recommendations that came out
20    of the programmatic review that would require updating some
21    of the design drawings to identify features credited in the
22    PSA.  Some additional site training would be anticipated,
23    particularly with respect to things like transient
24    combustibles, they become a lot more critical.
25              Basically, your fire becomes your design basis or
.                                                               413
 1    becomes the design basis type issue and, also, additional
 2    monitoring of equipment and plant features, which support
 3    the fire PSA.
 4              So I will go to conclusions.  The first question
 5    we started out with is, is the standard complete, and the
 6    answer we came up with was that, yes, with an implementation
 7    guide to address some of the things we discussed, it could
 8    be complete or would be complete.
 9              There are some open areas that need to be
10    addressed and we talked about those.  Is it practical, and,
11    again, yes, based on the quality and content of that
12    implementation guide.  Is it cost effective, and there are
13    some items out there that could impact cost, the Chapter 3
14    issues we talked about, circuit analysis issues, quality,
15    and monitoring issues potentially.  I don't expect that, but
16    there are some effectiveness issues.
17              Is it useable in whole, and our answer to that was
18    yes, and is it useable in part, our answer to that was yes,
19    as well.
20              I'd like to, again, thank the committee and if
21    there's any specific questions, we can --
22              MR. SIEBER:  Does anyone have any questions?
23              MR. NIJAFI:  I'd like to add, if you have a
24    minute, maybe just about this question that had been asked
25    several times.  Maybe it takes one minute, I'll just read
.                                                               414
 1    it, just so we don't --
 2              MR. SIEBER:  Just one minute.
 3              MR. NIJAFI:  This is about the issue of
 4    deterministic, probabilistic, whether this is fully
 5    performance-based or whether you go to the left, right.
 6              The standard, in general, is not an exclusive RIPB
 7    approach; rather, a hybrid of deterministic and RIPB
 8    approach.  The examples are not limited to only the Chapter
 9    3.  The example of that hybrid exists throughout the
10    standard in other places; example, where the performance
11    criterias are not probabilistic and, at times, the basis for
12    the deterministic are not tied into the performance goals
13    and objectives.
14              The pilot findings, I mean, what have we learned;
15    that even though the hybrid approach does not at present
16    challenge implementation of the standard, however, even
17    though it presents some challenges in implementation, but
18    does not prevent use of the standard in an effective way.
19              It does, however, impact the cost effectiveness of
20    the standard, this dual mode, both in a negative, by added
21    requirements, and positive, which will prevent RIPB
22    application, where acceptable, deterministic fire protection
23    measures do exist.
24              The other finding is that basically the hybrid
25    approach does not unleash the full potential of the RIPB
.                                                               415
 1    concept and understanding and managing plant fire risk.
 2              That's all I needed.
 3              MR. SIEBER:  Thank you very much.  I'd ask the
 4    staff to step forward to give us their thoughts on NFPA-805. 
 5    In the meantime, each of you has before you a group of
 6    slides that were prepared by Leon Whitney, which is on the
 7    topic of inspection activities, which is not on the agenda,
 8    but there are a lot of slides here.  You may want to look
 9    through those, since we probably won't have time to go
10    through that.
11              I did mention that the inspection of associated
12    circuits has been suspended indefinitely for the time being,
13    until industry completes its program.  You should understand
14    that there is a significance determination process with
15    regard to fire protection and that there is a baseline
16    inspection procedure, a resident's monthly procedure, and
17    triennial procedure.
18              And the triennial is pretty much a
19    performance-based inspection, but does cover a fair amount
20    of associated circuits at this time, which has been
21    suspended.
22              So this becomes a relatively recent inspection
23    document.
24              DR. POWERS:  What I see in the documents is the
25    assertion. What I have not seen is the justification, which
.                                                               416
 1    says that in suspending examination of these circuits, we
 2    are still providing adequate protection of the public health
 3    and safety.
 4              Does that exist in anything that we have?
 5              MR. SIEBER:  I have not -- well, I shouldn't
 6    answer the question, but I personally have not seen the
 7    justification, other than the desire to do that.
 8              MR. HANNON:  This is John Hannon, the Plant
 9    Systems Branch Chief.  We are in the process now of
10    preparing a white paper to explain our safety rationale for
11    that decision.  Should have it available in the next few
12    days.
13              MR. SIEBER:  I think that it would be good if you
14    could provide a copy of that to the ACRS for its review.
15              MR. HANNON:  Be happy to do that.
16              MR. SIEBER:  Thank you.
17              MR. SALLEY:  Hello.  I'm Mark Salley.  I'm one of
18    the staff fire protection engineers from NRR.  This is Mr.
19    Connell's presentation.  He couldn't be here today.  So I'm
20    your 11:45 fill-in.  So these are Ed's slides and I will try
21    to do the best job I can with them.
22              A lot of this has been covered, so Fred did a real
23    good job of summarizing a lot of the NFPA stuff, so I will
24    try to cut through that fairly quick and get more to the
25    staff opinions on a few things.
.                                                               417
 1              The standard, once again, is an encompassing
 2    standard for the whole site.  In June of '98, the Commission
 3    approved the staff's proposal to work with industry through
 4    the consensus process, which Fred talked about, to develop
 5    performance-based risk-informed consensus standard.
 6              The last time the staff briefed the ACRS was in
 7    subcommittee back in January of '99.
 8              Just a quick update.  Once again, Fred covered a
 9    lot of this information.  It was the NFPA issued a second
10    draft for public comment and Ed told me that there were like
11    over 100 comments on it that the committee had to work into
12    the draft.
13              The limited scope, Denis Shumaker discussed in
14    detail, so we can skip over that.
15              The rulemaking plan, 09, this is the one where the
16    Commission has directed the staff to -- if this is good, to
17    bring it into rulemaking.  And it's up for the NFPA
18    membership.
19              The technical committee will bring that to the
20    floor for the whole FNPA body and then give their
21    presentation and the NFPA membership is, in total, to decide
22    if it should become a standard or not.
23              So that's one important thing.
24              DR. POWERS:  Let me come back to these public
25    comments.
.                                                               418
 1              MR. SALLEY:  Yes.
 2              DR. POWERS:  Did the public comments draw
 3    attention to the writing committee to the fact that among
 4    their deterministic or fundamentals part of Chapter 3, they
 5    were imposing requirements that were more restrictive than
 6    Appendix R?
 7              MR. SALLEY:  Fred, you're on that committee.  Can
 8    you help me there?
 9              MR. EMERSON:  I wasn't involved in the writing of
10    the chapters.  I attended the more general committee
11    meetings.  I don't recall whether that was specifically
12    identified to the committee or not.
13              DR. POWERS:  You see what I'm fishing for is how
14    deliberate and conscious were these additional restrictions. 
15    If I find that the vast majority of the technical community
16    thinks the more restrictive requirements are definitely
17    necessary, that colors my view on things a lot more than if
18    I think, well, it was just the way the words went together
19    and it happens to conflict with --
20              DR. SEALE:  Is this an accident or a plugging
21    procedure loopholes?
22              MR. SALLEY:  Dana, I listened to your comment
23    earlier when you talked about that being more restrictive
24    and when I classically think of Appendix R, I classically
25    think of the backfit sections, 3G, J and O.
.                                                               419
 1              In those sections that were backfit, you won't
 2    find any requirements for fire pumps.  You'll have to go
 3    back and look at 50.48 and how the plant was licensed to the
 4    Appendix A or the BTP-951.
 5              Now, if you read BTP-951, it will talk about the
 6    fire pumps.  Of course, it's a "should" document, but things
 7    like three-hour barriers between fire pumps, that's always
 8    been there.  It's a "should" requirements.  I don't see that
 9    as being more restrictive.  That was in the original thing. 
10    Of course, if a plant decreased something different, they
11    were licensed that way and they had reason to do it, but I
12    don't see that as being more restrictive.
13              Overview.  Once again, I think we can just jump
14    right over this slide, for lack of time, and get to the meat
15    of some of the stuff here.  Let's talk about the changes
16    from Appendix R.
17              With the performance-based for the nuclear safety
18    allows the use of ADS/LPS for BWRs, feed and bleed for PWRs,
19    as the only shutdown method.  This is what your conversation
20    was about this morning with industry.  They're saying that
21    they're getting away from the one-train being free of fire
22    damage for the shutdown and going with these other methods.
23              The performance-based risk-informed approach
24    allows recovery of the systems, structures and components
25    versus free of fire damage.  This introduces a thing of
.                                                               420
 1    repair.  Where before we said this train shall be protected,
 2    now the repairs are allowed.
 3              The 72-hour requirement for cold shutdown has been
 4    eliminated, such that the plant can remain in hot shutdown
 5    mode.
 6              The alternate detection -- excuse me -- alternate
 7    dedicated shutdown requirements have been eliminated, so
 8    that takes the 3G.3 and 3L out of here.
 9              The eight-hour emergency lighting requirements
10    have been eliminated.  That's strictly on a performance base
11    for the lighting requirements.
12              And it's added the specific criteria for rad
13    release.  That's typically what we'd look at in Part 20.  So
14    those are some fair changes from Appendix R.
15              And with this, there's a number of -- we'll call
16    them outstanding technical issues or concerns, if you will. 
17    The first one being the nuclear safety performance criteria,
18    the circuit analysis methodology.  What is out there in 805
19    is pretty much consistent with the existing NRC guidelines
20    and there's somewhat of a conflict with the BWR Owners
21    Group/NEI approach as to how the analysis is done.  So
22    that's an area of concern.
23              The fact that they're allowing the recovery of
24    safe shutdown capability, that repair thing is something
25    new, that's a concern.
.                                                               421
 1              The fire protection capability following the safe
 2    shutdown earthquake, that's based on risk and I don't
 3    believe there's any requirements in there, is there, in the
 4    new 805 for that.  No.
 5              The fire protection circuit analysis are not
 6    required -- excuse me -- spent fuel pit circuits are not
 7    required to be identified.  That is something new. 
 8    Considering this is a comprehensive standard.
 9              Bundling of changes for the risk impact.  It's not
10    a one-on-one as to how that is to be handled.  There is some
11    concern about that.  And another concern is the
12    grandfathering of existing plant configurations.  Where a
13    plant had been granted exemptions or deviations, how that is
14    going to factor into the new -- if they would go to the new
15    805, would be a concern.
16              DR. POWERS:  My understanding of that last one was
17    a little more subtle than that.  And I could be wrong, of
18    course.  It's that if you have configuration in a particular
19    area that's been approved, can you extrapolate that to other
20    areas where it has not explicitly been approved.  Is that
21    the issue here?
22              MR. SALLEY:  Yes.  That's -- I guess I used
23    grandfathering, giving you a smaller example of a bigger
24    topic.
25              DR. POWERS:  Yes.  It's extrapolation that's more
.                                                               422
 1    the issue here.
 2              MR. SALLEY:  So those are some of the outstanding
 3    items of concern of the staff today.  There's also a number
 4    of questions on how we're going to implement 805, should a
 5    plant choose to use that.
 6              The first question is a partial adoption by the
 7    licensee.  Will the plant say we're going to do everything
 8    by 805 or, hey, we just want to do this one fire area, this
 9    one concern via 805, that's a concern.
10              We have a question of reactive adoption by
11    licensees.  Let me give you an example there.  An inspector
12    goes out, he finds a raceway that was supposed to have a
13    three-hour fire barrier installed for Appendix R compliance. 
14    He finds it was missing.  The licensee can come back, do
15    some performance-based 805, and come back and say, well, I
16    really don't need it because I'm in this 805 area, so I
17    don't have to comply with Appendix R.  So that's a concern
18    as to how that will work out.
19              Of course, we still have to develop the NEI
20    implementation guidance.  I guess that's going to form a big
21    part of this, as to how that document comes together.
22              As we advance the science of fire protection, the
23    oversight by the regions, we're going to be asking them to
24    be doing a lot more, if we're going to be asking the
25    inspectors to do some fire modeling or to do some risk-based
.                                                               423
 1    stuff.  So that's going to be a question of the regional
 2    resources.
 3              If you adopt the new 805 standard, how are you
 4    going to control changes, the change control process.  Today
 5    we go through the 50.59 and we do a number of things with
 6    the license, so that part will be impacted.
 7              DR. POWERS:  I guess I don't fully understand
 8    that.  Why wouldn't the 50.59 apply here?
 9              MR. SALLEY:  I'd have to defer for some help on
10    that.
11              MR. WEISS:  There is an NEI initiative that the
12    NRC is adopting.  I think Fred can help us out and describe
13    that.  But basically, it says if there is another regulation
14    or controlling mechanism that's operative, you don't need to
15    have the 50.59 process layered on top of it.
16              Is that a fair characterization, Fred?
17              MR. EMERSON:  As I understand it, yes.
18              DR. POWERS:  And that will happen when it happens.
19              DR. SEALE:  We will see.
20              DR. POWERS:  I mean, it seems to me that the 50.59
21    is perfectly adequate for deciding about changes in the fire
22    protection area.  It comes in and says, well, is it a big
23    change or a little change.
24              If it's a big change, come talk to the NRC.  If
25    it's a little change, go ahead and do it.
.                                                               424
 1              DR. SHACK:  But it may be something like the A-4,
 2    where you have to do both analyses.
 3              DR. POWERS:  I grant you that that conflict is
 4    something that ought to be smoothed out, but barring that,
 5    50.59 sounds perfectly adequate to me.
 6              MR. SALLEY:  Once again, these are just concerns
 7    that -- you know, how are we going to deal with change
 8    control.  I guess questions we're asking in advance here as
 9    we look at it in the staff.
10              And the last one is the NRR oversight of the
11    licensing implementation and if a plant chooses to go
12    through 805, what role is NRR going to play, how detailed
13    are we going to do a review, are we going to go through --
14    is it going to be a one-page license change or are we going
15    to go through detailed every step, every analysis the plant
16    did, just how much is going to be involved from NRR to
17    support a change in the license.
18              That's the other question we have as a staff.
19              MR. SIEBER:  How do you plan to resolve that, by
20    just doing the first one as a pilot and figuring out what it
21    is you need to do?
22              MR. SALLEY:  We don't know and that's what we're
23    trying to figure out.
24              MR. HANNON:  I could offer that one of the
25    processes that we are following closely is the RIP-50
.                                                               425
 1    process.  We are learning a lot from that and we'll probably
 2    be using that as a model for the risk-informing fire
 3    protection.
 4              DR. POWERS:  I think we shouldn't overlook this
 5    line that says oversight by the regions.  If we have an
 6    NFPA-805, we will have plants that are Appendix R plants,
 7    branch technical position plants, licensing condition
 8    plants, NFPA-805 deterministic plants, NFPA-805 performance
 9    plants, and then we will have the mixed bag, where some
10    areas are one and some areas are the other.
11              It seems like a step into more complexity in the
12    oversight process.
13              MR. SALLEY:  Yes, and we're introducing new -- I
14    guess I see it as we're introducing new things for the
15    region.  Like I said, the fire modeling, if a plant today
16    applied for a deviation or exemption and part of their
17    deviation or exemption was a detailed fire model,
18    classically, the region would come to NRR for help on that
19    and say, hey, can you review this, what do you think,
20    through a TIA or some vehicle as such.
21              With 805, this would almost become routine and
22    that's a big impact.  The same thing got introduced in the
23    whole probability risk aspect into it, for the inspectors to
24    be qualified to review the calculations, make the
25    determinations.  So it is a big impact on the region.
.                                                               426
 1              MR. SIEBER:  Do you expect to resolve all of these
 2    problems to your own satisfaction before you move forward
 3    with any kind of rulemaking or adoption?
 4              MR. SALLEY:  I'd like to think that, or we'd have
 5    a plan in place.  If we have to do training with the regions
 6    or whatever we would have to do.
 7              MR. SIEBER:  Okay.
 8              MR. SALLEY:  In closing here, the path forward. 
 9    Once again, this has to get through the full NFPA membership
10    vote.  So the NFPA, as a body, has to say, yeah, we agree
11    with it, we can go forward.  Then in December, based on
12    that, Ed will come back and hopefully write the SECY paper
13    to update the Commission.
14              Around the March timeframe, the standard will be
15    published for use.  What that means, 805 will appear in the
16    National Fire Codes as one of the volumes, like 801, 2, 3
17    and 4 are today.
18              April 2001, we're planning a public meeting for
19    rulemaking.  That will be the change in 50.48.  The proposed
20    rule will be published October 2001 and September of '02,
21    we'd publish the final rule.
22              Once again, those are all tentative, based on the
23    standard becoming real in the NFPA fire codes.
24              DR. APOSTOLAKIS:  We would be involved somewhere
25    there.  The ACRS would be involved.
.                                                               427
 1              MR. HANNON:  Absolutely right.
 2              DR. POWERS:  That means we should save these
 3    slides, right?
 4              MR. SIEBER:  Thank you very much.  Are there any
 5    questions?  If there are none, Mr. Chairman, that concludes
 6    the fire protection section on time.
 7              DR. POWERS:  Thank you.  What I think we will do,
 8    because of the unfortunate absence of our subcommittee
 9    chairman in connection with digital electronics, we will
10    handle that as a subcommittee report and we will probably do
11    it at the end of today's formal presentations.  It will
12    simply be an update for the members, a synoptic account of
13    what went on the subcommittee meeting.
14              What I can tell you is before Professor Uhrig
15    left, he has another subcommittee meeting taking place on
16    the same subjects in about a week and he planned to give us
17    a more comprehensive updating at our December meeting and
18    discuss some report that he would like to propose to the
19    committee.  So we'll get a more comprehensive view from him
20    and just an update here later this afternoon.
21              With that, I will recess for the lunch hour and
22    return at ten after one.
23              [Whereupon, at 12:10 p.m., the meeting was
24    recessed, to reconvene at 1:10 p.m., this same day.]
25
.                                                               428
 1                  A F T E R N O O N  S E S S I O N
 2                                                     [1:10 p.m.]
 3              CHAIRMAN POWERS:  Why don't we come back in to
 4    session.  With the warning that this is a contentious group
 5    today that's been fully primed by their forays into fire
 6    protection, I'll turn to Dr. Bonaca and license renewal.
 7              DR. BONACA:  Thank you, Mr. Chairman.
 8              We met with the staff and representatives of NEI
 9    October 19 and 20 to review the proposed guidance documents,
10    the draft guidance documents which had been prepared by the
11    NRC and NEI.  We received a good presentation focused on how
12    generic license renewal issues have been addressed into the
13    guidance documents, and we have invited the staff at NEI to
14    come to the full committee meeting today and to provide us
15    with an overview of the major guidance changes since the
16    previous draft documents that we read some time ago, an
17    overview of the GALL report, which has been significantly
18    restructured, and a discussion of programs for which more is
19    needed.
20              We asked them to walk us through an example of how
21    the guidance leads a reviewer to requiring a one-time
22    inspection, so that we will be taken through the GALL report
23    to one specific example, I believe.  We also have asked the
24    staff to explain to us how the stakeholder comments have
25    been addressed.
.                                                               429
 1              We raised a couple of issues regarding aging of
 2    components which support the EOPs in severe-accident
 3    management and whether or not they are covered.  There are
 4    some issues there, because the staff guidance indicates
 5    consideration of EOPs and the one of the industry doesn't. 
 6    So we'll hear some clarification there.
 7              We asked for some information regarding cable
 8    aging.  We know that GSI-168 is still open, and that's very
 9    significant to license renewal, so we'll hear something
10    about that, and finally, some information regarding nuclear
11    embrittlement.
12              With that, I'll turn to Mr. Chris Grimes, who is
13    the chief of the License Renewal and Plant Standardization
14    Branch.   MR. GRIMES:  Thank you, Dr. Bonaca.
15              About the only thing that I could add to that is
16    the staff is prepared to address the specific requests of
17    the subcommittee in its presentation today, and I would also
18    like to emphasize that we're in the process of calling
19    through the formal public comments on the August draft of
20    the improved renewal guidance, which consisted of a revised
21    generic age and lessons-learned report, an updated standard
22    review plan, and a regulatory guide that proposes to endorse
23    revision 2 of NEI 95-10.
24              We at this point can tell you about the comments,
25    but the comment evaluation process will proceed up to and
.                                                               430
 1    beyond a Commission meeting to describe the comments that is
 2    scheduled for December 4, and we're going to explain the
 3    state of the guidance documents as they are today based on
 4    the interactions that we've had with our stakeholders,
 5    principally a large working group assembled by the Nuclear
 6    Energy Institute.
 7              And so with that I'll turn the presentation over
 8    to Dr. Sam Lee.
 9              MR. LEE:  My name is Sam Lee.  I'm from the
10    License Renewal and Standardization Branch, NRR.  I'm going
11    to walk through the differences between the earlier draft
12    and the August draft of the documents.  But before I start I
13    want to acknowledge that this has been a significant Agency
14    effort, the NRR staff during the licensing applications,
15    Office of Research staff, and contractors from Argonne and
16    Brookhaven National Lab.
17              On my left I have Yung Liu.  He's the project
18    manager from Argonne National Lab.  On my right is Bob
19    Lofaro.  He is the electrical engineer from Brookhaven.
20              Based on NEI comments we deleted some things from
21    the December version of GALL.  Either they are not very
22    generic, like it's only one plan is about one concrete
23    containment.  And I guess we have some electrical equipment
24    in the December version of GALL, but apparently they only
25    applied to Oconee because of the hydroelectric dam.  So we
.                                                               431
 1    took those out.  And some of these are active, like the fan
 2    coolers and RSTs, they relate to the active functional
 3    components, so we threw those out.  And this is not in the
 4    scope for license renewal, so we took that out.
 5              And then we added some other generic kind of
 6    thing, the common carbon steel components and common
 7    bolting, we put it in one place, added that, so it would be
 8    consistent, rather than have it in ten different places and
 9    say different things.
10              And then in here we pull out the containment
11    isolation values from chapter 5 and put it into the system
12    where the value belongs.  Chapter 7, chapter 4.  But when
13    someone looks up the system, they see the value there.
14              Okay, so these are the significant changes, and
15    going forward, okay, we have been thinking about this
16    format.  Right now GALL is cumbersome, in a two-page format,
17    it is difficult to read on the computer, it's difficult to
18    match up, and then it's very repetitive, evaluation of
19    programs.  So we are going to be formatting it to go into
20    single-page format, and then move information into chapter
21    11 in terms of each program.
22              And the whole purpose in here is just to make the
23    report more readable, okay, and not to change the technical
24    substance.  We'll change the substance when we go through
25    the corporate evaluation.  But this step is not to change
.                                                               432
 1    the substance.
 2              DR. BONACA:  Now just a question.  In addition to
 3    this restructuring, you also included some technical basis
 4    or information that you got from the experience of Oconee
 5    and Calvert Cliffs, right, since the previous --
 6              MR. LEE:  In this version, yes.  That's correct. 
 7    When we start walking through this throughout we just feed
 8    in information that's there that becomes available.  Okay,
 9    like some of the license renewal issues, as they become
10    available, we fold them all in.
11              DR. BONACA:  Okay.
12              MR. LEE:  The other document is the standard
13    review plan, which references the GALL report, okay, and
14    focus the staff in areas where programs should be augmented.
15              There is an earlier version of the standard review
16    plan that's a '97 version that predated the license renewal
17    applications, also predated the GALL approach.  So we have
18    an early draft in April which basically is a complete
19    rewrite of the '97 version.  Okay?  And then we incorporated
20    lessons learned from the initial reviews and we used the
21    December version of GALL for this April version.
22              And after April we're going to the August version,
23    and that time then we updated that to the August version of
24    GALL, so the SRP and GALL would match in August.
25              And then we had the other document, which is the
.                                                               433
 1    regulatory guide, which proposes to endorse NEI Guidance
 2    Document 95-10.  In '96 that guide was issued and we
 3    proposed to endorse 95-10 revision 0.  In that guide we have
 4    certain exceptions to revision 0.  Since then 95-10 has been
 5    revised.  Now we are endorsing revision 2, and those
 6    exceptions are no longer necessary.     This 95-10 provides
 7    industry guidance to an applicant in terms of how to prepare
 8    an application, okay?  Like I said earlier, '96 the revision
 9    0, and now we have proposed to endorse revision 2.  And '96
10    version predated the license renewal applications, so most
11    of these changes are to incorporate the lessons from the
12    application.
13              Okay, for example, like in here.  In '96, because
14    there was no real application, so the -- and you are
15    provided some examples.  And because now we have several
16    real applications, so those examples that we remove and
17    instead you are pointed to the applications.  So if you want
18    an example, go look at the real application.  And that is
19    the major changes for report documents.
20              And the other item that ACRS wanted to discuss is
21    the documents, you know, future updates.  We plan these
22    documents to be living documents, and we'll continue to
23    update them to catch the lessons learned, like Dr. Seale
24    mentioned last time about making it a loose-leaf document. 
25    We have been talking with the NRC publication people to see
.                                                               434
 1    if that's feasible, and we'll continue to do that.
 2              There might be another option, to keep the most
 3    current version on the Web or make a CD available or
 4    something.  We'll continue to pursue that.  But the update
 5    frequency has not been determined.
 6              Okay, we know there's a need to do it but, you
 7    know, we haven't decided the frequency yet.
 8              So is there any question on my portion of the
 9    presentation.
10              DR. BONACA:  Just one last question I have before
11    you go beyond GALL.  In addition to all the structuring and
12    the lessons learned, were there major changes, technical
13    changes, that you incorporated into the GALL report?
14              MR. LEE:  Certain things like the aging
15    management, I guess, come up with some of the programs,
16    okay?  We have changed.  We have that in a few places, and
17    some of this is like aging effects, like for carbon steel.
18              DR. BONACA:  Yes.
19              MR. LEE:  We decided cracking is not an aging
20    effect in the reactor water environment.  So those have been
21    removed.  This is through interaction with NEI.  So actually
22    during the process, you'll hear about that later in a
23    presentation, NEI provided very constructive comment, okay,
24    for the early version, and they have worked with NEI to
25    incorporate, you know, their comments.
.                                                               435
 1              MR. DOZIER:  Hello.  I am Jerry Dozier from the
 2    License Renewal Branch.  On my right I have Barry Eliot from
 3    Division of Engineering, and on my left I have the next
 4    speaker, Steve Koenick.
 5              On the NEI comments we had for the December 6th
 6    version we had nearly 700 comments from NEI.  Over 70
 7    percent of those comments were incorporated into the
 8    document and we felt they were helpful and provided
 9    enhancements and clarity to the documents.
10              We did not agree with all of the comments.
11              The first, the use of GALL report for scoping, was
12    probably more of a misunderstanding.  NEI's position or the
13    comments that we actually received was to remove several of
14    the components from GALL and to minimize the set of
15    components that we had had in there.
16              Through discussions and meetings we did clarify
17    the purpose of GALL, which is basically that GALL is not a
18    scoping document.  If we include it, that scoping is a
19    plant-specific evaluation, and just because it is in GALL
20    don't mean it's in scope for all plants.
21              On the other hand, if we missed a component in
22    GALL that does not mean that the component is not in the
23    scope of license renewal.  In that case, the plant has to do
24    a plant-specific evaluation for that particular component,
25    so we did conclude that it is not a scoping and I think the
.                                                               436
 1    resolution of that comment is resolved.
 2              Use of minimum programs -- we agreed with NEI that
 3    we should give the minimum amount that we felt was
 4    sufficient for a program, kind of to set the bar.
 5              In some cases though it took not one program but
 6    maybe two programs to meet the 10 elements that we are
 7    trying to evaluate.  Of course, when we are looking at the
 8    component in Aging Effect we are having to evaluate those to
 9    that aging effect and in some cases we needed a preventive
10    measure such as chemistry control and we also needed a
11    detection method such as ISI, so in those cases to fulfill
12    the 10 elements in our evaluation, we would put two
13    programs.
14              The issue was try to get one, but like I said, in
15    cases, there was several cases that we had to have multiple
16    programs to make the evaluation clear.
17              Minimum program descriptions was primarily a
18    comment that for example again in ISI, in GALL we were
19    specifically putting the paragraph, we were putting the
20    evaluation that was actually performed such as a surface
21    examination or volumetric examination or visual test.
22              The comments seemed to suggest they wanted a
23    little higher level in case ISI changed.  Well, we were of
24    course basically writing a safety evaluation and we had to
25    really specify exactly what we are looking at to justify our
.                                                               437
 1    conclusion that no further evaluation was necessary.
 2              There were some issues on aging effects.  We felt
 3    that the aging effect was applicable and should be in GALL
 4    and NEI's position was that it shouldn't.
 5              Examples of those would be void swelling and
 6    Irradiation-Assisted Stress Corrosion Cracking in PWRs.
 7              Basically in both of those cases there is industry
 8    programs being performed to evaluate those further and new
 9    information is emerging, and until those results are
10    conclusive we felt like that they should stay in GALL.
11              The last item was inaccessible areas.
12              CHAIRMAN POWERS:  Could I ask you what was the
13    basis for NEI feeling an IASCC should not be in the report,
14    in the considerations?
15              MR. DOZIER:  For IASCC being in a PWR they said
16    that the oxygen levels were too low to actually -- I think
17    you need a higher oxygen level and maybe you can answer that
18    one a little bit better and in a PWR -- in a BWR it is
19    applicable for a BWR but since oxygen levels are less in a
20    PWR that maybe it didn't apply.
21              We did have operating experience though with the
22    baffle former bolts that IASCC was -- it's not a theoretical
23    thing.  It could happen and it has happened on that
24    particular piece and might happen in other areas.
25              Maybe Barry could elaborate on that.
.                                                               438
 1              MR. ELLIOT:  I don't think they think IASCC is
 2    applicable.  They just don't think it is applicable to all
 3    the components that we think it might be applicable to.
 4              It is definitely applicable to baffle former
 5    bolts, the baffle forwards.
 6              They have a problem and you have to ask them more
 7    or less I think is the scope of where they should be -- that
 8    particular aging effect, how many different components
 9    within the internals is really their main concern as far as
10    IASCC is concerned.
11              Does that help you?
12              CHAIRMAN POWERS:  Well, all it does is provoke,
13    okay, why don't they think if it can happen one place it
14    will not happen in other places?
15              MR. ELLIOT:  And that is what our feeling is.  In
16    fact, if it is happening in the baffle former, in the baffle
17    bolts it could happen in other places.
18              DR. SHACK:  There was some discussion of
19    irradiation levels that you would have to consider.
20              MR. ELLIOT:  Right, and we would have to see a
21    program and that is what we are doing.  We need a program
22    for that, to say how far out, how much fluence is applicable
23    before you have to be worried about it, and we will discuss
24    that a little bit more under my -- when we talk about
25    neutron embrittlement later, but that I think is one of the
.                                                               439
 1    main issues there.
 2              CHAIRMAN POWERS:  Is the IASCC controlled by
 3    irradiation of the metal or the local coolant?
 4              MR. ELLIOT:  IASCC is stress corrosion cracking,
 5    which is by the materials, the environment, stresses, and
 6    then the assisted part is the irradiation part.
 7              CHAIRMAN POWERS:  I guess what I am asking --
 8              MR. ELLIOT:  It's all those factors determine what
 9    materials and what components are affected.
10              CHAIRMAN POWERS:  I guess I am looking for a
11    little more mechanistic understanding of IASCC.  You have to
12    have a sensitive material --
13              MR. ELLIOT:  Yes.
14              CHAIRMAN POWERS:  You have to have a local
15    chemistry conducive to corrosion, and probably some other
16    things.
17              Now the question I ask is the irradiation assisted
18    sensitizing the material or is it creating a local chemistry
19    conducive to corrosion?
20              MR. ELLIOT:  I am going to ask Alan to answer that
21    when we get up here.  I think it is a combination of you
22    have to have a sensitive material and it doesn't have to
23    sensitized but it is a sensitive material, as Alan is coming
24    up right now.
25              MR. HIZER:  This is Alan Hizer from NRR.  I think
.                                                               440
 1    the role of irradiation in IASCC is just an accelerant
 2    overall.  It just is another factor that makes the stress
 3    corrosion cracking more likely to occur in the material.
 4              CHAIRMAN POWERS:  What I would like to know is
 5    whether it is causing the acceleration because of what the
 6    irradiation is doing to the metal or what it is doing to the
 7    coolant.
 8              MR. HIZER:  I believe it is the metal.  It is the
 9    interaction in the lattice of the metal itself.
10              CHAIRMAN POWERS:  Okay.
11              DR. SHACK:  What it does to the coolant doesn't
12    help.
13              [Laughter.]
14              DR. SHACK:  But the primary thing is what it does
15    to the metal.
16              MR. GRIMES:  This is Chris Grimes.  I would like
17    to emphasize that at this point in the presentation the
18    issue that we are most concerned with is that NEI's comments
19    were directed towards establishing minimum standards for
20    license renewal and to the extent that there are areas like
21    irradiation assisted stress corrosion cracking and the scope
22    of components that they sweep in, I think it was appropriate
23    for NEI to express their view about the extent to which we
24    have expectations about programs to manage those aging
25    effects that Barry and Alan are going to discuss the
.                                                               441
 1    particulars of reactor vessel internals in response to
 2    another agenda topic related to fluence levels.
 3              MR. DOZIER:  And one of the last items was
 4    inaccessible areas.  Basically I think Dr. Seale summed it
 5    up for inaccessible areas in the specific ACRS meeting
 6    earlier and he said that it looks like the Staff needs to
 7    kick a few tires to have confidence.
 8              In the case of inaccessible areas, that was one of
 9    those areas where we needed a little more confidence and we
10    were asking for plant-specific evaluations to justify the
11    inaccessible areas issue.
12              The Union of Concerned Scientists has also been
13    actively involved with the license renewal process.  They
14    have attended public meetings.  They have also provided us
15    with reports to evaluate and consider in the GALL reports.
16              We did evaluate the five reports that they gave
17    us.  We broke them down into the component and aging effect
18    and we looked in GALL to see if it was appropriate for them
19    to be in GALL, and we identified two pieces, the jet pump
20    sensing line and separator support ring, and we added those
21    to the August version of GALL.
22              Any questions?
23              [No response.]
24              MR. DOZIER:  I will turn it over to Steve Koenick.
25              MR. KOENICK:  Hello.  I am Steve Koenick, Project
.                                                               442
 1    Manager, License Renewal Branch.  I was assigned to project
 2    manage the license renewal issues inventory.
 3              Basically as you know the inventory was largely
 4    based on the 1997 draft SRP.  This was substantially
 5    rewritten to incorporate the GALL report and it was issued
 6    in April and revised and issued in August with the rest of
 7    the renewal guidance.
 8              Basically the disposition of the inventory was
 9    articulated in a letter dated May 4th and that was to NEI
10    and UCS and on the slide I have provided the basis for the
11    disposition.
12              It is basically the August 2000 draft incorporated
13    the GALL report.  The license renewal inventory was
14    incorporated into the revised guidance and basically the
15    aggressive review schedules for the GALL and SRP enveloped
16    this license renewal issues inventory.
17              Basically the stakeholders -- we had agreement
18    with them on this approach and that is basically how we
19    dispositioned them -- if you have any specifics -- and also
20    what we did do was we mapped the license renewal issues to
21    where it is in the revised guidance and we discussed that at
22    the subcommittee meeting.
23              If you have any specifics?
24              DR. BONACA:  Are all the issues resolved?
25              MR. KOENICK:  No, sir.
.                                                               443
 1              DR. BONACA:  Right, and so how -- so the
 2    resolutions, some of them would be resolved and then
 3    incorporated in the guidance at a later time?
 4              MR. KOENICK:  That's correct.
 5              As Sam mentioned, the GALL report is a living
 6    document.
 7              DR. BONACA:  Right.
 8              MR. KOENICK:  It will be updated accordingly and
 9    as Jerry has mentioned in his presentation, several of the
10    issues -- IASCC -- what we did to incorporate those in the
11    report is we said activities are ongoing, however look at it
12    in this context.
13              DR. BONACA:  So the document right now includes
14    the guidance that the reviewer needs?
15              MR. KOENICK:  Yes.
16              DR. BONACA:  Although that may be changed by
17    coming closure of the specific issue?
18              MR. KOENICK:  That's correct.
19              DR. BONACA:  Good.
20              MR. HOFFMAN:  Good afternoon.  I've got a couple
21    of people coming up to help here.  I've got Juan Peralta
22    from the QA Branch.  They do the methodology review for
23    scoping, and Chris Gratton from the Plant Systems Branch,
24    whose branch is responsible for the actual review of the
25    scope.
.                                                               444
 1              The two topics that came up at the Subcommittee
 2    meeting were the scope of the rule regarding emergency
 3    operating procedures and voluntary commitments such as
 4    severe accidents.
 5              Regarding the emergency operating procedures, they
 6    are part of the current licensing basis, consistent with the
 7    principles of the license renewal and must be maintained in
 8    extended period of operation in the same manner and to the
 9    same extent as it is during the current term.
10              The license renewal objective, when it was
11    developed, was to ensure that the current licensing basis
12    and design features of the plant carry forward into the
13    period of extended operations.
14              The scope was established to ensure that systems,
15    structures, and components of principal importance to safe
16    plant operation were identified and evaluated consistent
17    with the current licensing basis.
18              Now, the emergency operating procedures rely on
19    systems, structures, and components within the scope of
20    renewal, but they also rely on a lot of balance-of-plant
21    equipment.
22              And the balance of plant equipment, the Commission
23    had some concerns regarding maintenance for those, and this
24    was identified during the maintenance team inspections as
25    part of maintenance rule development, and they found that
.                                                               445
 1    there were common weaknesses in maintenance programs.
 2              So, in response to these weaknesses, the
 3    Commission directed the staff to develop the maintenance
 4    rule to address the weaknesses.  And it's actually limited
 5    to a specific set of actions to address those weaknesses and
 6    not the ares where the inspections found that the
 7    maintenance programs were acceptable at the operating
 8    plants.
 9              So because of these concerns, the Commission
10    intentionally made the maintenance rule scope much broader. 
11    They had a concern that the maintenance for balance-of-plant
12    equipment wasn't getting proper emphasis.  It was causing --
13    and degradation of this balance-of-plant equipment was
14    causing challenges to safety systems.
15              So more from a defense-in-depth standpoint, they
16    wanted the balance-of-plant equipment included in the
17    maintenance rule.
18              So, the maintenance rule is going to continue on,
19    you know, consistent with the CLB, and so the equipment that
20    may be outside the scope of license renewal but within the
21    scope of the emergency operating procedures, will continue
22    to be maintained in the same manner and to the same extent
23    as it is in the current term.
24              DR. BONACA:  But only the active components.  What
25    I mean is that you may have a pump, the active components
.                                                               446
 1    are in the maintenance rule because they are required by the
 2    maintenance rule.
 3              The passive elements are there, they're not being
 4    maintained in the license renewal.
 5              MR. HOFFMAN:  Well, they're not being reviewed for
 6    aging management under license renewal.
 7              DR. BONACA:  That's right.
 8              MR. HOFFMAN:  You know, the current activities at
 9    the plant will continue.  They're not being ignored by the
10    licensees.
11              DR. BONACA:  The reason why the issue was raised
12    is that again, one rule identifies the act -- the license
13    renewal rule excludes the active components because it
14    presumes that they are being dealt with and the fact that
15    they are being run, they are being maintained, including by
16    the maintenance rule.
17              That's why they're not including the active
18    components.
19              It then focuses on the passive components, and so
20    you have these components for which the active portions are
21    being maintained by the maintenance rule, the passive
22    components are being ignored.
23              And I raise it because I thought it was an
24    inconsistency there, and what gives you the confidence that
25    the aging of long-lived passive components in those systems
.                                                               447
 1    which are used in the EOPs, will, in fact, be just
 2    maintained, just because -- I don't know.
 3              For all the others in scope, you have to develop a
 4    GALL report and extensive programs to deal with them.  So it
 5    means that aging happens and programs are needed.
 6              Now, for this, they will be taken care of somehow,
 7    but the other thing I wanted to ask you is that a table in
 8    the SRP specifically refers to also looking at the EOPs as s
 9    source of information.
10              MR. HOFFMAN:  It's listed as an information source
11    to ensure that the scope was properly established by a
12    licensee.  It was not intended to be a scoping document.
13              DR. BONACA:  Okay.
14              MR. HOFFMAN:  When you talk about the maintenance
15    rule, though, the maintenance rule still is even much
16    broader than that, because it goes into -- it's got a third
17    criterion that deals with whose failure could cause a
18    reactor scram or actuation of safety-related systems.
19              So if you're really trying to compare the two
20    scopes, maintenance rule is much, much broader.   Again, the
21    Commission was trying to go more for their defense-in-depth
22    philosophy there, whereas license renewal is trying to
23    maintain the current licensing basis.  There is a pathway,
24    you know, determined as part of the original licensing basis
25    to achieve the safety functions.
.                                                               448
 1              DR. BONACA:  But you recognize also that the EOPs
 2    are part of the current licensing basis.
 3              MR. HOFFMAN:  Yes, it is.
 4              DR. BONACA:  They are in the FSAR and they are
 5    under 50.59.
 6              MR. HOFFMAN:  But the current licensing basis is
 7    much, much greater than the scope of renewal.
 8              DR. BONACA:  I understand.
 9              MR. HOFFMAN:  Any other questions?
10              [No response.]
11              MR. HOFFMAN:  Okay, the second one was
12    continuation of voluntary commitments.
13              CHAIRMAN POWERS:  I'm still a little bit confused. 
14    You have these EOPs the operator is going to use.
15              They require some equipment that functions.  Some
16    of that equipment has passive elements to it; some of the
17    equipment has active elements.
18              The active things are covered by the maintenance
19    rule.  What covers the passive things?
20              MR. HOFFMAN:  The primary systems -- in
21    establishing the scope of license renewal, it was looking at
22    those specific systems, structures, and components that were
23    essential for achieving a safety function.
24              The emergency operating procedures will credit
25    additional equipment beyond that, so that it gives the
.                                                               449
 1    operators additional options for achieving a safety function
 2    beyond that.
 3              But license renewal is trying to maintain that
 4    licensing basis by which we originally licensed the plant,
 5    to achieve the required safety functions.
 6              CHAIRMAN POWERS:  But didn't you tell me that the
 7    EOPs were part of the licensing basis?
 8              MR. HOFFMAN:  Yes, but if -- you know, licensing
 9    basis includes any commitment made by the licensee that's on
10    the docket.  So there are a lot of commitments, there's a
11    lot of activities, requirements that are on the current
12    licensing basis that don't really always deal with safety. 
13    It's much broader.
14              DR. SHACK:  But the EOPs aren't one of those parts
15    of the licensing basis.
16              MR. HOFFMAN:  The EOPs are part of the current
17    licensing basis; they're just not scoped in, because the
18    maintenance rule and license renewal, really, the Commission
19    had totally different -- there were different intentions.
20              The Commission was trying to address specific
21    concerns about maintenance weaknesses in three areas in
22    developing the maintenance rule.  And they established their
23    scope to address those concerns, whereas license renewal was
24    trying to go back, you know, and maintain the CLB.
25              MR. GRIMES:  This is Chris Grimes.  I would like
.                                                               450
 1    to attempt to clarify that it is our expectation that
 2    because of the differences that Steve pointed out, and the
 3    Commission's objectives with the maintenance rule and
 4    license renewal, we would expect that the programs that
 5    license renewal relies on to maintain systems, structures,
 6    and components, would apply to these other structures and
 7    components that are relied in the EOPs.
 8              And they are part of the licensing basis. 
 9    However, those system, structures, and components are not
10    designated as safety-related systems, structures, and
11    components in the licensing basis for a reason.
12              And for that same reason, the Commission did not
13    extend a requirement to maintain an aging management program
14    pursuant to a renewed license.
15              That's not to say that we don't expect that the
16    equipment is not going to be maintained; we certainly expect
17    that it's going to be maintained.
18              But we're not now imposing a regulatory standard
19    on that that has to be maintained with the licensing basis.
20              DR. BONACA:  The reason why I expressed a concern,
21    Mr. Grimes, was that particularly for the older plants, you
22    know, there were very succinct FSARs, a couple of volumes. 
23    They have been expanded in the updated one, but still they
24    are very succinct.
25              And they are accident analyses that essentially
.                                                               451
 1    cover some essential equipment, and then they relate to the
 2    operator taking action and doing something wonderful there.
 3              So if you try to understand how you get down to a
 4    cold shutdown, you really have to go to the operating
 5    procedures.    I don't think there were any procedures
 6    contained chance equipment there, they don't have only
 7    essential equipment as relied to get down to safe shutdown.
 8              And that is really mostly what my concern was
 9    regarding for those plants, because when they established
10    the CAT-1 systems, they pulled them out from those accident
11    analyses.
12              A lot of stuff was probably missed.  That's why
13    we've been talking about scoping.  That's why we look at
14    scoping for the other plants and find such a narrow view of
15    it, and we look at the newer plants and we see a big scope.
16              And that was the reason why that was raised.  And
17    because a focus purely on a narrow definition of CAT-1
18    systems and support systems for those, it's a very narrow
19    focus for some plants, I mean, some older plants.
20              And I don't deny the logic.  I think that the
21    conversation is clarifying, and that it is important.
22              MR. GRIMES:  I would like to emphasize that the
23    reason that the Commission concluded that it was appropriate
24    to maintain such a narrow focus for license renewal is
25    because of reliance on regulatory process that makes
.                                                               452
 1    decisions about whether or not the current licensing basis
 2    and its definition of what are safety-related systems,
 3    structures, and components, is adequate.
 4              Even during the review of Oconee, systems and
 5    components were added to the scope of license renewal
 6    because the licensing basis was changing at the same time.
 7              When you say that the older plants may have missed
 8    something, it is our belief that the regulatory process
 9    reveals those continually, and that the Q-Lists are updated
10    to add more things to that scope of what is now determined
11    to be safety-related, because of a recognition that it's
12    relied on to prevent or mitigate design basis accidents.
13              Those things are also revealed during license
14    amendment reviews.  One of the reasons that we use the EOPs
15    as a guide to do a license renewal review is to test the
16    licensing basis.
17              But if we do find that there is an issue about
18    whether or not a system or a component is relied on and
19    should be a safety-related system or component, we refer
20    those to an appropriate backfitting process to decide.
21              So we have confidence that the regulatory process
22    will continue to add to the scope of license renewal in the
23    future, as part of the maintaining the licensing basis.
24              And that's what gives us the comfort that using
25    the current licensing basis as the standard for determining
.                                                               453
 1    what should be subjected to an aging management review is an
 2    appropriate screening criteria.
 3              DR. BONACA:  Okay.
 4              MR. HOFFMAN:  Voluntary Commitments:  Again,
 5    regulatory commitments, including voluntary initiatives such
 6    as severe accident mitigation guidelines, are part of the
 7    current licensing basis, like we just talked about, which,
 8    you know, is required to be carried forward in the same
 9    manner and to the same extent as it is during the current
10    term.
11              So, all of the commitments will carry forward into
12    the extended period of operation, unless they are changed in
13    accordance with an approved process.
14              We have just issued a regulatory issues summary
15    that summarizes guidance for managing regulatory commitments
16    made by licensees.  And in there, the Commission endorsed an
17    NEI guideline 99-04, for managing commitment changes.
18              And Staff guidance has been put out and two NRR
19    Office Letters, 807 and 900.  Number 807 deals with the
20    control of licensing basis for operating plants, and 900
21    specifically covers managing commitments made by licensees
22    to the NRC.
23              So, we've got Commission guidance out there to
24    control these commitments in the future.  Specifically, the
25    severe accident mitigation, that one's actually being
.                                                               454
 1    covered by a more recent initiative concerning -- the
 2    Commission directed the Staff to develop guidelines for
 3    managing, inspecting, and oversight of voluntary industry
 4    initiatives that may be in lieu of regulatory requirements.
 5              That was just published in the Federal Register in
 6    August, and I think the comment period just ended in
 7    October.  But the last I heard, severe accident mitigation
 8    guideline implementation would be covered by the outcome of
 9    that voluntary initiative.
10              DR. BONACA:  Again, here, I wasn't worrying about
11    carrying forward, the commitment.  It means also that the
12    equipment that supports the commitment has to be operable.
13              MR. HOFFMAN:  Okay.
14              DR. BONACA:  I mean, I can understand that we
15    don't check the aging for the first 40 years, but I
16    understand now, your clarification.
17              You said something about those are also part of
18    the current licensing basis?
19              MR. HOFFMAN:  Yes, it's a docketed commitment by
20    the licensees.
21              DR. BONACA:  Okay, thank you.
22              MR. HOFFMAN:  Whoever is up next can figure it
23    out.
24              MS. BLOOMER:  Thanks, Steve.
25              Hi, I'm Tamara Bloomer.  I'm with NMSS High-Level
.                                                               455
 1    Waste.  I was on rotation to NRR License Renewal.  To my
 2    left is Mary Wegner from Research.  To my right, immediate
 3    right, is Jim Davis from DE.  And to my far right is Yung
 4    Loo from Argonne.
 5              I was asked to explain, going through an example
 6    of one-time inspection and how it's dealt with within GALL
 7    and the SRP.  As you can see, we felt that some aging
 8    effects of specific structures and components may need
 9    verification to the effectiveness of the aging-management
10    program, and how we propose to do that is through one-time
11    inspection within both GALL and the SRP.
12              CHAIRMAN POWERS:  Are items that are affected by
13    IASCC among those subjected to one-time inspections?
14              MS. BLOOMER:  I have a list actually of a couple
15    of things, and I don't think IASCC is affected.  That's not
16    on the list, no.  That's looked at I believe in a
17    plant-specific and with the use of the -- Barry.  MR.
18    ELLIOT:  Barry Elliot.  Our last slide in this package is
19    about neutron irradiation embrittlement, and we'll --
20    originally we were going to talk just about neutron
21    irradiation embrittlement, but apparently you want to hear
22    about IASCC.  So we'll talk about that also.
23              CHAIRMAN POWERS:  Okay.
24              MR. ELLIOT:  On that slide.  Is that okay with
25    you?
.                                                               456
 1              CHAIRMAN POWERS:  That's fine.  I'm patient.
 2              MS. BLOOMER:  Okay.  The example that I'm going to
 3    follow through is for one-time inspection.  It has to deal
 4    with spent-fuel-pool cooling and cleanup corrosion.  And
 5    that's using the water chemistry program.
 6              As it says here in chapter 7, section A3, page
 7    A3-4, if you look at GALL for that, we're talking about
 8    filter housing, which is carbon steel, which does have loss
 9    of material and is identified as pitting and crevice
10    corrosion.  When you go to A3-4 in the aging-management
11    program column, you find indications again that, very near
12    the bottom, an acceptable verification program consists of
13    one-time inspection of select components in susceptible
14    locations in a system.
15              Then you would refer to chapter 11, where the same
16    language is used in the water chemistry program.
17              And then in the further-evaluation column you have
18    a yes and detection of aging effects should be further
19    evaluated.  That's typically how it is referred to when
20    they're talking about one-time inspection throughout GALL.
21              The other case we look at is in SRP, and if you
22    look at section 3.3, subsection 3.3.2.2.1, yes, there are a
23    lot of them.  Again, actually it's talking a loss of
24    material that you saw in the GALL column, general galvanic
25    pitting and crevice were the two items that we saw in the
.                                                               457
 1    example that I just showed you.  And again, near the bottom,
 2    and actually my page has it highlighted and theirs doesn't. 
 3    A one-time inspection of selected components in susceptible
 4    locations is an acceptable method.  So it follows through
 5    into the SRP.
 6              DR. WALLIS:  Someone has to check up on the
 7    adequacy of this, because how you select and what you think
 8    is susceptible is up to whoever is doing the job.  Right?
 9              MR. DAVIS:  That's right.  Just based on
10    experience.
11              DR. WALLIS:  So there's a lot of flexibility here.
12              MR. DAVIS:  Yes, there is, and it's site-specific.
13              DR. WALLIS:  Right.  So someone's got to make sure
14    the job is done right.
15              MS. BLOOMER:  Well, that's why the
16    further-evaluation column says that we need to further
17    identify it.  We couldn't give every possible location for
18    all the components and all the different plants.  Thereby,
19    by looking in the further-evaluation column, staff knows to
20    review what they selected, and if it's appropriate for this
21    particular component.
22              DR. BONACA:  Now, as the time goes by, we have
23    more applications, there will be information available to
24    the reviewers of how this was handled for other plants. 
25    Right?
.                                                               458
 1              MS. BLOOMER:  Correct.
 2              DR. BONACA:  So that information will be made
 3    available in the GALL report?
 4              MS. BLOOMER:  Generally the same reviewers who are
 5    doing the other plants will be doing the new plants as they
 6    come in.  But yes, as we update GALL, more information will
 7    be fed in, and if some of this changes, if we find in ten
 8    years all the plants that have come through so far have no
 9    indication, this may be something that we decide to take out
10    because it's no longer useful.  Or they may begin to build a
11    one-time inspection into their programs or when they're
12    looking at a previous inspection go ahead and identify and
13    say no, we see no evidence of loss of material in that
14    component and identify that when they've put in their
15    application.
16              It also appears in a couple of other places in the
17    SRP that ties it with GALL, the table 3.3-1 and the FSAR in
18    section 3.3, 3.3-2, which is actually page 3.3-18, I
19    believe.  Again, the first one is the aging-management
20    program, refers back to where we got it from from GALL, the
21    components that you need to be careful of or look out for,
22    and then the further-evaluation column says the same as it
23    did in GALL.  And when you look in the FSAR table, actually
24    one-time inspection is broken out in and of itself, and for
25    the water chemistry program that I just identified, it
.                                                               459
 1    specifies that to verify the effectiveness of the reactor
 2    water chemistry program consists of a one-time inspection. 
 3    If they chose that method, this is the program that they
 4    would be referring to, and this is what the reviewers would
 5    look into.
 6              DR. WALLIS:  Obviously it hasn't been edited. 
 7    It's got "is performed" twice.
 8              MS. BLOOMER:  Well, we're still editing.  It's
 9    only a draft version, so we're okay.
10              Are there any questions?
11              MR. VORA:  Good afternoon, Mr. Chairman.
12              My name is Jit Vora and I am a team leader in the
13    Division of Engineering Technology of the Office of Nuclear
14    Regulatory Research.  To my right is Mr. Bob Lofaro from the
15    Brookhaven National Laboratory, who has been doing a lot of
16    work with regards to the LOCA testing of the low voltage I&C
17    cables in the context of resolution of GSI-168.
18              On October 6th the members of the RES staff had
19    the opportunity to provide to you and discuss with you some
20    of the technical elements and the results of the six sets of
21    LOCA tests for the low voltage I&C cables in the context of
22    GSI-168 and at the same time we also discussed about the
23    pros and cons of various condition monitoring methods to
24    evaluate the aging effects in the installed cable systems.
25              On October 9th the Staff had the opportunity to
.                                                               460
 1    present to you and discuss with the subcommittee the Chapter
 2    6 of the GALL report on the electrical components.
 3              Based on the direction that I received for today's
 4    presentation, I would like to present to you and discuss
 5    with you the effectiveness of condition monitoring methods
 6    for the cable aging in operating nuclear power plants and
 7    also present to you and discuss with you the impact of the
 8    resolution of GSI-168 on the license renewal.
 9              With regards to the condition monitoring method,
10    and strictly from the technical perspective and using my
11    engineering hat, the issues that are involved to understand
12    the cable aging in the nuclear power plant is threefold.
13              One is actually how to evaluate and how effective
14    is the current condition monitoring techniques to evaluate
15    the localized or the bulk properties of the insulating
16    materials along the length of the installed cable system.
17              DR. KRESS:  What properties are you looking for,
18    Jit?
19              MR. VORA:  Beg pardon?
20              DR. KRESS:  What properties are you looking for --
21    thermal, electrical --
22              MR. VORA:  We are looking at electrical,
23    mechanical and the physical properties.
24              DR. KRESS:  All those, okay.
25              MR. VORA:  And these properties for the bulk
.                                                               461
 1    insulating materials can be evaluated in situ or you can
 2    actually retrieve the samples of the materials and evaluate
 3    those properties under controlled laboratory conditions.
 4              The bigger challenge comes on actually how to
 5    evaluate the integrity of the entire cable system, the
 6    installed cable system from end to end, one end to the
 7    other, which includes the splices, the connectors, the
 8    terminations, and to me actually a very important aspect of
 9    this thing is what about the interfaces which actually forms
10    a entire cable system, because many a time you can evaluate
11    the bulk properties of localized materials or you can
12    evaluate the insulating cables, but many times in the
13    electrical signals and transmission the interfaces are
14    sometimes the most weak link, and this is where you have the
15    minimum dialectic integrity in the strength, and they become
16    more susceptible to the various environmental conditions.
17              DR. WALLIS:  When you test it, you test it as it
18    is and the last time you were here I think you were talking
19    about cables in the presence of a LOCA.  How they behave in
20    a LOCA is not the same as they behave when you test them.
21              MR. VORA:  This is correct --
22              DR. WALLIS:  So it is very difficult to know what
23    to measure as a property.
24              MR. VORA:  Exactly.  I think that is one of the
25    things we tried to do actually as a part of the LOCA
.                                                               462
 1    tests --
 2              DR. WALLIS:  Right.
 3              MR. VORA:  -- as I talk with the next viewgraph
 4    that there are about 11 different techniques and parameters
 5    that we used that at different times offered the pre-aging,
 6    thermal pre-aging, radiation pre-aging, before LOCA, after
 7    LOCA, and see if there are any parameters which we can
 8    actually identify by monitoring, by trending, by evaluating
 9    can we actually determine if they are able to survive the
10    LOCA or not, so you are absolutely right with your question.
11              The third part is about the technical -- how to go
12    about determining the residual life or the service life or
13    an installed cable system.
14              You can monitor, evaluate the localized material
15    properties of the bulk insulating materials in the
16    laboratory.  We can do some checking of the entire installed
17    cable system, then by using the suitable models, using the
18    operating experience, if you can put all of this together
19    then can we actually determine what is the residual of life
20    of an installed cable system.  Is it 30 years, 40 years, 50
21    or 60 years based on the condition indicated parameters and
22    the trending over time.
23              If you have that information and data, I think we
24    can actually go about doing the residual life evaluation of
25    the service life of the cable systems.
.                                                               463
 1              The technical challenge that comes about for this
 2    condition monitoring technique for installed cable systems,
 3    and please forgive me if I talk about installed cable with a
 4    big emphasis on the system, because installed cable system,
 5    that is what we really want to evaluate the integrity from
 6    the aging perspective is actually what happens for the
 7    system.
 8              DR. WALLIS:  It is the whole life of the cable
 9    that matters and if you took it and cut it in pieces to test
10    each piece, it doesn't matter if it has got a fault
11    somewhere.  Each piece may be fine that you test but it may
12    have a fault somewhere else.
13              MR. VORA:  This is correct and also interfaces and
14    all the connections --
15              DR. WALLIS:  Right, everything.
16              MR. VORA:  And what actually I'll talk about a
17    little bit more is as far as the challenge is concerned is
18    to detect and locate the incipient effects and localized
19    anomalies in an installed cable system prior to failure.
20              When you have the failures in the cable, whether
21    you have open circuit or you have a short circuit, they are
22    readily detectable.  One can actually evaluate and see when
23    you do the functionality test or you have the signals that
24    you can actually detect it and there are techniques which
25    are available today which are primarily the electrical
.                                                               464
 1    techniques like time domain reflectometry where you can send
 2    and transmit the signals and actually see the reflections
 3    and based on the changing the impedance corrector speed you
 4    can actually evaluate the conditions of the cable.
 5    The question is when you have a degraded state of the
 6    insulating materials due to aging of the polymers, you might
 7    have a little bit of leakage current or you have some cracks
 8    or you actually have a pending failure, that is the
 9    challenge of how we can detect those things prior to when
10    the actual occurring in the installed cable system.
11              CHAIRMAN POWERS:  Your point is that the time
12    domain, the reflectometry does not detect things in the
13    cable insulation, it only detects in the wire, doesn't it?
14              MR. VORA:  This is correct.  Primarily for the
15    wires, but if you have a gross defect or if you are on the
16    verge of short circuit, then it might pick it up, and I
17    think many of the technologies are being developed now, very
18    sophisticated time domain reflectometry, the signal
19    analyses, the microprocessors, and signal to noise ratio
20    filtering, et cetera, and so things are happening, but we
21    are not at this point in time.
22              The condition monitoring needs to not only be
23    effective to detect the defect in the incipient state prior
24    to failure but it needs to be non-intrusive.  It will be
25    ideal if we can actually do and scan the entire cable length
.                                                               465
 1    from end to end without disconnecting the equipment on
 2    either end.
 3              It needs to be reliable.  Can you actually repeat
 4    whatever condition indicated parameter you monitor for this
 5    cable system, whether it is a power factor, a modular -- is
 6    it reliable?  Can you repeat these things?
 7              There are techniques now available for detecting a
 8    partial discharge in the installed cable system, but we are
 9    not able to actually reproduce reliably the data using the
10    techniques which are available.
11              CHAIRMAN POWERS:  May I ask a question about cable
12    insulation aging?
13              Is a better analogy for cable aging, insulation
14    aging, a time dependent degradation that at constant
15    temperatures is constant, or is it a process given to
16    nonlinearities with time?
17              MR. VORA:  I think it could happen both ways.  You
18    know, you could actually be in the linear stage, but
19    actually at a certain point in time if you go to a certain
20    level temperature you could go into the nonlinearity and you
21    could have rapid degradation.
22              CHAIRMAN POWERS:  If it's all temperature
23    constant -- is the degradation going to proceed linearly
24    with time or are there phenomena that will cause it to
25    become nonlinear with time?
.                                                               466
 1              MR. VORA:  Normally -- it would be linear, but
 2    then we combine that thing with the moisture and other
 3    environmental parameters it could go into the nonlinear
 4    state.  I don't know.
 5              Do you have any idea?
 6              MR. LOFARO:  Yes, I think if you look at
 7    temperature in itself as the only stressor acting on the
 8    cable you would probably have a linear relationship, but
 9    that is not the case typically in the plant.  You have other
10    stressors such as radiation aging that will take place as
11    well.
12              There could be other things such as maintenance
13    damage to the cable.  There are a lot of things that could
14    happen to affect the degradation rates.
15              I think you are probably looking at a nonlinear
16    rate.
17              CHAIRMAN POWERS:  If I hold temperature and dose
18    rate, and let's put aside maintenance and those things, but
19    just temperature and dose rate constant, is that linear on
20    time now?
21              MR. LOFARO:  Even holding those two elements
22    constant it might not be linear along the whole life of the
23    cable.
24              There could be instances where when you get to a
25    certain degradation point the rate changes because of the
.                                                               467
 1    condition of the structure of the material itself.
 2              DR. WALLIS:  Well, eventually it fails in a
 3    nonlinear way, so the failure isn't a linear process.  It is
 4    a catastrophic thing sometimes.
 5              MR. LOFARO:  It could be catastrophic when it
 6    ultimately fails.
 7              DR. WALLIS:  A chunk of insulation falls off or
 8    something.
 9              MR. LOFARO:  Eventually you can reach a state
10    where the insulation is completely brittle, for example, and
11    then it could actually fall off if it were damaged.
12              MR. VORA:  Well, then I have a question.  Dr.
13    Powers, what temperature level are we talking about? 
14    Constant temperature at 100 degrees C?  Was it 50 degrees C
15    or the ambient environment?  So I think the lower the
16    temperature of course it will be more and more linear
17    behavior but normally in reality it will start to actually
18    change it after so many years of operation.
19              Did I answer your question?
20              CHAIRMAN POWERS:  I'm just looking for some
21    intuition.     One could look at these things and say, gee,
22    cable insulation is okay for 40 years.  What is going to
23    happen to it in an additional 20?
24              What you are saying is a lot can happen to it.
25              MR. VORA:  The 20 years, depending on the -- I am
.                                                               468
 1    not an polymer expert but depending on the activation energy
 2    involved in and what actually happens to the chemical
 3    processes and bonding of the polymers and materials and what
 4    happens with time, temperature, super-position, will decide
 5    actually how good that will be for the next 20 years.
 6              If we do an extrapolation in small incrementals,
 7    as long as there are no face changes I think that one is
 8    able to actually use the proper extrapolations from 40 to 50
 9    or 60 years.
10              CHAIRMAN POWERS:  Thank you.
11              The other technical challenge that comes about is
12    for the low voltage instrumentation and control cables where
13    you don't have the shield or the ground seal available. 
14    What is actually happening is that you have all 12 or
15    different 15 types of condition monitoring techniques and
16    methods and you can actually evaluate or use those things
17    for evaluation of the localized materials or bulk
18    properties, but to scan the entire length of the cable
19    system from end to end at least in my personal view it has
20    to be an electrical technique or measurement technique so
21    you can scan the entire length of the cable system.
22              To actually have that effective measurement
23    technique I think it is always useful to have a good ground
24    shield for the grounding system available so that you can
25    actually apply the proper voltages, the currents, and do the
.                                                               469
 1    effective shielding, et cetera.
 2              For many of these low voltage I&C cables which do
 3    not have the ground shield effective and there are
 4    unshielded cables, the task becomes much more challenging.
 5              The part of the research tests that we did and
 6    LOCA tests there were 11 techniques that were used by Mr.
 7    Lofaro in connection with the Wylie Laboratory that includes
 8    the visual instruction where one could provide a qualitative
 9    assessment of color, chafing, cracks and sometimes somebody
10    could actually freeze that thing up about how stiff the
11    cable is.
12              Elongation at break is actually the percent
13    increase in the elongation at the time of fracture.
14              DR. WALLIS:  How would you use that to monitor
15    though?  You would have to have a sample and break it,
16    wouldn't you?
17              MR. VORA:  Which one, the elongation?
18              DR. WALLIS:  The elongation at break.
19              MR. VORA:  It is a destructive testing.
20              DR. WALLIS:  It is not a useful way to monitor in
21    situ.
22              MR. VORA:  Exactly right.  This is correct.
23              MR. LOFARO:  Right, unless you had sacrificial
24    cables in the plant.s
25              MR. VORA:  Then also we used what we call the
.                                                               470
 1    oxidation induction time, the time at which the rapid
 2    oxidation of the materials occurred when held at a constant
 3    elevated temperature in flowing oxygen environment and this
 4    has started to show some promise, the oxidation induction
 5    time and the temperatures, and Dr. Ken Gillen is doing a
 6    significant amount of work at Sandia National Laboratory and
 7    there are more and more sensitive data are being obtained to
 8    this effect.
 9              The other technique we tried is the 40 year
10    transformer phorespectoscopy involved in the measurement of
11    absorption and transmission of the infrared radiation.
12              The compressing modular for a ratio -- the
13    industry had developed actually a tool that you can actually
14    take that thing directly into in situ where you have access
15    of the cables and the materials that you could actually see
16    and detect the properties and see the compressive strength
17    of the material.
18              Of course we talked about the hardness test that
19    is just a less sophisticated indenter and then we had the
20    four electrical measurements which we did -- the dialectic
21    gloss of the properties of the material, the insulation
22    resistance, the voltage versus current, the functional
23    performance test which probably gives a going over
24    indications or you can do the voltage withstand test to see
25    the dialectic strength of the cable insulation materials.
.                                                               471
 1              DR. KRESS:  Have you tried signal analyses, just
 2    tapping the electric signal that goes through the cable
 3    itself and use something like signal analyses to see how it
 4    changes with time?
 5              MR. VORA:  This is actually -- no, these are the
 6    techniques that we use for this program but there are now
 7    new sophisticated technique being developed by the industry
 8    and especially by the Department of Defense and the other
 9    Federal agencies.   We are talking about the measurement,
10    especially with the Air Force is now very much concerned
11    about the cable in the older jet aircraft and the NASA
12    people are interested in it and they have developed what is
13    called the partial discharge technique where you can
14    actually send voltage signals and see, but you have the
15    partial discharge and do your correlations and do the signal
16    processing.
17              DR. KRESS:  Yes.
18              MR. VORA:  But again to do this thing in situ --
19              DR. KRESS:  It would be tough in situ.
20              MR. VORA:  It is very difficult and also at what
21    voltage level do you have enough 600 volt cables where
22    somebody would allow you to put 2400 volts cable, 24 volts,
23    to do some meaningful correlations, so this technique we
24    tried it, and there is not one single technique that we feel
25    comfortable with which is effective to scan the entire
.                                                               472
 1    length of an installed cable system in operating -- which is
 2    cost effective, reliable and nonintrusive.
 3              DR. KRESS:  Do you monitor the environment these
 4    cables are in?  Do you have instrumentation that tells you
 5    what or a given table, the cable spreading room or
 6    something, what the temperature and the moisture is as a
 7    function of time and that sort of thing?
 8              Do you monitor that?
 9              MR. VORA:  I think not.  Some utilities are doing
10    it on their own.
11              DR. KRESS:  The only reason I ask is for example
12    one of the time limited aging analyses that are done is
13    fatigue of various piping things.  They don't go in and
14    measure how much fatigue damage they got.  They know ahead
15    of time by lab tests what fatigue, what the environment does
16    to it so if you could know ahead of time by sufficient
17    laboratory tests what the environment does to, say, the
18    insulation, then you could do a time-limiting aging analysis
19    that is just analogous to the way you do fatigue.
20              I was wondering if that was --
21              MR. VORA:  I think you are absolutely right.  If
22    you do then monitoring and analysis and combine that thing
23    with the behavior of the materials in those environments you
24    can correlate this.  You are absolutely right.
25              But what is actually happening is that even though
.                                                               473
 1    these things are not all totally effective to detect the
 2    defects in the operating nuclear power plants, one could do
 3    the periodic walkdowns and inspections.  One could do
 4    actually the monitoring of the environment and see what are
 5    the temperatures and what kind of hot spot might be existing
 6    there.
 7              To give you some idea, there are some cables the
 8    manufacturers have rated them for 90 Degrees C, good for 40
 9    years, and we know from these tests now that if you actually
10    do the 90 Degrees C for 40 years they would not survive, so
11    if you know the temperature, however it's the same cables,
12    if you know that they are not exceeding the 60 degree
13    environment and which is the case in most of the plants,
14    that operating environments are much lower than the rated
15    temperatures, you are able to have confidence that, no,
16    those cables would be okay for 40 years, so you are
17    absolutely right.
18              If you know the environment, that will give us
19    much more data and information to base on and determine some
20    of the residual life of the installed cable system.
21              But with regard to that advanced technique, I had
22    the opportunity to work with NIST and the Air Force Program
23    for the measurements of partial discharge.
24              Detroit Edison has started to now develop sort of
25    current comparators that can monitor the behavior of the
.                                                               474
 1    current signals associated with energized cable system and
 2    correlate to the partial discharges.
 3              The Department of Defense is evaluating the Air
 4    Force -- what they call the impedance spectroscopy and also
 5    the DOE EPRI Program through Dr. Ken Gillen is developing
 6    some advanced techniques and we are keeping track of all
 7    these programs to see where we go with regard to the
 8    condition monitoring of the cables, so that is the status of
 9    the condition monitoring cables.
10              With the issue of cable aging and the resolution
11    of GSI-168, I think for license renewal the EQ cable is
12    considered a time limited aging analysis, because the
13    equipment normally is qualified to a specific life usually
14    of 40 years.
15              The requirement of 10 CFR 50.41(20)(c) however
16    provides the options to demonstrate the continued EQ during
17    renewed life system.  The equipment if it is originally
18    qualified to 60 years or the equipment can be requalified by
19    test or by analysis for 60 years or one could actually rely
20    on some sort of condition monitoring or the feedback
21    mechanisms.
22              If you do identify those condition indicator
23    parameters of an installed cable system and if you do the
24    monitoring and trending of this condition indictor over a
25    period of time, for 10 years, 20 years, 40 years, that could
.                                                               475
 1    give actually the health of this cable and do some
 2    predictions whether they are good for the next 20 years or
 3    40 years or 60 years.
 4              For EQ equipment the licensees are expected to
 5    continue to comply with the requirements of 50.49 during the
 6    renewed license period.  The regulatory process is in place
 7    for license renewal to address the EQ of the electric cables
 8    for the license renewal period for nuclear power plants.
 9              DR. WALLIS:  How do you keep track of when
10    licensee replace cables?  Presumably if the cables are part
11    of a safety system they have to write a report, but if they
12    are not then you don't know about it, do you, if a cable has
13    to be replaced by a licensee?
14              You would presumably like to know.
15              MR. VORA:  If they are within the scope of
16    50.49 --
17              DR. WALLIS:  Yes.
18              MR. VORA:  -- they are actually required by the --
19              DR. WALLIS:  There must be other cables which are
20    not you wouldn't know about at all?
21              MR. VORA:  Correct.  But however, in the space of
22    the license renewal we are asking not only for the EQ
23    carries over for a licensed period of time, however for the
24    non-EQ cable the licensee is to demonstrate and have an
25    Aging Management Program.
.                                                               476
 1              We learned our experience from the Calvert Cliffs
 2    and Oconee that, yes, it is really an effective way to
 3    address the non-EQ cables.
 4              The GSI-168 that we talked about on October 6th,
 5    the Staff is still evaluating the various options for the
 6    resolution of GSI-168 and for non-EQ cable the licensees are
 7    expected to propose an appropriate Aging Management Program
 8    for license renewal.
 9              DR. WALLIS:  You say evaluating options.  The
10    impression I got was that you might not have a good option
11    yet.
12              MR. VORA:  I think one of the points of what
13    actually happened, to give an example of it, we had some
14    actually issue some of these banded jacket-insulated cables
15    and we had some catastrophic failures during our test
16    program.
17              We interacted between the two offices.  We
18    interacted with the industry and NEI actually issued and
19    surveyed and we got input from the 103 operating nuclear
20    power plants where these types of cables are used and under
21    what operating environment or temperatures are used, and we
22    got very significant good feedback from the industry about
23    these cables, where they are used.
24              With regard to the overall cable aging research,
25    we have not yet communicated.  We are in the process of
.                                                               477
 1    communicating this result from the industry and I think that
 2    is going to be a very, very significant input to get the
 3    industry feedback, to get their ideas and thoughts about it
 4    would also be useful towards the resolution of GSI-168, so
 5    we still have to do a little more homework.
 6              Any other questions?
 7              DR. SHACK:  I am a little confused between what is
 8    going to be done for the non-EQ cables and the EQ cables. 
 9    Again, I can sort of see the trouble with the EQ cable is
10    that the real test of it is something that you are in an
11    environment that you can't test that, I mean but the cables
12    that aren't EQ qualified you can actually test.  They
13    operate in the environment they operate in.
14              MR. VORA:  But also on the non-EQ cable what we
15    are finding, Dr. Shack, that some cables are accessible,
16    some others are not.
17              If you have the buried cables, then we cannot do
18    any inspections or get the materials, but there are
19    techniques which could be used for non-accessible cables,
20    for instance like Duke Power or what we did at Davis-Besse. 
21    We were able to use some electrical measurement techniques
22    to understand --
23              DR. SHACK:  Yes, but wouldn't that be reasonably
24    effective for those cables because -- you mean you are
25    actually testing under the conditions you are interested in
.                                                               478
 1    and the problem with the EQ cable is you can't do the tests?
 2              MR. VORA:  Yes, and the question is whether it
 3    will survive the LOCA --
 4              DR. SHACK:  Yes.
 5              MR. VORA:  -- the bottom line.
 6              DR. SHACK:  But the non-EQ cable doesn't have that
 7    problem.  You can do the electrical tests and if it passes,
 8    it passes.
 9              MR. VORA:  Correct.  You can monitor the power
10    factor.  You could do the functionality test.  Various
11    options exist for the non-EQ cables, that's correct.
12              DR. SHACK:  So basically your 13, 14 slides are
13    really for EQ cables?
14              MR. VORA:  This is correct.
15              The GSI-168, the focus only for the EQ cables and
16    low voltage I&C cables.
17              DR. BONACA:  Since you are here, as part of the
18    GSI-168 has there been any consideration of taking cables
19    from plants which have operated for 30 or 40 years -- there
20    are big plants out there -- and using those under accident
21    conditions rather than just using laboratory aging?
22              MR. VORA:  As a part of this overall program, Dr.
23    Bonaca, what we did, we were able to obtain the cables which
24    are 10 years old and 24 year old cable, naturally aged cable
25    from decommissioned operating nuclear power plants, and they
.                                                               479
 1    were indeed the part of this overall test program.
 2              What we found out -- and this is very
 3    interesting -- that this naturally aged cables, 10 years or
 4    24 years old, which were actually qualified according to the
 5    old DOR guidelines, performed better than the artificially
 6    aged cables so we got some very significant input and data
 7    from those two tests but we are not able to get any 40 year
 8    old cable.
 9              DR. BONACA:  Okay.
10              MR. VORA:  We tried to get some cable from the
11    Shippingport Atomic Power Station where we interacted with
12    Admiral McGee, and got some cables but they are, first of
13    all, very very hot environment and also we are not able to
14    the get the pedigree and the data and documentation on those
15    cables, which is very important to have to make some sort of
16    correlations.
17              DR. BONACA:  Thank you.
18              MR. VORA:  Thank you.
19              DR. KRESS:  I would like to thank the speaker.  I
20    thought that that was a very good talk --
21              DR. BONACA:  Very good.
22              DR. KRESS:  -- with very few slides, and very
23    informative.
24              DR. WALLIS:  The thing that I am still not sure
25    about is whether or not this is a problem that has been
.                                                               480
 1    resolved and how would I explain it to my colleagues back
 2    home or something if they ask me is there a problem with
 3    cables?  I am not sure how I would answer it.
 4              DR. KRESS:  It is not resolved but there are
 5    things that you can do --
 6              DR. SEALE:  There are things that are being done.
 7              DR. WALLIS:  There are things being done, yes, but
 8    how close are we to knowing that we have some confidence
 9    that things will be okay?
10              DR. KRESS:  That is a good question.
11              DR. BONACA:  Right.
12              DR. KRESS:  We will know in 20 years.
13              DR. SEALE:  Here comes the alchemist.
14              DR. APOSTOLAKIS:  Go ahead.  He has to do
15    something.  Please go ahead.
16              MR. ELLIOT:  I was originally going to talk about
17    neutron irradiation embrittlement but as a result of the
18    discussion that I have heard so far, I think I am going to
19    expand the discussion.
20              We are going to talk about neutron irradiation. 
21    To my right is Alan Hizer of Material and Chemical
22    Engineering Branch and to my left is Frank Grubelich of the
23    Mechanical Engineering Branch.
24              Neutron irradiation in internals causes three
25    mechanisms.  They are void swelling, IASCC -- which is
.                                                               481
 1    irradiation assisted stress corrosion cracking -- and
 2    neutron embrittlement.
 3              Void swelling causes a swelling of the component,
 4    changing dimensions, and could possibly lead to cracking.
 5              Irradiation assisted stress corrosion cracking is
 6    stress corrosion cracking, which is enhanced by irradiation
 7    and again is a cracking mechanism.
 8              Neutron embrittlement affects the material
 9    characteristics, the ability of the material to resist
10    fracture.  It is not cracking; it is a fracture-resistance
11    issue.
12              I originally was going to talk about neutron
13    embrittlement, but we are going to talk about all three.
14              With respect to GALL, the intent of our -- for
15    these issues in GALL we identified all the components that
16    we thought in the internals could be affected by these aging
17    mechanisms, and essentially it was all the components in the
18    internals.
19              The only place that we describe in the GALL where
20    there is a screening criteria for these aging mechanisms is
21    for neutron embrittlement and the only screening mechanism
22    we have is the irradiation of 10 to the 17th and it's just
23    the neutron embrittlement.
24              There is no screening criteria for void swelling
25    and there's no screening criteria for irradiation stress
.                                                               482
 1    corrosion cracking.  All the components for those two
 2    mechanisms are identified.
 3              All the components are identified for neutron
 4    embrittlement but in this case we have allowed a screening
 5    criteria of 10 to the 17th and that we developed, we
 6    determined that from our current regulations.
 7              In the current regulations the neutron
 8    embrittlement or void swelling or irradiation stress
 9    corrosion cracking of internals is not within the current,
10    not identified as issues in the current regulation per se.
11              However, neutron embrittlement of reactor vessel
12    materials is addressed in the current regulations.
13              DR. WALLIS:  This is a fluence unit or something? 
14    There's no units on your --
15              MR. ELLIOT:  Yes.
16              The current regulations on reactor vessels, there
17    are three regulations.
18              There's Appendix G, Appendix H, and then there's
19    the PTS rule.
20              In Appendix H we have established that if the
21    neutron fluence is less than 10 to the 17th neutrons per
22    centimeters squared that irradiation is not going to impact
23    embrittlement.  Now we have carried that forward for reactor
24    vessel internals.  Now the reactor vessel is a ferritic
25    material.  It's carbon manganese steel.  The internals are
.                                                               483
 1    stainless steel.  They are wrought, cast, and weld material.
 2              At the moment we do not have any way of screening
 3    out for these materials what should be an applicable
 4    screening method other than the one we chose.
 5              What we proposed for the previous applications is
 6    that they would develop a program to develop these screening
 7    criteria and then in addition selective locations that are
 8    most susceptible would be looked at, and that is where we
 9    are today.
10              Now I will open it up to any questions.
11              MR. LEITCH:  In the previous presentation I guess
12    there was, I think it was pointed out that there was some
13    difference between the NRC Staff and NEI --
14              MR. ELLIOT:  Yes.  Do you want me to discuss that?
15              MR. LEITCH:  Yes, would you please?  Also, just a
16    corollary to that question is that I thought I also heard
17    that there were some indications that certain areas in the
18    reactor vessel were already well in excess of 10 to the
19    17th.
20              MR. ELLIOT:  You mean reactor vessel internals?
21              MR. LEITCH:  Well, that is what I am not quite
22    clear about.
23              MR. ELLIOT:  Okay.  Let me clarify that.
24              The reactor vessel belt line, all plants have
25    exceeded -- the belt line is the vessel material adjacent to
.                                                               484
 1    the active core.  All of the reactor vessel materials have
 2    exceeded 10 to the 17th by now.
 3              The same thing holds for the internals in that
 4    region.
 5              Now the higher up you go on the internals above
 6    the belt line it would be much lower fluences, so there
 7    could be internals that are high up above the core that have
 8    not received that neutron fluence.
 9              The Staff position is, as I said here, 10 to the
10    17th is the only screening criteria that we think should be
11    used at this moment based upon our knowledge.
12              NEI I think has proposed 10 to the 21st.  We don't
13    have enough data yet to reach a conclusion that that is the
14    applicable screening criteria, not for the reactor vessel
15    but for the internals and in particular for the three
16    mechanisms I said that we are looking at.
17              DR. WALLIS:  That is a factor of 10,000?
18              MR. ELLIOT:  Yes.   DR. KRESS:  That's quite a
19    jump.
20              DR. WALLIS:  That is quite a jump.
21              MR. ELLIOT:  Right, but you have to remember this
22    study is in its infancy.
23              Currently the internals around the core, in the
24    belt line region, are projected to see 10 to the 21st within
25    the current license --
.                                                               485
 1              DR. WALLIS:  Well, they have 10 to the 21st.  How
 2    many of the atoms have been knocked significantly out of the
 3    lattice?
 4              MR. ELLIOT:  Displacements per atom -- we have
 5    that in displacements per atom too.
 6              DR. WALLIS:  That makes some sense.
 7              MR. HIZER:  Ten to the 21st -- that's about one
 8    DPA, about one displacement per atom.
 9              DR. WALLIS:  But that sounds big to me.
10              MR. ELLIOT:  That is going to occur within the
11    current licensing life for the internals --  DR. SHACK:  Or
12    it anneals out.
13              MR. ELLIOT:  But will not happen for the reactor
14    vessel.  The reactor vessel we are talking about the maximum
15    it will go to is like in five or six times 10 to the 19th.
16              MR. LEITCH:  In 40 years --
17              MR. ELLIOT:  In 60 years.
18              MR. LEITCH:  -- in the original surface.
19              MR. ELLIOT:  In 60 years.
20              MR. LEITCH:  60 years.
21              MR. ELLIOT:  The fluence for the internals is
22    much, much higher.
23              MR. LEITCH:  Sure.
24              MR. ELLIOT:  But that doesn't mean we have this --
25    we have different materials here, so the radiation
.                                                               486
 1    embrittlement that affects ferritic materials may not affect
 2    the austenitic materials, the stainless steel materials that
 3    are in the internals and that is what we are looking at
 4    right now.
 5              DR. KRESS:  You are not apt to get much data on
 6    that, are you, unless people pull things out of the vessels
 7    and you have a good knowledge of -- and you take them away
 8    and test their properties?
 9              Is that how you, what you intend to do to get this
10    data?  I don't know how you deal with the 10 to the 17th for
11    stainless steel unless you have some data.
12              MR. HIZER:  Well, let me try to expand a little
13    bit.
14              What we were looking for was a conservative level. 
15    We didn't want to set the bar way high that there could be
16    problems developed below the criteria we set.
17              DR. KRESS:  Okay.
18              MR. HIZER:  Admittedly we have a very conservative
19    level.  We do have somewhat of a regulatory tie.
20              DR. KRESS:  How do you know it is conservative
21    for --
22              MR. HIZER:  Ten to the 17th?
23              DR. KRESS:  Yes.
24              MR. HIZER:  I think we're --
25              [Laughter.]
.                                                               487
 1              MR. HIZER:  -- very comfortable with it.
 2              DR. KRESS:  You have a theoretical basis that you
 3    know what all these displacements do to the properties?
 4              MR. HIZER:  There is some data at lower neutron
 5    fluence levels -- you know, 10 to the 17th, 10 to the 18th,
 6    10 to the 19th.
 7              DR. KRESS:  Yes.
 8              MR. HIZER:  You know, the 10 to the 21st, 10 to
 9    the 22nd, the kinds of levels that we are looking at --
10              DR. KRESS:  It takes a long time to get them up
11    there.
12              MR. HIZER:  Well, where you do --
13              DR. KRESS:  It's hard to even do it in a test
14    reactor.
15              MR. HIZER:  You do highly accelerated experiments
16    and the Office of Research and some international activities
17    are developing data for all three that as mechanisms that's
18    the kind of exposure levels that we are interested in.
19              DR. KRESS:  Oh, okay.
20              MR. HIZER:  Sort of the philosophy that we tried
21    to take with the two applications and within GALL, knowing
22    that the research activities are going on and they are going
23    to fill in a lot of the uncertainties, let's set the bar
24    fairly low.  Let's come up with a list of components --
25              DR. SHACK:  You set it very low, like all fluence
.                                                               488
 1    levels.  That's very low.  I mean how about 10 to the 20?
 2              DR. SEALE:  Yes.  If the number you are after at
 3    the end of the life is 10 to the 22nd that you expect, then
 4    you can get 10 to the 17th in three months.
 5              DR. SHACK:  But for the mechanisms for the IASCC
 6    and the swelling 10 to the 17th isn't even a warmup.
 7              DR. SEALE:  That's right, that's right.
 8              DR. SHACK:  I mean you do have data, Alan.  I mean
 9    you could go to the fast breeders for swelling and --
10              DR. SEALE:  Sure.
11              DR. SHACK:  -- and look at what fluences you need
12    to get swelling at, say, 400 C, which you know would be a
13    conservative estimate.
14              MR. HIZER:  Yes, and again the philosophy we tried
15    to take was to come up with a list of components that could
16    be susceptible and with Calvert and Oconee what they have
17    agreed to do is to do inspection on the most limiting
18    components, the most susceptible, so it is not as if every
19    component that is screened in they are going to have to go
20    out and do inspection every 10 years.
21              DR. SHACK:  So they are really only going to
22    inspect the limiting component which is well up there?
23              MR. HIZER:  Right, and the idea is that if
24    problems are found with those limiting components then you
25    ratchet your inspection sample down to include some of the
.                                                               489
 1    other components.
 2              Is it a conservative methodology?  I think
 3    everybody agrees that it is but until we have a lot -- until
 4    we have firm models that have been validated that have good
 5    mechanistic background, we thought that this was the best
 6    approach to try to handle things.
 7              We are going into territory that hasn't been
 8    charted at this point and could we be less conservative?  I
 9    think everybody agrees.  Maybe a factor of 100, 1000,
10    10,000, but --
11              DR. KRESS:  It is always hard to decide how
12    conservative to be.
13              MR. ELLIOT:  I mean if industry in response to our
14    goal had come up with data that said this is a better
15    number, here is the data, you know --
16              DR. KRESS:  Then you could have looked at it.
17              MR. ELLIOT:  But they haven't.
18              MR. HIZER:  Here's a mechanistic model and here's
19    some validation data --
20              MR. ELLIOT:  In response to our positions in GALL
21    there answer is we expect that it is not going to happen,
22    it's not going to be a mechanism.  Well?
23              DR. SHACK:  I would certainly agree that no
24    reasonable screening criteria would eliminate the highest
25    fluence components and that is really what you are looking
.                                                               490
 1    at anyway, so whether you have the screening criteria or you
 2    didn't, you would still be looking at those components.
 3              MR. HIZER:  Right.
 4              MR. GRIMES:  This is Chris Grimes.
 5              I think in fairness to the industry their concern
 6    is with the commitment to the extent.  It is not that it
 7    won't -- whether or not the effect is occurring.  Certainly
 8    the effect is occurring.  What they are looking for is a
 9    threshold for action where they think the effect is
10    demonstrably occurring as opposed to checking in
11    anticipation of damage occurring.
12              That is part of the industry concern about void
13    swelling is, you know, until there is some more demonstrable
14    evidence of that, the extent of damage and how it affects
15    intended function, don't make me -- should the licensees be
16    required to be looking for it, and I think our approach is
17    one that is intended to make sure that we have in the terms
18    of the safety evaluation reasonable assurance that actions
19    will be taken to ensure the intended functions, and so we
20    are reluctant to push the thresholds out to demonstrably
21    needed standards.
22              Therein lies the difficulty with trying to push
23    the state-of-the-art too far, too fast, from the Staff's
24    perspective.
25              CHAIRMAN POWERS:  If I screened all of the
.                                                               491
 1    components I had that had fluences of 10 to the 19th and
 2    higher and saw nothing, would I then have to screen down to
 3    10 to the 17th?  I am asking if there is a nonlinearity
 4    here?
 5              MR. ELLIOT:  Are we going to raise the screening
 6    criteria to 10 to the 19th?  Is that --
 7              CHAIRMAN POWERS:  No.  I am asking the question of
 8    I am in a plant.  I am worried about embrittlement.  I have
 9    gone through and I have screened everything at fluences of
10    10 to the 19th and higher.
11              DR. KRESS:  What do you mean, screened them?  You
12    went in and looked at them?
13              CHAIRMAN POWERS:  I looked at them, whatever I had
14    to do.
15              MR. ELLIOT:  Well, let me just say that the
16    current requirements is not to screen anything.  The current
17    requirements is to --
18              CHAIRMAN POWERS:  Well, I just did this.
19              MR. ELLIOT:  I mean the current requirement is to
20    do a VT-3 for the internals and we think that for many
21    components that may be acceptable.
22              The question is is it at high fluences.  There
23    might be some components that that inspection is not
24    sufficient and that a more powerful, better inspection might
25    be necessary.  We are not yet at the point where we can say
.                                                               492
 1    what fluence is necessary before we need to do a more, a
 2    better inspection.  We aren't there yet where we can say
 3    that.
 4              That's all I can tell you today is that we don't
 5    think we are at that point yet.  That is a "today issue"
 6    that we are looking at as far as the baffle former bolt
 7    issue is necessary today, at today's fluence levels, what
 8    components.
 9              DR. SEALE:  There is another point, and Bill just
10    briefly mentioned it.  In the FAST reactor program, there
11    was a fair amount of -- I say "fair" -- there were data that
12    were accumulated up to around 10 to the 22nd.
13              DR. SHACK:  Well, I mean void swelling is a big
14    problem in a FAST reactor.
15              DR. SEALE:  Yes, right, and so it is not as if
16    there hasn't been any experience, any evidence or whatever
17    of these things.  It's something that you know is there and
18    you know how to recognize it when you see it.
19              MR. HIZER:  Part of the problem with that data in
20    particular is how to extrapolate it back to --
21              DR. SEALE:  That's right -- but if anything the
22    effect is probably less significant than it was with the
23    FAST reactor, for the same fluence.
24              MR. HIZER:  Probably, given temperature
25    differences and things like that would be the main thing.
.                                                               493
 1              DR. SEALE:  That's right.  Annealing was greater.
 2              MR. HIZER:  But again I think what we are looking
 3    for in the enhanced ISI programs is looking at the highest
 4    stresses, highest fluences, things like that from a
 5    standpoint that you can then bound other components that
 6    have lower fluence, lower stress and maybe there are welds
 7    versus non-welds.  Then I think you do not have as much of a
 8    concern with the lower ranking components, so from that
 9    standpoint no, you wouldn't expand your sample size if you
10    don't find anything with the most susceptible components.
11              DR. WALLIS:  Well, should I have a warm feeling
12    after this or not?
13              MR. HIZER:  I think you should have a warm
14    feeling, yes.
15              MR. ELLIOT:  I think we have given you what we
16    think is a program that we can push through to give
17    you license renewal -- we are talking about something that
18    is going to happen in the distant future and we have
19    identified all the components and we are not going to leave
20    anything behind.
21              Whatever program results we get from the current
22    programs we are going to apply those to all the -- for the
23    license renewal, and that is what our approach is here.
24              DR. SEALE:  And I think given --
25              MR. ELLIOT:  We haven't answered the present
.                                                               494
 1    operating license what is going to be necessary, so
 2    certainly we don't want to leave anything out for the
 3    license renewal period.
 4              MR. HIZER:  Given the ongoing and planned work, in
 5    five years GALL may look a lot different on these three
 6    topics.
 7              MR. ELLIOT:  Right.
 8              MR. HIZER:  But at this point we don't feel we
 9    have sufficient knowledge to --
10              DR. WALLIS:  You're going to stay alert then?
11              MR. HIZER:  Right.
12              MR. ELLIOT:  We have today's issues that we are
13    dealing with and it's going to affect license renewal.
14              DR. SEALE:  But when they get ready to do those 60
15    to 80 year ones they'll do it.
16              [Laughter.]
17              DR. BONACA:  Any other questions from the members?
18              DR. SHACK:  It will be all saturated by then.
19              MR. ELLIOT:  Thank you.
20              DR. BONACA:  Okay.  This I guess concludes the
21    presentation by the Staff?
22              MR. GRIMES:  That is correct, Dr. Bonaca.
23              MR. WALTERS:  Good afternoon.  My name is Doug
24    Walters with the Nuclear Energy Institute.  I have
25    responsibility for license renewal, and I appreciate the
.                                                               495
 1    opportunity to be with you again today.
 2              I initially was planning to talk through our
 3    guidance document with you, but I'll ask you indulgence, and
 4    let me take what time we may have left to approach this
 5    whole GALL SRP issue from maybe a different perspective, and
 6    that's the process.
 7              I'm more process-oriented in what I do at NEI than
 8    I am technically-oriented, and I can't answer your questions
 9    about IASCC and the like, and although I find that
10    discussion very interesting, I'm not sure I'm going to be
11    able to satisfy all your questions in the technical area.
12              But what I'd like to do is talk about the process,
13    because our comments really are focused on the process.  If
14    I can go back just a little bit in time, GALL is the outcome
15    of the existing program issue that we raised with the
16    Commission last Summer.
17              We were very concerned that it wasn't clear how
18    existing programs would be credited in license renewal.  And
19    when you sit around and talk about a lot of these technical
20    issues, it raises at least in our minds, well, why aren't we
21    talking about that today?
22              What's so magical about that 40-year number?  You
23    heard in the last presentation that there are three areas in
24    embrittlement arena, two of which aren't, at least if I
25    understood it correctly, addressed by the regulations.
.                                                               496
 1              But you're going to have to do something for
 2    renewal.  And so when we sat down and looked at GALL, we
 3    wanted to understand the technical rationale or basis for
 4    why a one-time inspection was necessary, or why a program
 5    enhancement was needed.
 6              And that's our -- that really is the underpinning
 7    of our comments.  We felt that was very important to
 8    understand.
 9              And so our comments, in turn, if we didn't see
10    that, we said, well, why are you asking us to do that?  Or
11    we don't think the threshold needs to be at that particular
12    level; it can be here.
13              The question was raised -- and I think the Staff
14    captured our comments pretty succinctly, on, I think, page 7
15    -- the answer to the aging effects question is, in fact, one
16    of scope.  I mean, that is correct.
17              And, again, it's making sure that we understood
18    why was a particular aging effect identified in GALL?  If I
19    go back a little bit in history, we when we changed the
20    rule, we were very specific about saying the purpose of
21    license renewal should be managing the effects of aging to
22    ensure functionality, not the mechanisms, because the
23    effects are readily identifiable.
24              You can go through the GALL, and you can see that
25    listed in there.  So, again, I go back to the process.
.                                                               497
 1              When we commented, we thought about this threshold
 2    that was being established.  Somehow there's a threshold you
 3    go over when you go into the renewal period and you have to
 4    do something different.
 5              Well, how is that threshold defined?  What's the
 6    basis for that?  And that helps us identify what we think we
 7    need to do.
 8              I'm sorry if I'm jumping around.  I just made a
 9    couple of comments based on what I heard, and I wanted to be
10    responsive to that.
11              There was some discussion about the inaccessible
12    area issue.  I will tell you that we still don't understand
13    that one, particularly when there is a rule that indicates,
14    at least by our reading of it, that in 50.55(a), what you do
15    for inaccessible areas today is okay for renewal.
16              And why all of a sudden there's some change to
17    that, I'm not sure.  And the reason that all this is
18    important, obviously is, we want to get through the process
19    and know that at the end of that process, we're going to
20    have success, meaning that we get the renewed license.
21              And so GALL is, other than the submittal of the
22    applications, this is probably the most significant
23    undertaking on the -- I think, on the Staff's part and the
24    industry's part since those -- other than the applications
25    being submitted, as I said.
.                                                               498
 1              So we want to get it right because the next wave
 2    of applicants are going to rely on it.  We need to
 3    understand what's in there.
 4              We react -- just another example:  We kind of
 5    react like this when we hear or we read -- and I pulled the
 6    copy of the slide out, the discussion about the water
 7    chemistry programs.
 8              And if you read that, there is -- I thought I
 9    pulled it out, but maybe I didn't -- but in any event,
10    there's language that says -- let me just get it, so I don't
11    -- it talks about the EPRI reports.
12              And then it says:  However, high concentrations of
13    impurities at crevices and locations of stagnant flow could
14    cause...
15              Okay, it could.  Does that mean we need to manage
16    it for license renewal?  There's a fine line there, I think. 
17    We heard that in the last presentation; you could have these
18    effects.  So where do we draw the line between what we
19    really need to manage and what's real and what could cause
20    or could occur?  And that's -- I mention this again, only to
21    give you a framework or a reference of how we prepared those
22    700 comments or the basis for those 700 comments that we
23    prepared.
24              One-time inspections was discussed, and I made a
25    note about that.  It's kind of interesting to me that we
.                                                               499
 1    heard, well, if over ten years, there's nothing that comes
 2    out of those, then we could eliminate them.
 3              Well, it would seem to me that if you're imposing
 4    a one-time inspection, you might anticipate that something
 5    is going to come out of that.  That ought to be the basis
 6    for doing the one-time inspection; that you think there is
 7    something going on there that you might want to see.
 8              Again, that's a reference for our comments.  Let
 9    me just close by offering one observation on the disposition
10    of the issues, the issues list that Steve Koenick talked
11    about.
12              I do think we were fairly satisfied that we got at
13    least to the high priority items, and I think we came to
14    resolution on a majority of those, and the ones that aren't
15    are in GALL, and we'll deal with those separately.
16              But we're fairly satisfied with the way that that
17    came out.  I also would just like to acknowledge that I
18    think where we're headed is in the right direction.  We have
19    differences, some of which I just tried to give you a
20    thumbnail sketch of.
21              Those will always exist, in my view, because of
22    the nature of the document, and you can't address every
23    situation.
24              We're headed in the right direction; it's a good
25    document and it will be very useful to the next wave of
.                                                               500
 1    applicants.
 2              I would mention one other concern, and probably
 3    the most overarching concern is we're still not sure how
 4    GALL's going to be used.  An example of that is in the
 5    tables that are in your handout.
 6              There's -- I'll just reference A3-1.1 as the item
 7    number, and if you read what's on the right-hand side of the
 8    page, if you will, it talks about the aging management
 9    program as ISI, Generic Letter 88-05, no further evaluation
10    required.
11              Well, we are obligated to do, as licensees --
12    well, I'm not a licensee.  But what licensees will be
13    obligated to do is even though that says no, there is still
14    a large amount of work that they need to do. They need to
15    look at their program, make sure that it matches what's in
16    GALL.  And I think the words in the SRP are that we need to
17    certify that our program looks like the program that was
18    evaluated in GALL.
19              We don't know what certification means; we have a
20    meeting set up with the Staff to try to flesh that out so
21    that there's -- we're all speaking from the same page, if
22    you will.
23              But that's our overarching concern, is, we don't
24    really know at this point, how GALL would be used, and what
25    does it mean to certify that you've got a program that looks
.                                                               501
 1    like the program that was evaluated in GALL?
 2              I have confidence that we're going to get through
 3    that.  I don't see that as choke point at this point in
 4    time, but that is something that we do need to consider.
 5              So, with that, I appreciate the opportunity to
 6    just share a few thoughts with you.  And if you have any
 7    questions, I'd certainly be happy to try and address them.
 8              CHAIRMAN POWERS:  I guess one of the -- I guess I
 9    have a couple of questions.  The first one is maybe directed
10    to the staff, as long as you're sitting here:  What does
11    certify mean?
12              MR. GRIMES:  Certify means the same thing that it
13    has in the past for submittal of anything under oath and
14    affirmation.  We used that term with an expectation that the
15    licensees would understand how they attest to something
16    before the Staff.
17              In this situation, it's somewhat unique, because
18    instead of the applicant or a licensee writing out the
19    language or their choice to certify under oath and
20    affirmation, the Staff wrote it out in a report that the
21    licensees and applicants are now trying to figure out how
22    they're going to certify under oath and affirmation.
23              And we do agree that we think it's appropriate
24    that there should be a clear understanding of what that
25    expectation is.
.                                                               502
 1              I think I would say I am a little concerned and
 2    disappointed that they didn't understand that to begin with,
 3    but then the licensing process evolves.
 4              DR. SEALE:  Well, presumably, Baltimore and Duke
 5    did something.
 6              MR. GRIMES:  They submitted their applications
 7    under oath and affirmation, and we verified through
 8    inspection, that the contents of the application and the
 9    evaluation basis were reasonable and well supported by
10    evidence in the plants.
11              CHAIRMAN POWERS:  The next question comes back to
12    the crevice corrosion issue that you brought up.  I mean, it
13    is -- is there some doubt in your mind that crevice
14    corrosion can occur?
15              MR. WALTERS:  No.
16              CHAIRMAN POWERS:  Then maybe your point is lost on
17    me.  Maybe I missed the point.
18              MR. WALTERS:  Well, I think the point is that I'm
19    not sure what -- I'm not sure what --
20              [Laughter.]
21              MR. WALTERS:  Let me try to not address,
22    necessarily, crevice corrosion.  I think the issue is that
23    when you say there's no requirement to deal with it today,
24    but you've got to do something in the renewal term, just as
25    a practical matter, I don't understand that.
.                                                               503
 1              I mean, what's so different about operating in
 2    Year 41?  Why aren't we concerned about it today and doing
 3    something about it today?
 4              Now, we heard that there is work underway that
 5    will impact what we do today.  But, you know, I'm looking
 6    for, on all these issues where we have to do something, I'm
 7    looking for the basis.  I'm looking for the rationale that
 8    justifies making a license renewal applicant go that extra
 9    yard.
10              And in most cases, I think that's been provided
11    and we're reasonably satisfied that we understand that.  But
12    there are some situations where -- because, look, let's be
13    candid:  There's no backfit protection under license
14    renewal, and if -- and I'll just leave it at that.     DR.
15    BONACA:  Any other questions for Mr. Walters?
16              [No response.]
17              DR. BONACA:  I would just like to say a couple of
18    things:  Not having participated in the meetings between the
19    Staff and the industry, but having seen some of the
20    products, I really believe that this is a major undertaking.
21              And I think that it's a successful undertaking in
22    many ways.  I feel also that looking at the progress, for
23    example, the changes in the SRP between the previous version
24    and today, they are much more clear.
25              I know that the industry provided a lot of
.                                                               504
 1    comments.  I was curious about those, and I found that they
 2    were really an improvement in that.
 3              I think that I believe that the industry and the
 4    Staff should be very much complimented for a massive
 5    undertaking here.  So, I think I'm expressing the views,
 6    probably, of many of the members of the Committee.
 7              With that, Mr. Chairman, I'll give it back to you.
 8              CHAIRMAN POWERS:  Okay.  Can you tell me when
 9    we're going to risk-inform this whole thing?
10              [Laughter.]
11              MR. WALTERS:  If I could, I mean, I would second
12    that.  I'm not here to criticizes or necessarily point the
13    finger at anybody.
14              DR. APOSTOLAKIS:  On the risk-informing it?
15              [Laughter.]
16              MR. WALTERS:  Well, risk-informing it would be
17    okay.  It has been a very --  DR. SHACK:  It might be too
18    much for you.
19              MR. WALTERS:  It has been a very successful
20    effort.  The interactions with the Staff have been
21    absolutely first class, and very productive.
22              The series of meeting we went through in whatever
23    it was, February through July, were very productive; there
24    were a lot of good exchanges, very open minds, and a
25    willingness to really listen to one another and make changes
.                                                               505
 1    as appropriate.
 2              So it has been successful, and I do believe it's
 3    headed in the right direction.  There are just a few things
 4    that we need to focus on, and then we'll move on.  But it
 5    has been successful, and you're right.
 6              CHAIRMAN POWERS:  I guess I'm a little surprised
 7    you didn't have more to say about this GSI-168.
 8              MR. WALTERS:  Well, I'd be happy to talk about it.
 9              [Laughter.]
10              CHAIRMAN POWERS:  You looked at the clock.
11              MR. WALTERS:  Well, I'm not sure even where to
12    start with that.  I mean, I would answer the gentleman's
13    question and say I don't think there's a problem with
14    cables, but -- DR. WALLIS:  What is that based on?
15              MR. WALTERS:  Well, just for example, there was
16    mention of the cables that failed the 90 degree C-40 test,
17    Okonite single bonded jacket cables.
18              We found six plants that have them, and two of
19    those plants, they're jumper cables.  They plan to replace
20    them.
21              And in the others, the environment that they're
22    seeing is nowhere close to 90 degrees.  So while I respect
23    the fact that the testing was done, I would say that we need
24    to be careful when we look at those results, and we need to
25    go out and find out what's really going on in the field.
.                                                               506
 1    So I don't get too alarmed when I hear those test results,
 2    because we've done the survey and we know what's really out
 3    there.
 4              CHAIRMAN POWERS:  I thought you might be more
 5    alarmed with the implication that you're going to -- your
 6    licensees are going to be cast in the role of having to
 7    prove a negative; show me some technique that shows from
 8    cable end to cable end, that this system doesn't have a flaw
 9    in it that's going to get me in some period of time.
10              MR. WALTERS:  Right.
11              CHAIRMAN POWERS:  And if you take a chunk out of
12    this cable and go test it in the laboratory, you still
13    haven't satisfied me.  That's where I thought you might be
14    modestly agitated.
15              [Laughter.]
16              MR. WALTERS:  Well, we are.  I don't think that's
17    the only area where that occurs, but actually, my take on
18    168 is that we're going to wait and see what the proposed
19    resolution is.  That's all we can do at this point.
20              CHAIRMAN POWERS:  That's a fair comment.
21              MR. WALTERS:  If it's proving the negative, then
22    we'll comment on that.  I would mention to you, though, that
23    I believe this issue was discussed in front of ACRS -- I
24    forget the date -- and subsequently, I know that some
25    letters were submitted to try to provide some industry views
.                                                               507
 1    on that whole task action plan for 168.  I believe they were
 2    sent in by EPRI, so --
 3              CHAIRMAN POWERS:  Any other comments on this?
 4              [No response.]
 5              CHAIRMAN POWERS:  I think that brings us to a
 6    close of our transcripted agenda.
 7              MR. WALTERS:  Thank you.
 8              CHAIRMAN POWERS:  So we can dispense with the
 9    transcription.
10              [Whereupon, at 3:12 p.m., the Committee recessed,
11    to reconvene in unrecorded session.]
12
13
14
15
16
17
18
19
20
21
22
23
24
25

 

Page Last Reviewed/Updated Tuesday, July 12, 2016